Loading...
HomeMy WebLinkAboutOWTS Design 10.13.2022129 Cains Lane Carbondale, CO 81623 970.309.5259 carla.ostberg@gmail.com October 13, 2022 Project No. C1756 Brian Hanlen brian@brooksdesignbuild.com Onsite Wastewater Treatment System Design 4-Bedroom Residence + Future Bunkhouse TBD CR 108 Garfield County, Colorado Brian, CBO Inc. has completed an onsite wastewater treatment system (OWTS) design for the subject residence. The 35-acre property is located outside of Carbondale, in an area where OWTSs and wells are necessary. Legal Description: Section: 32 Township: 7 Range: 88 THAT PARCEL OF LAND IDENTIFIED AS THE PADGETT HOUSE PARCEL AS PER SUBDIVISION EXEMPTION PLAT RECEPTION NO. 960325 AS AMENDED PER AMENDED EXEMPTION PLAT RECEPTION NO. 973918 (35 AC) Parcel ID: 2393-323-00-379 SITE CONDITIONS This large agricultural property is developed with several residences and structures and utilized for ranching. The proposed development is on an area of the property that is currently undeveloped. A 4- bedroom residence is proposed, and a bunkhouse is contemplated in the future. The structures will be served by an onsite well. The well will be located greater than 50-feet from the proposed septic tank and greater than 110-feet 1 from the proposed soil treatment area (STA). A ditch runs to the east of the proposed development. There must be a minimum 60-foot 2 setback from the ditch to the STA. The proposed STA location has an approximate 7-8 percent slope to the east. The proposed area is vegetated with native grasses. There should be no traffic or staging of material over the future STA site to avoid compaction of soils prior to construction of the STA. SUBSURFACE 1 The setback calculation is based on a design flow of 1125 gallons/day and the “8-foot rule” applies. Garfield County OWTS Regulation, Table 7-1, note 3 “Add eight feet additional distance for each 100 gallons per day of design flows between 1,000 and 2,000 gallons per day…” 2 The same “8-foot rule” setback applies to the ditch setback. Page 2 The subsurface was investigated by Kumar and Associates, Project No. 21-7-382.1 and is documented in a report dated August 18, 2022. One Profile Pit and three additional Pits were sampled for the evaluation. A sample was taken from the Profile Pit between 4 and 5-feet below grade. Soils consisted of 43% sand, 36% silt, and 21% clay. Kumar and Associates has classified soils as Soil Type 2, Loam. A long term acceptance rate (LTAR) of 0.6 gallons per square foot will be used to design the OWTS. DESIGN SPECIFICATIONS Design Calculations: 4-Bedroom Residence = 75 GPD x 2 people/bedroom x 3 Bedrooms + 75 GPD (4th Bedroom) = 525 GPD Bunkroom = 4 bunk beds = 8 ppl x 75 GPD/person = 600 GPD Average Design Flow = 525 GPD + 600 GPD = 1125 GPD LTAR = 0.6 GPD/SF 1125 GPD / 0.6 GPD/SF x 0.8 (pressure dosed trenches) x 0.7 (chambers) = 1050 SF The OWTS design is based a 4-bedrooms residence and a future Bunkhouse. An average daily wastewater flow of 1125 GPD will be used. Page 3 For the purposes of this OWTS design, Benchmark Elevation as Finished Floor of the 4-bedroom residence has been established as 100’ (6492’). CBO Inc. should be notified of any discrepancies or problems with grade elevations of proposed components during installation of the OWTS. OWTS Component Minimum Elevation Primary Tank Inlet Invert Approximate horizontal distance 53’ / min 2% fall to septic tank / min. 13.25” fall Automatic Distributing Valve Approximate horizontal distance 28’ / min. 1% rise for drain back / min. 3.5” rise Infiltrative Surface Approximate horizontal distance 38’ / min. 1% fall to furthest trench / min. 4.25” fall *Elevations are based upon standard OWTS installation practices. Component elevations may change during installation due to site conditions. The sewer line exiting the residence must have a double-sweep clean out and a minimum 2% grade to the septic tank. The future bunkhouse will be served by a separate septic tank, placed upgradient of the proposed septic tank. A separate OWTS Permit must be obtained from Garfield County Environmental Health Department prior to installation of this future septic tank. At the time the future bunkhouse is constructed, we recommend the dose setting for the pump be re-evaluated based on the increased design flow. The system installation will include a 1500-gallon, two-compartment concrete septic tank with an Orenco® Biotube Pump Vault and an Orenco® PF3005 pump in the second compartment of the septic tank. Risers must bring the manhole lids to grade for access. If more than one riser is added to the septic tank, an extension handle must be installed on the effluent filter and float tree. The floats should be set to dose approximately 60 gallons each pump cycle, allowing approximately 3 gallons of drain back after each pump cycle. A pump curve is enclosed. The control panel for the pump must be located within line of sight of the septic tank. We recommend Valley Precast out of Buena Vista be contracted for start-up of the pumping system. Pump Table (based on dose volume for the 4-bedroom residence) Dose Range Max = 134.25 gal. (525 GPD x 25% + 3 gal drain back) Min. 49.4 gal. (11.6 gal x 4) + 3 gal drain back Dose Setting 60 gallons/dose 3 gallons drain back (28’ / 1.5” diameter pump line) Float Separation 1500 gallon 2-compartment Valley Precast concrete septic tank 6” on/off float separation Pump Criteria 17.1 gallons per minute (GPM) 17.7 feet total dynamic head (TDH) Effluent will be pumped through a 1.5-inch diameter pump line from the pump chamber to an Orenco® automatic distributing valve (ADV), model 6605. This pump line must have a minimum 1% grade for proper drain back into the tank after each pump cycle. The ADV must be placed at a high point in the system in an insulated riser with access from grade. Screened rock must be placed below the ADV to support the ADV and to assure the clear pipes exiting the ADV remain visible for future inspection and maintenance. Effluent will be pressure dosed through 1.5-inch diameter pipes to five trenches, each with 18 ‘Quick 4’ Plus Standard Infiltrator® chambers, for a total of 90 chambers and 1080 square feet of infiltrative area. There must be at least 4-feet of undisturbed soil between each trench. Effluent will be pressure dosed to 1.5-inch diameter laterals, which must be hung with zip ties from the underside of the chambers. Laterals will have 5/32-inch diameter orifices facing up, with the exception of the first and last holes facing down for drainage. Orenco® Orifice Shields may be placed under each downward-facing orifice. The orifices Page 4 must be placed 3-feet on center. Each lateral must end in a 90 degree ell facing up with a ball valve for flushing. Valves may be placed in a valve box, accessible from grade, for access. Inspection ports must be placed at the beginning and end of each trench. Ports may be cut to grade and covered with a valve box for access. COMPONENT SPECIFICATIONS The component manufacturers are typical of applications used by contractors and engineers in this area. CBO Inc. must approve alternative components prior to installation of the OWTS. Requests must be submitted, in writing, to our office for approval prior to installation. Component technical data sheets are available upon request. COMPONENT MANUFACTURER MODEL NO. COMMENTS Septic Tank Valley Precast Item # 1500T-2CP-HH 2-compartment concrete septic tank with high head pump Pump Orenco® PF500511 ½ HP 120 Volt Biotube ProPak Pump Package Orenco® BPP30DD Vault, Filter, Control Panel (demand dose) Tank Risers and Lids Orenco® Double-walled PVC Risers and Lids (24” diameter) ADV Orenco® V6605A 1.5” Inlet and Outlets ADV Riser and Lid Orenco® Double-walled PVC Risers and Lids (30” diameter) Chambers Infiltrator® Standard Plus ‘Quick 4’ 90 ‘Quick 4’ chambers Orifice Shields Orenco® 10 Orifice Shields Flushing Assembly Orenco® 1.5” diameter (2) 45° or 90° long sweep only (5 total) The component manufacturers are typical of applications used by contractors and engineers in this area. Alternatives may be considered or recommended by contacting our office. Construction must be according to Garfield County On-Site Wastewater Treatment System Regulations, the OWTS Permit provided by Garfield County Building Department, and this design. INSTALLATION CONTRACTOR CBO Inc. expects that the installer be experienced and qualified to perform the scope of work outlined in this design. The installer must review this design thoroughly and coordinate with our office in advance of installation. Any additional conditions in this design or county permit must be completed and documented prior to final approval of the OWTS installation. Communication between the installer and this office is expected throughout the installation. INSTALLATION OBSERVATIONS CBO Inc. must view the OWTS during construction. The OWTS observation should be performed before backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing siphons, and other plumbing, as applicable, must also be observed. CBO Inc. should be notified 48 hours in advance to observe the installation. In an effort to improve the accuracy of the record drawing, we request that the installer provide a sketch of the installation, including path of the sewer lines, water line installation (if applicable), septic tank location, STA location, and measurements from building corners or another fixed Page 5 objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design Packet. Photographs of the installation and final cover are also requested to supplement our installation documentation. REVEGETATION REQUIREMENTS An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing characteristics (but without taproots), provides a maximum transpiration rate, and competes well with successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over the STA. Until vegetation is reestablished, erosion and sediment control measures shall be implemented and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation cover. OPERATION INFORMATION AND MAINTENANCE The property owner shall be responsible for the operation and maintenance of each OWTS servicing the property. The property owner is responsible for maintaining service contracts for manufactured units, alternating STAs, and any other components needing maintenance. Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing fixtures should be checked to ensure that no additional water is being discharged to the OWTS. For example, a running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA. If an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned annually, or as needed. If the OWTS consists of a pressurized pump system, we recommend the laterals be flushed annually, or as needed. The homeowner should pump the septic tank every two years, or as needed gauged by measurement of solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS. Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste only. ADDITIONAL CONSTRUCTION NOTES If design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of freezing. The pump shall have an audible and visual alarm notification in the event of excessively high water conditions and shall be connected to a control breaker separate from the high water alarm breaker and from any other control system circuits. The pump system shall have a switch so the pump can be manually operated. Excavation equipment must not drive in excavation of the STA due to the potential to compact soil. Extensions should be placed on all septic tank components to allow access to them from existing grade. Backfill over the STA must be uniform and granular with no material greater than minus 3-inch. LIMITS: The design is based on information submitted. If soil conditions encountered are different from conditions described in report, CBO Inc. should be notified. All OWTS construction must be according to the county regulations. Requirements not specified in this report must follow applicable county regulations. The Page 6 10-25-2022 contractor should have documented and demonstrated knowledge of the requirements and regulations of the county in which they are working. Licensing of Systems Contractors may be required by county regulation. Please call with questions. Sincerely, CBO Inc. Reviewed By: Carla Ostberg, MPH, REHS Romeo A. Baylosis, PE 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado August 18, 2022 Brooks Design Build Attn: Brian Hanlen 231 Robinson Street, #226 Basalt, Colorado 81621 brian@brooksdesignbuild.com Project No. 21-7-382.1 Subject: Subsoil Study for Foundation Design and Septic Field, Proposed Residence, Crystal River Ranch, 1508 County Road 108, Garfield County, Colorado Dear Mr. Hanlen: As requested, Kumar & Associates, Inc. performed a subsoil study for foundation design and septic disposal feasibility at the subject site. The study was conducted in accordance with our agreement for geotechnical engineering services to Brooks Design Build dated June 8, 2022. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: The proposed residence will be a one story wood frame structure over a crawlspace located on the site as shown on Figure 1. Ground floors are proposed to be structural over crawlspace. A detached garage with slab-on-grade floor is proposed to the northeast of the house. Cut depths are expected to range between about 3 to 6 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. The septic disposal system is proposed to be located about 50 feet east of the house. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: The site is currently vacant cow pasture which slopes gently down to the east below an active irrigation ditch, located about a quarter mile northeast of the main ranch area. The building area is relatively flat with slopes down to the east at about 3% to 5%, down to the east. Vegetation in the building area consists of grass. There are pinon trees to the west and uphill of the building area. There is another active irrigation ditch located east and downhill of the proposed building site. Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating three exploratory pits in the building area and one pit in the septic disposal area at the approximate locations shown on Figure 1. The logs of the pits are presented on Figure 2. The - 2 - Kumar & Associates, Inc. ® Project No. 21-7-382.1 subsoils encountered, below about 1 foot of topsoil, consist of mostly medium stiff, sandy silty clay down to the bottom of the pit depths of 7 to 8 feet. Silty, sandy gravel with small cobbles and rock fragments were encountered in Pit 1, closest to the upper irrigation ditch. Results of swell-consolidation testing performed on relatively undisturbed samples of the sandy silty clay soils, presented on Figures 3 and 4, indicate low compressibility under existing low moisture conditions and light loading and a low to moderate potential under increased loading after wetting. Results of a gradation analysis performed on a sample of slightly silty sand and gravel (minus 5-inch fraction) obtained from Pit 1, are presented on Figure 5. A gradation/hydrometer analysis of the loam soils encountered in the Septic Profile Pit are presented on Figure 6. The laboratory test results are summarized in Table 1. No free water was observed in the pits at the time of excavation and the soils were moist. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend spread footings placed on the undisturbed natural soil designed for an allowable bearing pressure of 1,500 psf for support of the proposed residence. Footings should be a minimum width of 20 inches for continuous walls and 2 feet for columns. Loose and disturbed soils encountered at the foundation bearing level within the excavation should be removed and the footing bearing level extended down to the undisturbed natural soils. We should observe the completed foundation excavation to confirm suitable bearing conditions. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 55 pcf for the on-site soil as backfill, excluding organics and rock larger than 6 inches. Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab-on-grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of imported granular soils such as ¾-inch road base devoid of vegetation, topsoil and oversized rock. - 3 - Kumar & Associates, Inc. ® Project No. 21-7-382.1 Underdrain System: Although free water was not encountered during our exploration, there is an active irrigation ditch uphill of the residence. We recommend below-grade construction, such as retaining walls and crawlspace areas, be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free-draining granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1% to a suitable gravity outlet or sump and pump. Free-draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1½ feet deep. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. Free-draining wall backfill should be capped with about 2 feet of the on-site, finer graded soils to reduce surface water infiltration. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. Septic Field: The soils exposed in the Profile Pit consist of USDA Loam soils to a depth of 8 feet. Based on the soil gradation shown on Figure 6, the soils are Type 2. A civil engineer should design the infiltration septic disposal system. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Figure 1, the proposed type of construction and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants Kumar & Associates Kumar & Associates · · · · ™ Kumar & Associates Kumar & Associates Kumar & Associates Kumar & Associates TABLE 1 SUMMARY OF LABORATORY TEST RESULTS Project No. 21-7-382.1 SAMPLE LOCATION NATURAL MOISTURE CONTENT NATURAL DRY DENSITY GRADATION USDA SOIL TEXTURE SOIL TYPE PIT DEPTH GRAVEL SAND SILT&CLAY GRAVEL SAND SILT CLAY (ft) (%) (pcf) (%) (%) (%) (%) (%) (%) (%) 1 6 to 7 45 45 10 Silty Sand and Gravel 2 2 19.9 104 Slightly Sandy Silty Clay 3 20.4 101 Slightly Sandy Silty Clay Profile Pit 4 to 5 43 36 21 Loam Garfield County, CO Developed by Account Number R084702 Par cel Number 239332300379 Acr es 35 Land SqFt 0 T ax Ar ea 010 2019 Mill Levy 79.7800 Physica l Addr ess 0 108 C OUNTY RD C ARBONDALE 81623 Owner Addr ess C RYSTAL RIVER RANC H C OMPANY 555 17TH STREET, SUITE 2400 DENVER C O 80202-3941 2019 T otal Actual V alue $1,030 Last 2 Sales Date Pr ice 4/22/2022 $0 4/22/2022 $0 Date created: 10/15/2022 Last Data Uploa ded: 10/13/2022 12:05:15 AM 921 ft Overvi ew Legend Parcels Roa ds Parcel/Account Number s Owner Na me Lakes & River s County Boundar y Line