Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department l0g 8th Street, Suite ¡O1 Glenwood Springs, CO 81601 (9701 94s-8212 www.qarfield-countv.com BUILDING PERMIT APPLICATION DemolitionCommercial/M ulti-Family Manufactured Home or ReroofIResidential {SF, Duplex or Townhome) Dwell Unit . MÆ(IMUM SIZE OF FEET 9205 County rd 115 Glenwood Springs, CO 81601 579-5s21 EmailAddress: 303Phone: roger@softridge.com Property Owner:Roger Wilson Mailing Address: Luis Hernandez/AMl Construction lnc phone: . P.O. Box 806 Glenwood Springs, CO 81601 Contractor:r97o )309-7331 Mailing Address EmailAddress:AM LConstruction I nc@hotmail.com Architect: Phone: Maillng Address: EmailAddress: Jon Steurer/Evolve Structural Design phone:510-0773970Engineer: Maillng Address:1040 Main Street Catrbondale, CO 81623 Email Address:jon@evolvestruct.com Manufactured Home lnstatler: Phone: ( )- Mailing Address: Email Address: Describe Work:Buid a carpo rt following Evolve structural design Job Address:9205 County rd 115 Glenwood S Ft. or Acres): Sq. Ft. of Assessol's Parcel Number: 16.39 acres 15ftHeight: co 81601 Zl81 36{ oö too # of Floors:1 AdditionRemodellAlterationñlewClass of Work: Detached,/AttachedGarage: ECf DETAIUi CONT¡NUED Septic: Type of Heat:NaturalI I ÌI N k Ex(51rÑ 6 Propane Community Electric Other ì Driveway , Pgrmlti Permit #: NOTICE Authoriw. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Perm¡t, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit, A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. , CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct, I understand thãt the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (subm¡ttals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Dívision. ln consideration of the issuance of the Bu¡lding Permit, I agree that I and my agents wil¡ comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notlce from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Perm¡t does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder that I have read and understand the Not¡ce and Certification above, as well as, have required information which is correct and accurate to the best of my knowledge. 0610612022 and Sign Date tl¿6¿¿ éiÞo75oãc Special Conditions: oNLY ParD, S tO 8,? l 'w'ti"?ø Home Fee:l*Manu. N Misc. Fees:^N/ft.Adiusted Valuation: þ ß.zzn.oo ! Plan Check Fee:, 106.71 BP No: ßtRE-7h5/. OìilTSfuo:--Fl/hFees Paid: slo3. 1 r Balance Due: , tb725Totál Fees:þ 2-F.qê Zon¡ng:OCC Group: t.R.c Type: . R.C Const. I 'setbacks: BUITDING / PLANNING DIVISION : Signed Approval Date I(hJ Garfteld County BUILDING DEPARIMENT 708 Eighth Streel Suite 401, Glenwood Springs, CO 87601 Tel: (970) 945-8212 PLA N REVIEW CHECKLIST Øt*gevz-7b5loPermit No: Building lssues Planning/Zoning lssues ryEngineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ Topography 30% Attach Residential Plan Review List Subdivision Plat Notes Fire Department Review Valuation Determination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign APPlication Parcel/Schedule No. 40# Snowload Letter - Manu. Homes Property Line Setbacks 30 ft. Stream Setbacks Flood Plain Building Height Zoning Sign-Off Road lmpact Fees Grade/ Topography 40% Planning lssues Subdivision Plat -/-7 t'/rt rú A lqzS exqnpþ'o2.,, le4 i bit|(l' i^ I rÊar+t:*'L i e P.ór Descriotion & Summa rV Cø.farà lbSx#lg oþut / /r,t/,y /a/" / soils Report \zmp* op,rtl,nle(wl E.o,F,.qqwo-l'nrlleÐ r 3tu,oo Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specifiei. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Officialthat additional information is necessary to review the application and/or plans ior complianıe, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building w!!!gut a CO wilibe considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this LuisHernandezlAMLConstruction lnc 0610612022 Print and Sign Date a a