f{eport #1
Fage I of 1
Inspection Re port
Dates: 3-14-22, 3-16-22, and 3-21-22
Project: Pestotnik Residence Lot 20 Ranch @ coulter c¡eek
Address: 133 Saddle Cir. Carbondale, CO
Building Permit No: BLRE -Ag-Zt-7A97
General Confractor: Dave Cardiff Const.
Contractor that Perforrned Wonåc: Sopris Steel
Ins n of sho fabrication 0r fieÍd wonh at ob site: Sho
Report: V y inspected complete joint penetration shop welding in process
at the apex of the bent beams pi ece marked 98l, 1081, and 1181. Above
inspections included verification of welderr qualifications/w.p.s., use of proper
welding electrodes/materials, inspection of the joint preparation, root pass welds,
random observations of the intermediate weld pass layers, and a finalinspection of
the completed welds.
The shop welding inspected above appeared to be in substantial confonnance
with the shop plans & the quality requirements of the AWS Dl.1 Structural
Welding Code.
Inspector/Technician ; Douglas E young
! Sr'e,.:i ,3¡$oåtíng S llaspeaÉon
l'rpray-apruüierf f;ire¡iroal{illg åarspecfoa.
n
åy;'$s?*,',r,
?æs7ü7-4//b