HomeMy WebLinkAboutConditions of PermitcoN DITI oNs OF PERMIT
BLCO- 11-22-7913 Meter Bldg
BLCO- 11-22-7914 Air Compressor Bldg
BLCO- 11-22-7915 Gas Chromatograph Bldg
MountainWest PiPeline LLC
TBD CR 2ó5 (Swallow Lane), Rifle
1) ALL WORK SHALL COMpLy wtTH THE 2O1s INTERNATIONAL BUILDING
co DE ( l. B.C. ) AND MANU FACTU RER',S I NSTALLATI ON I NSTRUCTIO NS.
2) ALL WORK MUST COMPLY WITH CONDITIONS OF THE CURRENT LAND USE
PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LOCKS, LATCHES AND LANDTNGS SHALL COMPLY WITH 201518C, SECTION
1 008
5) CONTRACTOR TO VER|Fy CDOH CERTIFICATION PRIOR TO SCHEDULING
BUILDING FINAL INSPECTION
ó) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS
CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING
REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO
SPECIFIC ITEMS ON THIS LIST.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT
FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL
INSPECTION & CERTIFICATE OF OCCUPANCY'
B) LTGHT AND VENTILATION PER 2015 lBC, CHAPTER 12 AND 2015 IMC
CHAPTER 3.4
ç) HtcH STRENGTH BOLTTNG / FrELD WELDING (lF ANY PERTAINS), SHALL BE
REOUIRED BY SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT
TO BE AVAILABLE FOR BUILDING FINAL.
1O)GARFIELD COUNTY FINAL / COMPLETION INSPECTION lS REOUIRED.
11)CONTACT ORRIN MOON, FtRE MARSHAL, COLORADO RIVER FIRE RESCUE,
TO ENSURE COMPLIANCE WITH APPLICABLE FIRE CODES AND
REOUIREMENTS and/or RECOMMENDATIONS BY THE LOCAL FIRE DISTRICT'
coNTACT PHONE 970-625-1243 EXT 29 0r orrin.moon@crfr.us