HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLCO-05 -23-8241
Wheeler Gulch Compressor Station
Replace Existing Housing of Air Compressor and Air Drying Packages
Township:ó Rang e:96 Section :1 - Lat/Long: 39.487983N/-1 08.095309W
Parcel:2171 12300003
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL BUILDING CODE (I.B.C.)AND
MANUFACTURER'S I NSTALLATION I NSTRUCTIONS.
2) ALL WORK MUST COMply W|TH CONDTTTONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LOCKS, LATCHES AND LANDTNGS SHALL COMPLY W|TH 2015 lBC, SECTION 1010.1.9 -
DOOR LATCH TO BE OPERABLE FROM INSIDE WITHOUT A KEY OR SPECIAL KNOWLEDGE.
s) pRovtDE A LANDtNc OUTSTDE THE EXTERTOR DOOR. CAN BE 7" BELOW THE INTERIOR
o) CONTRACTOR TO VERTFy CDOH CERTTFTCATTON PR|OR TO SCHEDULING BUILDING FINAL
INSPECTION
7) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
8) LtcHT AND VENTTLATTON pER 2015 rBC, CHAPTER '12 AND 2015 IMC CHAPTER 3-4
9) HtcH STRENGTH BOLTTNG / FTELD WELDTNG (lF ANY PERTAINS), SHALL BE REOUIRED BY
SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT TO BE AVAILABLE FOR
BUILDING FINAL.
1O) GARFIELD COUNTY FINAL / COMPLETION INSPECTION IS REOUIRED.
1 1) PROV|DE AN EXCAVATTON OBESERVATTON REPORT FROM A GEOTECH ENGINEER AT THE
FOOTING INSPECTION, 2OOO PSF TO BE VERIFIED.