Loading...
HomeMy WebLinkAboutEmail from Engineer 10.26.2022From:John Hendricks To:Brooke Winschell Subject:FW: 151 Sundance SD14 Framing Date:Wednesday, October 26, 2022 2:30:30 PM Attachments:image001.png image001.png Engineer’s email for Permit #7605 John Hendricks Building Inspector Community Development Department jhendricks@garfield-county.com 108 8th St, Suite 401 | Glenwood Springs, CO 81601 From: Matt Provost <mprovost@garfield-county.com> Sent: Tuesday, October 25, 2022 7:26 AM To: John Hendricks <jhendricks@garfield-county.com> Subject: Fwd: 151 Sundance SD14 Framing For your inspection today. Cheers Matt Begin forwarded message: From: "mike zagbuilt.net" <mike@zagbuilt.net> Date: October 25, 2022 at 7:21:28 AM MDT To: Matt Provost <mprovost@garfield-county.com> Subject: 151 Sundance SD14 Framing  Matt Engineer Nate approved the cricket construction and the wall under the duct work in the Laundry. Thanks, Mike From: Nate Decker <nate@dbsd.com> Sent: Monday, October 24, 2022 1:36 PM To: mike zagbuilt.net <mike@zagbuilt.net> Subject: Re: 151 Sundance SD14 roof Hey Mike, 1. The cricket framing with hangers is acceptable. 2. The shear wall strapping is acceptable. Thanks, Nate Decker, PE, SE Principal | Partner | Engineer P: (801)529-6481 E: Nate@dbsd.com /89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/ /ec8d8d53-075a-419a-a810-0e922340d062/ On Mon, Oct 24, 2022 at 1:05 PM mike zagbuilt.net <mike@zagbuilt.net> wrote: Nate Favor to ask. Could you send a brief description of what you accepted? 1. Cricket with hangers 1. Shear wall strapped in the laundry room. Inspector Matt may ask me on the time of inspection. Thanks a ton. From: Nate Decker <nate@dbsd.com> Sent: Monday, October 24, 2022 12:58 PM To: mike zagbuilt.net <mike@zagbuilt.net> Subject: Re: 151 Sundance SD14 roof Hey Mike, That all looks acceptable to me. Thanks, Nate Decker, PE, SE Principal | Partner | Engineer P: (801)529-6481 E: Nate@dbsd.com /89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/ /ec8d8d53-075a-419a-a810-0e922340d062/ On Mon, Oct 24, 2022 at 12:47 PM mike zagbuilt.net <mike@zagbuilt.net> wrote: Nate Sorry I forgot to attach the pictures. Attached is the location, framing with hangers and left side sitting on the roof with blocking. Also here is a picture of how we took care of the strapping below the duct work in the laundry room. Thanks again for your help. I will be going for my framing inspection tomorrow. Mike Zag. From: Nate Decker <nate@dbsd.com> Sent: Monday, October 24, 2022 9:21 AM To: mike zagbuilt.net <mike@zagbuilt.net> Subject: Re: 151 Sundance SD14 roof Hey Mike, Can you share some pictures and identify in plan where this occurs? Thanks, Nate Decker, PE, SE Principal | Partner | Engineer P: (801)529-6481 E: Nate@dbsd.com /89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/ /ec8d8d53-075a-419a-a810-0e922340d062/ On Fri, Oct 21, 2022 at 3:13 PM mike zagbuilt.net <mike@zagbuilt.net> wrote: Nate We created a cricket and the inspector asked me to share and check if we are okay on this framing. I was thinking we can install some hangers on the right side. Let me know your thoughts. Thank you Mike Zagrzebski 2379 W. Ridges Blvd. Grand Junction, CO 81507 970-257-0171 office 970-260-9808 mobile