Loading...
HomeMy WebLinkAboutScope of WorkSCOPE OF WORK - Clough Compressor Station Deactivating existing Clough Discharge Line to Anvil Points Discharge Line. Will install temporary traps that ties into underground pipíng' t. What is our grading plan? No grading plan. The excavation completed here will be regraded to the same elevation as previous to excavation. 2. What willthe backfill be like? Backfillwill utilize a combination of the excavated soiland fine soil. 3. What drainage plans do we have? Due to size and scope, no drainage plan is designed. Excavation activities will utilize industry best practices with regards to silt fences/straw swaddles to prevent erosion and dispersion offsite. 4. Add anything you can that's pertinent and easily added' N/A 5. What is the total Earthwork? Square footage & Cubic Yards? 72,960 cubic feet or 480 cubic yards