HomeMy WebLinkAboutApplicationGørfuld County ß-+
RECEIVE Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
fñË,ì5'iFi3'f'f iilJ'---.'::,';"',;*n.."'
BUILDING PERMIT
APPLICATION
Commercial/Multi-Family Demolition
Manufactured Home (Single or Multi-Level)
I Residential (SF, Duplex or Townhome)Reroof
Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET
970 379-1644
P.O. Box 188 New Castle, Co 81647
Phone:Property owner: Terry Gambrel
Emait Addresr. Teaglexinc@live.com
Mailing Address:
conrractor: Terry Gambrel Phone. (970 p79-1644
P.O. Box 188 New Castle, Co 81647
Email Addresr. teaglexinc@live.com
Mailing Address:
Architect: Phone:
Mailing Address
Email Address:
Address: 1015 W. Horsetooth Road, Suite 203 Fort Collings, Co 80526
Emait Addresr. natetorres@tkengineering.bíz
Mailing
Engineer:TK Engineering Consultants LLC 720 936-8787Phone:
Manufactured Home lnstaller: Phone:
Mailing Address:
Email Address:
*orn. 30x50 metal building for storage and work shop
rob Address: 4050 County Road 31 1 New Castle, Co 81647
Assessor,s parcet Number: 217 924100308
14Height:
Describe
Owner's Valuation of Work:(
Sub.
Sq. Ft. of Building:1500
Lot _ Block
# of Floors: 1
Property size (sq. Ft. or Acres): 13'24 Acres
,/Class of Work:New Remodel/Alteration Addition
,/Garage:Attached Detached
: PROJECT
i Sept¡c:
DETAI[S CONTINUED
Community
l- rvpe or ¡lèat:
I
t. -. - ... -. -,..-.- , ,-,. --.
Driveway
Permit:
NOTTCË
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identif¡ed above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, lagree that land my agentswill
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
ngr, e and/ or builder
I hereby acknowledge that I have read and understand the Not¡ce and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
Natural Gas Propane Electric Other
Permit #:
tr/tr./r-
Owner Print and Sign Date
,/'r{ t('OFFICIAT USE ONIY
6e€ athaohed ØNDtn2lVSSpecial Conditions:
Adiusted Valuation:
ö'ug,mo.aa
Plan Check Fee:q05,e t 'å:2ä:ur6 Manu. Home Fee:ÈlÊ *rrr.ñZA
'azøæTotal
l1
Fees Paid:øtdrrô5..
Balance Due:
bL7,æ
BP Nd:flQs-ìqm OWTS
k)1,
Úo:
ì
'"'oöÞND occ Grouo:
=Pn
t""'SäL
l,il,7+h
Signed Approval
BUITDING / PTANNING DIVISION :tT'g-zL
Date
G,ørfietd Cou:ntY
BUILDING DEPARTMENT
708 Elghth Street, Su¡te 4O7,ìlenwood Springs, CO 87607
Tel: (970) 945-8272
PLA NR EVI E WC HEC KLIST
F*a rr il i ngfZ,on F rig Íssi¡es
EuEf,el ñrrg issues
(í" '¡ ',
./
A
Surveyed S Plan
nA{r /b Se otic'b it and
Grade/ ToPograPhY 30%
Attach Residential Plan Review List
Subdivision Plat Notes
Fire DePartment Review
Valuation Determination/ Fees
Red Line Plans/ StamPs/ Sticker
Attach Conditions
Application Signed
A
Plan Reviewer to Sign APPlication
Parcel/schedule No.
40# Snowload Letter - Manu' Homes
Soils RePort
Kurna*- 22-7-A/Z
7-/ Z- Zôzz ld
6aas./, x { v2: 15 aoooo
Engineered Foundation
DrivewaY Permit
AND property Line setbacks
36ft. str.ut Setbacks
-¿
Flood Plain
Building Height
Zoning Sign-Off
î Road lmpact Fees
--,/ Grade/ TopograPhY 40%
Planning lssues
Subdivision Plat
L?æ ezxerzzf)'1'ã-?-
peez/ &o*to=
D'=se l"i Surælrra
gpØ,nhd/Cre4
2oaa7rrr'
@*tþrle/.r; rrysÉÉßÉ-b
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold untilthe required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
o
r r/ tø/zz-
Property Owner Print S Date