Loading...
HomeMy WebLinkAboutPermit Original  Garfield County Public Health  2014 Blake Ave.   Glenwood Springs, CO 81601  Phone: (970) 945‐6614 ext. 8150  For inspections, call: 970‐945‐6614 ext. 8150 and call the Design Engineer, if applicable   Project Address: TBD Deer Park Court, Glenwood Springs, CO 81601    Parcel No.: 218534400021  Owner Name: Lydnsay and Garrett Jammaron      Owner Phone: (970) 704‐3104  Designed By: Sopris Engineering, LLC.     Designer Phone: (970) 704‐0311         Number of Bedrooms _5__Minimum Tank Capacity _1,500‐gal__Minimum Absorption_560 SF  OWTS PERMIT   KEEP AVAILABLE AT PROJECT SITE   Permit Number _SEPT‐7879________________________  Permit Type X New X Repair X Remodel/addition X Tank only X Field Only X Amendment   Issue Date 11/04/2022    Expiration Date 11/04/2023   Permit Conditions:   This OWTS Permit is approved on the condition of compliance with the design as submitted by Sopris  Engineering, LLC. dated October 19, 2022. Changes must be approved by Garfield County Public  Health and the designer prior to construction.     The new OWTS will serve a new 5‐bedroom residence. The system will consist of a new, two‐ compartment 1,500‐gallon septic tank set level with access to the compartments provided at grade  and an effluent filter in the outlet tee of the septic tank followed by a 500‐gallon pump chamber  with a high‐head pump in the chamber. Effluent will be pressure‐dosed to an Automatic Distribution  Valve (ADV) set level with access to grade at the high point of the system that will distribute effluent  to 874 ft2 of STA. The new STA will consist of four gravelless chamber trenches with 18 Quick4 (or 13  Bio‐diffuser) chambers per trench (72 Quick4 or 52 Bio‐Diffuser chambers total). The pump line shall  consist of 1.5‐inch diameter Schedule 40 PVC. Laterals shall consist of 1.5‐inch diameter Schedule 40  PVC and have 5/16‐inch diameter orifices facing up every two‐feet on‐center (O.C.). The first and last  orifices per lateral shall face down with orifice shields to allow proper drainage of the laterals.  Laterals shall end in a sweeping ell facing up with a ball valve for flushing. Inspection ports shall be  installed at each end of each trench. Maintain all setbacks and elevations as designed.    Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final  inspection of the installed system prior to backfill.  Agreement   All installations must comply with all requirements of the Garfield County OWTS regulations  including but not limited to the conditions specified above.   In consideration of the issuance of the permit, the applicant hereby agrees to comply with all  laws and regulations related to the zoning, location, construction and erection of the proposed  OWTS and associated structures for which this permit is granted. The applicant further agrees  that if the above said regulations are not fully complied with in the zoning, location, erection  and construction of the above described OWTS and structure, the permit may then be revoked  by notice from the Health Department and immediately become null and void.  The issuance of a permit and specifications of terms and conditions therein will not constitute  assumption of liability, nor create presumption that the local public health agency or its  employees may be liable for the failure or malfunctioning of any system. Permit issuance will  not constitute a certification that the system, the equipment used in the system, or any  component used for system operation will ensure continuous compliance with the provision of  the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.   Permit Approval  Plans and specifications for the proposed OWTS have been reviewed and are considered  satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated  in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from  the date of issuance unless construction on the system has commenced. An "as‐built" drawing  must be submitted and inspection of the system must be completed by GCPH before final  approval of the system will be issued.        11/04/2022  Issued By: Garfield County Environmental Health  Department  Date