Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-04-23-8048 Scott & Heidi Young New SlF Dwelling w/ attached garage 982 CR 245, S¡lt Greene Subdivision Exemptio n, LoT 2 1) ALL WORK SHALL COMpLY W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE (l.R.C.) AND 2009 TNTERNATTONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACH ED "GARFI ELD COU NTY BU I LDI NG REOU I REM ENTS". N U M BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND IN ACCORDANCE WITH SUBDIVISION EXEMPTION RECORDED PLAT NOTE #3. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR MORE INFORMATION. s) opEN-HoLE SOTLS REPORT MUST BE PREPARED BY THE GEOTECHNTCAL ENGINEER OF RECORD. 2,500 PSF SOIL BEARING CAPACITY. GEOTECHNICAL ENGINEER MUST BE ON PREMISES THROUGHOUT DRIVEN PILE INSTALLATION AND PROVIDE PILE INSTALLATION REPORT FOR BUILDING FILE RECORDS. COMPACTION REPORT IS REOUIRED FOR ANY COMPACTED STRUCTURAL FILL (SEE SLABS). ¿) pRE-ENctNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR TNSPECTOR AT TIME OF FRAME INSPECTION. 7) HtcH STRENGTH BOLTTNG AND FTELD WELDTNG REOUIRES SPECTAL TNSPECTOR. lT SHALL BE AT GARFIELD COUNTY BUILDING INSPECTOR'S DISCRETION, BASED ON OBSERVED INSTALLATIONS AND SITE CONDITIONS .- TO REOUIRE SUCH SPECIAL REPORT AT FRAMING INSPECTION. 8) SEPTIC SYSTEM REVIEW / APPROVAL: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OCCUPANCY PROVIDE FINAL APPROVAL / SIGN -OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPT.