Loading...
HomeMy WebLinkAboutFinal Installation Observations 04.21.20232789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com April 21, 2023 Project#02434-0001 Mr. Travis Ruonavaara 1337 E 8th Street Rifle, Colorado 81650 Subject: OWTS Installation Inspection Parcel 212728100382 Garfield County, Colorado Reference: OWTS Design, Parcel 212728100382, Garfield County, Colorado by Huddleston- Berry Engineering & Testing, LLC for Travis Ruonavaara, March 31, 2022. Dear Mr. Ruonavaara, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at Parcel 212728100382 in Garfield County, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering Cc: Garfield County Building Department 04/21/23 ATTACHMENTS NEW HOME WATER LINE REPAIR AREA 1,500 GALLON TANK STA CISTERN PARCEL 212728100382 AS-BUILT SITE PLAN Project # 02434-0001 Date: 04/21/23 By: WDA N Scale: 1" = 50' 2789 Riverside Parkway Grand Junction, CO 81501