Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 08.17.2022Silver Town Structures 3O7N AABC Aspen, CO 81611 August 17,2022 RE: Anderson Residence 278 Ronce Lane Carbondale, CO To whom it may concern: Please accept this letter as a confirmation that I have inspected the construction at the address above for plan compliance. I made a final walkthrough of the residence on August 16, 2022. Peter Stewart of Stewart Builders and Michael Fuller of Fuller Architects were both present. The construction did not vary from the plans in a magnitude that requires any additional documentation with exception to the chimney cap modification that is attached to this letter. During a prior site observation, I noted a few items that had not been completed and I confirmed several framing layout situations. All of these conditions have been either completed or already met code structural requirements. Please feel free to call with any questions regarding this matter. Sincerely, Hein Brutsaert P.E. NÀL 44 L BRU