HomeMy WebLinkAboutFinal Installation Observations 02.27.2023 CLOSEOUT OBSERVATION Job# 2022-12736 (Client #:44769) 10 Wild Rose Dr. Glenwood Springs, CO 81601 9100 W Jewell Ave STE. 200 Lakewood, CO 80232 720-440-9450 www.dlengineer.com Closeout Letter 2022-12736_10 Wild Rose Dr_23-2-27 Page 1 of 2 2/27/2023 FRWC 2575 Highway 6 & 50 Grand Junction, CO 81501 DL Engineering Inc. reviewed the progress of construction from photos provided by the contractor for the subject project on February 27, 2023. The following is a summary of the observations made: NEW OBSERVATIONS : PUSH PIERS • Reviewed the (23) push piers. Below is a table summarizing pier locations: Pier Quantity Wall Location (N/S/E/W) Pier Spacing (on center) 23 Full Perimeter Per Plans  The pier spacing was observed and appears to be in conformance with the construction documents.  The piers were installed to refusal or to a depth no less than that specified in the construction documents.  The push piers appear to be installed in conformance with the structural mitigation plan.  Existing foundation condition was reviewed, and condition was found to be adequate to support the existing design. No special considerations were required. HOUSE PERIMETER CONDITIONS • Site grading around the perimeter of the house did not appear to be modified. • Vegetation around the perimeter of the house did not appear to be modified. VOLATILE SOILS: The moisture around the foundation elements must be controlled for the useful life of the building. Time has shown that Colorado soils can be unstable, and structures can experience damaging movements due to expanding and shrinking soils, primarily when moisture changes occur. Maintaining consistent soil moisture contents around all foundation elements is crucial to minimizing foundation movements. Even with properly engineered/constructed foundation systems these volatile soils can still exert excessive pressures causing damage in the residence. If the Owner would like further insight about the on-site soil conditions and preventative measures, a Geotechnical Engineer should be consulted. C LOSEOUT OBSERVATION Job# 2022-12736 (Client #:44769) 10 Wild Rose Dr. Glenwood Springs, CO 81601 9100 W Jewell Ave STE. 200 Lakewood, CO 80232 720-440-9450 www.dlengineer.com Closeout Letter 2022-12736_10 Wild Rose Dr_23-2-27 Page 2 of 2 G EOTECHNICAL CONSIDERATION: It is possible that the piers may consolidate the soil under the piers. Because of this, periodic surveys of the supported structures should be conducted to assure project success. The Owner should be responsible for annual surveys certifying project success. It is recommended that a baseline survey be conducted immediately. The Owner should report all findings and reports to the Structural Engineer. If vertical movement of the foundation walls is discovered, the piers should be re-pressurized. A Geotechnical Engineer should be present for the re-pressurizing of the piers. D ISCLAIMER In as much as the site review of an existing structure for the purpose of observing the structure conditions requires that certain assumptions be made regarding existing conditions and because some of these assumptions may not be verifiable without expending additional sums of money or destroying otherwise adequate or serviceable portions of the building, the Client agrees that, except for negligence on the part of the Engineer, the Client will hold harmless, indemnify and defend Engineer from and against any and all claims arising out of the professional services we have provided. If you should have any further questions, please feel free to contact me at (720) 440-9450 or dgabrielson@dlengineer.com. Sincerely, Dave Gabrielson Under the direct supervision of, Giovanni Palmieri, PE Giovanni N. Palmieri, P.E. Digitally signed by Giovanni N. Palmieri, P.E. Date: 2023.02.28 12:04:23 -07'00'