Loading...
HomeMy WebLinkAboutObservation of Excavation 08.19.2022Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) In Place Wet Density (pcf) Probe Depth (in) Percent Compaction Min Comp. (%) Optimum Moisture Tolerance (%)Remark 1 08/19/22 203-22 B (D698)CL-ML 12.2 118.4 12.6 117.2 132.0 10 99 98 0 / 3 DP/MP Test Information Test #Test Location Elevation Reference Gauge Make / Model / SN / Calibrated Field Technician 1 Structural Fill: Footing Backfill: South Corner Footing Grade Troxler / 3430 / 35438 / 05/21/2020 Philip Orgill Remarks DP/MP: Density Pass / Moisture Pass Comments Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. 1: The contractor has placed about 2' of under footing backfill in the southern corner of the Lot. Compaction was judged to be adequate based on our test results. This report presents opinions formed as a result of our observations of soil compaction. We have relied on the contractor to continue applying the recommended compactive effort and moisture to the fill during times when our observer is not observing operations. Tests are made of the soils only as believed necessary to calibrate our observer¶s judgement. Test data are not sole basis for opinions on whether the soils meets specifications. These test results only apply to the samples which were tested. The testing report shall not only be reproduced, except in full, without the written approval of Kumar and Associates, Inc. Nuclear gauge density testing performed in accordance with ASTM D6938. Page 1 of 1 Soil Compaction Report Test Method: ASTM D 6938 Client: SCIB, LLC Aspen, CO 81611 0115 Boomerang Road, Suite 5201B Project: Lot 279, Ironbridge 21-7-591.A Glenwood Springs, CO 81601 Blue Heron Vista 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Glenwood Springs