HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT
BLRE-12-22-7950
Angel Garcia
DETACHED GARAGE
159 River Boat, New Castle
Riverbend Subdivision, Lot 1 1
1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESIDENTIAL CODE (l.R.C.)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE
ATTACH ED "GARFIELD COU NTY BU I LDING REOUI REM ENTS". NU MBER REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LISÏ.
3) ELECTRTCAL PERM|TTING AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECÏRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) Wl LDFI RE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL
FIRE DISTRICT.
5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION, 1500 PSF SOIL
BEARING.
ó) pRE-ENctNEERED ROOF TRUSSES, HAVE ENGINEERING FOR INSPECTOR AT TIME OF
FRAMING INSPECTION.
7) THE BUILDING STRUCTURE HAS BEEN REVIEWED AS A PRIVATE USE DETACHED GARAGE
ONLY ACCESSORYTO THE MAIN RESIDENCE. ANY FUTURE CHANGE IN BUILDING
OCCUPANCY OR USE, WILL FIRST BE SUBJECT TO A NEW BUILDING PERMIT APPLICAÏION
AND REVIEW FOR COMPLIANCE WITH ZONING REGULATIONS, LAND USE & BUILDING
CODES IN EFFECT AT TIME OF FUTURE WORK.
s) A LOT TMPROVEMENT CERTTFTCATE SEALED BYA COLORADO LICENSED SURVEYOR, lS
REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE. INCLUDING ROOF
OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH SETBACKS
AND THE RIVERBEND PUD.
9) BUtLDtNc AppLtCATtON SUBMTTTED AS STRUCTURE WITH NO PLUMBING, MECHANICAL
HEATING OR ELECTRICAL PROPOSED.
10) DETACHED GARAGE tS PROPOSED rN FATRLY CLOSE PROXIMITY TO BURIED PROPANE
TANK. GENERAL CONTRACTOR TO ENSURE BUILDING LOCATION COMPLIES WITH 2015
TNTERNATIONAL FIRE CODE (lFC)TABLE 6104.3
LIQUEFIED PETROLEUM GASES
SECT¡ON 6104
LOCATION OF LP.GAS CONTAINERS
6104.1General. The storage and handling of LP-gas and the
installation and maintenance of related equipment shall com-
ply with NFPA 58 and be subject to the approval of the fire
code fficial, except as provided in this chapter,
6104.2 Maximum capacity within established limits'
V/ithin the limits established by law restricting the storage of
liquefied petroleum gas for the protection of heavily popu-
lafed or congested areas, the aggtegate capacity of any one
installation shall not exceed a water capacity of 2,000 gallons
Q57A D (see Section 3 of the Sample Legislation for Adop-
tion ofthe International Fire Code on page xxi).
Exception: In particular installations, this capacity limit
shall be determined by the fire code fficial, after consid-
eration of special features such as topographical condi-
tions, nature of occupancy, and proximity to buildings'
capacity ofproposed LP-gas containers, degree offire pro-
tection to be provided and capabilities of the local fire
department.
6104.3 Container location. LP-gas containers shall be
located with respect to buildings, publíc ways and lot lines of
adjoining property that can be built upon, in accordance with
Table 6104.3.
6104.3,1 Installation on roof prohibited. LP-gas con-
tainers used in stationary installations shall not be located
on the roofs ofbuildings.
6L04.3.2 Special hazards" LP-gas containers shall be
located with respect to special hazards including, but not
limited to, above-ground flammable or combustible licluid
TABLE 6104.3
LOCATION OF LP-GAS CONTAINERS
For SI: 1 foot = 304.8 mm, 1 gallon = 3.785 L.
a. Minimum distance for undãrground Lp-gas containers shall be measurcd from the pressure rclief device and the filling or liquid-level gaüge vent connection
at the containel., except that ;ll parts of aã underground LP-gas containel shall be not less than t 0 feet from a building or lot line of adjoining property that cân
be built upon.
b. For other thafi installations in which the overhanging structure is 50 feet or more above the relief-valve discharge outlet. In applying the distance between
buildings and ASME Lp-gas containers with a water capacity of 1 25 gallons or more, not less than 50 percent of this horizontal distance shall also apply to all
portionı of the building tñat project more than 5 feet from the building wali and that are higher than the relief valve discharge outlet. This horizontal distance
shall be measurecl iro,,,, u pJint'O"termined by projecting the outsidJedge of such overhanging structure vertically downward to grade or other level upon
which the Lp-gas containei is installed. Distances to the building wall shall be not less than those prescribed in fhis table.
c. Where underground multicontainer installations are composed of individ-ual LP-gas containers having a water capacity of 125 gallons or mo¡e, such
containers shãil be installed so as to provide âccess at theil ends or sides to facilitate working with cranes or hoists
d. At a consumer site, if the agglegate water capacity of a multicontainer installation, comprised of individual LP-gas containers having a water capacity of less
tha' 125 gallons, is :00 galionior rnore, thé minimum distance shall comply with the appropriate portion of Table 6104'3, applying the aggregate capacity
rather than the capacity per Lp-gas container. If more than one such instaliation is made, each installation shall be separated from other installations by not
less than 25 feet. Minimum distances between LP-gas containers need not be applied,
e. The following shall apply to above-ground containers installed alongside buildings:
1 . Lp-gas containers of less than a l25-gallon water capacity are allowed next to tlte building they serve where in compliance with Items 2, 3 and 4.
2. Depaltment of Transportation (DOTn) specification LP-gas containers shall be located and installed so that the discharge from the container pressure
relief device is not less than 3 feet horizontally from building openings below the level of such discharge and shall not be beneath buildings unless the
space is well ventilated to the outside ând is not enclosed -[o[ rnore than 50 percent of its pcrimctcr. The discharge from LP-gas contaiuer prcssure relief
devices shall be located not lcas thon 5 feet from exterior sources of ignition, openings info direcl-vent (sealed combustlon system) appliances or
mechanical ventilation air intakes.
3. ASMELp-gascontainersoflessthanal25-gallonwatercapacityshallbelocatedanclinstatledsuchthâtthedischargefrompressurereliefdevicesshall
not terminate in er beneath buildings ancl shall be located not iess than 5 feet horizontally from building openings below the level of such discharge and
not less than 5 feet fì.om exterior sources ol ignition, openings into dilect vcnt (sealed combustion system) appliances, ot'mechanical ventilation air
intakes
4. The filling connection and the vent from liquidJevel gauges on either DOTn or ASME LP-gas containers filled at the point of ìnstallation shall be not less
than l0 feet from exterior sources of ignition, openings into direct vent (sealed combustion system) appliances or mechanical ventilation air intakes.
f. This distance is allowecl to be reduced to not less than 10 feet for a single LP-gas container of 1,20O-gallon water capacity or less, provided such container is
tìut less than 25 feet fÍom othcr LP-gûs containers of more thân 1 2s-gatlon water capacity'
4ít8 2015 TNTERNATTONAL F|RE CODE@
LP'GAS CONTAINER CAPACITY
(water gallons)
MINIMUM SEPARATION BETWEEN LP.GAS CONTAINERS AND
BUILDINGS, PUBLIC WAYS OR LOT LINES OF ADJOINING
PROPEFTY THAT CAN BE EUILT UPON MINIMUM SEPARATION
BETWEEN LP.GAS CONTA¡NERSb''
(feet)Mounded or underground
LP-gas containerså
(feet)
Above-ground
LP-gas containersb
(fêet)
Less than 125"d 10 5"None
125 to 250 10 10 None
251 ro 500 10 10 3
501 to 2,000 10 25.'r 3
2,001 to 30,000 50 50 5
30,001 to 70,000 50 75
(0.25 of sum of diameters of
adjacent LP-gas containers)70,001 to 90,000 50 100
90,001 to 120,000 50 125