HomeMy WebLinkAboutEmail from Engineer 10.26.2022From:John Hendricks
To:Brooke Winschell
Subject:FW: 151 Sundance SD14 Framing
Date:Wednesday, October 26, 2022 2:30:30 PM
Attachments:image001.png
image001.png
Engineer’s email for Permit #7605
John Hendricks
Building Inspector
Community Development Department
jhendricks@garfield-county.com
108 8th St, Suite 401 | Glenwood Springs, CO 81601
From: Matt Provost <mprovost@garfield-county.com>
Sent: Tuesday, October 25, 2022 7:26 AM
To: John Hendricks <jhendricks@garfield-county.com>
Subject: Fwd: 151 Sundance SD14 Framing
For your inspection today.
Cheers
Matt
Begin forwarded message:
From: "mike zagbuilt.net" <mike@zagbuilt.net>
Date: October 25, 2022 at 7:21:28 AM MDT
To: Matt Provost <mprovost@garfield-county.com>
Subject: 151 Sundance SD14 Framing
Matt
Engineer Nate approved the cricket construction and the wall under the
duct work in the Laundry.
Thanks, Mike
From: Nate Decker <nate@dbsd.com>
Sent: Monday, October 24, 2022 1:36 PM
To: mike zagbuilt.net <mike@zagbuilt.net>
Subject: Re: 151 Sundance SD14 roof
Hey Mike,
1. The cricket framing with hangers is acceptable.
2. The shear wall strapping is acceptable.
Thanks,
Nate Decker, PE, SE
Principal | Partner | Engineer
P: (801)529-6481 E: Nate@dbsd.com
/89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/
/ec8d8d53-075a-419a-a810-0e922340d062/
On Mon, Oct 24, 2022 at 1:05 PM mike zagbuilt.net <mike@zagbuilt.net> wrote:
Nate
Favor to ask. Could you send a brief description of what you accepted?
1. Cricket with hangers
1. Shear wall strapped in the laundry room.
Inspector Matt may ask me on the time of inspection. Thanks a ton.
From: Nate Decker <nate@dbsd.com>
Sent: Monday, October 24, 2022 12:58 PM
To: mike zagbuilt.net <mike@zagbuilt.net>
Subject: Re: 151 Sundance SD14 roof
Hey Mike,
That all looks acceptable to me.
Thanks,
Nate Decker, PE, SE
Principal | Partner | Engineer
P: (801)529-6481 E: Nate@dbsd.com
/89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/
/ec8d8d53-075a-419a-a810-0e922340d062/
On Mon, Oct 24, 2022 at 12:47 PM mike zagbuilt.net <mike@zagbuilt.net> wrote:
Nate
Sorry I forgot to attach the pictures. Attached is the location,
framing with hangers and left side sitting on the roof with blocking.
Also here is a picture of how we took care of the strapping below the
duct work in the laundry room.
Thanks again for your help. I will be going for my framing inspection
tomorrow. Mike Zag.
From: Nate Decker <nate@dbsd.com>
Sent: Monday, October 24, 2022 9:21 AM
To: mike zagbuilt.net <mike@zagbuilt.net>
Subject: Re: 151 Sundance SD14 roof
Hey Mike,
Can you share some pictures and identify in plan where this occurs?
Thanks,
Nate Decker, PE, SE
Principal | Partner | Engineer
P: (801)529-6481 E: Nate@dbsd.com
/89494782-27fe-48b2-b119-000263b9d390//35b8f4de-1031-4f66-bcef-692c7bbef589//062b341e-7e9f-401c-aecd-2ec937471a2a//8ac9d2d9-3a41-4e83-b97e-94cde6e250a7/
/ec8d8d53-075a-419a-a810-0e922340d062/
On Fri, Oct 21, 2022 at 3:13 PM mike zagbuilt.net <mike@zagbuilt.net> wrote:
Nate
We created a cricket and the inspector asked me to share and check
if we are okay on this framing. I was thinking we can install some
hangers on the right side. Let me know your thoughts. Thank you
Mike Zagrzebski
2379 W. Ridges Blvd.
Grand Junction, CO 81507
970-257-0171 office
970-260-9808 mobile