Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT B LM F -1 0-22-7 884 & B LM F- 10-22-7 883 Kay & Bernard Crook NEW MODULAR 2-UNrT (DUPLEX) DWELLING ON PERMANENT FOUNDATION CRAWL SPACE, SERVED BY NEW ONSITE WASTEWATER TREATMENT SYSTEM TBD HWY ó, SiIt Davis Point Exemption, Lot 4 - 217902400549 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COTORADO DEPT. OF HOUSING (c.D.o.H.)AND ALL FACTORy-BUTLT RESTDENTTAL STRUCTURES INSTALLED rN GARFTELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE. 2) FOUNDATTON CRAWL SPACE & ANY S|TE CONSTRUCTED DECKS / PORCHES / EXITING MEANS OF EGRESS SHALL COMPLYWITH 2015 I.R.C., 2OO9 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND MANUFACTURER'S INSTALLATION REOUI REMENTS. 4) ALL pLUMBtNG AND cAS ptptNG CONNECTTONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 5) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT BASEMENT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 6) pRtoR TO FTNAL BUtLDtNc tNSPECT|ON & CERTTFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN.OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER TREATMENT SYSTEM. 7) GARF|ELD COUNTY BUtLD|NG DEPT. TNSPECTìONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2,000 psf OPEN HOLE SOILS REPORT lS REOUIRED AT FIRST FOOTING INSPECTION B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS Ë. SITE / CRAWL SPACE FRAMING CONNECTIONS AND 'f ANY APPLICABLE ËXTERIOR DECKS, STAIRS, DOOR LANDINGS SHALL BE COMPLETE AT FRAMING INSPECTION. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: cARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY 8)BOTH DWELLING UNITS SHALL HAVE AN NFPA 13D FIRE SPRINKLER SYSTEM INSTALLED WITH A WATER SUPPLY STORAGE TANK OF 25 MINUTES OF WATER FOR THE SPRINKLER SYSTEM. THIS REOUIREMENT IS BASED ON THE ACCESS ROAD BEING MORE THAN 1O% GRADË. DETAILS FOR THE FIRE SPRINKLER SYSTEM CAN BE OBTAINED FROM THE COLORADO RIVER FIRE RESCUE'S (CRFR) FtRE MARSHAL OFFICE, ORRIN MOON, (970) 625-1243 EXT 29. 9) CURRENI / FUTURE LOT OWNERS: SEE ATTACHED DIRECTOR'S DECISION LETTER INCLUDING CONDITIONS OF APPROVAL - CROOK 2-UNIT DWELLING GAPA-02-22-8879. FOR GENERAL AWARENESS, BUILDING PERMIT PROJECT SCOPE IS FOR APPROVAL OF 2-UNIT DWELLING STRUCTURE ON 30.5 ACRE PARCEL IN RURAL ZONE DISTRICT. PROPOSED DUPLEX FIRE WALL OFFERS FIRE SEPARATION BETWEEN UNITS, THOUGH 30.5 ACRE PARCEL SHALL REMAIN WHOLE (wtTH NO PROPOSED NEW PROPERTY LtNE BISECTING SAID DUPLEX STRUCTURE).