HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Rç{_qhffifd Springs, cO 81601
pTare4s-82L2
ii åi',j ¡ WWW¡Farfield-countv.com
ulti-Demolition
Manufactured Home (Single or Multi-Level)
T ReSidential (SF, DUpleX Or TOWnhOme) residential addition of a sun ffi, dæk snd bath@m Reroof
Accessory Dwelling Unit {ADU) - MAXIMUM SIZE OF L000 SQUARE FEET
G
ffVOLVEDPARTIES
Property owner: Lily Daniali & Benson Pulikkottil phone: (72O I 788-29A4
Mailing Address:166 S Wilwaukee St, Denver Co. BO21O
Email Addresr, ldaniali@gmail'com
€ontrac,tor: Stirling Management Aspen, Travis Bourgeois phone:970 456-2400
Maílíng Address: 210 AABC Unit J, Aspen Co 81611
Emait Addres*. travis@stirlingaspen.com
Architecr Engineering Studio Denver Phone:720 612-7553
Mailing Address:1801 Wewatta St Floor 11 Denver Co 80202
Emait Addres.. adm in@esdenver.com
Engineer: Engineering Studio Denver, Dustin Randle phone:720 612-7553
Mailing Address: Engineering Studio Denver, Dustin Randle
Emait Addresr. dustin@esdenver.com
Manufactured Home lnstaller: ftiâ Phone: { )
MailingAddress:
Emaif Address:
PßOJECTDETAIU¡
Describe Work:Adding a sun room to existing home with a wrap around deck.
Also adding a bathroom in the garage
Iob Address:2368 112 County Rd Carbondale Go 80210
Assessor,s parcetNumber: 239310400383
SUb.
*' tot*þ: 7 Rangô: 884 lr h Lot 16 Sæ- 10 ed bt7 Ss 1l
LOt Block
Oulner's Valuation of Work; $l,Òoo.o)a Propefi Size (Sq. Ft. or Acres):/ 0 ec-rcS
fu. Ft. of Building:Height:# of Floors: I
Class of Work:New r'Remodel/Alteration r'Addition
Garage:Attached Detached
3\
BUILDING PERMIT
APPLICATION
Septic:Community
I Propane Electric Other
I
GasType of Heat:
Driveway
Permit:
AuthoriW. This application for a Building Permit must be signed by the Owner of the property, described above,
oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,sígnedby
the Owner. must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Divisíon.
Other Permits. Multiple separate permits may be required: (L) State Electrical Permit, (2) County OWTS Permit,
{3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATIOTiÛ
I hereby certify that I have read this Applicatíon and that the information contained above is true ånd correct. I
understand that the BuÍlding Division accepts the Application, along w¡th the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the subrnittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Bu¡lding Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the locatíon, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to ¡nspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1-)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
constructÍon or use of the structure{s} or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not const¡tute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
designer, engineer andl or builder.
PROJECT DETAII.S CONTINUEDt-
I
fflExemnt
Permit #:
that I have read and understand the Notice and Certification above, as well as, have
information which is correct and accurate to the best of my knowledge.
6t19t23
NOTTCü
OFFICIAT USE ONTY \
Special Conditions:6æ a#aùel ØNDlvcl/s
îryi:ä:#2:w
Plan Check Fee:5q5,8r ¡t
Balance DueîalotØ
¡
Manu. Home Fee:iì'È'Ëøpþnø
'åi\lär,rf BP No:
6WL-B\*L
OWTS No:
setbacS:O OCC Group:
RÔ
{const. rroi,p.
C.,
toflr'
I 7-Zl-23BUttDtNG / PIANNtNG DtVtstON:
Slgned Approval Date
Property Owner Print and Sign Date
æ
Gørfteld County
EUILDING DEPARTMENT
70a E¡ghth Street, su¡te 407, Glenwood Springs, CA 81æ1
Iel: {970} 5-8212
P LAN REVIEW CHECKLIST
Permit No: BLRE-0ó-21-91 7A
Building lssues Planning/Zoning lssues Rrfol
l-ê/¡nþ I
^DrivewayJ L/atet-¿- Surveyed
,ffiEngineered Foundation
na aØ
Pe íta
Grad el 30%
Attach Residential Plan Review List
Subdivision Plat Notes
Fire Department Review
Val uation Determínation/ Fees
Red Line Plans/ Stamps/ Sticker
Attach Conditions
Applícatíon Signed
Plan Reviewer to Sign Application
Parcel/schedule No.
40# Snowload Letter - Manu. Homes
Soils Report
Property Line Setbacks
35 ft. Stream Setbacks
Flood Plain
Building Height K/F=
-/
-/
¿/--7
-/
Nh
/
mninus
Grade/ Topography 40%
Planning lssues
Subdivision Plat
5o/7ry
Ktr 87.Þ:
Description & Summarv:
FLî 6b3 x 4, b8 tl4t ltz,,6+
Zoning Sign-Off /2ãooffi,
Road lmpact Feds '
n¿t
F/s //7x%,ôf= g)7ø7,5h
ucfø /603 y lZ t4/ub,o0
e6 urîuS?4;'H/a,üa1ua/a¿tb'i 149¿,pf,h/þ
'*ru¿,ao
"rr%:'#il E.O,K.
K-s
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the reguired information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/@
inspection requirements will be attached to your approved field set of plans.)
I ñereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
6t19t23
Print Date
o
o