Loading...
HomeMy WebLinkAboutApplicationGørfuld County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 l970l94s-82t2 www.ga rfield-cou ntv.com BUILDING PERMIT APPLICATION TYPE OF CONSTRUCTION Commercial/Mu lti-Fami ly Demolition Manufactured Home (Single or Multi-Level) x Residential (SF, Duplex or Townhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET INVOTVED PARTIES Property Owner:Jessica Gosda Phone 424 603-7234 Mailing Address: 35 River Vista Glenwood Springs, CO 81601 Email Address:gosda.jessica@gmail.com Contractor:The Fireplace Company Phone:r970 ì963-3598 Mailing Address:935 Cowen Drive Carbondale, CO 81623 Email Address:meagan@thefpco.com Architect:Phone: Mailing Address: Email Address: Engineer:Phone: I ì Mailing Address: Email Address: Manufactured Home Installer:Phone: Mailing Address: Email Address: PROJECT DETAITS Describe Work:lnstallation of a free-stand¡ng flreplace gas unit (Enviro S40) in a new home. Unit w¡ll include a horizontal ventilation that will extend up from unit, turn 90, and exterminate through a new wall penetration and out to the exterior of the home. Job Address:35 River Vista Glenwood Springs, CO 81601 Assessor'sparcetNumber: ?3î5' Ol3 La Lo1. su¡.lronb, ,Ce¿,Pr. 2 ,Fn. l,tl,ittt 1s¡ trr{ Block , - r -Owner's Valuation of Work: ${ 5,300 .oo Property Size (Sq, Ft. or Acres):6 Sq. Ft. of Building:14oo ú Height:f.l/A # of Floors: 1 Class of Work:New IV Remodel/Alteration Addition Garage:¿Attached Detached PROJECT DETAII.S CONTINUED Septic:SWTS X Community Type of Heat:Natural Gas Propane Electric Other Driveway Perm¡t: pt ñl^Permit #: NOTICE Authoriw. This application for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Lesal Access, A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION lherebycertifythatlhavereadthisApplicationandthattheinformationcontainedaboveistrueandcorrect. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuanceof the Building Permit, lagreethat land myagentswill comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have required information which is correct and accurate to the best of my knowledge. 7-12-2022 Owner Print and Sign Date orçlCllL USE ONIY p¿ ,le/, + t e ,c. .o7 /zz/zø22 êça.¿ Special Conditions: Adiusted Valuation::Þç.tu.æ Plan Check Feer RI, qI Permit Fee: -t125.2-9 Manu. Home Fee:N/A ''ñ7À TotalFees:?ib.bb Fees Paid:* gl.4t *,1ï'hl2ê BP No:B&-7bqq OWTíNo:T7A '"'oô(I7r4 oCCGroup: t RL Const.TVRe:, RC 'Vùb BU|LD¡NG / PLANNTNG DrvrsroN , 0u) fr*f-lt a4 q- L2 Signed Approval Date Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved fìeld set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. 7-12-2022 P Owner Print and Sign Date a