Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Special Epoxy Inspection Report 03.22.2023
THUNDER MOUNTAIN TESTING P.O. Box 62 / Collbran, CO 81624 Cell (970) 210-7008 E-Mail: thundermountaintesting@gmail.com www.thundermountaintesting.com Peak 3 Ltd. March 22, 2023 310 Market Street Basalt, CO 81621 ATTN: Mr. Rafael Medina RE: Voss Residence Permit #BLRE-0602207625 1065 Hidden Valley Drive Glenwood Springs, CO. *Field Inspection Dear Mr. Medina, As requested, special inspection was conducted per the IBC 2018 Edition - Chapter 17: Structural Tests and Special Inspection and the Garfield County requirements. I arrived on site at 9:45 AM. I met with you to review project requirements and material ready for inspection. While on site I received and reviewed a copy of an email clarification from the project engineer of record Mr. Nate Decker, PE, SE with DB Structural Design accepting the 5/8" diameter by 12" deep all threaded rod utilizing Simpson Strong-Tie SET-XP Epoxy for a total of 10 each hold downs ties. Please refer to the attached email correspondence for project documentation. Continuous epoxy anchor inspection was conducted at the Foundation Plan Level for this project. I observed the anchor installed for the Holdown plates at grid line A & 5, A & 6, B & 6, B & 7, C & 1, D & 1, D & 7, and E & 7 as referenced on supplied engineering approved drawings provided by DB Structural design. A total of 10 all threaded anchors were installed at depths of 12" minimum as referenced on above drawings. Epoxy utilized for this project was Simpson Strong-Tie SET-XP Epoxy. I observed the drilled hole depth check, the cleaning of each drilled hole with a wire brush (3 times) and compressed air blown into the bottom of each hole, and the epoxy introduction and counterclockwise rotation and insertion of all the threaded anchors as per the manufacturer's instructions. Upon completion, I observed all epoxy anchors to be in compliance with project specifications and epoxy manufacturers recommendations. PAGE 2 Respeeflrally Submitted, '#91040201 ICC Certified #0863569-81 & S2 ASNT NOT Level III #30242 Thunder Mountain Testing 3/24/23, 3:18 PM Gmail - FW: Voss Residence - Need site visit to review Structural Notes Gmail Scott Maxwell <thundermountaintestmg@gmail.com> FW: Voss Residence - Need site visit to review Structural Notes 1 message Rafael Medina <rafael@peak3aspen.com> To: Scott Maxwell <thundermountaintesting@gmail.com> Wed, Mar 22, 2023 at 1:03 PM Hi Scott, Here is the communication with the structural engineer in regards holdowns . Please let me know if you need anything else. Best Regards, Rafael. From: Nate Decker <nate@dbsd.com> Sent: Wednesday, March 22, 2023 10:07 AM To: Rafael Medina <rafael@peak3aspen.com> Cc: Tom Doogan <tom@peak3aspen.com>; Dustin Burner <dustin@dbsd.com> Subject: Re: Voss Residence - Need site visit to review Structural Notes Hey Rafael, That is acceptable. Thanks, 1)1) STRUCTURAL DESIGN Nate Decker, PE, SE Principal | Partner | Engineer P: (801)529-6481 E: Nate@dbsd.com https://mail.google.com/mail/u/0/?ik=c4fb891 ad7&view=pt&search=all&permthid=thread-f: 1761095748054701785&simpl=msg-f:1761095748054701785 1 /4 3/24/23, 3:18PM Gmail - FW: Voss Residence - Need site visit to review Structural Notes On Wed, Mar 22, 2023 at 10:53 AM Rafael Medina <rafael@peak3aspen.com> wrote: Hi Nate, Reference in field conditions: The drilling is %" in diameter by 12" deep with epoxy (Simpson Strong-Tie SET-XP), 5/8" diameter all threaded rod. Thanks. Best Regards, Rafael. From: Nate Decker <nate@dbsd.com> Sent: Monday, March 20, 2023 9:27 AM To: Tom Doogan <tom@peak3aspen.com> Cc: Dustin Burner <dustin@dbsd.com>; Rafael Medina <rafael@peak3aspen.com> Subject: Re: Voss Residence - Need site visit to review Structural Notes Hey Tom, See attached for our comments on these conditions. Let me know if you have any questions. Thanks, 1)11 STRUCTURAL DESIGN Nate Decker, PE, SE Principal | Partner | Engineer P: (801)529-6481 E: Nate@dbsd.com https://mail.google.com/mail/u/0/?ik=c4fb891ad7&view=pt&search=all&permthid=thread-f:1761095748054701785&simpl=msg-f:1761095748054701785 2/4 3/24/23, 3:18 PM Gmail - FW: Voss Residence - Need site visit to review Structural Notes On Tue, Mar 7, 2023 at 1:48 PM Tom Doogan <tom@peak3aspen.com> wrote: Hi Nate, Please see attached as built Structural Notes for the Voss Residence. Let us know when it is convenient for you to do a site visit. Need your expertise. © Thank you so much. Respectfully, TOM DOOGAN Project Manager CONSTRUCTION + DEVELOPMENT + ESTATE MANAGEMENT 970.379.9089 Attn : PeakS LTD 310 Market Street Basalt, CO 81621 www.peak3aspen.com tom@peak3aspen .com The contents of this email message and any attachments are confidential and directed to the intended recipient. If you have received this transmission in error, any use, reproduction or dissemination of this transmission is strictly prohibited and violators will be prosecuted to the fullest extent of the law. If you are not the intended recipient, please immediately notify the sender by reply email or phone and delete this message and its attachments, if any. From: Catherine Purvis <catherine@peak3aspen.com> Sent: Tuesday, March 7, 2023 12:38 PM https://mail.google.com/mail/u/0/?ik=c4fb891 ad7&view=pt&search=all&permthid=thread-f: 1761095748054701785&simpl=msg-f: 1761095748054701785 3/4 3/24/23, 3:18 PM Gmail - FW: Voss Residence - Need site visit to review Structural Notes To: Tom Doogan <tom@peak3aspen.com>; Rafael Medina <rafael@peak3aspen.com> Subject: Structural Notes CATHERINE PURVIS Marketing & Management Assistant CONSTRUCTION + DEVELOPMENT + ESTATE MANAGEMENT 432.528.8092 Attn : PeakS LTD 310 Market Street Basalt CO 81621 www.peak3aspen.com catherine@peak3aspen.com https://mail.google.com/mail/u/0/?ik=c4fb891 ad7&view=pt&search=all&permthid=thread-f: 1761095748054701785&simpl=msg-f: 1761095748054701785 4/4