Loading...
HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT BLRE -07 -22-7 637 4E CROSS, LLC New S/F Dwelling with attached gurage & finished basement 177 7 CR 241, New Castle Sec.13, T.05, R.91 212513200040 1) ALL WORK SHALL COMplyW|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (r.R.c.)AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.l 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNc AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: CoMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT, 5) PRE FABRICATED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION, 6) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 3,000 psf 7) ENGINEERED SEPTIC SYSTEM: ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. CONDITION Of PERMIT: AN ELEVAT¡ON SURVEY, SEALED tY A COLORADO pROFESSIONAL LICËNSED SURVEYOR, IS REQUIRED AT FRAME INSPECTIÕN TO VER¡FYTHAT AS-BUILT ROCIFS COMPLY WIÏH GARFIELD CÕUNTY,S z5-FOOT BUILDING HEIGHT LIMIT AS DËFINED IN THË LANÜ USE DEVELOPMENT CODE. 8)