Loading...
HomeMy WebLinkAboutEngineers Framing Letter 11.03.2021Studio M Eneineers, LLC Structural Engineering Consultants Conæp/æce an?/Qæ9, L Fra-zryhì/a- Innov ation By P er ceptíon www.m bengineerin g. elementfx.com studiom.engineer@gmail.com November 3,202I Re: 14 River View Place, Parachute CO To Whom it May Concern: We were asked by our client, Mr. Reymundo Ruiz, to inspect the framing at the residence located at the address above. It was our understanding that the building department had initially tried to inspect the framing, but noted so many variations from the original plan set issued by our office (dated July 3, 2020) that they requested that our office come inspect. We inspected the framing on July 7, 202I and develop ed a 26 item punch list that ranged from minor discrepancies to major construction issues. We re-inspected the project based on the 2"d request by Mr. Ruiz on September L6,2021and systematically walked through the itern by item list developed in July. During the walkthrough we discovered that the list was not completely remediated and that outstanding framing issues still existed. A 3'd walkthrough occurred on October 21". The same 26 itempunch list was carefully examined. Of the 26 item list, 4 were noted as being outstanding. They were: 1. The TBE connector clips referenced on note 4, sheet S4.0 were not installed at the tirne my last inspection. Mr. Ruiz emailed me photos of the installed clips on Nov 2,2021. The issue is considered as resolved as of the writing of this letter. 2. Truss type T3 had a darnaged web that was repaired via plywood gusset installed on both North and South faces of the truss. The contractor coordinated with the truss manufàcturer (Teny from Overholt) to identiff the installed f,tx was acceptable. The documentation from Overholt was reviewed this morning by my office. The issue is considered as resolved as of the writÍng of this letter. 3. Exterior Porch Roof Column Support (South) need replaced with the right mernber. This condition is still outstanding. 4. Exterior Porch Roof Support (North) needs to be added. This condition is still outstanding. Items 3 and 4 were noted as being exterior conditions. In light of this the owner asked if he coulcl proceed with insulation on the building interior. From our perspective, this is acceptable, but default the final decision to the governing building department. a rÍ East 3td St. #zo2 a Rifle Colorado o 8t650 .970-366-869o . Witlr the exception of items 3 and 4 above, we are excited to announce that the building interior framing is in cornpliance with the plan set and clarifications issued by our office for construction (July 3,2020). Limitations: The framing inspections made by Studio M Engineers do not make Studio M Engineers, LLC responsible for warranting, directing, or superintending the contractor's work, means or methods of work, safety in, on or near the work site, timeliness in performarrce of the work, nor ariy other aspect of conshuction f'or which the contractor has responsibility. Similarly, unless specifically stated otherwise, the inspections and this letter do not relieve the contractor of his responsibilities for performing the work in accordance with the proiect plans and specifications issued by our office. The inspections were performed from reasonable and readily accessible points of vantage and did not include the removal or partial dernolition of construction systems or components to gain better access. If framing defîciencies are discovered as the job progresses, we reserve the right to modiff or change our conclusions. Respectfully, W¿%,.Ft Michael J. Baca O rfl East 3rdst.#2O2 a Rífle Colorado t 8t65o .97o-366-869o .