HomeMy WebLinkAbout1.09 Floodplain Analysis
North Hangs Mine
February 2023 37
Floodplain Analysis
See the attached floodplain analysis.
North Hangs
June 2021 1
MEMO: North Hangs Mine – Garfield County Conditional Use Permit Application
Floodplain Impact Evaluation
DATE: June 15, 2021
TO: Garfield County Flood Control Officer
The North Hangs Mine, as proposed by Western Slope Materials, near Silt, CO, will disturb 72.8
acres of ground through sand and gravel mining. Mining of sand and gravel material at the site will
entail the excavation of substantial depth of alluvium within the floodplain of the Colorado River in
this area. In accordance with Garfield County Land Use Code (Section 3-301), WSM has prepared
this floodplain analysis for the North Hangs Mine. It will analyze the baseline (existing) conditions of
the floodplain in this area and demonstrate how the proposed mining operation will not lead to any
increase in the water surface elevation of the 100-YR flood event in the area of proposed operation.
1. Modelling Basis and Methodology
A flood routing model was built in the US Army Corps of Engineers HEC-RAS software. A steady
state flow model using the Colorado Water Conservancy Board’s (CWCB) determined flow of
34,900 CFS for the 100-YR event was built. An upstream and downstream Normal Depth of 0.2-
0.3% was used as boundary conditions. These slopes are measured from the LIDAR survey data
available from Garfield County.
Garfield County LIDAR survey data was used as the basis for cross sections in the HEC-RAS
model in both the baseline and developed conditions. The I-70 bridge was modelled as a single
entity in each model based on the LIDAR captured elevations at of its abutments.
Using Civil 3D models of the proposed maximum mining scenario (end of Phase 2), the LIDAR
topography was modified for use in a developed scenario model. The results of the two models are
compared to see if the change in topography adjacent to the Colorado River leads to offsite flood
impacts.
Baseline Conditions
The baseline conditions of the area represent the current, pre-mining state of the Colorado River
corridor in the area of the proposed operation. This includes portions of the Town of Silt, the I-70
bridge over the Colorado River, the Silt Pit south of the river, and the existing agriculture properties
along the river downstream of I-70.
Developed Conditions
The developed conditions of the area represents the maximum mining state of the Colorado River
corridor in the area of the proposed operations. Cross sections used in the baseline condition model
are re-used in the developed conditions model, with the only change being the presence of the
North Hangs
June 2021 2
mining excavation and onsite berms. No permanent facilities are proposed as part of the mining and
processing operations, and therefore no building pads are included.
To be conservative in the HEC-RAS model, the mining excavation is modelled as an obstruction at
its top. When pit dewatering is not taking place, the active mining cell will fill with groundwater to an
elevation roughly four feet below the existing grade. If this condition was modelled completely in
HEC-RAS, the four feet of depth to groundwater would provide some storage for floodwaters and
potentially lowering the downstream flooding extents. Therefore, the mining excavation is modelled
as an obstruction to ensure this storage component is not part of the model.
2. HEC-RAS Results
Results of the HEC-RAS models are summarized in the table below. As shown, the water surface
elevation (WSE, ft.) does not increase from the baseline to developed condition. This is expected as
the mining activity does not create a fill in the floodplain that would cause floodwaters to route into
new areas.
North Hangs
June 2021 3
Table 1. HEC-RAS Data Results
River Sta Plan Q Total Min Ch El Crit W.S. E.G. Elev E.G.
Slope
Vel Chnl Flow
Area
Top
Width
Froude #
Chl
W.S. Elev W.S. Elev
Change
190208 Baseline 34,900 5402.4 5407.8 5409.9 0.0 12.1 3368.1 2143.3 0.9 5407.8 -0.1
190208 P2 Mining 34,900 5402.4 5407.7 5409.9 0.0 12.5 3237.4 2116.3 1.0 5407.7
189185 Baseline 34,900 5399.5 5406.0 5409.1 1.0 14.1 2484.2 474.7 1.0 5406.0 0.0
189185 P2 Mining 34,900 5399.5 5406.0 5409.1 0.0 14.1 2484.2 474.7 1.0 5406.0
189067 I-70 Bridge Bridge
189060 Baseline 34,900 5399.3 5405.7 5408.7 1.0 13.9 2505.7 419.8 1.0 5405.7 -0.4
189060 P2 Mining 34,900 5399.4 5405.7 5408.7 0.0 14.9 2342.8 421.8 1.1 5405.3
188860 Baseline 34,900 5398.6 5405.2 5408.0 0.0 13.6 2619.9 1990.2 1.0 5405.2 0
188860 P2 Mining 34,900 5398.6 5405.1 5408.0 0.0 13.6 2620.5 1990.2 1.0 5405.1
188427 Baseline 34,900 5398.3 5401.9 5403.6 0.0 14.4 3799.0 7823.9 1.4 5401.9 -0.4
188427 P2 Mining 34,900 5398.3 5401.4 5403.2 0.0 14.4 3550.8 7818.8 1.6 5401.4
187293 Baseline 34,900 5393.6 5394.9 5396.5 0.1 14.5 3731.9 5660.3 2.2 5394.9 0
187293 P2 Mining 34,900 5393.6 5394.9 5396.5 0.1 14.7 3678.6 5608.8 2.3 5394.9
185842 Baseline 34,900 5390.3 5393.0 5394.4 0.0 12.2 4137.2 5353.5 1.4 5393.0 -0.1
185842 P2 Mining 34,900 5390.2 5392.9 5394.3 0.0 12.2 4167.2 5359.2 1.4 5392.9
184556 Baseline 34,900 5387.3 5390.4 5391.4 0.0 11.3 5721.6 5893.0 1.2 5390.4 0
184556 P2 Mining 34,900 5387.3 5390.4 5391.4 0.0 11.4 5714.9 5881.5 1.2 5390.4
183265 Baseline 34,900 5382.0 5386.9 5388.1 0.0 10.6 5773.0 5666.3 1.1 5386.9 -0.1
183265 P2 Mining 34,900 5382.0 5386.8 5388.1 0.0 10.8 5603.6 5706.3 1.2 5386.8
North Hangs
June 2021 4
Cross Sections
Cross sections are the basis of steady state flood modelling in HEC-RAS. The baseline and
developed condition at each cross section is show in the figures below attached as Appendix 1. The
cross sections at the mine location are shown in Figure 1. Each cross section shows the channel
geometry at the cross section along with the water surface level (WS) for each scenario. The mining
excavations are modelled as obstructions (solid black).
Figure 1. Baseline vs. Developed Conditions
North Hangs Phase 2
Mining Excavation
Colorado River
channel
North Hangs
June 2021 5
3. Floodplain Revisions
The Federal Emergency Management Association and the Colorado Department of Public Health
and Environment are currently working with Garfield County to revise the floodplain in this area.
Prior to developing the HEC-RAS model for the North Hangs Mine, Lewicki & Associates consulted
with CDPHE staff and reviewed the draft floodplain. The cross sections used in the North Hangs
Mine HEC-RAS model are based on the draft floodplain model. Furthermore, the draft floodplain
model was compared to both baseline and developed conditions as a general control of the model.
Floodway
No floodway is mapped in the area of North Hangs Mine. CDPHE staff informed Lewicki &
Associates that no modelling of the floodway through this area is planned. Given that the developed
condition shows no increase in the WSE from the baseline conditions, the North Hangs Mine will
not alter flood patterns in this area, and thus will not affect whatever floodway may exist.
North Hangs Phase 2
Mining Excavation
Colorado River
channel
North Hangs
June 2021 6
4. Conclusion
Modelling of the North Hangs Mine’s potential impact on the flood waters of the Colorado River in
this area shows no increase in WSE. Therefore, the North Hangs Mine will have no impact on
flooding in the valley.
Ben Langenfeld, P.E.
benl@lewicki.biz
(720) 842-5321
North Hangs
June 2021
Appendix 1 – HEC-RAS Cross Sections
0 500 1000 1500 2000 2500 3000 3500
5395
5400
5405
5410
5415
5420
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
Merged US Survey 47000XS
(ft)
(
f
t
)
Legend
EG PF 1 - P2 Mining
EG PF 1 - Baseline
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.04 .07 .035 .07 .1
0 500 1000 1500 2000
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - P2 Mining
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 500 1000 1500 2000
5395
5400
5405
5410
5415
5420
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - P2 Mining
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 500 1000 1500 2000
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - P2 Mining
EG PF 1 - Baseline
Crit PF 1 - Baseline
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
WS PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .07 .035 .07 .1
0 500 1000 1500 2000
5396
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .1
0 2000 4000 6000 8000 10000
5380
5400
5420
5440
5460
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .
0
3
5
.07
0 2000 4000 6000 8000
5360
5380
5400
5420
5440
5460
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
Surveyed XS 4546000XS
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .035 .07
0 1000 2000 3000 4000 5000 6000 7000 8000
5380
5390
5400
5410
5420
5430
5440
5450
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 1000 2000 3000 4000 5000 6000 7000 8000
5360
5380
5400
5420
5440
5460
5480
5500
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 1000 2000 3000 4000 5000 6000 7000
5360
5380
5400
5420
5440
5460
5480
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .035 .07
North Hangs
June 2021 1
MEMO: North Hangs Mine – Garfield County Conditional Use Permit Application
Floodplain Impact Evaluation
DATE: June 15, 2021
TO: Garfield County Flood Control Officer
The North Hangs Mine, as proposed by Western Slope Materials, near Silt, CO, will disturb 72.8
acres of ground through sand and gravel mining. Mining of sand and gravel material at the site will
entail the excavation of substantial depth of alluvium within the floodplain of the Colorado River in
this area. In accordance with Garfield County Land Use Code (Section 3-301), Western Slope
Materials (WSM) has prepared this floodplain analysis for the North Hangs Mine. It will analyze the
baseline (existing) conditions of the floodplain in this area and demonstrate how the proposed
mining operation will not lead to any increase in the water surface elevation of the 100-YR flood
event in the area of proposed operation.
1. Modelling Basis and Methodology
A flood routing model was built using the US Army Corps of Engineers HEC-RAS software. A
steady state flow model using the Colorado Water Conservancy Board’s (CWCB) determined flow
of 34,900 CFS for the 100-YR event was built. An upstream and downstream Normal Depth of 0.2-
0.3% was used as boundary conditions. These slopes are measured from the LIDAR survey data
available from Garfield County.
Garfield County LIDAR survey data was used as the basis for cross sections in the HEC-RAS
model in both the baseline and developed conditions. The I-70 bridge was modelled as a single
entity in each model based on the LIDAR captured elevations at its abutments.
Using Civil 3D models of the proposed maximum mining scenario (end of Phase 2), the LIDAR
topography was modified for use in a developed scenario model. The results of the two models are
compared to see if the change in topography adjacent to the Colorado River leads to offsite flood
impacts. The only difference between Baseline and Development Conditions is the presence of the
Phase 2 mining topography.
Baseline Conditions
The baseline conditions of the area represent the current, pre-mining state of the Colorado River
corridor in the area of the proposed operation. This includes portions of the Town of Silt, the I-70
bridge over the Colorado River, the Silt Pit south of the river, and the existing agriculture properties
along the river downstream. The baseline topography can be seen as a color gradient with the
cross-section locations in Figure 1. The project area is marked in red.
North Hangs
June 2021 2
Figure 1. Baseline Conditions HEC-RAS Map
Developed Conditions
The developed conditions of the area represent the maximum mining state of the operation along
the Colorado River corridor. Cross sections used in the baseline condition model are re-used in the
developed conditions model, with the only change being the presence of the mining excavation and
onsite berms. No permanent facilities or sturctures are proposed as part of the mining and
processing operations, and therefore no building pads are included. Figure 2 shows the Developed
Conditions topography and cross sections.
To be conservative in the HEC-RAS model, the mining excavation is modelled as an obstruction at
its top. When pit dewatering is not taking place, the active mining cell will fill with groundwater to an
elevation roughly four feet below the existing grade. If this condition was modelled completely in
HEC-RAS, the four feet of depth to groundwater would provide some storage for floodwaters and
potentially lowering the downstream flooding extents. Therefore, the mining excavation is modelled
as an obstruction to ensure this storage component is not part of the model.
North Hangs
June 2021 3
Figure 2. Developed Conditions HEC-RAS Map
2. HEC-RAS Results
Results of the HEC-RAS models are summarized in the table below. As shown, the water surface
elevation (WSE, ft.) does not increase from the baseline to developed condition. This is expected as
the mining activity does not create a fill in the floodplain that would cause floodwaters to rise.
North Hangs
June 2021 4
Table 1. HEC-RAS Data Results
River Station Plan Q Total
(CFS)
Min Ch El
(ft)
Crit W.S.
(ft)
E.G. Elev
(ft)
E.G.
Slope
(ft/ft)
Vel Chnl
(ft/s)
Flow
Area
(sq. ft.)
Top
Width
(ft)
Froude #
Chl
W.S.E. (ft) W.S.E. Ch
(ft)
190208 Baseline 34,900 5402.4 5407.8 5409.9 0.0 12.1 3368.1 2143.3 0.9 5407.8 -0.1 190208 P2 Mining 34,900 5402.4 5407.7 5409.9 0.0 12.5 3237.4 2116.3 1.0 5407.7
189185 Baseline 34,900 5399.5 5406.0 5409.1 1.0 14.1 2484.2 474.7 1.0 5406.0 0.0 189185 P2 Mining 34,900 5399.5 5406.0 5409.1 0.0 14.1 2484.2 474.7 1.0 5406.0
189067 I-70 Bridge Bridge
189060 Baseline 34,900 5399.3 5405.7 5408.7 1.0 13.9 2505.7 419.8 1.0 5405.7 -0.4 189060 P2 Mining 34,900 5399.4 5405.7 5408.7 0.0 14.9 2342.8 421.8 1.1 5405.3
188860 Baseline 34,900 5398.6 5405.2 5408.0 0.0 13.6 2619.9 1990.2 1.0 5405.2 0 188860 P2 Mining 34,900 5398.6 5405.1 5408.0 0.0 13.6 2620.5 1990.2 1.0 5405.1
188427 Baseline 34,900 5398.3 5401.9 5403.6 0.0 14.4 3799.0 7823.9 1.4 5401.9 -0.4 188427 P2 Mining 34,900 5398.3 5401.4 5403.2 0.0 14.4 3550.8 7818.8 1.6 5401.4
187293 Baseline 34,900 5393.6 5394.9 5396.5 0.1 14.5 3731.9 5660.3 2.2 5394.9 0 187293 P2 Mining 34,900 5393.6 5394.9 5396.5 0.1 14.7 3678.6 5608.8 2.3 5394.9
185842 Baseline 34,900 5390.3 5393.0 5394.4 0.0 12.2 4137.2 5353.5 1.4 5393.0 -0.1 185842 P2 Mining 34,900 5390.2 5392.9 5394.3 0.0 12.2 4167.2 5359.2 1.4 5392.9
184556 Baseline 34,900 5387.3 5390.4 5391.4 0.0 11.3 5721.6 5893.0 1.2 5390.4 0 184556 P2 Mining 34,900 5387.3 5390.4 5391.4 0.0 11.4 5714.9 5881.5 1.2 5390.4
183265 Baseline 34,900 5382.0 5386.9 5388.1 0.0 10.6 5773.0 5666.3 1.1 5386.9 -0.1 183265 P2 Mining 34,900 5382.0 5386.8 5388.1 0.0 10.8 5603.6 5706.3 1.2 5386.8
North Hangs
June 2021 5
Cross Sections
Cross sections are the basis of steady state flood modelling in HEC-RAS. The baseline and
developed condition at each cross section are shown Appendix 1. The cross sections at the mine
location are shown in Figure 3 and Figure 4. Each cross section shows the channel geometry at the
cross section along with the water surface level (WS) for each scenario. The mining excavations
are modelled as obstructions (solid black).
Figure 3. Baseline vs. Developed Conditions at Cross Section 188427
North Hangs Phase 2
Mining Excavation
Colorado River
channel
North Hangs
June 2021 6
Figure 4. Baseline vs. Developed Conditions at Cross Section 187293
3. Floodplain Revisions
The Federal Emergency Management Association and the Colorado Department of Natural
Resources (CNDR) are currently working with Garfield County to revise the floodplain in this area.
Prior to developing the HEC-RAS model for the North Hangs Mine, Lewicki & Associates consulted
with CDNR staff and reviewed the draft floodplain. The cross sections used in the North Hangs
Mine HEC-RAS model are based on the draft floodplain model. Furthermore, the draft floodplain
model was compared to both baseline and developed conditions as a general control of the model.
No inconsistencies were found.
Floodway
No floodway is mapped in the area of North Hangs Mine. CDNR 1 staff informed Lewicki &
Associates that no modelling of the floodway through this area is planned. Given that the developed
1Discussions with Marta Blanco Castano, CDNR 05/12/21
North Hangs Phase 2
Mining Excavation
Colorado River
channel
North Hangs
June 2021 7
condition shows no increase in the WSE from the baseline conditions, the North Hangs Mine will
not alter flood patterns in this area, and thus will not affect whatever floodway may exist.
4. Conclusion
The analysis in this report has been conducted to satisfy the requirements of Garfield County Land
Use and Development Code Sections 4-109 7-1002.A.
Modelling of the North Hangs Mine’s potential impact on the flood waters of the Colorado River in
this area shows no increase in WSE. Therefore, the North Hangs Mine will have no impact on
flooding in the valley.
Ben Langenfeld, P.E.
benl@lewicki.biz
(720) 842-5321
North Hangs
June 2021
Appendix 1 – HEC-RAS Cross Sections
0 500 1000 1500 2000 2500 3000 3500
5395
5400
5405
5410
5415
5420
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
Merged US Survey 47000XS
(ft)
(
f
t
)
Legend
EG PF 1 - P2 Mining
EG PF 1 - Baseline
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.04 .07 .035 .07 .1
0 500 1000 1500 2000
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - P2 Mining
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 500 1000 1500 2000
5395
5400
5405
5410
5415
5420
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - P2 Mining
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 500 1000 1500 2000
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - P2 Mining
EG PF 1 - Baseline
Crit PF 1 - Baseline
WS PF 1 - Baseline
Crit PF 1 - P2 Mining
WS PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .07 .035 .07 .1
0 500 1000 1500 2000
5396
5398
5400
5402
5404
5406
5408
5410
5412
5414
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .1
0 2000 4000 6000 8000 10000
5380
5400
5420
5440
5460
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .
0
3
5
.07
0 2000 4000 6000 8000
5360
5380
5400
5420
5440
5460
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
Surveyed XS 4546000XS
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .035 .07
0 1000 2000 3000 4000 5000 6000 7000 8000
5380
5390
5400
5410
5420
5430
5440
5450
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 1000 2000 3000 4000 5000 6000 7000 8000
5360
5380
5400
5420
5440
5460
5480
5500
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.07 .035 .07
0 1000 2000 3000 4000 5000 6000 7000
5360
5380
5400
5420
5440
5460
5480
North Hangs Plan: 1) Baseline 6/16/2021 2) P2 Mining 6/16/2021
(ft)
(
f
t
)
Legend
EG PF 1 - Baseline
EG PF 1 - P2 Mining
Crit PF 1 - Baseline
WS PF 1 - Baseline
WS PF 1 - P2 Mining
Crit PF 1 - P2 Mining
Ground
Ineff
Bank Sta
.1 .035 .07