HomeMy WebLinkAboutConditions of PermitôoilDtnoolS /af2
CONDITIONS OF PERMIT
BLRE-07 -23-8 191
Guillermo & Marjorie Altonaga
New S/F Dwelling w/ attached garage
TBD Diamond A Rd, Carbondale
Aspen Glen FLG 1, Lot D-20
1) ALL WORK SHALL COMPLY W|TH THE 2015 INTERNATIONAL RESIDENTTAL
coDE (t.R.c.)AND 2018 TNTERNATTONAL ENERGY CONSERVATTON CODE
(r.E.c.c.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS
CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING
REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO
SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMTTT|NG AND INSPECTIONS BY COLORADO STATE
ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT
FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL
INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION lS RECOMMENDED: SHOULD COMPLY WITH
WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER
COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE
REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE
FOR ADDITIONAL IN FORMATION.
5) OPEN-HOLE SOILS REPORT MUST BE PREPARED BY THE GEOTECHNICAL
ENGINEER OF RECORD. SUPPLY REPORT TO GARFIELD COUNry BUILDING
INSPECTOR AT FOOTING INSPECTION. 1,500 PSF SOIL BEARING.
ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR INSPECTOR AT
TIME OF FRAME INSPECTION.
7) A LOT TMPROVEMENT CERTTFICATE, SEALED BY A COLORADO LTCENSED
SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY
STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER
PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM BUILDING
ENVELOPM ENT REOU I REM ENTS.
B) RACE STMULATOR ROOM SHOWN ON 43.1 SHALL BE SUPPLIED WlrH
MECHANICAL VENTILATION PURSUANT TO 2015 IRC SECTION R303.4.
GoNTINUE NEXr PAGE (9,10,1 1)
aoNolnnNs Z"fz
9) FOR COMPLTANCE W|TH THE ADOPTED 2018 tECC, ARCHITECT SPECIFIES
TOTAL UA-ALTERNATIVE PRESCRIPTIVE METHOD WITH SUPPORTING
RESCheck and MANUAL J REPORTS (ATTACHED).
o RESCheck documents show window U- factor 0.28 and doors U- factor
0.32
. Building Envelope and insulation R-Values shown on 45.1
. Crawl space to be conditioned by residential home heating system
o Garage is NOT currently proposed to have any heating system
installed; if garage heating is added during construction, Builder or
Architect of Record must resubmit a REVISED RESCheck Report and
REVISED Manual J Report
. Wrightsoft Manual J report lists Heating Equipment: York, 95 AFUE and
Cooling Equipment York 1 3.0 EER2 , 16.3 SEER2 (report attached)
. Attic truss space is unconditioned area pursuant 45.1, verify insulation
on bottom chord of truss and attic access opening sealed following
instal lation of d rywal l.
o Energy Efficient Light detail on 45.1
o Energy Sealing details and notes on 45.4
ANY CHANGES TO DESIGN OF THE THERMAL ENVELOPE, MECHANICAL
EOUIPMENT SIZING AND/OR LIGHTING EFFICIENCY -- MAY NECESSITATE
SUBMISSION OF A NEW RESCheck and MANUAL J REPORT FOR THE
BUILDING FILE RECORD.
10) BLOWER DOOR TEST lS REOUIRED. MUST SUBMIT BLOWER DOOR TEST
REPORT TO GARFIELD COUNTY COMMUNIry DEVELOPMENT DEPT. OFFICE
PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL.
1 1) BUILDER MUST PERMANENTLY POST A RESIDENTIAL ENERGY EFFICIENCY
CERTIFICATE VISIBLE IN THE GARAGE MECHANICAL ALCOVE CLOSET (OR
oTHER APPROVED LOCATTON). SHALL BE POSTED AT BUILDING FINAL
INSPECTION.