This is super helpful and takes care of all the remaining questions I have'
Enjoy your vacatíon.
Once the plan set ís completed, the Community Development Technicían will have a few administratíve steps to
complete i.e. preparing permit invoices and printing issued permit documents.
The permit contact will be called AS SOON AS lT lS made ready'
Enjoy your vacatíon, and please wait for a call from a Technicían when the permit is ready'
Have a good day!
Colleen W¡rth
Plans Examiner
Garfield County Buílding Divisíon
L08 8th Street, Suite 401
Glenwood Springs, CO 81601
cwirthfôearfi -countv.com
office {970) 945-L377 ext. 1610
From: adam hunt <rmbs-adam @aol.com>
Sent: Thursday, October 27,2022 8:36 AM
To: Col leen Wirth <cwirth @ garfield-cou nty.com>
subject: BLRE-10-22-7849 LAWTON RE MODE L
The loft wíll be a total of 128 sq ft. The size of the loft wíll be 8'wide by 16' long. lt will be used for storage only. lt will be
framed wíth 2xg's on L6" center and sheeted with 3/4 plywood as stated the loft will be framed per storage loft notes
on the prints.
The house is on its own septic system. As of right now the house is a 3 bedroom and we want to convert ít to a 2
bedroom and 3 bath. The room to the left of the living room wíll be a office.
lf you have any more questions please feel free to give me a call. As tomorrow I will be on vacation till November the
7th. Thanks and have a great daY.
Sent from the all new AOL app for Android
1
Colleen W¡rth
From:
Sent:
To:
Subject:
Dona I d Eg gers < don.eg gers@eg gersa rchitectu re.com >
Friday, October 28,202212:24 AM
Colleen Wirth; ronlawton@outlook.com; rmbs-adam @aol.com
RE: BLRE-1A-22-7849 - LAWTON remodel, 890 Kings Row is UNDER REVIEW
Colleen,
Below are answers to your questions:
L. Theloftframingdetailsarelistedonthearchitectural plans:2xSfloorjoists@L6"o.c.with"Á"plywood
sheathing. The floor load was calculated at 1"00 psf for light storage. The space is non-habítable overflow
storage for the master closet and accessed only by a library ladder. The maximum vaulted ceiling height is 5'-0"'
2. The residence is served by an existíng septic system. There is no change to service load. There are three existing
bedrooms which are remaining as is. I will verify with the owners that there are no íssue with the current
function of the system and get back to you'
Please let me know if you have any further questions'
Thanks,
Don Eggers
Eggers Architecture, Inc
PO Box 798
Kremmling, CO 80459
C:970-4A9-9790
Eggersarchitecture. com
From : Col I een Wirth <cwirth @ garf ield-cou nty.com >
Sent; Wednesday, October 26,20221:39 PM
To: ronlawton@outlook.com; rmbs-adam@aol.com; Donald Eggers <don.eggers@eggersarchitecture.com>
Subject: BLRE-10-22-7849 - LAWTON remodel, 890 Kings Row is UNDER REVIEW
BLRE-I9-22-7849 - LAWTON remodel,890 Kings Row
Courtesy Update for Lawton Project Team:
This afternoon l've started archítectural review of your proposed resídential alteratíons'
Have a few questions as follows:
1. proposed main level references a storage loft. Will the loft framíng details be included in engíneer's
deferred structural submíttals? What is the anticipated square feet of the new loft? Please confirm, the
loft will be utilized for non-habitable storage use only? Correct?
Z. The application form check box indicates the house is served by an existing septic system. Correct?