Loading...
HomeMy WebLinkAboutInsulation CertificateHUMTSPAR. R9, Insulation Gertif icate BUILDING SOLUTIONS Closed -Cell Spray Polyurethane Foam This form must be filled out and posted to comply with building code requirements. Meets IRC Chapter 11 Energy Efficiency Requirements and IECC Chapter 4, Commercial Energy Efficiency Requirements. The following spray polyurethane foam product(s) has/have been installed. Q Heatlok HFO PRO 2.0-2.4 lbs/ft3 Heatlok HFO High Lift 2.0-2.4 lbs/ft3 Heatlok XT high Yield (s) 2.23 lbs/ft3 El Heatlok XT High Lift (s) 2.23 lbs/ft3 Ej Foam-Lok 2000-4C 2.0-2.2 lbs/ft3 Foam-Lok 2000-3C 2.0-2.3 lbs/ft3 Foam-Lok 2000 2.0-2.3 lbs/ft3 [] Proseal HFO 2.0 Ibs/ft3 [] Proseal LE 2.2 IbsMP Proseal 2.21bs/ft3 Heatlok Eco 2.0 lbs/ft3 1APM0 UES ER-0565 lCC-ES ESR-4073 [CC -ES ESR-3824 (w) 2.17 lbs/ft3 ICC-ES ESR-3883 ICC-ES ESR-3824 (w) 2,17 lbs/ft3 ICC-ES ESR.-3883 CCRR-1025 ICC-ES ESR-4501 [CC -ES ESR-2629 CCRR-1108 ICC-ES ESR-3500 ICC-ES ESR--3500 ICC-ES ESR-3198 Consult International Building Code, Chapter 26-Plastic and International Residential Code (lRq R316 Foam Plastics for specific requirements. 1 e. spray po yurethane foam insulation system(s) has/have been installed in accordance manu- facturer's processing guidelines to provide a thermal resistance of: ­r,4ominai tritexnesses are represerttatve or meld, spray -applied foam material. Jobs[te Address: 009 rox ErDuil t n Date of [nstalla#lan: &&_17.2 Building Contractor. AD U, ` as HBS Contractor: A Phone: q]n —Zq 1—� 1.-7- I Installed By: -Post Near Electrical Panel- 9 L51 = z t 5 A C-1 A-1 Le 0 rh p CD