Loading...
HomeMy WebLinkAboutObservation of Excavation''' lli çTLiTllú?t PSCll Glenwood $prlngs 234 Center Drive Glenwood Springs, CO 916û't Phafle: 97&945-2809 Field Observaticn Report RapoÉ#: FOR400001 05/26r2AU Cliant:ProJoct: Alan Debek 3S1 Sky Ranch ûrlve Glenwood Springs, CO 81601 GS067û4.ûû0F.38ã 250 Maroon Ðrive 250 Maroon Ðrive Gsf¿ld County, CO ActMty ÐraÉ: A5Q6l2Ð22 Placement Locallon: Foundation Excavation id¡\nr ;{ f¡ :¡l;l:Eiscrepancy: GARFTËIÞ couNTy The tþms obsarued were found to ba ln gsneral conformanc* wlth the approved ffilll{U$HtûåtrffiePüËUtstn¡citEn practlce: Ø v*" Il No Illscrcpancy: flv* ffisto Genaral Remarks: Site visit was made as req*ested to ¿bse¡ve soils exposed ât þãttom of excavation at 250 Maroon Þrive. Per CTL Thomps{:n Report GS044518.0008-120, dafed March 't8,2Aú5, we recommended the footlngs be suppcrted by the undisturbed native clayey la silty gravel and csbbles. At the time af our site visit, the fsundalion excavation had ken completed and consete farm* were set. The sails exposed at bottom of footing elevation consisted of clayey to silty gravel *nd cobbles. We judge the ¡oils exposed arø accaplable for *upport of footi*g foundations. Photos of sur sife visit are attached. lmage*: Coms¡cnlr: Foandation excavation, looki*g south from northwegt c$mer Technlclan: ûownlng, Thomas RECEIVET} Córnmêntg: Foundation excavation, looking norlleast ?cm southwest cornêr Legal: Cantractor to ensure integrity of completed worlc is maintained during subsequënt construction activities.Page 1 of 2 w CTL:THOMFSOH ûlenwood Sprrngr 234 Center Drive Glenwood Sprirqs, tiü 81ttt 1 Phone: 97&945-28,@ Field Observation Report Roport fi FOR.000001 osn6l2fl?2 Cllcnl:Þroject: Aan Debek 3961 Sky Ranch Orive Glernvood Springs, CO 81601 GS06?û4.000Ë.30S 250 Maroon Drive 250 Maroon D¡ive Garfefd Counþ, CO Commcnt¡: Fsandation excavation, looking south lrom nsrth side of excavation Colruüênts: Fou¡da*on excavalíon, looking west from southeast cómet Legal: Ccntractor la ensure Íntegrity of completed wolJ< is maintained during subsequont con*truction activities.?aqe 2 al 2