HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
B LRE-08-2 2-77 24
Brittney Westphal & Sean Sullivan
New S/F Dwelling w/ attached garage
330 Blue Heron Vista, GWS
lronbridge, PH 2, FLG 1 ,2&3, Lot 285
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE
(r.R.c,)AND 2009 TNTERNATTONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS", NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTI FICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT.
5) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED
SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE -
INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS -- IS WHOLLY
CONTAINED WITHIN LOT 285 PROPERTY BOUNDARIES,
ó) OPEN-HOLE SOILS REPORT AND STRUCTURAL F|LL COMPACTION REPORT MUST
BE PREPARED BY THE GEOTECHNICAL ENGINEER OF RECORD. 1,500 PSF SOIL
BEARING CAPACIry.
7) STRUCTURAL ENGINEER SHALL FIELD VERIFY PLACEMENT OF STEEL
REINFORCEMENT BARS, ANCHOR BOLTS AND FORMWORK PRIOR TO CONCRETE
SLAB POUR. PROVIDE ENGINEERS SEALED APPROVAL REPORT AT UNDERGROUND
PLUMBING INSPECTION,
8) STRUCTURAL ENGINEER SHALL BE FULLY RESPONSIBLE FOR REVIEW AND
INSPECTION OF CONCRETE MATT SLAB FOUNDATION. PROVIDE ENGINEER'S
SEALED APPROVAL REPORT (WET STAMPED & SIGNED) PRIOR TO FRAMING
INSPECTION.
9) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR INSPECTOR AT TIME
OF FRAME INSPECTION.
10)EXTER|OR WALLS, OPENINGS AND PROJECTIONS WITHIN 5 FEET OF THE
PROPERry UNE MUST COMPLY WITH THE 2015 IRC, TABLE R302.1.