Loading...
HomeMy WebLinkAbout1.43 Water Augmentation Memo and LtrWater Augmentation Memo    Page 1 of 1    Water augmentaƟon plans in the State of Colorado require approval from the Colorado Division of Water Resources and Colorado water courts. This process involves months of review and public comment in most cases. Furthermore, the water requirements for augmentaƟon are dependent on approved mining and reclamaƟon plans from State and Local permits. Therefore, water augmentaƟon plans are typically pursued following the issuance of State reclamaƟon permits and Local land use approval. Western Slope Materials will apply for its water augmentaƟon plan once the Garfield County use permit and Colorado Division of ReclamaƟon, Mining, and Safety permit are issued. To facilitate condiƟonal approval of the Garfield County use permit, a will‐serve leƩer from West Divide water conservancy district is included to demonstrate that water is available to meet North Hangs augmentaƟon needs when the Ɵme comes.   WEST DIVIDE . WATER CONSERVANCY DISTRICT 818 Taiighenbaiigh Blvci., Suite 101 P.O. Box 1478 Rifle, Colorado 81650-1478 Tel: (970) 625-5461 Web: www.wdwcd.org Email: watcr@wdwcd.org 7/12/23 To Whom It May Concern, The letter is being provided to document the availability of legal water supply for property owned by North Hangs Ranch, LLC located in Section 9, Township 6S, Range 92W of the 6^“^ P.M with Parcel Identification Number 217909200106. This property lies within the West Divide Water Conservancy District's (WDWCD) Colorado River Service Area which has a decreed plan for augmentation in Case No. 02CW123. After reviewing Case No. 06CW121, which quantified 48.44 acre-feet of Historical Consumptive Use credits in excess of the amount required to augment the full build-out gravel pit operation, it is assumed that approximately 43 acre-feet of augmentation water will be required from WDWCD to fully augment evaporative depletions related to the gravel pit operations (Table 1). These water rights should be verified by the Applicants water rights attorney or engineer prior to applying for a contract. Table 1: Estimation of Augmentation Needed for North Hangs Pit. Pond Area (ac) 29 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Evap(ft)* 0.06 0.09 0.16 0.29 0.4 0.51 0.52 0.45 0.32 0.2 0.1 0.06 Evap(ac-ft) 1.7 2.6 4.6 15.1 13.1 9.3 5.8 2.9 1.78.4 11.6 14.8 Total 3.16 91.64 Credits from Hangs Ranch Change Case 06CW12r (ac-ft)4,5 10.15 19.26 14.53 48.44 Approximate WDWCD Aug Supply (ac-ft) 1.7 2.6 4.6 8.4 7.1 4.6 -4.2 -1.5 9.3 5.8 2.9 1.7 43.2 *Decreed values from Case No. 06CW121 WDWCD has water supplies available to augment the North Hangs Gravel Pit at this level of demand if and when an augmentation contract is needed. / Tammy Keenah 9WiWCD Rich;ird L. McNeill Tom Jankovsky Dan R. HarrisonSamuel B. Potter Kelly CoueyDirectors: