HomeMy WebLinkAboutApplicationGurfield CountY
Commun¡ty Development Department
RECËl\/ED 108 8'h Street, Suite 401
Glenwood SPrings, CO 81601
(970) 94s-8212
GAF([-lËt*.D tür"iþ-¡ry
COMM
tr MINOREI MAJOR
INVOLVED PARTIES
309.9151Phone:
EmailAddress:simon@co loradoextreme.org
5190 Upper
Blue Mind, LLC
Cattle Creek, Carbondale
Property Owner:
Mailing Address:
EmailAddress:
ABOVE
Phone :lContractor:Blue Mind LLC
Mailing Address:
Mailing Address:
RE: Land, lnc p03Phone:
Email Address:nick@re-land.com
ì 829.8362
Architect:
404.308570Phone:
Email Address:jsp ung@jvajva.com
PROJECf NAMEAND LOCATION
239336400267
Earthwork (square feet):ÐO00 sq.ft.
Job Address:2340 CountY
.Colorado ExtremeProiect Name
Cross ServiceTrenches for new HolYDescribe Work:
Road 100, Carbondale, Co.
Grading for Rink and Chillers
Assessol's Parcel Number:
Earthwork (Cubic Yards)800 Cu. Yd.Sub.Lot .---..- -Block
Authorltv' rhis a¡rplication foüárìl¡ñg permii mürt be sigrrett uv itrì ò*ne,. of tire ôräpértr ãòriiitràJ above, oranauthorizedagent' lfthesignatrrrebelowisnotthatoftheowner,asepar.rtcletterofauthority,signedbythe
Owner, must be provided with this Application.
Legal Access' A Building Permit cannot be issued without proof of legal and adequate access to the property forpurposes of inspections by the Building Division.
other Permits' Multiple separate permits may be required: (1) state Electrical perm¡t, (2) county owrs permit,(3) another permit required for use on the property identified above, e.g. state or county Highway/ Road Access ora State Wastewater Discharge permit.
Void Permit. A Building permit becomes null and void if the work
the date of issuance and if work is suspended or abandoned for a
authorized is not commenced within 1g0 days of
period of 180 days after commencement.
AIL UTILITIES MUST BE TOCATED PRIOR TO ANY GRADING
t{oTtcE
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. Iunderstand that the Building Division accepts the Application, along with the plans and specifications and otherdata submitted by me or on my behalf (subm ittals), based upon my cert¡fication as to a ccuracy. Assumingcompleteness of the submittals and approval of this Application, a Building permit will be issued grant¡ngpermission to me, as Owner, to construct the structure(s)and facilities detailed on the submittals reviewed by theBuilding Division. ln consideration of the issua nce of the Building permit, I agree that I and my agents will complywith provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTSregulations and applicable land use regulations (County Regulation(s)). I a cknowledge that the Building permitmay be suspended or revoked,upon notice from the county, if the location, construction or use of the structu re(s)and facility(ies), described above, are not in compliance w¡th Cou trty Regulati on(s) or any other applicable law.I hereby grant perrrrission to the Building Division to enter the property, described above, to inspect the work. Ifurther acknowledge that the issuance of the Building permit does not prevent the Building Official from:(1)requiring the correction of errors in the submittals, if any, discovered after issuance; or (2)stopping construct¡onor use of the çtrrrrt¡rralcì ^rfâ.il¡+r,ri^-l iJ -..^L :^ r-rte, vr rq!rrrrylrçr, tr suLtt t5 [l vioiation of County Reguiation(s) or any other applicable lawReview of this Application, including submittals, a nd inspections of the work by the Building Division do notconstitute an acceptance of responsibility or liability by the County of errors, om issions or discrepancies. As theOwner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulationsrest with me and my auth orized agents, including without limitation my a rchitect designer, engineer and/ orbuilder
read and understand the Notice and Cert¡f¡cation above as well as
which is correct and accurate to the best of my knowledge.
fo&r-(,'o W(tr/u.
Property Sign Dâte
that I
ired
oFFtctAt
TÓ,
L€,
Conditions:special
,Ax¡fi?ø'*',€A ct"+?>,L-É-B f2-ûrt T€ft?ß
tL7ofuâ"J N Cr ^rø\Trtq (aAùÞ r$\<6€Õ^rl t1ñ€-HT2cn¡.STð6€Actt5 65r s
Fec:Mlsc Feqsi^$lH -$iön.ø 0uFees
CO
.-r.X
Grading Permit:gRÐ-?8 lssue Date:
\o/17 lqa
Zoning!
BUITDING / PLANNING DIVISION :
Date
Job Name:2340 CATHERINE RD 3PH UG LINE ICE RINKMaLocation:6536CoutJWIO#:24642COVER PAGEwith transformersquafeBox4'squaremanhole lid4'square vaulttransformer lid
-aI
¡
¡
\
I
I
@
+"
T -l
L II
SECÏION +"PAD CENÏERED ON VAULT
56"
N
1
2
3
+
5
6
7
B
OTES
56
28,, MANHOLE
3/4" HOLE (TOTAL Or FOUR)
GROUND LEVEL
BACKFILL TO BE WELL COMPACTED
SOIL UNDTR BASE TO BE
UNDISTURBED OR WELL COMPACTED
FOUR KNOCKOUTS (16"X18")
GROUT HOLE IF CONCRETE BOTTOM
IS BROKEN OUT
FOR CONSUMERS INSTALLING
STCONDARIES, CABLE TAILS
SHALL BE 60" LONG MEASURED
FROM TOP OF PADVAULT CENTERED ON BASE
Splice Vault (Square)
or
I +IOLY CROSS ENERGY
4, SQUARE
MANHOLE VAULT
SPECIFICATION
APPENDIX
UM_3OS
;tì -
Ø-
@j
SECTION
I
I
{
i
VAULT CENTERED ON BASE
PAD CENTERED ON VAULT
TRANSFORMER ON PAD
NO
l.
2.
3.
4.
5.
6.
7.
B,
TYPICAL TRANSFORMER OUTLINI
3/4'' HOLE (TOTAL OF FOUR)
LÍFTINC HOLES
BACKFILL TO BE WELL COMPACTE
SOIL UNDER BASE TO BE UNDISTU
OR WELL COMPACTED
D
RBED
roN
THREE PHASE TRANS. VAULT (300 KVA & Smaller)
or
- 4O5OO Påd 3Phâse -3.400 lbs.
v,4.tJ t_'l- l) L_5 ã{; r'l
5 r? F{ å i: I i.:,q"i-l {} þJ :iffi 3 PHASE (300 KVA OR SMALLER)
TRANSFORMER VAULT
SPECIFICATION
APPENDIX
UMI -I 35
r
I
I
_T
I
I
I
I
llttttiÕj
4
24
25
6
SECTION
84
84"
84
PAD CENTERED ON VAULÏ
TRANSFORMER ON PAD
NOTES
84"
1. TYPICAL TRANSTORMER OUTLINE2. LTFTTNG HANDLES (2) PER VAULT SECI|ON3. LIFTING HOLES+. BACKFILL TO BE WELL COMPACTED5. SOIL UNDER BASE TO BE UNDISTURBED
OR WELL COMPACTED6. (6) KNocKours 8"x12" pER VAULT sECTtoN7. CONDUTT(S) TNSTALLED THROUGH
KNOCKOUTS SHALL BE GROUTEDB. BoND #2 coppER tNTo GRoUND sysrrM
WITH ROD AND NEUÏRAL
VAULT CENTERED ON BASE
THREE PHASE TRANS. VAULT (5OO KVA & LaTqeT)
e
| - 4O8OO Vault. 6'xZ'H -J.000 lþs. tach
- 4O5ôO ParI 3Phaçe -3.4OO lbs.
ú
q
TT-]
o
0 +IOLY CROSS ENERGY
3 PHASE (500 KVA OR LARCER)
TRANSFORMER VAULT
SPECIFICATION
APPENDIX
UMI _I I S