HomeMy WebLinkAboutSoil & Foundation Investigation 06.29.2022LKP Engineeringo Inc.
CIVIL/GEOTECHNICAL
SOIL AND FOUNDATION INVESTIGATION
FOR A
PROPOSED RESIDENCE
LOT 680 LOS AMIGOS RANCH FILING 5, PHASE 2
683 MONARCII ROAD
GLENWOOD SPRINGS
GARFIELD COUNTY, COLORADO
PROJECT NO. 22-3628
JUNE 29,2022
PREPARED FOR:
STEVEN KUSCHNER
P.O. BOX 3484
BASALT, CO 81621-3484
P.O. Box 724,Eugle, CO 81631 Tel. (970) 390-0307 wwrv.LKPEngineering.com
TABLE OF CONTENTS
EXECUTTVE SUMMARY
SCOPE OF STUDY
SITE DESCRIPTION
PROPOSED CONSTRUCTION......
FIELD INVESTIGATION
SUBSURFACE SOIL AND GROUNDWATER CONDITION
FOI.INDATION RECOMMENDATIONS
SLAB CONSTRUCTION
RETAINING WALLS.
TINDERDRAIN SYSTEM
SITE GRADING AND DRAINAGE
LAWN rRRrGATION.......................
LIMITATION
FTGURES
LOCATION
SUBSURFACE EXPLORATION LOGS
GRAIN SIZE DISTRIBUTION
PERIMETER DRAIN DETAIL.
STRUCTURAL FILL V/ITH GEOGRID
2
2
2
5
tJ
3
4
5
5
6
6
7
n
.DRA\MING NO. 1
,FIGURENO's 1-2
.....FIGURE NO's 3
.....FIGURE NO. 4
,...FIGURE NO. 5
LKP Engineering,Inc.
EXECUTIVE SUMMARY
The proposed resiclence should be supported with
conventionai type spread footings, designed for an allowatrle soil
bearing pressure of 2000 psf. They should construct the footings
on the undisturbed silty, sandy clay with basalt rocks or structural
fill with geogrid. See Foundation Recommendations.
SCOPE OF STUDY
This report presents the results of a subsurface Soil and Foundation Investigation f'or a
proposed resiclence to be constructed on Lot 68, Los Amigos Ranch Subdivision, Filing 5, Phase
2,683 Monarch Road, Glenwood Spdngs, Garfìeld Count5r, Colorado. The purpose of the
subsurface soil and foundation investigation was to detennine the engineeriug characteristics of
the foundation soil and to provide recomtnendations for the foundation design, grading, and
drainage. Geologic hazard sîuclies \are oulside of our scope of sen'íces'
SITE DESCRIPTION
Lot 68, Lot 68, Los Amigos Ranch Subclivision Filing 5, Phase 2,683 Monarch Road,
Glenwood Springs, Garfield County, Colorado is 9.489 acres lot and it is located at the end of
Monarch Road, off of EIk Springs Drive off of CMC Road, on the north side of Highway 82,
Glenwood Springs, Garfield County, Colorado. Vegetation within the proposed building site
consisted of grass, juniper trees, and sage brush. The topography was moderate with average
slopes from about 7 percent. Drainage is to the southwest. To west, north and east the property is
LKP Engineering,Inc.
I
surrounded by HOA parccls. To the southeast ârld southwesl are existing lesidenue. To the soutlr
are two vacant lots. Lot 68 was also vacant.
PROPOSED CONSTRUCTION
At the time of the soil and foundation investigation, architectural plans have not been
developed yet. We have assumed that the proposed residence will be two story. wood frame
oonstruction otl a concrete foundation, with an attached garage. We anticipate loads to be light,
typical of residential construction.
If tire finalizecl plans differ significantly from the above understanding, they shoulcl
notiSr us to reevaluate the recorrunentlations of this repofi.
FIELD INVESTIGATION
The f'reld investigation, conducted on June 23,2022. consisted of excavating, logging and
sampling two test pits. The test pits were dug by Ryan Ivy with a l)eere 60G trackloe.
Approximate locations of the test pits are shown on Drawing No. 1. We show the soil profile of
the test pits on the Subsurface Exploration Logs, Figure No's 1 and?. Soil samples for
laboratory soil analysis and observation were not taken due to the shallow refusal on basalt
cobbles and boulders,
SIJBSURFACE SOIL AND GROUNDWATER CONDITION
The soil profrles encountered in the tu¡o test pits were unifonn, consisting of about 1.5
feet of topsoil over whitish, calcarer¡us. gypsiferous. silty. sandy clay rvith basalt rocks of gravel
to cobblcs and boulder size, cemented, to the maximum de¡rth ex¡r1,rred of 5 and 2.5 feet
respectively, wlrere practical trackhoe refusal was encountered nn the basalt boulders. Grm¡nd
LKP Engineering,Inc.
4
water was not encormtered in the test pits
FOUNDATION RECOMMENDATIONS
The proposed residence shoulcl be supportecl rvith conventional type spread footings,
designed for an allowable soil bearing pressure of 2000 psf. They shoulcl construct the footings
on the undisturbed silty-sandy clay with basalt gravel, cobbles and boulders. Frorn previous
experience with similar soils, it is very likely that excavation of the large basalt rocks to level the
foundation excavation for the construction of the footings, can leave large voids and nneven
subgrade. If the thickness of the leveling, structural fill is more than 6 to 8 inches, sfiuctural fill
improved with Tensar geogrid, as shown on the attached tletail, tigure number 4, will be
implemented,
The cornpletedfoundation excava.tic¡n nutst be observecl and tested by the wdersigrced
engineer to verifu that the soíl condittons enc.ountered during construcliot't ere as ttntícipated in
lhis report.
We recomnend a minimum width of 16 inches for the continuous footings and 2 feet for
the isolated footing pads. Continuous fonndation walls should be reinforced top and bottom t<r
span an unsupported length ofat least 10 feet.
The proposecl foundation should be set at a minimum clepth of four feet belorv the
finished grade or at the minimun depth required by the local building cotle. The forindation
excavation should be free from excavation spoils, frost, organics and standing water. We
reconrmend proof-rolling of the foundation excavation. Soft spots detected during the proot:
rolling, should be removed by overexcavation, Any overexcavation wjthin the proposed
fourrdation shoulcl be bac.kfilled, in I inc.hes loose level lifts and compacted to l00Ya r:f the
rnaxirnum dry density and within 2 percent of the optirnum rnoisture content as detennined in a
laboratory frorn a Standarcl Proctor test (ASTM D-698). A structural fill, placed under footings
should be tested by a qualified professional.
LKP Engineering,Inc
5
SLAB CONSTRUCTION
The natural on-site soils, exclusive of topsoìl and organics. are suitable to support lightly
loaded slab-on-gratle construc'.tion. The subgrade for the slab-on-grade construction shoultl be
proof cotnpacted to detect ancl remove soft spots. They shoulcl backfill overexcavated soft spots
and other trndetslab fill with the on-site soil, free from topsoil ancl organics, or other suitable
material, compacted to a minimum of 95 percent of the maximum standard Proctor density
(ASTM D-698). Suitable material should be free from topsoil, organics and rock fragments
greater than 3 inches. If during excavøtion.fbr the slab-on-grade similar conditions, øs described
in the aboveþundation recomntendation.s section, with large voids o¡'uneven surface are
created, strucîural.fìll çs-desu'ibe ubotte and as showtt on the Structural.fill with geogríd detail,
figure nLtmber 1 yvill be used.
The concrete slab should be constructed over a 4-inch layer of clean gravel consisting of
-314-inch gravel u'ith at least 50% retained on the No. 4 sieve and less than 3 percent passing the
No. 200 sieve.
They should reinforce the concrete slab-on-grade and score conh"ol joints according to
the Ame¡ican Concrete Institute requirements and per the recomrnendations of the designer to
recluce damage due to shrinkage. The concrete slab shoulcl be separatecl from the foundation
walls and columns wlth expansion joints to allow for indepenclent movement rvithout causing
damage.
RBTAINING WALLS
Founclation walls retaining earth and rctaining struclures that are laterally supported
should be designecl to resist an equivalent fluid densilv of 60 pcf for an "at-rest" condition.
Laterally unrestrained structures, retaining the on-site earth, should be designed to resist an
equivalent fluici density of 40 pcf for the "active" Ça,se.
LKP Engineering,Inc.
6
The above design recommendations assume drained backfill conditions and a horizontal
backfîIl surface. Surcharge loading due to adjacent structures, weight of temporary stored
corrstruction rnaterials and equipment, inclined backfill and hydrostatic pressure due to
undrained backfîll should be inr:orporated in the clesign. They should try to prevent the buildup
of hydrostatic pressure behind the retaining wall.
Passive earth pressure of360 psfcan be used lor the lateral pressure against the sides of
the footings. Resistance to sliding at the bottom of the footings can be calculated based on a
coeffîcient of friction of 0.5. Undisturbed soil or a stnlctural fill cornpacted to 100 percent of the
maximurn dry density and r.vithin 2 percent of the optimum moistrue content will be used to
resist lateral loacls at the sides of the footirrgs.
UI\DERDRAIN SYSTEM
To reduce the risk of surface water infiltrating the foundation subsoil. we recommend
installation of a f'oundation perimeter drain (see Figure No. 4). The f-oundation perimeter drain
should consist of a 4-inch diameter, perforated pipe, sloped to a suitable gravity outlet, at a 7 4
inch per foot for flexible or at a 1i8 of an inch for rigid pipe. The bottom of the trench ad-iacent
to the footing shoulcl be lined with a polyetþlene moisture barrier glued to the foundation wall.
The drain pipe should be covered with a minirnum of 6 inches of -314-inch fi'ee-draining
granular material. Geotextile (Mirafi l40N or equivalent) should be used to cover the free-
draining gravel to prevent siltation and cloggilrg of the drain. The backfill above the drain should
be granular rnaterial to within 2 feet of the ground surfãce to prevent a buildup of hydrostatic
pfessure.
SITE GRADING AND DRAINAGE
The follorving recommendations are general. Exterior backfill should be compacted at or
near the optirnum moisture content to at least 95o/o aTthe maxitnum standard Proctor density
under pavement, sidewalk and patio areas and to at least 90% of the maximum standard Proctor
LKP Engineering,Inc
7
clcnsity uucler lanclscaped areas. They should use mec.harúr:al methods of rompaction. Do not
puddle the foundation excavation.
The site sunounding the building structure should slope away from the builcling in all
directions. A minimum of I 2 inches in the first l0 feet is recommended in unpaved areas, and
tlu'ee inches in the first 10 feet in paved areas. The top of the granular foundation backfill should
be coverecl with a minimum of I foot of relatively impervious fill to reduce the potential of
surface water infiltrating the foundation subsoils.
Surface water naturally dtaining toward the proposed builcling site should be diverted
arouud and away from it by means of drainage swales or other approved methods. The roof
drains arrd rJownspouts should extend and discharge beyond the limits of the backfill.
LAWN IRRIGATION
It is not recommended to introduce excess water to the foundation soils by installirg
sprinkler systems next to the building. The installation of the sprinkler heads should ensure that
the spray from the heads will not fall within 10 feet of foundation walls. porches or patio slalrs.
Lawn inigation must be controlled.
LIMITATION
This report has been prepared according to locally accepted Professional Geotechnical
Engineering standards for similar methods of testing ancl soil conditions at this time. The type of
soil testing was selectecl by the owner and general contractor as the preferred rnethod for the soil
and foundation investigation over a soil and f'oundation investigation with a drill rig. There is uo
ofher warrc¿nty either expressed or implied.
The findings and rccornmendations of this report ale based on field exploration,
laboratory testing of samples ohtained at the specific locations shown on the Location Sketch,
Drawing No.I and on assumptions stated in the report. Soil conditions at other locations may
vary, which ma]¡ not become evident until the foundation excavation is completed. If soil or
LKP Engineering,Inc.
8
,s"-.$,i?ffi,'#ffi
øÌà:iiï;i:Y "
Luiza Petrovska, PE
water conditions seem different from those described in this report, we should be contacfed
immediately to reevaluate the recommendations of this report. We are not responsible for
technical interpretation by others of the data presented in this report.
This report lras been prepared t'or the exclusive use of Steven Kuscl'tner, for the specific
application to the proposed residence on Lot 68, Los Amigos Ranch Subdivision, Filing 5, Phase
2,683 Monarch Road. Glenwoocl Springs, Glenwood Springs, Carfield County, Colorado.
Sincerely,
LKP ENGINEERINGO NC'
J:\ WP X4-LKP\ 2A22\22-3 628CLAY-SAND-GRAV-BASALT-PIIS.DOCX
LKP Engineering,Inc
NOTE: THE LOCATION OF THE TEST PITS IS
APPROX¡MATE, IT IS NOT BASED ON A SURVEY
LKP
CIVIL/GEOTECHNICAL
Engineering, fnc.
P.O. Box 724, Eogle, CO 81631
Iel (970) 390-0507 www.LKPEnglnèerlng.com
LOCATION SKETCH
LOT 68, LOS AMIGOS RANCH, FILING 2,
PHASE 2
683 MONARCH ROAD
PN 239305107032
GARFIELD COUNTY, COLORADO
PROJÈC I NO:
22-3628
scALEi -1"=1oo'
DRAWING NO.:
I
DA'IE OBSERVED: JUNE 23, 2422
ELEVAÏ1ON:
Test Pit f 1
ÐEP7H
FEET
s
Y
M
B
o
L
s'
A
M
P
L
E
ÐESCRIPNON OF MATERIAL
ANÐ SAMPLE LOCANON
LABARATORY
TEST RESULTS
REMARKS
5
_10
_15
20
À
M
ffi I
Topsoil
Blocky, sîlty-sondy clay over
whitish, calcoreous, silty, cloyey,
sondy, grovelly matrix with basolt
cobbles and boulders over brown,
silty, slightly cloyey, grovelly sand
wîth basalt cobbles and boulders
MC=|2 Z
-200:11.6%*4:35.8%
Refusal at 5 feet on basalt
boulders
Graund liloter
Encountered
I,EGEND:
Br
ÐÐ
MC
- 2-inch O.D. Cotífornío Liner Somple
-200
- Eulk Somple
- Noturol Dry Darcity (pcf)
- Noturql Moisture Content
- Percent Passìng No. 200
- Llquld Lìmit
- Plosticíty lndex
- Ground water
(t€)
Sieve
LL
PI
cw
tKP ENGINEERING, INC.SUBSURFACE UXPLORATION LOG
PRO,EC| tto,:22-3628
IFIA,tff ,/lr:
DATE OBSER\ED: JUNE 23,2022
ELEVATI0NT
Test Pit f 2
DEPTH
FEEî
s
Y
MI
o
L
s
A
M
P
L
E
DESCRPNON OF MATERIAL
AND SAMPLE LACANON
LABORATORY
TEST RESU¿Is
REMARKS
5
_10
-15
_20
È-.ó\\l;
7*ÉÈ
Topsoíl owr whítish, colcøreoua, sílty,
clo¡æy, sond¡+ gravetly matrix wÍth
bosdlt cobbles (weathered bedrock)
Refusal at 2.5 feet on basalt
bautders
Ground Water
Encountered
I,EGEND:
tr - 2-lnch 0.4. Califomia Liner SompleI - Eulk SompleDD - Noturol Dry Density (pcf)
MC - Noturol Moisture Content (%)
-200 - Percant Paselng No. 2O0 SieveU - Liquíd LìmitPl - Plosticíty lndexeW - Ground water
tKP ENGINEERING, INC.SUBSURFACE EI(PTORATION IOG
ffi¡rur rYa,.22-3628
FEIE
'YA.'2
rsroìo$sìI$=IñÞlt,üaeIP("4FRON: Test Pit I at 4 feetus srAIØAþ s¡nà æÐln6 ûr, úto6ê 1 t 2rv. , r.U.S SlA¡øAfu gEIÃ'WNÆRSù.t J 1 C EIO ntî n &)¿rOfl mrOOr,lOnOH'TWEFo908070I3eoos$-o€¡osS¡o2Ato,a20JOIo-$50ðüq609F70s6090oloo5ootoo 50to5I 0.5a1 0.05o.oaîo.oolSand: 5262Flnes lî.61\\\\\\\Sllt * ClaytundfrnemcdlumcaanseGravtglfrtecoargaCobbteellolsture Co¡ztqt: 12t&avel: 35.6XDcscríptían: S'tlty dlghtly damy, grovdly sand
t
FOONNG
Þ
'.ô<..!Þ:{È
Þ<
ñ\
"Q"fNt-\
AWAY FROM BUILDING
R BACKFILL WITH A MINIMUM
OF ONE FOOT OF RELATIVELY
IMPERVIOUS SOIL
rLTER FABRtt (MtRAF|
,I4ON OR EOUIVALENT)
3/4.INCH DIAMETER, COARSË,
CLEAN CRUSH ROCK
30 MIL MINIMUM THICKNESS,NCH DIAMËTER PERFORATED PIPE SLOPED TOPLASTIC LINER, GLUED TO A DAYLIGHT LOCATION AWAY FROM THE
FOUNDATION AT 1/4-INCH PER FOOT FOR
FLEXIBLE AND 1/8-INCH MINIIIIUM FOR RIGID PIPE
FOUNDATION WALL
cwILlcEoTECEIUCAL
Engineering, Inc.
P.O. Box 724, Eagle, CO 81031
Tel (970) 390-0307 www.Ll(PEng¡nce¡ing.com
LKP
PERTMETER DRAIN
LOT 68, LOS AMIGOS RANCH, FILING 2,
PHASE 2
683 MONARCH ROAD
PN 239305107032
GARFIELD CÔUNTY, COLORADO
22-3628
scALE: N.T.s.
4
NGURE NO.:
OVEREXCAVATION.STRUCÏU RAL FI LL
AND GEOGRID
N.T.S,
MINUS 3/4-INCH CLEAN CRUSH
ROCK {for under slab on grade
5' min
8"
TriAx
UNDISTURBED G TXl50
US 3-INCH ROAD BASE OR OTHER
SUITABLE STRUCTURAL FILL
APPROVED BY THE ENGINEER
NOTË:
't.
2.
3.
4.
Ã
o.
EXCAVATE THE TOPSOIL AND OTHER UNSUIÏABLE SOIL
BACKFILL WITH 6-INCHES OF STRUCTURAL FILL
CONSTRUCT THE FIRST LAYER OF TENSAR Ir¡Ax GEOGRID OVER THE STRUCTURAL FILL
CONTINUE WITH THE STRUCTURAL FILL AND TENSAR GËOGRID TO WITHIN 6-INCHES OF THE BOTTOI\4 OF
SLAB ON GRADE ELEVATION.
BACKFILL OVER THE LAST LAYER OF GEOGRID WITH 6.INCHES OT MINUS 3/4-INCH CLEAN CRUSH ROCK.
ANY SUBSTITUTIONS MUST BE VERIFIED WITH THË ENGINEER.
THE GEOGRID AND GEOTEXTILE PLACEMENT WILL BE ACCORDING TO THE MANUFACTURERS
RECOMMENDATIONS,
FOR STRUCTURAL FILL PLACEMENT OVEREXCAVATE:
4 FEET BELOW THE PROPOSED FOOIINGS ELEVATION
3 FEËT BELOW THE PROPOSED SLAB ON GRADE ELEVATION
SLAB ON GRADE
cfftL/çEoTEcENICÀI
Engineering, Inc.
P.0. Box 724, Eagle, CO 81631
Ie! (970) 39o-0307 www,LKPEngineering.com
LKP
STRUCTURAL FILL WTTH GEOGRID
LOT 68, LOS AMIGOS RANCH, FILING 2
PHASE 2
683 MONARCH ROAD
PN 239305107032
GARFIELD COUNTY, COLORADO
PRDJECT NO l 22-3628
scALE: N.T.s.
5
FIGURE NO.: