Loading...
HomeMy WebLinkAboutEngineer Report for Concrete Wall Pour Cold-Joints October 18, 2022 Marty Treadway & Richard Backe c/o: John Plano Net Zero Builders Garfield County Building Department PO Box 261, Carbondale, Co 81623 (970) 274-0277 Marty (970)-379-4198 Richard marty@netzerobuilders.com rich@netzerobuilders.com RE: Structural Concrete Wall Pour Cold Joints Sungold Heights Residence, Garfield County, Colorado ESD Project # 21.097C Marty & Rich, Per your request, we have reviewed the details of the concrete wall construction joint. The locations of the cold joints due to pour stops are along grid 1 between grids E and F and along grid 10 between grids F and G. Vertical shear keys have been formed in the concrete wall at the joint. The horizontal wall reinforcement is continuous through the joint. We find the locations and the detail to be in general conformance with our structural design and thus should be capable of sustaining the design loads of the 2015 IRC/IBC and Garfield County amendments. Waterproofing and envelope design should be addressed by others, typically the architect, building envelope engineer or contractor. Should you have any further questions regarding this issue, please feel free to contact our office. Sincerely, Evolve Structural Design LLC Reviewed By: Jonathan Steurer, P.E. Sara Mickus, P.E. Project Engineer Principal 10/18/2022