Loading...
HomeMy WebLinkAboutScope of WorkSCOPE OF WORK - Cottonwood Compressor Station Deactivating existing Clough Discharge Line to Anvil Points Discharge Line. Will install temporary traps that ties into underground piping. 1. What is our grading plan? No grading plan. The excavation completed here will be regraded to the same elevation as previous to excavation. 2. What will the backfill be like? Backfill will utilize a combination of the excavated soil and fine . soil. 3. What drainage plans do we have? Due to size and scope, no drainage plan is designed. Excavation activities will utilíze industry best practíces with regards to silt fences/straw swaddles to prevent erosion and dispersion offsite. 4. Add anything you can that's pertinent and easily added. N/A 5. What is the total Earthwork? Square footage & Cubic Yards? L2,96O cubic feet or 480 cubic yards