Loading...
HomeMy WebLinkAbout1.14 Pre-Application Conference Summary Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 945-8212 www.garfield-county.com PRE-APPLICATION CONFERENCE SUMMARY TAX PARCEL NUMBER: 2185-354-23-007 DATE: 1/12/22 APPLICANT: Multi-Family Dwelling CURRENT OWNER: Blue Heron Properties LLC CONTACTS: Cal Kendrick, Wes Cole REPRESENTATIVES: David Mylar (Attorney), Richard Dooley (Builder/Contractor) PRACTICAL LOCATION: Located at 1007 Westbank Rd., on a portion of the Iron Bridge Golf Course, within the Westbank Subdivision south of Glenwood Springs off of County Road 109. TYPE OF APPLICATION: Limited Impact Review – Multi-family Dwelling ZONING: Residential Suburban Density I. GENERAL PROJECT DESCRIPTION The Property Owner is proposing conversion of a portion of the existing office/maintenance structure into residential apartments for housing of employees. The second floor of the 5,000 sq.ft. structure would be remodeled into 4 apartments while the lower level would continue to be utilized for golf course storage and maintenance functions. The facility is located on the 93.86-acre golf course property and is access off of Westbank Rd. The site is currently improved with access driveways and off-street parking. Based on Assessor’s Office records the facility was built in approximately 1965 prior to zoning within the County and apparently was the club house for the golf course which operated on the property. Golf course operations have since been incorporated into the larger Iron Bridge Golf Course. The facility is served by central water (Westbank Water System) and an OWTS. Confirmation of taps or will serve letters for water and also confirmation of the capacity of the OWTS to serve the proposed change in use will be required. The pre-application meeting included extensive input from the County Building Department on building code requirements including occupancy separation and life safety considerations. The need for a licensed architect to prepare the plans and a licensed structural engineer to review structural issues was noted. The Applicant should continue to reach out to the Building Department for any follow-up questions and the Building Department will be a referral agency for the Land Use Permit Application. II. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS • Garfield County Comprehensive Plan 2030 as amended. • Garfield County Land Use and Development Code as amended. • Residential Suburban Zone District - Use Table (Table 3-403). • Residential Suburban Zone District - Lot/Building Requirements (Table 3-201) • Review Process (Section 4-104) and Procedures (Section 4-101). • Table 4-102 Common Review Procedures and Required Notice. • Application Materials (Table 4-201 and Section 4-203). • Waivers, Section 4-118 (Standards) and Section 4-202 (Submittal Requirements). • Article 7, Standards – Division 1, 2 & 3 as applicable. • Article 15, Definitions – Multi-Family Dwelling III. REVIEW PROCESS The Application will follow the Limited Impact Review Process contained in Sections 4-101 and 4-104 and in Table 4-102 (see attached flow chart): • Pre-application Conference • Submittal of Application (3 hard copies plus one digital PDF copy on CD or USB Stick) • Determination of Completeness, if Technically Complete the Applicant will be notified and the request scheduled for a public hearing before the Board of County Commissioners. If it is not technically complete the Applicant will be advised of the deficiencies and has 60 days to complete the application. • Once determined to be complete, the Application is sent out to referral agencies. • A public hearing before the Board of County Commissioners is scheduled. • Four additional hardcopies of the Application are provided for the Board of County Commissioners review. • Applicant completes public notice for the public hearing (mailing, posting, and publication) a minimum of 30 days prior to the hearing. • Staff prepares a report including public and referral comments • Review and Action by the Board of County Commissioners at the public hearing. • The Board of County Commissioners action is formalized by a resolution. • If approved with conditions the Applicant must meet the conditions prior to issuance of the Land Use Change Permit. • The Applicant has one year to meet all conditions of approval. IV. SUBMITTAL REQUIREMENTS Application submittal requirements are detailed in Table 4-201, and Section 4-203, Description of Submittal Requirements. Please use the summary provided below as a supplemental check list.  General Application Materials (application forms, agreement to pay form, Statement of Authority for Trusts, corporations or LLC’s, authorization to represent, and payment of fees).  Evidence of ownership such as a deed for the property and title work.  Narrative description of the proposal.  List of property owners within 200 feet and any mineral rights owners on the property. A statement on how mineral owners were researched is required.  Vicinity Map (including the area generally within 3 miles of the site).  Site plan with information on proposed use including, existing structures, parking, access roads/driveways, topography & significant site features, easements, utilities, ditches, water lines, existing and proposed wastewater treatment systems (OWTS). The site plan may be limited to the area immediately adjacent to the proposed use and waivers may be requested based on the based the proposal to remodel an existing building.  Grading and drainage plans. Existing conditions/improvements need to be documented along with any proposed modifications associated with the change in use.  Landscaping Plan, existing and proposed.  Impact Analysis. This section includes information existing uses, surrounding uses and potential impacts of the proposal many of which may be addressed by reference to the existing improvements/condition of the property. A waiver regarding sections on environmental impacts or wildlife may be requested with supporting justification. Please contact the staff planner for additional information on potential waiver requests.  Legal access, physical access, and compliance with Roadway Standards Table 7 -107. Demonstration of adequacy of the roadway and compliance with Roadway standards must be submitted.  Traffic Study: A waiver from a full traffic study may be requested, however basic traffic generation information will need to be provided to support the waiver request. Please contact the staff planner for additional information on potential waiver requests.  Water Supply Plan and supporting documentation including the status of any additional tap fees and/or will serve letters for the proposed change in use.  The submittals should address any additional fire protection demands and water requirements should sprinklers be required for the proposed use.  Wastewater treatment plans and supporting documentation. Needs to include information on the adequacy of the existing OWTS or plans for a new/expanded system.  Information to address applicable sections of Article 7, Divisions 1, 2, and 3, needs to be provided. Application formatting that addresses each section of Article 7 are recommended.  Significant Article 7 Standards for this project are anticipated to include: zoning compliance, comprehensive plan compliance, compatibility, drainage, fire protection (including potential fire suppression sprinkler requirements), lighting, access, water and sanitation and parking (demonstration of compliance with the standards in Table 7- 302.A. needs to be provided) The Application submittal needs to include 3 hard copies of the entire Application and 1 Digital PDF Copy on a CD or USB Stick. Both the paper and digital copies should be split into individual sections. Please refer to the pre-application summary for submittal requirements that are appropriate for your application. Any request for a waiver from standards shall be processed pursuant to Section 4-118 of the Land Use and Development Code. Submittal waiver requests should be consistent with the Pre-Application summary, and Section 4-202. Follow-up meetings with Planning Staff on potential waiver requests is recommended. V. APPLICATION REVIEW a. Review by: Staff for completeness recommendation and referral agencies for additional technical review b. Public Hearing: ___ Director’s Decision (with notice – not a public hearing) ___ Planning Commission _X_ Board of County Commissioners ___ Board of Adjustment c. Referral Agencies: May include but are not limited to County Attorney, County Building Department, Fire Protection District, County Road & Bridge, Division of Water Resources or Water Service Provider, County Vegetation Manager, County Environmental Health, and County Consulting Engineer. VI. APPLICATION REVIEW FEES a. Planning Review Fees: $ 400 b. Referral Agency Fees: $ TBD – consulting engineer/civil engineer fees c. Total Deposit: $ 400 (additional hours are billed at $40.50 /hour) VII. GENERAL APPLICATION PROCESSING The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. This summary does not create a legal or vested right. The summary is valid for a six-month period, after which an update should be requested. The Applicant is advised that the Application submittal once accepted by the County becomes public information and will be available (including electronically) for review by the public. Proprietary information can be redacted from documents prior to submittal. Pre-application Summary Prepared by: ____________________________________________ _2/16/22__ Glenn Hartmann Date Principal Planner