Loading...
HomeMy WebLinkAboutObservation of Excavation 06.07.2023CTL I THOMPSON -- - = =- __ June 7, 2021 Stewart Custom Builders P.O. Box 1358 Carbondale, CO 81623 Attention: Peter Stewart Subject: Footing Subgrade Observation 278 Ronce Lane Garfield County, Colorado Project No. GS06528.001 F-305 We visited 278 Ronce Lane in Garfield County on June 2, 2021. The purpose of our site visit was to observe the footing subgrade soils in the foundation excava- tion for the building. Photographs from our site visit are attached. CTL I Thompson, Inc. performed a geotechnical engineering investigation for the project (Project No. GS06528.000-120; report dated January 21, 2021). Our re- port recommended a footing foundation for the building that is supported by the un- disturbed, silty gravel and cobble soil or densely -compacted, granular structural fill. Our representative observed the natural gravel and cobbles exposed at foundation elevation during multiple site visits on May 25 and 27 and June 2, 2021. Based on our field data, as well as observations during our site visits, we judge the natural gravel and cobbles are suitable for support of footings designed for a maximum allowable bearing pressure of 4,000 psf. We are available to discuss the contents of this letter. If you have questions or need additional information, please call. CTL I THOMPSON, INC E T Ryan R. Barbone, E.I.T. Project Engineer J me D. Kellogg—E. E. D Ision Manager JDK:abr 234 Center Drive I Glenwood Springs, Colorado 81601 Telephone: 970-945-2809 Fax: 970-945-7411 10.6 ..CrRj�c Vim' �.3fii17 _ _ tea_ Looking west over west portion of excavation Looking east over east portion of excavation STEWART CUSTOM BUILDERS 278 RONCE LANE Fig. 1 PROJECT NO. GS06528.001F-305