Loading...
HomeMy WebLinkAboutObservation Report 10.18.20221. Report Number: 6. Project Name: 7. Project Number: 8. Project Location: 9. Time In & Out: Daily Observation Report 1053 Elkton Drive 3885 Forest Street Colorado Springs, CO 80907 Denver, CO 80207 Vivid Engineering Group, Inc Rifle Compressor StationD22-1-300 - DOR - SEM - 10-18-2022 8am-5pm I arrived on-site as scheduled and made contact with Buck (Mears Group) to discuss plan of the day. Buck and I discussed 2 areas that were reworked on the GC and Control Building Pads. Both areas were retested for moisture density. All results appeared to be within project specifications. I reported results to Cody (Mears Operator). Time of Observation 11. Observations Performed Today and Location of Work 2. Date: Observation & Location 10/18/22 Mears Group4. Client: 10. Mileage:5. Contractor: 7:30am-12:00 / 12:30-5:00pm (9.0 Hrs) 8 Miles 3. VIVID Representative:Sarah McCormick D22-1-300 613 CR 264, Rifle, CO. 81650 12. Nonconformance, Deficiencies, Rework, or Punchlist Items Identified or Resolved I observed scarifying, moisture conditioning, and recompaction of the on-site native soils in an excavated area prior to the placement of fill material for the Instrument Air Building. I performed moisture density testing on structural fill, all results appeared to be within project specification. See my SDR for details. Discussiosn were had with Mears Group regarding concrete and earthwork schedule for the next day. I sent a copy of my SDR to Buck prior to leaving site. Page 1 of 2 Yes/No Yes No No No No No No No Photo 1 Description:Photo 2 Description: 16. Observations and testing performed today are _________________ with project plans and specifications. X Signature of VIVID Representative: Reviewed By:Date:10/19/2022 Flatwork 15. Additional Comments / Remarks Other Instrument Air Building pad. Instrument Air Building Area pad. 14. PHOTOS Type of Test or Sample Performed Earthwork Asphalt Sample Numbers NA Supplimental Forms D22-1-300 - SDR - SEM - 10-18-2022 Results relate only to the items observed or tested. This test report shall not be reproduced, except in full, with the written approval of VIVID Engineering Group, Inc. and report shall be signed or otherwise approved by authorized staff members only. Compliant w\ Exceptions Compliant Non-Compliant In Process / Incomplete Jesse Dortch Sarah E. McCormick 13. Sampling and Testing Performed this Date and Suplimental Testing Forms Submitted Structural Concrete PCCP Grout/Shotcrete Masonary Page 2 of 2