Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 10.12.2022STRUCTURAL ENGINEERING MEMO -rHPAFIA.'LLTL *å r-.r r¿Ë t L¿å-¿åå Ë.rrcJ ¡..[3r¿ ë r ras.sð October 12,2022 Bella Villa Builders Attn: Russell Burton russell.burton@bellavillabuilders.net 303-358-BB3B RE:Framing Inspection Items for New Residence at 109 Diamond A Ranch Rd, Carbondale, CO 40P fob#: DAN2L127 Russell, It is our understanding that the county inspector identified several framing items at the above-reference project that need approval from the engineer of record. Those items, and subsequent approvals, are provided below. l. Add hanger at exterior back deck framing a. This has been done by the contractor 2. Truss ROlAGE has been altered a. We have analyzed the altered truss and recommend aZx4be sistered to the side of the flat uprights on each side of each window and face nailed with 2-16d @\6"oc. 3. Change to door/window at great room a. We have analyzed the kings. We recommend that a 6'tall, vertical strap be installed on inside and outside face of the cut trims and the strap centered vertically over the break at the header. Where the kings are adjacent to the steel frame they acceptable as they are currently. 4. Change to header at master bedroom exterior door a. We have reviewed this header and kings and the change acceptable 5. Change to floor framing above master bath a. The floor framing is consistent with the latest revision dated 6.27 .22. The header around the plumbing is acceptable as well. 6. Shimmed Trimmer at Znd floor walkout header a. We have analyzed the kings. We recommend that a2' tall, vertical strap be installed on inside face of the cut trims and the strap centered vertically over the break at the header. The shim is not ideal but acceptable with the addition of the straps. 7. Change to Trim and King per plan at stair a. We have analyzed the kings. We recommend that aZ' taIl, vertical strap be installed on inside face of the cut trims and strap centered vertically over the break at the header. B. H2.54 missing at lookouts a. This will be done by framing contractor Please do not hesitate to contact me if you have any questions Sincerely, 4Ott' Parallel Structural Engineering, LLC U, PE n 970.227.6368 D a n i el (ô 4 0 thPara1lelSEesxû D By: STRUCTURAL ENGINEERING MEMO THPAFlA,¡s{rLåüttås"ä-Å fE LLËL c3.ËI.}.å:$'ëÐËå13Ëå' RE: October 10,2022 Bella Villa Builders Attn: Russell Burton russell.burton@bellavillabuilders.net 303-358-BB3B Framing Inspection Items for New Residence at 109 Diamond A Ranch Rd, Carbondale, CO 40P fob#: DAN2LL27 Russell, It is our understanding that the county inspector identified several framing items at the above- reference project that need approval from the engineer ofrecord. Those items, and subsequent approvals, are provided below. 1. One second floor joist over the kitchen has two holes [slotted 4"x6" and circular 2") that are approximately 6" apart. a. We have analyzed the joist, and the holes are acceptable. 2. One second floor joist over the master closet has four closely spaced plumbing holes in the web [2 x37/z" and 2 x 2r/2"). a. We have analyzed the joist, and the holes are acceptable' 3. Several main floor joists below the main level pantry have four closely spaced plumbing/electrical/HVAC holes in the web (1- x1,", L x2", L x3t/2", and 1- x 4"). a. We have analyzed the joists, and the holes are acceptable' 4. One stud in the 2x6 wall between the main floor master bath and closet has been notched almost completely through for plumbing. a. This wall is non-structural, and therefore the notched stud does no¡ affect the structural performance of the structure. As a precaution, we recommend thata 4' tall, vertical strap be installed on each side of the notched stud to maintain the wall stiffness until drywall is applied. 5. Basement beam pockets are not grouted solid. a. The main floor steel beams have adequate support in the beam pockets without any formal attachment to the concrete foundation wall. Where feasible, we recommend grouting the beam pockets solid. Please do not hesitate to contact me if you have any questions Sincerely, 4Oth Parallel Structural Engineering, LLC Daniel M Belleau, PE Principal 970.227.6368 Daniel@40thParall elSE.com By