Loading...
HomeMy WebLinkAboutEngineer's Truss Clarification ReportYou don't often get email from 135hiddenvalley@gmail.com. Learn why this is important From:John Hendricks To:Brooke Winschell Subject:FW: REVISED LAYOUT/SHOPS Date:Tuesday, January 17, 2023 2:28:43 PM Attachments:image001.png Truss engineering clarification Permit # 7661 John Hendricks Building Inspector Community Development Department jhendricks@garfield-county.com 108 8th St, Suite 401 | Glenwood Springs, CO 81601 From: Carrie&Jesse Douglas <135hiddenvalley@gmail.com> Sent: Tuesday, January 17, 2023 12:58 PM To: John Hendricks <jhendricks@garfield-county.com> Subject: Fwd: REVISED LAYOUT/SHOPS 135 Hidden Valley Truss correspondence Jesse D Carrie D Begin forwarded message: From: Trusfab <trusfab@yahoo.com> Date: January 13, 2023 at 9:20:40 AM MST To: Carrie&Jesse Douglas <135hiddenvalley@gmail.com>, Nathan Torres <natetorres@tkengineering.biz> Subject: Re: REVISED LAYOUT/SHOPS Reply-To: Trusfab <trusfab@yahoo.com>  Provided that the over frame is done properly and strutted down to the trusses below so as not to create point loads then it is acceptable. Brian Budd TRUSFAB INC. PHONE: 970-984-2336 FAX: 970-984-3533 On Friday, January 13, 2023 at 08:23:23 AM MST, Nathan Torres <natetorres@tkengineering.biz> wrote: TrusFab - Left hand side of the A1 trusses over the garage. The building inspector wants to know/see that it is acceptable to have over framing on this side of these trusses. The location is over the common wall between the garage and habitable structure of the home. Your plans show over framing as do the ARchitectural sheets, but nothing in writing (that we could find) on the truss shop drawings confirming that additional DL is acceptable. Please advise and feel free to call me to discuss. On Wed, Sep 14, 2022 at 4:39 PM Nathan Torres <natetorres@tkengineering.biz> wrote: you are correct. On Wed, Sep 14, 2022 at 2:57 PM Carrie&Jesse Douglas <135hiddenvalley@gmail.com> wrote: Nate chime in on this if you would please. Jesse D Carrie D Begin forwarded message: From: Carrie&Jesse Douglas <135hiddenvalley@gmail.com> Date: September 14, 2022 at 2:46:40 PM MDT To: Trusfab <trusfab@yahoo.com> Subject: Re: REVISED LAYOUT/SHOPS I believe that wall under the C gable is bearing as the engineer has it called out as a thickened slab detail. I can bring him in on the conversation if needed. Jesse D Carrie D On Sep 14, 2022, at 2:43 PM, Trusfab <trusfab@yahoo.com> wrote:  This is a revised layout and shops showing the attic trusses. We also need to confirm whether or not the wall under the C gable is a bearing wall. Brian Budd Brian Budd TRUSFAB INC. PHONE: 970-984-2336 FAX: 970-984-3533 -- Nathan Torres, PE // Principal TK Engineering Consultants, LLC mailing: 1015 W. Horsetooth Road, Suite 203, Fort Collins, CO 80526 physical: Glenwood Springs, CO 81601 Direct: 720-936-8787