Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-O6-23-8163 Martin Ranch ll LLC 2,255 SO FT SECONDARY DWELLING UNIT ON CRAWL SPACE 3602 CR 1OB CARBONDALE MARTIN EXEMPTION, LOT 2, 239536400152 MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.) AND Att FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 1 ) FOUNDATTON CRAWL SPACE & EXTERTOR DOOR LANDTNG / STATRS SHALL COMPLY WITH 201s l.R.c., 2OO9 I.E.C.C. AND MANUFACTURER'S INSTALLATION REOUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND MANUFACTURER'S INSTALLATION REOUI REM ENTS. 3) WILDFIRE MITIGATION IS REAUIRED PURSUANT TO PLAT NOTE #ó (ATTACHED FOR REFERENCE): COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FORËST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COM M UNITY DEVELOPM ENT WEBSITE FOR ADDITIONAL I NFORMATION. 4) ALL PLUMBING & GAS PIPING CONNECTIONS MUST BE PERFORMED BY A CO LICENSED PLUMBER & ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A CO LICENSED ELECTRICIAN. 5) ELECTRTCAL PERMtTTtNG AND TNSPECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. ó) pRtoR To FTNAL BUtLDtNG TNSPECTTON & CERTIFTCATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM. 7) A LOT IMPROVEMENT CERTTFTCATE SEALED BYA COLORADO LTCENSED SURVEYOR lS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS & OTHER PROJECTIONS _ COMPLIES WITH MINIMUM SETBACK OR BUILDING ENVELOPE REOMTS. 8) BUtLDING PERMtTAPPLTCATTON HAS BEEN PROCESSED CONCURRENT WITH AN ADMINISTRATIVE APPROVAL GAPA-05.23-89ó5 FOR CONSIDERATION OF A SECONDARY DWELLING UNIT. SEE ATTACHED DIRECTOR DECISION LÊTTER. WATER PUMP AND OUALIry TEST RESULTS TO BE COMPLETED AND REPORT PLACED IN COMMUNITY DEVELOPMENT FILE GAPA-05.23-89ó5 PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 9) cARFtELD COUNTy BUTLDTNG DEPT. TNSPECTIONS TO TNCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 2,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPTH & UFERGROUND INSTALLED, OPEN HOLE SOILS REPORT PREPARED BY THE GEOTECHNICAL ENGINEER IS REQUIRED AT FIRST FOOTING INSPECTION. OWNER BUILDER IS RESPONSIBLE TO NOTIFY THEIR PROFESSIONAL GEOTECHNICAL ENGINEER (KUMAR & ASSOCIATES)ONCE EXCAVATION OF THE ACTUAL FOUNDATION AREA IS COMPLETED _ GEOTECH SHALL REVISITTHE JOB SITE TO OBSERVE AND VERIFY ACTUAL SOIL CONDITIONS TO PREPARE THE "OPEN HOLE REPORT" FOR THE OWNER - PROVIDE WRITTEN 'OPEN HOLE SOILS REPORT'TO THE GARFIELD COUNTY BUILDING INSPECTOR AT FOOTING INSPECTION. B. FOUNDATION WALL INSPECTION C. SEPTIC SYSTEM CONNECTION D. PLUMBING/GAS E. IF ANY SITE FRAMING, STAIRS, GUARDS OR HANDRAILS. F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* *NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY