Loading...
HomeMy WebLinkAboutScope of WorkClough Tie ln 2.4 Clough Tie-ln Location Overview: Deactivating existing Clough Discharge Line to Anvil Points Discharge Line. Will install temporary trap that ties into underground piping. Trap will be removed at end of project. 2.4.L What is our grading plan? No grading plan. The excavation completed here will be regraded to the same elevation as previous to excavation. 2.4.2 What willthe backfill be like? Backfillwill utilize a combination of the excavated soiland fine soil. Site will be restabilized and vegetated/seeded as close to original state as reasonably possible. 2.4.3 What drainage plans do we have? Due to size and scope, no drainage plan is designed. Excavation activities will utilize industry best practices with regards to silt fences/straw swaddles to prevent erosion and dispersion offsite. 2.4.4 Add anything you can that's pertinent and easily added. N/A 2.4.5 What is the total Earthwork? Square footage & Cubic Yards? 1,080 square feet and 480 cubic yards. - i clrola ttench jqu"ntity g€pihlttÌ t2'æ 6'æ 6'O0 lD¡amererf¡n' r2.OO !7æ 12.{þ a¡m 12.OO 12.00 ¡2.110 12.fl} wadlh[tt] 2¿-d] 3.0o 3.00 lo.ø¡tttl t2.6 rLoa ';2.Ú t2,ú 12.00 12'OO 12.01t 12.00 LenFhlf:) 3o.fl) lvolume{ft"3) volum€(ft^3} q640,æ , ivolume+sdú Volume+l)9ó f¿9ó0.0O :-'1 Área lftÀ21 7æ.w. .larea lft^21,jlrea+5096 Âree+5d6 r,080.m L 6æ 6.& 3.(x, 3.m Su6 8,64O.00 ri¡,960.00 /r8O.00 7m-& t,(tso.æ fr3 tt^? yds^3 tt2 tt^2