Loading...
HomeMy WebLinkAboutCorrespondenceC"*rce BtRs-06-?z-757ðColleen W¡rth From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Brian Kuftz < kurtzengineer@yahoo.com > Wednesday, July 20,2022 3:31 PM johnS@sgm -i nc.com; uriel.mel lin @hotmail.com; Colleen Wirlh Matt Provost; Sam lrmen; Sheryl Bower Re: [External] BB Green Mesa Pl - BLRE-06-22-7570 Follow up Flagged Hello all, Uriel requested that we provide an alternate foundation design for a crawl space to replace the walk-out basement design. We issued those foundation and main floor framing drawings on July 11,2422. The design is based on the original roof framing plan as produced by sGM. I recommencl that our office serve as the engineer of record for the entire project, and that our office review shop drawings from the truss manufacturer. Brian Kurtz, P.E. Kurtz & As,sociatesr lnc. Structural Engineers (970)-945¡6305 On Wednesday, Juty 2A,2022 at 03;07:16 PM lVlDT, Colleen Wirth <cwirth@garfield-county.com> wrote NEED STAT|jS UPDATE on the current desiEn ENGINEER OF RECORÐ at 88 Green Mesa Flace, Battlement Mesa I ask that Uriel Mellin, SGM and Kurtz Engíneering work with each other and confirm in writing who is to be the ENGINEER OF RËCORD responsible foitfre structural design details of this residential build moving forward. Foruard e ma i I res po ns e to cr¡virth@qarfie ld-cou ntv. co m. Today's activity Eariy lhis morning I began review of a change order dated July 13, 2A22 $rom hand rendered unstamped foundation and traming plans) wiih tne cfrange order work scope "to delete unfinished basement and create a crawf space instead.'; lnquiries to SGM, the stamped engineer for the original design indicated SGM representatives were unaware of July 13,2022 design changes. Concr¡rrent with my effort, fulatt Provost, building tnspector was called to the job site this rnorrtittg fot foutirig irtspectiott work where it became apparent the as-built construction did not match plan drawings and the foundation contractor had a different set of plans. I Late morning, Sam lrmen, Permit Technician, reseived at our front desk the attached set of wet stamped drawings from Kurtr Eng.ineers, lF Brian Kurtz is dcsignoted to scrvc as thc $tructurel E¡rgineer of Record moving forward, I'l[ nced sonrcthing stsrnpcd signed in writing from Brian and the propeüy owner. We will also need to administratively update E.O.R. contâct information for BLRE-06-22-757A records. Should therc be any structural conections requested at fourrdation or framing inspections, we hope to avoid confusion who is,stamping drawings and approving changes. Right now. I have two different versions of REVISED plans, I ask to confirm this before I continue the review Cordially Colleen \tuirth Plans Examiner Garfield County Building Division 108 8th Street, Suite 401 Glenwood Springs, CO 8'1601 cwirth@q a rfield-co univ. corE office (970) 945"1?7V ext, 1610 From: John Boulden <JohnB@sgm-inc.com> Sent: Wednesday, July 20, 20229:57 AM To: Colleen Wirth <cwirth@ga rfield-co u nty. com> $ubjecil {ExternalJ 88 Green Mountain Good mornlng Cotleen, t checked around the office and found that nobody was aware of the change, We wiff review ìt with Sergio when he provides us with the pfans and íssue new drawíngs. Thank you again for lettíng me know- 2