Loading...
HomeMy WebLinkAboutEngineer LetterStructural conditions as-built As built 1 Main floor framing plan: • 1. Perimeter PT at ledger and top of foundation has being tripled to achieve floor height. 2 As built 2 Steel base plate, anchor: • 1.Column’s base plate was modified for installation. As built 3 Beam buckets: • 1. Dropped beam at crawlspace, buckets welded to columns on site. 3 As built 4 Roof framing. • 1. Roof members have been replaced for 9.25” ML • 2. Headers connected to columns have been added for support at living/kitchen & hallway • 3. (3) 9.5” ML headers have been installed to support trusses over east hallway (3) areas. 4 As built 5 Flat roof Wood I-joist •1. Ledger has been screwed to face of 2x6 wall to support I-joist framing for flat roofs. As built 6 Holdown Details •1. Holdown imbed anchor rod not in place, installed after concrete. 5 As built 7 Floor joist headers • 1. Floor headers have been installed for supports around openings. As built 8 Beam post • 1. The column are installed and beam exceeds width of column, plywood blocks have being installed between column and beam.