Loading...
HomeMy WebLinkAboutConditions of PermitôoilDtnoolS /af2 CONDITIONS OF PERMIT BLRE-07 -23-8 191 Guillermo & Marjorie Altonaga New S/F Dwelling w/ attached garage TBD Diamond A Rd, Carbondale Aspen Glen FLG 1, Lot D-20 1) ALL WORK SHALL COMPLY W|TH THE 2015 INTERNATIONAL RESIDENTTAL coDE (t.R.c.)AND 2018 TNTERNATTONAL ENERGY CONSERVATTON CODE (r.E.c.c.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMTTT|NG AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION lS RECOMMENDED: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL IN FORMATION. 5) OPEN-HOLE SOILS REPORT MUST BE PREPARED BY THE GEOTECHNICAL ENGINEER OF RECORD. SUPPLY REPORT TO GARFIELD COUNry BUILDING INSPECTOR AT FOOTING INSPECTION. 1,500 PSF SOIL BEARING. ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR INSPECTOR AT TIME OF FRAME INSPECTION. 7) A LOT TMPROVEMENT CERTTFICATE, SEALED BY A COLORADO LTCENSED SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM BUILDING ENVELOPM ENT REOU I REM ENTS. B) RACE STMULATOR ROOM SHOWN ON 43.1 SHALL BE SUPPLIED WlrH MECHANICAL VENTILATION PURSUANT TO 2015 IRC SECTION R303.4. GoNTINUE NEXr PAGE (9,10,1 1) aoNolnnNs Z"fz 9) FOR COMPLTANCE W|TH THE ADOPTED 2018 tECC, ARCHITECT SPECIFIES TOTAL UA-ALTERNATIVE PRESCRIPTIVE METHOD WITH SUPPORTING RESCheck and MANUAL J REPORTS (ATTACHED). o RESCheck documents show window U- factor 0.28 and doors U- factor 0.32 . Building Envelope and insulation R-Values shown on 45.1 . Crawl space to be conditioned by residential home heating system o Garage is NOT currently proposed to have any heating system installed; if garage heating is added during construction, Builder or Architect of Record must resubmit a REVISED RESCheck Report and REVISED Manual J Report . Wrightsoft Manual J report lists Heating Equipment: York, 95 AFUE and Cooling Equipment York 1 3.0 EER2 , 16.3 SEER2 (report attached) . Attic truss space is unconditioned area pursuant 45.1, verify insulation on bottom chord of truss and attic access opening sealed following instal lation of d rywal l. o Energy Efficient Light detail on 45.1 o Energy Sealing details and notes on 45.4 ANY CHANGES TO DESIGN OF THE THERMAL ENVELOPE, MECHANICAL EOUIPMENT SIZING AND/OR LIGHTING EFFICIENCY -- MAY NECESSITATE SUBMISSION OF A NEW RESCheck and MANUAL J REPORT FOR THE BUILDING FILE RECORD. 10) BLOWER DOOR TEST lS REOUIRED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 1 1) BUILDER MUST PERMANENTLY POST A RESIDENTIAL ENERGY EFFICIENCY CERTIFICATE VISIBLE IN THE GARAGE MECHANICAL ALCOVE CLOSET (OR oTHER APPROVED LOCATTON). SHALL BE POSTED AT BUILDING FINAL INSPECTION.