HomeMy WebLinkAboutInsulation CertificateHUMTSPAR. R9, Insulation Gertif icate
BUILDING SOLUTIONS
Closed -Cell Spray Polyurethane Foam
This form must be filled out and posted to comply with building code requirements. Meets IRC Chapter 11 Energy
Efficiency Requirements and IECC Chapter 4, Commercial Energy Efficiency Requirements.
The following spray polyurethane foam product(s) has/have been installed.
Q Heatlok HFO PRO
2.0-2.4 lbs/ft3
Heatlok HFO High Lift
2.0-2.4 lbs/ft3
Heatlok XT high Yield
(s) 2.23 lbs/ft3
El Heatlok XT High Lift
(s) 2.23 lbs/ft3
Ej Foam-Lok 2000-4C
2.0-2.2 lbs/ft3
Foam-Lok 2000-3C
2.0-2.3 lbs/ft3
Foam-Lok 2000
2.0-2.3 lbs/ft3
[] Proseal HFO
2.0 Ibs/ft3
[] Proseal LE
2.2 IbsMP
Proseal
2.21bs/ft3
Heatlok Eco
2.0 lbs/ft3
1APM0 UES ER-0565
lCC-ES ESR-4073
[CC -ES ESR-3824 (w) 2.17 lbs/ft3 ICC-ES ESR-3883
ICC-ES ESR-3824 (w) 2,17 lbs/ft3 ICC-ES ESR.-3883
CCRR-1025
ICC-ES ESR-4501
[CC -ES ESR-2629
CCRR-1108
ICC-ES ESR-3500
ICC-ES ESR--3500
ICC-ES ESR-3198
Consult International Building Code, Chapter 26-Plastic and International Residential Code (lRq R316 Foam Plastics for
specific requirements. 1 e. spray po yurethane foam insulation system(s) has/have been installed in accordance manu-
facturer's processing guidelines to provide a thermal resistance of:
r,4ominai tritexnesses are represerttatve or meld, spray -applied foam material.
Jobs[te Address: 009 rox ErDuil t n Date of [nstalla#lan: &&_17.2
Building Contractor. AD U, ` as
HBS Contractor: A Phone: q]n —Zq 1—� 1.-7- I
Installed By:
-Post Near Electrical Panel-
9
L51 = z t 5 A C-1
A-1
Le
0
rh
p
CD