HomeMy WebLinkAboutEngineer's Framing Letter 04.18.2023DB Srnucrunru, Structural lnspection Report Aprit 18, 2023 - +)I-oo-q) ú, -o.l-+)(Joo-tn(- - rıI- +)U -l-)l-Ptrt Structural DB Structural Design Ltd. 1229 Sage Ct. Rifte, CO 81ó50 (8011s2e-6481 Project:Spire Ridge Aspen Glen Lot H8 To whom it may concern: This letter is to summarize the conditions identified on site that needed to be verified/ctarified by DB Structural Design: a The framing of the gabte end watl at the great room has been coordinated and is acceptabte as framed. Rafters are acceptabte over the office vs the prefab trusses that were originatty shown. It is acceptabte to use Simpson top ftange hangers around the perimeter foundation wal.ls vs what is shown on detail 5154.0. The roof overframing is acceptabte The ledger condition for truss support is acceptabte with (3)Timbertok screws into each stud The ledger at the dropped framing for the showers is acceptable. Shear watts Zip panels are acceptabte as shear watls in the garage and do not require additionat strapping At[ other shear walts not identified as "SW-Z" require 1/2" sheathing. Since Zip panets were atready instalted on the exterior, a layer of Vz" sheathing is required on the inside face of the watts. See the framing ptans and shear wa[[ schedute for nailing and strapping requirements. Any window openings greater than 7'-0" at the main [eve[ require a doubte sitl ptate, atl other window sill ptates are acceptabte as framed The office header needs to be a (3)5 yz" LVL, atl other headers are acceptable as framed. Ftoor joists that have been headered to accommodate ptumbing are acceptable. The crawtspace columns against the foundation watts are acceptable There were a few conditions where the stud was gapped between the footing and the stud, provide additional stud/shim as required to ensure futl bearing on footing a a a o o o a a a Sincerety, DB Structural Design Ltd. Nate Decker, PE, SE 04t18t2023 56450 (,rn ctr ¿¿J ,ÏAL Þ,0 0¿