Loading...
HomeMy WebLinkAboutConditions of PermitcoN DITIONS OF PERMIT BLMF-03-23-8029 KIMBERLY & STEVE OCHKO NEW 696 SO FT MANUFACTURED ADU 4362 CR 1OO CARBONDALE Lot2lrene Green Exemption Plat - 2391 301 00027 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. oF HOUSTNG (C.D.O.H.)AND ALL FACTORY-BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 1) FOUNDATTON CRAWL SPACE & S|TE ERECTED DOOR ENTRY STOOP/ LANDING/STAIRS AND/OR DECKS SHALL COMPLY WITH 2015 I.R.C., 2OO9 I.E.C.C. AND MANUFACTURER'S I NSTALLATION REOU IREM ENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND MANU FACTURER'S INSTALLATION REOUIREM ENTS. 3) ALL pLUMBtNG AND GAS ptptNc CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 4) ELECTRTCAL PERMtTTtNG AND tNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 5) pRtoR TO FTNAL BUILDING TNSpECTTON & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. o) cARFtELD COUNTy BUtLDTNG DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST FOOTING INSPECTION, 1,500 PSF. B. FOUNDATION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. ANY SITE BUILT FRAMING F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY