May 17,2O22
Richard Harbus
201 Commons Park South
Stamford, Connecticut 06902
.com
Project No.22-7-21,0
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 86, Filing 7,
Elk Springs, 56 Gossamer Road, Garfield County, Colorado
Dear Richard:
As requested, Kumar & Associates, Inc. performed a subsoil study for design of foundations at
the subject site. The study was conducted in accordance with our agreement for geotechnical
engineering services to you dated March2,2022. The data obtained and our recommendations
based on the proposed construction and subsurface conditions encountered are presented in this
report.
Proposed Construction: The proposed residence will be a wood-frame structure with attached
garage located between the exploratory pits as shown on Figure 1. Ground floor could be slab-
on-grade or structural over crawlspace. Cut depths are expected to range between about 2 to
5 feet. Foundation loadings for this type of construction are assumed to be relatively light and
typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those described
above, we should be notified to re-evaluate the recommendations presented in this report.
Site Conditions: The subject site was vacant at the time of our field exploration. The ground
surface slopes down to the south at a grade of about 10 percent through the building site then
about25 percent further down to the southeast. Vegetation consists of sagebrush, grass and
weeds in the proposed building area with juniper on the steeper slope. Basalt cobbles and
boulders were visible at the surface of the building area.
Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating
three exploratory pits at the approximate locations shown on Figure 1. The logs of the pits are
presented on Figure 2. The subsoils encountered, below about I to IYz feet of topsoil, consist of
dense, basalt, gravel, cobbles and boulders in a highly calcareous sandy silt matrix down to the
maximum explored depth of 3 feet. Excavating in the dense cobbles and boulders was difhcult
",
and practical refusal was encountered in the deposit. Results of a gradation analysis perfbnned
on a sample of silty sandy gravel (minus 3-inch fraction) obtained from the site are presented on
Figure 3. No free water was observed in the pits at the time of excavation and the soils were
slightly moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread footings
placed on the undisturbed natural granular soil designed for an allowable soil bearing pressure of
2,500 psf for support of the proposed residence. The matrix soils could tend to compress after
wetting with expected minor post-construction foundation settlement. Footings should be a
minimum width of 16 inches for continuous walls and 2 feet for columns. Topsoil and loose
disturbed soils encountered at the foundation bearing level within the excavation should be
removed and the footing bearing level extended down to the undisturbed natural granular soils.
Difficult excavation conditions could be encountered at the site due to the cobbles and boulders
in the cemented matrix. Foundation excavations will probably require alarge excavator and/or
chipping equipment. Exterior footings should be provided with adequate cover above their
bearing elevations for frost Placement of footings at least 36 inches below the
exterior grade is typically used in this area. Continuous foundation
---
walls should be reinforced
top and bottom to span local anomalies such as by assuming an unsupported length of at least
12 feet. Foundation walls acting as retaining structures should be designed to resist a lateral
earth pressure based on an equivalent fluid unit weight of at least 50 pcf for the on-site soil as
backfill excluding organics and rock larger than 6 inches.
Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded
slab-on-grade construction. To reduce the eflbcts of some ditÏerential movement, floor slabs
should be separated from all bearing walls and columns with expansion joints which allow
unrestrained vertical movement. Floor slab control joints should be used to reduce damage due
to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be
established by the designer based on experience and the intended slab use. A minimum 4-inch
layer of relatively well graded sand and gravel such as matl base should be plaued beneath the
garage slab for support. 'l'his material should consist of minus Z-inch aggregate with less than
50% passing the No. 4 sieve and less thanZo/opassing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least95%o of maximum
standard Proctor density at a moisture content near optimum. Required fill can consist of the
on-site soils devoid of vegetation, topsoil and oversized rock.
Ku¡nar & As¡ocides" lne. @ Proiectilo. 2?.3-210
-J-
Underdrain System: Although free water was not encountered during our exploration, it has
been our experience in the area that local perched groundwater can develop during times of
heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched
condition. For slab-on-grade or shallow crawlspace construction where the finish floor grade is
at or above surrounding grade an underdrain system is not required. We recommend below-
grade constructiono such as retaining walls and deeper crawlspace areas, be protected from
wetting and hydrostatic pressure buildup by an underdrain system.
Where used, the drains should consist of drainpipe placed in the bottom of the wall backfill
surrounded above the invert level with free-draining granular material. The drain should be
placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and
sloped at a minimum l%oto a suitable gravity outlet or sump and pump. Free-draining granular
material used in the underdrain system should contain less than 2o/opassing the No. 200 sieve,
less than 50% passing the No. 4 sieve and have a maximum size of 2 inches. The drain gravel
backfill should be at least lYz feet deep and covered with filter fabric such as Mirafi l40N or
160N.
Surface Drainage: The following drainage precautions should be observed during construction
and maintained at all times after the residence has been completed:
l) Inundation ofthe foundation excavations and underslab areas should be avoided
during construction.
2) Exterior backfill should be adjusted to near optimum moisture and compacted to
at least 95%o of the maximum standard Proctor density in pavement and slab areas
and to at least 90%o of the maximum standard Proctor density in landscape areas.
Free-draining wall backfill should be covered with filter fabric and capped with
about2 feet of the on-site, hner graded soils to reduce surface water infiltration.
3) The ground surface surrounding the exterior of the building should be sloped to
drain away from the foundation in all directions. We recommend a minimum
slope of 6 inches in the first l0 feet in unpaved areas and a minimum slope of
3 inches in the first 10 feet in pavement and walkway areas. A swale may be
needed uphill to direct surface runoff around the residence.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Landscaping which requires regular heavy irrigation should be located at least
5 feet from the building.
Kumar & Associales, lnc. @ Froþct l{o' 22--Í-24ü
-4-
I"inimin¡: This study has bem mdr¡ded in aæordmæ wih gßnÊraily aooEÉsd gwtofti¡cal
Gnginffiiqg trifüplcs and þactiæ in lftis ilüa d -' :s time, l#e make no wmmty eifrer
qress or iryliolt The conclusirm md rmcnddirms s¡hiüsd in ti$ rEput acbasod
qmúe dúfuined from the @trdmypib excandod dtro locdions indicdodon Figue f
md to ftG dcptrs ehov,'n on Figrne I lhe pqoood type of mstruøion, d on qleriæ in
treaea Oussrris do not inctudedetemininglhep¡esenæ"pudimmpoesibillityofmold
ø otrerbiological onta¡ninants ([[OBC) dslrtilqlû4g in üG fure. IfftG rri€d is msnd
úoü trláOBC, "'- a professional in ltis ryGúl fidd ofpacfiæ should bo oons¡ltert Orn
findingn inctüdo ¡úcnpolation and æAolrim of fre sbo¡råæ oonditiw ifuified at úo
euqllordmypits d vmiations infre submrñoe ditims may notbome Gvidcrt until
excardim is performed. If conditirrrs enomusd ùriag msftudim rycr ditrrrrm frm
ftoæ desøibed in ftis rqnrt, we úmld be difrod at moo so rçer¿ah¡dim oflùe
rmaddionsmay be made.
fhis rcput has bm prepared forfre exch¡sir¿e re by un dient fu design prpm- üre ae not
rcryonsibl€ fitr tffiical interprffiirm by fu ofou infudim- l\s úe projoct ermlves, we
úould povi& offiinued consr¡lMm md frdd sr¿im dudng CIomffi¡dion to rsr¿iew md
mgriüm frc ftn[lematation of owrmr¡menddicrc" æd b \¿€riry thx üe rmendatirm
h¿ne b€Gn rypoerldety interprebd. signifrcaú d€sign drrqgcs may roqnire adûTimd m¿lyrús
ømodiñcdim to fte recommaddisrs pesøod hcrein V/c romd orsiþ oñeerndim
of excarødirrx md foundation bemiry ffi md t€Sing of Sr¡ch¡ral fill by a rqrestntaûive of
fre gsoteúnical engineer.
IfSrou harøe my questions or if rema¡rbe offfiq m¡mæ, ptease lct us know-
Rcryodilty Submiüe{
Kumar & Associates, Inc.
JmeslL Pusms, P
Revicuredb¡n
ffi**-
Støvonl- Pawlalq P.E.
IHPlIæ,
attnr:hmcrfn Figrne I - LocatiomrrfftriludmyPits
Figwe 2 - I-ogs of'E:Smdory Pits
Figue 3 - Gradati¡m Thd Remlts
Kumar & Associales, lnc, @ Project No. 22-T-210
s$,
s0
srl
e'
6"
t0
dr$
è f t oi)\. ¿{il ı¿r
/,
."rq,
'\deso- é ¿
10'x5-0' Util
Eosem
{,t {
30 0 0
APPROXIMATE SCALE-FEET
LOCATION OF EXPLORATORY PITS Fig. 122-7 -210 Kumar & Associates
I
PIT I
EL. 6939.5'
PIT 2
EL. 6931.5'
PIT 5
EL. 6934'
o
t-
l¡JulL
I-t-(L
tdô
I +4=52
-200=1 4
Ft¡JIJ
LL
ITt-fL
LIô
5 5
LEOEND
TOPSOIL; SANDY GRAVELLY SILT, ROOTS AND ORGANICS FIRM, SLIGHTLY MOIST, TAN, WITH
SCAÏÏERED BASALT COBBLES.
GRAVEL
SILT MA
(CU); g¡s¡Lr GRAVEL, COBBLES AND BOULDERS lN A HIGHLY CALCAREoUS SANDY
TRIX, DENSE, SLIGHTLY MOIST, TAN.
I
I
I
I
DISTURBED BULK SAMPLE
PRACTICAL DIGGING REFUSAL.
NOTES
1. THE EXPLORATORY PITS WERE EXCAVATED WITH A BACKHOE ON MAY 6, 2022.
2. THE LOCATIONS OF THE EXPLORATORY PITS WERE MEASURED APPROXIMATELY BY PACING FROM
FEATURES SHOWN ON THE SITE PLAN PROVIDED.
3. THE ELEVATIONS OF THE EXPLORATORY PITS WERE OBTAINED BY INTERPOLATION BETWEEN
CONTOURS ON THE SITE PLAN PROVIDED.
4. THE EXPLORATORY PIT LOCATIONS AND ELEVATIONS SHOULD BE CONSIDERED ACCURATE ONLY
TO THE DEGREE IMPLIED BY THE METHOD USED.
5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE
APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL.
6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF EXCAVATION. PITS WERE
BACKFILLED SUBSEQUENT TO SAMPLING.
7. LABORATORY TEST RESULTS:+4 = PERCENTAGE RETAINED ON NO. 4 SIEVE (¡STV O ¿ZZ);
-2OO= PERCENTAGE PASSING NO. 200 SIEVE (ASTM D 1140).
22-7-210 Kumar & Associates LOGS OF EXPLORATORY PITS Fis. 2
HYDROMETER ANALYSIS SIEVE ANALYSIS
U.S, STÑDARD SERIES CLEAN SOUARE OPENINGS
at^. t/^n t tttartt{at
TIf,E READINOS
aôltN teMtx ¿vtNt4 HRS 7 HnSa¡ ltN l¡ vt¡
T
100
90
ao
70
a0
50
40
30
20
fo
o
o
lo
20
30
&
30
60
70
ao
to
ro0
=
OIAMETER OF IN RS
CLAY TO SILT COBBLES
GRAVEL 52 X SAND 31
'6
LIQUID TIMIT PLASTICITY INDEX
SAMPLE OF: Highly Colcor€ous Silþ Sondy Grovel
SILT AND CLAY 11 i4
FROM: Pít3O2.5'-3'
thc¡c lc¡l rGsull! opply only lo lh.
.omplc¡ rhlch v.r. lc¡lcd. Tha
lrsllng rcporl lholl nol b. rcproduccd,.xc.pf ln full, vllhoul lh. wrlfl.ñ
opprovol of Kumor & Arrociol.r, lnc.
Sl.v. onolysb l.lllñg l! p.rfom.d ¡n
occordqnc. ulth ASTY 069f3, ASTII D7928,
ASTM C136 ond/or ASTM Dll,l0.
GRAVELSAND
FINE MEDIUM ICOARSE FINE COARSE
22-7-210 Kumar & Associates GRADATION TEST RESULTS Fig.3