HomeMy WebLinkAboutFoundation proposal and scope of workPage 1 of 13
ESTIMATE
Prepared For
Eri nn Tozer
47 White Peaks Lane
Gl enwood Springs, CO 81601
(858) 442-6674
Aspen Foundation Repairs LLC
732 Buc khorn Drive, Unit B
Rifle, Colorado 81650
Phone: (970) 235-0092
Email: info@aspenfoundationrepairs.com
Web: www.aspenfoundationrepairs.com
Estimate #1081
Date 04/04/2023
Business / Tax #84-4655006
Descripti on Rate Quanti ty Total
Foundation stabilization on hydraul ic pushed piers $101,200.00
Hydraulic pushed piers on foundation x 46 $2,200.00 46 $101,200.00
- Excavation
- Installation of steel chair under footing anchored with a concrete bolt to foundation
- 3" driven piers down to refusal or rock bed.
- Lifting of foundation to the original level and stabilization.
- Backfill with existing ground
N.B. Exceeding 30' deep a charge of $30 per linear foot of pipes will apply.
Subtotal $101,200.00
Total $101,200.00
Payment Schedul e
Deposit (30%)$30,360.00
2nd Payment (30%)$30,360.00
3rd Payment (30%)$30,360.00
Final Payment (10%)$10,120.00
Page 2 of 13
Notes:
N.B.
- A first contrac t was es tablis hed prior to this one includi ng frenc h drai n and waterproofing.
The cli ent asked to remove the french drai n installation.
Aspen foundation repairs wi ll not be responsibl e for any di sruptions caused by water i nfil trati on
or soi l movement outsi de our scope
of work.
- Permits and engi neering not i ncluded , we can provide engi neering and permit ( between
$2,500 and $4,000 )
- Redo lands caping is not i ncluded
Quotes are valid for 30 days
Page 3 of 13
Page 4 of 13
Page 5 of 13
Page 6 of 13
Page 7 of 13
Page 8 of 13
Page 9 of 13
Proposal
This proposal is valid for a peri od of 30 days
Payment Terms
30% at the signature
30% firs t-day work
30 % Mid work
10% at completi on
All addi ti onal work agreed by both party and compl eted is to be paid at the time of service.
General Clause
1.Work description
The work described on contract i nclude and exclude the foll owing:
a) i nclude: - backfil l with the excavated material
- leveli ng of the ground fol lowing the backfil l
- cl ean up of work area at the end of each work
day ( unless heavy rai n )
- Underground util ity identificati on call at 811
b) exclude - removal of contaminated materi al or others as,
oversize roc ks, concrete and underground
structures
- landscaping damaged by work
- Spri nkler systems damaged by work
- Private underground facil ity l ocator fees
- Removal of exc ess material after backfill
c) unidentified underground facili ti es
- The owner is responsible to have any underground
fac ili ties that are not Identified by 811 to be identified
by a pri vate loc ator at hi s own expense.
- Aspen Foundation Repairs LLC acc ept no responsibi lity
on any damage on any unidentified fac ili ties or any
direct damage to the house or equipments related to
the damage done to any utili ti es not pri orl y i dentified.
2.Plans and estimate
All the pl ans, esti mates, work des cription or extras, si gned by the cl ient and a representative of
Page 10 of 13
Aspen Foundati on Repairs LLC will be an integral part of this contract.
The cli ent mus t provide an engineering plan and assume the cos t when necessary unless it i s
part of the contract for Aspen Foundation Repai rs to provide the pl an.
3.Permits and licenses
The cli ent has the responsibili ty to make sure that the work to be done in the work description i s
in conformity to the munici pal law, county, and state, and to obtain, if needed, the authori zation
of the munici pali ty or any other c ompetent authori ty unless it is part of the contract for As pen
Foundati on Repairs to provi de the permit.
4.Buil ding site facilities
The cli ent mus t provide at all ti mes access to the site, access to water and electrici ty for the
duration of the work.
5.Codes and regulations
The contractor wi ll perform the work in a reasonable way according to the codes and regulati ons
in force.
6.Material substitution
In the event that some materi al to be us ed in the execution of the work should not be avai lable
in the scheduled time or in satisfactory condition, the contractor may substitute with a material
of same quality and val ue with 48 hours noti ce.
The cli ent will have the choi ce to approve or not.
In that case, the client accepts ahead of ti me, on one hand, al l delay i n the delivery of the work
without right or rec ours e against the contractor and on the other hand, ac cept all cos t increase
of the material concerned by the non-substitution.
7.Insurance
The contractor has adequate public li ability i nsuranc e.
8.Fi re insuranc e
The cli ent has the responsibili ty to have the contractor name added to thei r fire i nsurance pol icy
in order that any l oss to the contractor in the event of a fire, be payable with appl icable interest.
9.Work modific ations
The cli ent will be abl e to ask for modifications to the present des cription of the work l isted,
under the condition that a written agreement oc curs between both parties concerning the c ost
and details associated with those modificati ons.
Page 11 of 13
10.Worksite maintenanc e
The contractor wi ll keep reasonabl y c lean the work si te during the work period. At the end of the
work period, the contractor wi ll remove al l c onstruction material and cl ean the work area
excl uding the ‘1b’ cl ause.
11. Public ity
The cli ent authorizes As pen Foundation Repairs LLC to instal l publi city posters on their property.
12.Delay i n the execution of work
In the execution of his work, the contrac tor wil l not be made responsible for del ays c aused by
the client or caused beyond control . In the i nterpretation of the c ontract (cause beyond control)
inc ludes all cli mati c c ondi ti ons (rain and others) and the impossi bili ty to hire quali fied
manpower at a reasonable cost.
13.Contractor default
The cli ent will be abl e to resign the contractor should the contractor refuse or neglect to respect
any of the contract cl auses after the expiration of a written warning giving the contrac tor 7 days
to conform to the present conditi on of the contrac t. The c lient wi ll al so be able to claim to the
contrac tor the overpaid amount of paid fees exceeding the value of the work done by the
contrac tor, all without prej udice or recourse.
In the event that the cl ient c ancels the contract without serious reason, the contractor will have
the ri ght to 20% of the value of the total c ontract on top of the value of the work already done
and the materi al at the time of the canc el lation.
14.Cli ent default
The contractor could canc el the c ontract if the client refuses or neglects to apply any clauses in
their responsibili ty according to thi s present contract, 7 days after a written warning to conform
to the present contract.
The contractor wi ll be able to keep all the given payments already rec ei ved from the c lient as
compensation without damage or any other recourse.
The contractor could as well put the work on hold in case of the cli ent default after informing
him of the work cessati on. The cli ent will then have the responsi bility of the work and worksite
and will take c harge of all ri sk and l osses.
15.Unforeseen work
The cli ent will assume the extra c ost caused by unfores een work not mentioned i n the present
contrac t, that has bec ome necessary, as long as the work, the cos t and additional time been
approved ahead of time by the client.
Page 12 of 13
16.Work and encroachment
In the eventuality that the work should take place i n part on the property line of the neighbor, the
client will obtain written permiss ion from the owner of the land before the beginning date of the
work schedul e.
In that case, the damages that could resul t in the neighbor’s bui ldings wil l be on charge of the
client at the exception of the contractor negligence.
17.Transfer of cl ai m
The cli ent yi el d and transport to Aspen Foundati on Repairs LLC all loans, subventions or other
financings, obtai ned for the work accomplished for this contract, for pavement in part or i n ful l
of the c ost of the contrac t as well as all extras attached to the c ontract.
The presentation of the c ontract to the company moneylender will consis t of val uable transport
in favor of Aspen Foundation Repairs LLC.
18.Delay of payment
The cli ent consent to pay to Aspen Foundation Repai rs LLC a 15 % addi tional if the remaining
amount is not paid at the same day of the delivery of the work plus an addi tional monthl y
interest of two percent (2%), on the annual rate of twenty-four perc ent (24%), of unpai d bill s.
The cli ent consent to pay to Aspen Foundation Repai rs LLC all the legal fees and expenses for the
recovery of unpai d bills.
19.Conflict resolution
In the event of c onfli ct or disagreement between the two party ’s, client and c ontractor, the cl ient
agrees to choose the way of conflict resolution only through a mediator that i s approved by both
party ’s, the client and contractor.
The cli ent refuses their rights to bring to court As pen Foundation Repairs LLC or any of its
representatives or to us e any other means than a mediator.
20.Responsibility
The contractor can not be held responsi ble for damages caused throughout hi s di ligent work
execution, notably but wi thout restric ti ng of all damages c aused to landsc aping, trees, fences,
asphalt, patio, balc ony, slabs or exterior structures or the bui lding.
The contractor can not be held responsi ble for the damages caus ed to the building or personal
goods of the c lient at the exception of negligenc e from the contrac tor i n the execution of his
work.
The cli ent has the obl igation to allow access to the worksite and to remove all objects that they
want to protect, inc luding all exterior structures includi ng exterior sheds.
Page 13 of 13
21.Warranty
Aspen Foundati on Repairs LLC offers a five (5) year warranty on water infiltration on the treated
area of the buil ding.
Aspen Foundati on Repairs LLC will fix any water infiltration oc curring in the previ ously treated
zone without any fees for the cl ient i f maintenance is nec es sary.
Although we certify the quality of our work, we c an not give an overall warranty on the state of
the entire building. In the event of water i nfil trati on, the c lient wi ll take all the necessary
precaution to protect his personal bel ongings and without delay inform Aspen Foundation
Repairs LLC.
Aspen Foundati on Repairs LLC does not acc ept responsibility of water infiltration c aused by a
natural dis as ter suc h as earthquake, tornado or flood from streams, lakes and other that
overflow.
The warranty on waterproofing can not be applied to damages caused by a struc tural movement
of the buil ding, or by water infiltration comi ng through the concrete s lab from hydrostatic
pressure or other.
Aspen Foundati on Repairs LLC offers a warranty on hi s structural work accomplis hed for the
client for a period of five (5) years foll owi ng contract completion.
In the event that As pen Foundation Repairs LLC woul d have to execute test and expertis e
following a warranty call and that i t turns out that our work was not defic ient, the reasonable
expertis e fees will be at the cl ient c harges.
Si gned on: 04/04/2023
Erinn Tozer