HomeMy WebLinkAbout1.00 General Application MaterialsGlenwood Springs Office
910 Grand Avenue, Suite 201
Glenwood Springs, Colorado 81601
Telephone (970) 947-1936
Facsimile (970) 947-1937
GARFIELD & HECHT, P.C.
ATTORNEYS AT LAW
Since 1975
www.garfieldhecht.com
Haley Carmer
hcarmer@garfieldhecht.com
February 23, 2023
VIA EMAIL AND DELIVERY
Garfield County Development Department
c/o Glenn Hartmann, Planner
108 8th Street, Suite 401
Glenwood Springs, Colorado 81601
RE: 214 Center Drive, LLC/Glenwood Partnership LLLP
Cooper Subdivision Minor Subdivision Application
Dear Glenn:
214 Center Drive, LLC (“Applicant”) hereby submits to Garfield County (“County”) its
application for minor subdivision (“Application”) of the real property commonly known as 214
Center Drive, Glenwood Springs, Parcel No. 218506100042, and legally described in the title
commitment provided herewith (the “Property”). Pre-application meetings were held regarding the
Application on September 15, 2022, and November 28, 2022. The Garfield County Community
Development Department’s Pre-Application Conference Summary is included with the Application
materials. The purpose of this letter is to provide additional information regarding the proposed
subdivision and its compliance with the Garfield County Land Use and Development Code (“LUC”).
The Property is a 15.8-acre parcel located in unincorporated Garfield County immediately to
the north of the Glenwood Springs Mall and is zoned Commercial Limited (C/L). The Property was
part of a larger 30-acre parcel that as divided into three smaller parcels pursuant to a subdivision
exemption approved by Resolution No. 80-254, although no subdivision exemption plat was recorded.1
Instead, the two smaller tracts approved by Resolution 80-254 were simply deeded to a third party and
ultimately incorporated into what is now the Glenwood Springs Mall PUD. The Property comprises the
third, 16-acre remainder parcel approved by Resolution 80-254, less approximately .2 acres that were
deeded to the County for Storm King Road.
Glenwood Partnership LLLP (“Owner”) has owned the Property since it was divided
pursuant to Resolution No. 80-254. Owner has authorized the submission of this Application and
provided a letter of consent to that effect. As reflected in the Certification of Mineral Ownership
Research, Owner’s attorney has identified that the Owner is the owner of 100% of the Property’s
mineral estate. The mineral owner certification includes additional details regarding the mineral owner
research conducted for this Application.
1 Because there was no subdivision exemption plat was recorded, the title of the Final Plat does not reference the prior
subdivision exemption. However, the subdivision exemption resolution is referenced in the notes.
Mr. Glenn Hartmann
February 23, 2023
Page 2 of 10
2783222_2
Applicant is proposing to subdivide the Property into three lots as shown on the draft final
subdivision plat (“Final Plat”) submitted with the Application. Two commercial buildings are currently
located on the Property and will be contained within what is shown as Lot 1 on Final Plat. Those
buildings were construct by Owner pursuant to the Special Use Permit approved for the Property
pursuant to Resolution No. 81-121 (the “SUP”). The configuration of the proposed subdivision takes
into account the location (including setbacks), utility, and access needs of the existing buildings. A
summary of the uses, dimensions, parking, and other site features of the existing buildings is attached
hereto as Appendix B.
Applicant intends to develop Lot 2 of the subdivision with three new buildings. One building
will be used for self-storage and the other two will include several flex units. The flex units will have
office space at the front and warehouse/storage space at the back. The self-storage building will also
include three apartments2 to house employees of the self-storage facility or one or more of the tenants
in the flex buildings. While the use of each individual flex unit is not yet known, uses will be limited to
those allowed under the SUP, namely, wholesale and retail establishments, personal service
establishments, general services establishments, and offices. A site plan showing the existing and
proposed buildings on Lots 1 and 2 is included herewith, which site plan also includes dimensional and
other zoning standards applicable to the Property. Neither Owner nor Applicant has development plans
for Lot 3 at this time.
Applicant believes that its Application satisfies the review criteria set forth in LUDC Section
5-301(C) as explained in Applicant’s responses (in bold italics) below:
1. It complies with the requirements of the applicable zone district and this Code,
including Standards in Article 7, Divisions 1, 2, 3 and 4. See Appendix A
2. It is in general conformance with the Comprehensive Plan. See Appendix A
3. Shows satisfactory evidence of a legal, physical, adequate, and dependable water
supply for each lot. The Property is already served with water by the City of Glenwood
Springs. The City has provided a will-serve letter confirming it can and will serve the
Property for up to 60 EQRs, which is more than enough to satisfy the existing and
proposed uses on the Property. The Application materials also include a report from
Applicant’s water engineer, Sopris Engineering, which further explains the water
demands of the Property and the legal and physical availability of water to meet those
demands.
4. Satisfactory evidence of adequate and legal access has been provided. The Property is
adjacent to Storm King Road and Donegan Road, which provides legal public access
to the site. Each lot has direct access to at least one of those public roads, but private
easements for circulation within the Property are identified on the Final Plat.
Applicant and Owner are finalizing the details of the reciprocal easement agreement
that will govern the operation and maintenance of the interior private roads and
other shared infrastructure. That agreement will be recorded along with the
Final Plat.
2 The SUP allows for up to three residential units on the Property.
Mr. Glenn Hartmann
February 23, 2023
Page 3 of 10
2783222_2
5. Any necessary easements including, but not limited to, drainage, irrigation, utility,
road, and water service have been obtained. All necessary new and pre-existing
easements are shown on the Final Plat. No off-site easements are needed for the
proposed subdivision.
6. The proposed subdivision has the ability to provide an adequate sewage disposal
system. The Property is already served with sanitary sewer service by the West
Glenwood Springs Sanitation District. The District has provided a will-serve letter
confirming it can and will serve the existing and proposed uses on the Property. The
enclosed report by Sopris Engineering provides additional details and information
regarding the sanitary sewer service to the Property.
7. Hazards identified on the property such as, but not limited to, fire, flood, steep slopes,
rockfall and poor soils, shall be mitigated, to the extent practicable. The Property is
not located in any flood plain and is not in close proximity to any river, stream, creek,
or other body of water, so there is no risk of flooding or mudslides. The site does not
have steep slopes or rockfall hazards, with the ground surface generally sloping from
north to south with grades of less than 5 percent. The soils at the developed portion
of the Property have performed exceptionally well. Any movement of the buildings,
sidewalks, parking areas, Center Drive, or Storm King Road have been minimal over
the past 40 years. Soils performance for future buildings is expected to perform the
same considering the size of the Property. Finally, wildfire danger at the Property is
no different than that of the surrounding area. The West Glenwood Springs Fire
Station is less than two minutes away, and the Property is served with fire flows by
the City’s water system. NFPA-compliant fire sprinkler and fire alarm systems are
installed within the two existing buildings and will be installed within future
buildings in compliance with fire district requirements.
8. Information on the estimated probable construction costs and proposed method of
financing for roads, water distribution systems, collection systems, storm drainage
facilities and other such utilities have been provided. This information has been
provided in the form of engineering reports and plans from Sopris Engineering.
9. All taxes applicable to the land have been paid, as certified by the County Treasurer’s
Office. All applicable taxes have been paid as indicated in the Statement of Taxes
Due that is provided with the Application.
10. All fees, including road impact and school land dedication fees, shall be paid. Applicant
agrees that all applicable fees will be paid at the appropriate time if the Application
is approved.
11. The Final Plat meets the requirements per section 5-402.F., Final Plat. The Final Plat
submitted herewith complies with all LUDC Sec. 5-402(F) requirements.
The documents identified below are being submitted with and as part of the Application. Note
that because Applicant is not seeking any extended vested rights, a proposed development agreement is
not included. Additionally, Appendix A covers the issues identified in the impact analysis that may be
Mr. Glenn Hartmann
February 23, 2023
Page 4 of 10
2783222_2
applicable to the Property, so a separate impact analysis has not been provided. Finally, regarding the
Improvements Agreement required under Section 4-203(K), the only public improvement anticipated
at the County level is the installation of a sidewalk, curb, and gutter along Lot 2’s northern boundary
adjacent to Donegan Road. Applicant will work with the County Attorney to prepare that agreement
during the Application review process.
1. Land Use Application Form
2. Payment for Application fees ($1,000.00)
3. Statement of Authority for Owner
4. Authorization Letter from Owner
5. Payment Agreement Form
6. Statement of Taxes Due
7. Mineral Owner Certification Form
8. List of Landowners within 200 feet
9. Pre-Application Conference Summary
10. Title Commitment
11. Site Plan/Existing Conditions Survey and Civil Plans
12. Proposed Final Plat (including vicinity map)
13. Building elevations
14. Landscape Plan
15. Sopris Engineering Water, Wastewater and Drainage Report and cost estimate
16. Kimley Horne traffic report
17. Colorado Geological Survey form
Applicant has provided a total of 3 copies of all of the foregoing documents and will email
a link that includes an electronic version of the same. Please contact us if you need additional
information or have questions regarding any of the Application materials. We look forward to
working with the County as we proceed through the application process.
Sincerely,
GARFIELD & HECHT, P.C.
Attorneys for Applicant
By:
Haley Carmer
David McConaughy
Enclosures
Mr. Glenn Hartmann
February 23, 2023
Page 5 of 10
2783222_2
APPENDIX A
Compliance with LUDC Article 7 Standards
LUDC Section Applicant Response
7-101: Zone District
Use Regulations
All existing uses on the Property are permitted uses in the Commercial
Limited zone district and under the SUP. Self-storage is listed as a type
of “general service establishment” under the County’s 1978 zoning
regulations that were in effect when the SUP was issued, and it is a use
permitted by right in the C/L zone today. Specific tenants/uses of the
units in the flex buildings are not yet know, but Applicant understands
that such uses my comply with the SUP. Applicant is not requesting any
change in permitted uses under the SUP.
7-102:
Comprehensive Plan
and IGAs
The Garfield County Comprehensive Plan 2030 Future Land Use Map
designates the Property as mixed use with the Glenwood Springs Urban
Growth Area. The Comp Plan supports and reinforces that new growth
should occur in areas that have, or can easily be served by, urban
services. For that reason, the Comp Plan strongly supports and
encourages infill. Urban growth areas growth areas “are the preferred
locations for commercial and employment uses that can take advantage
of supporting infrastructure and a close by client base that reduces travel
demands.” Growth in UGAs and town centers adds to the economic
diversity of the County, and growth in these areas should include a
compact mix of commercial, office, employment, residential, and
industrial uses.
The existing and proposed development of the Property both complies
with and furthers the above Comp Plan goals and policies. The
development will include office and warehouse space for local business,
much needed self-storage units for members of the public, and three
residential units for employees working at the Property. The Property is
already connected to and served by all necessary utilities and has access
to two public roads. Applicant’s proposal is a typical infill project.
While annexation of properties in UGAs is encouraged, Owner
attempted to do just that a year ago, but the citizens of the annexing
municipality—the City of Glenwood Springs—rejected the annexation
and the proposed development that the Glenwood Springs City Council
found to be in compliance with the City’s comprehensive plan. In light
of this feedback from the public, Applicant is proposing a development
that includes office, warehouse, and residential uses consistent with the
existing SUP for the Property and the mixed-use classification of the
Property under both the County and City comprehensive plans.
7-103: Compatibility
The current and future office, warehouse, and general service use of the
Property is consistent with the nature, scale, and intensity of the other
commercial uses to the south and west of the Property. The height and
design of the buildings adjacent to Donegan Road take into account and
are consistent with the single family homes across the street.
Mr. Glenn Hartmann
February 23, 2023
Page 6 of 10
2783222_2
7-104: Source of
Water
The Property is already served with water by the City of Glenwood
Springs. The City has provided a will-serve letter confirming it can and
will serve the Property for up to 60 EQRs, which is more than enough
to satisfy the existing and proposed uses on the Property. The
Application materials also include a report from Applicant’s engineer,
Sopris Engineering, which further explains the water demands of the
Property and the legal and physical availability of water to meet those
demands.
7-105: Central Water
Distribution and
Wastewater Systems
See Sopris Engineering report
7-106: Public
Utilities
Public utilities, including gas and electric, currently serve the Property
and all buildings on it. Pre-existing and new utility easements are shown
on the Plat. All existing utilities except major power transmission lines,
transformers, switching and terminal boxes, meter cabinets, and other
appurtenant facilities are or will be located underground.
7-107: Access and
Roadways
The Property is adjacent to Storm King Road and Donegan Road. Center
Drive, a private road, provides access off of Storm King Road into the
Property. Additional internal access easements are shown on the Final
Plat and will be constructed to County standards. The easements will be
privately owned and maintained by the owners of the Property. A
reciprocal access easement agreement outlining use, operation, and
maintenance responsibilities will be recorded with the Final Plat.
Applicant’s engineering report provides further information and
explanation regarding access to the Property.
7-108: Use of Land
Subject to Natural
Hazards
N/A
7-109: Fire
Protection
Wildfire danger at the Property is no different than that of the
surrounding area. The West Glenwood Springs Fire Station is less than
two minutes away, and the Property is served with fire flows by the
City’s water system. NFPA-compliant fire sprinkler and fire alarm
systems are installed within the two existing buildings and will be
installed within future buildings in compliance with fire district
requirements.
7-201: Agricultural
Lands N/A
7-202: Wildlife
Habitat Areas
The vacant portions of the Property are irrigated pasture lands that
Owner formerly used for its horses. There are no known wildlife habitat
areas on the Property.
7-203: Protection of
Waterbodies N/A
7-204: Drainage and
Erosion See Sopris Engineering report
Mr. Glenn Hartmann
February 23, 2023
Page 7 of 10
2783222_2
7-205:
Environmental
Quality
Aside from any air quality impacts related to general construction and
operation of buildings, the Application will have no impact on air quality
in the area.
7-206: Wildfire
Hazards
The Property is in the NR or Low category of the County’s Wildfire
Susceptibility Index, so this section does not apply.
7-207: Natural and
Geologic Hazards N/A
7-208: Reclamation N/A
7-301: Compatible
Design
The current commercial and general service use of the Property is
consistent with the nature, scale, and intensity of the other commercial
uses on adjacent properties. Future buildings on the site will be similar
in size and massing to the commercial buildings on the Property and
adjacent lots. The proposed subdivision configuration takes into account
the location (including setbacks) and utility and access needs of the existing
buildings. Proposed elevations of the self-storge and flex buildings are
included with the Application. The height, mass, location, and exterior
features of the new buildings are also sensitive to and take into account the
single-family dwellings to the north of the Property.
7-302: Off-Street
Parking and Loading
Standards
See site plan
7-303: Landscaping
Standards
See enclosed landscape plan
7-304: Lighting
Standards
The exterior lighting currently on the Property complies with the
LUDC standards because it is downcast, does not shine on other
properties, does not create a traffic hazard, is not flashing, and no
lighting is more than 40 feet in height. Future lighting will similarly
comply.
7-305: Snow Storage
Standards
Each new lot will have sufficient open space within its boundaries for
snow storage. The Property slopes to the south, so snowmelt will not
drain onto adjacent lots. The engineering report and related plans
provide additional information on this point.
7-306: Trail and
Walkway Standards N/A
7-401: General
Standards
A reciprocal access agreement to be recorded with the plat will address
use, operation, and maintenance obligations related to
7-402: Subdivision
Lots
Lot area, width, frontage, depth, shape, location, and orientation of the
proposed lots comply with the C/Lzone requirements. Specifically, all
lots exceed the minimum lot area and frontage on a dedicated street, and
the applicable front, rear, and side setbacks are in compliance with Table
3-201.
The depth and width of the proposed lots provides enough space for
required off-street parking and loading facilities. No lots are divided by
municipal boundaries, County roads, or public rights-of-way.
7-403: Survey
Monuments
Permanent survey monuments have been set—or will be set upon
recordation of the subdivision plat—within the Property. All
Mr. Glenn Hartmann
February 23, 2023
Page 8 of 10
2783222_2
permanent survey markers set by Applicant’s surveyor will have its
registration number securely fixed to all monuments, markers, and
benchmarks.
7-404: School Land
Dedication
Any school land dedication or fees in lieu thereof will be paid as required
under the LUC.
7-405: Road Impact
Fees
Any road impact fees required in connection with the Application will
be paid prior to and as a condition of recordation of the Final Plat.
Mr. Glenn Hartmann
February 23, 2023
Page 9 of 10
2783222_2
Appendix B
Existing Buildings
1. Uses and associated building area:
OFFICE WAREHOUSE SOILS LAB
BUILDING AREAS
GBC Building 1
Colo Water Resources
4,203 ‐ ‐
Vertical Design
966
897 ‐
Glen Part./ Diemoz Constr. Co.
1,031
1,304 ‐
Ruiz, Allstate Insurance
949 ‐ ‐
JJNJ, Inc.
889 ‐ ‐
KWE Primary Investments
397 ‐ ‐
The Software Store
397 ‐ ‐
CTL Thompson, Inc.
1,757
448
959
Electrical/ Mechanical Rooms ‐ ‐ ‐
Subtotal Building 1
10,589
2,649
959
GBC Building 2
U.S. Dept. of Agriculture
4,452 ‐ ‐
Aspen Events & Tents
690
1,357 ‐
Smart Start
496
1,476 ‐
Western States Fire Protection
848
1,106 ‐
S2M Construction Co.
1,990
2,086 ‐
Electrical/ Mechanical Rooms ‐ ‐ ‐
Subtotal Building 2
8,476
6,025 ‐
2. Building Area:
a. Building 1: 14,980 square feet (gross)
b. Building 2: 15,244 square feet (gross)
Mr. Glenn Hartmann
February 23, 2023
Page 10 of 10
2783222_2
3. Building Height:
a. Building 1 Approximately 17 feet
b. Building 2 Approximately 17.25 feet
4. Parking: 112 spaces total
Glenwood Springs Office
910 Grand Avenue, Suite 201
Glenwood Springs, Colorado 81601
Telephone (970) 947-1936
Facsimile (970) 947-1937
GARFIELD & HECHT, P.C.
ATTORNEYS AT LAW
Since 1975
www.garfieldhecht.com
Haley Carmer
hcarmer@garfieldhecht.com
May 25, 2023
VIA EMAIL AND DELIVERY
Garfield County Development Department
c/o Glenn Hartmann, Planner
108 8th Street, Suite 401
Glenwood Springs, Colorado 81601
RE: 214 Center Drive, LLC/Glenwood Partnership LLLP
Supplement to Cooper Subdivision Minor Subdivision Application
Dear Glenn:
On February 23, 2023, 214 Center Drive, LLC (“Applicant”), with the consent of
Glenwood Partnership LLLP (“Owner”), submitted its application for minor subdivision
(“Application”) of the real property commonly known as 214 Center Drive, Glenwood Springs,
Parcel No. 218506100042 (the “Property”). On April 3, 2023, we received your completeness review
letter regarding the Application. The purpose of this submission is to provide the additional documents
and information regarding the Application requested in your letter.
As noted in the Application cover letter, the Property is a 15.8-acre parcel located in
unincorporated Garfield County immediately to the north of the Glenwood Springs Mall and is zoned
Commercial Limited (C/L). The Property was part of a larger 30-acre parcel that was divided into three
smaller parcels pursuant to a subdivision exemption approved by Resolution No. 80-254. No
subdivision exemption plat was recorded. Instead, the two smaller tracts—Tract A and Tract B—
approved by Resolution 80-254 were simply deeded to a third party and ultimately incorporated into
what is now the Glenwood Springs Mall PUD. The Property comprises the third, 16-acre remainder
parcel approved by Resolution 80-254, less approximately .2 acres that were conveyed to the County
for Storm King Road in the deed recorded at Reception No. 325169. No other boundary line adjustments
or lot modifications involving the Property have occurred. The minor subdivision proposed in the
Application will therefore be an amendment to the subdivision exemption approved by Resolution No.
80-254 that accounts for the transfer of Tracts A and B and Storm King Road and divides the Property
into three new lots.
As was also explained in the Application cover letter, a Special Use Permit was approved for
the Property pursuant to Resolution No. 81-121 (the “SUP”). Simultaneously with this supplement,
Applicant is submitting an application to amend the SUP to (1) apply the SUP to all three lots that will
result from the minor subdivision proposed in the Application, and (2) make minor adjustments to the
site plan that approved as part of the SUP. The particulars of the SUP amendment are set forth in detail
in the SUP amendment application, which is incorporated here by reference.
Mr. Glenn Hartmann
May 25, 2023
Page 2 of 2
2822124_1
With this letter, Applicant submits the documents listed below to supplement the Application
that was delivered on February 23, 2023. Applicant is not requesting a waiver of any Article 7 standards
pursuant to Section 4-118 of the LUC or of any submittal requirements under LUC Section 4-202.
1. Recorded Statement of Authority for Owner
2. Improvement Survey Plat of the Property
3. Revised Sopris Engineering Water, Wastewater and Drainage Report with appendix
4. Revised Site Plan and Civil Plans
5. 1981 Special Use Permit
6. Resolution 81-121 (SUP)
7. Resolution 80-254 (Subdivision Exemption)
8. Copies of deeds conveying Tracts A and B and Storm King Road
9. Email to Road & Bridge Department enclosing driveway permit application for CR
130/Donegan Road (includes traffic study that was previously submitted)
10. Building height diagram
11. Draft Subdivision Improvements and Cost Estimate
12. Draft Reciprocal Easement Agreement
Applicant has provided a total of 3 copies of all of the foregoing documents and will email
a link that includes an electronic version of the same. Please contact us if you need additional
information or have questions regarding any of the Application materials. We look forward to
working with the County as we proceed through the application process.
Sincerely,
GARFIELD & HECHT, P.C.
Attorneys for Applicant
By:
Haley Carmer
Enclosures
x
Glenwood Partnership, LLLP (Owner)/
214 Center Drive, LLC (Applicant)
214 Center Drive
Glenwood Springs CO 81601
floyd@diemoz.net; john@diemoz.net
Chad Lee, Johnston / Van Arsdale/ Martin, PLLC (JVAM)
Haley Carmer, Garfield & Hecht, P.C.
970 945-6712
970 922-2122
970 947-1936
Cooper Subdivision
2 1 8 5 0 6 1 0 0 0 4 2
214 Center Dr., Glenwood Springs, CO 81601
15.82 acresCommercial, Limited (CL)
Section 6 Township: 6 Range: 89 A Parcel of Land situate in the NE 1/4 & NWSE of Section
6, Said Parcel being more particularly described per deposited survey No. 719.
JVAM, P.O. Box 878
Glenwood Springs CO 81601
chad@jvamlaw.com hcarmer@garfieldhecht.com
NON-NEGOTIABLE
NON-NEGOTIABLE
Account Number R020404 Parcel 218506100042
Acres 15.830
Assessed To GLENWOOD PARTNERSHIP LLLP
214 CENTER DRIVE
GLENWOOD SPRINGS, CO 81601-2564
Legal Description Situs Address
Section: 6 Township: 6 Range: 89 A PARCEL OF LAND SITUATE IN THE NE1/4 & NWSE OF SECTION 6, SAID
PARCEL BEING MORE PARTICULARLY DESCRIBED PER DEPOSITED SURVEY NO. 719.
000214 CENTER DR
Year Tax Interest Fees Payments Balance
Tax Charge
2022 $84,249.16 $0.00 $0.00 ($84,249.16)$0.00
Total Tax Charge $0.00
Grand Total Due as of 02/22/2023 $0.00
Tax Billed at 2022 Rates for Tax Area 001 - 1G-X - 001
Authority Mill Levy Amount
GARFIELD COUNTY 11.7160000 $12,148.30
GARFIELD COUNTY - ROAD & B 0.0940000 $97.47
GARFIELD COUNTY - SOCIAL SE 0.4430000 $459.35
GARFIELD COUNTY - CAPITAL E 0.9350000 $969.50
GARFIELD COUNTY - RETIREMEN 0.4670000 $484.23
WEST GLENWOOD SAN 0.7620000 $790.12
GLENWOOD AND RURAL FIRE - G 12.3460000 $12,801.57
COLO RIVER WATER CONS 0.5010000 $519.49
SCHOOL DISTRICT RE-1 - GEN 23.7590000*$24,635.71
SCHOOL DISTRICT RE-1 - MIL 13.1720000 $13,658.05
SCHOOL DISTRICT RE-1 - BON 10.4690000 $10,855.31
COLORADO MTN COLLEGE 4.0850000 $4,235.74
GARFIELD COUNTY PUBLIC LIBR 2.5020000 $2,594.32
Taxes Billed 2022 81.2510000 $84,249.16
* Credit Levy
Values Actual Assessed
OFFICES-LAND $1,533,000 $444,570
OFFICES-
IMPROVEMENTS
$1,475,690 $427,950
WAREHOUSE/STORAGE-
IMPS.
$566,820 $164,380
EXEMPT-STATE-LAND-
NONRES
$51,970 $15,070
EXEMPT-STATE-IMPS-
NONRES
$355,750 $103,170
Total $3,983,230 $1,155,140
IMPORTANT INFORMATION ABOUT LIENS-PLEASE READ
ALL TAX LIEN SALE AMOUNTS ARE SUBJECT TO CHANGE DUE TO ENDORSEMENT OF CURRENT TAXES BY THE LIENHOLDER OR TO
ADVERTISING AND DISTRAINT WARRANT FEES. CHANGES MAY OCCUR AND THE TREASURER'S OFFICE WILL NEED TO BE CONTACTED PRIOR
TO REMITTANCE AFTER SEPTEMBER 1ST.
IN ORDER TO AVOID DELAYS IN PROCESSING/ISSUING CERTIFICATES OF REDEMPTION, IT IS RECOMMENDED THAT REDEMPTIONS BE
REMITTED WITH CERTIFIED FUNDS, I.E., CASH, CASHIER'S CHECK, MONEY ORDER OR WIRE TRANSFER.
Garfield County Treasurer
P.O. Box 1069
Glenwood Springs, CO 81602-1069
(970) 945-6382
Garfield County Treasurer
Statement Of Taxes Due
A Mountain Law Firm
Aspen Buena Vista Basalt Glenwood Springs
PO Box 878, Glenwood Springs, CO 81602
P 970.922.2122 F 970.315.4107
Chad J. Lee, Esq.
P.O. Box 878
Glenwood Springs, CO 81602
D: 970.893.8242
February 21, 2023
Garfield County Community Development
c/o Glenn Hartmann
101 West 8th Street
Glenwood Springs, CO 81601
Re: Application for Glenwood Partnership, LLLP – Mineral Owner Notification
Section 4-101(E)(1)(b) of the Garfield County Land Use and Development Code requires
applicants to provide notice to mineral owners in accordance with C.R.S. § 24-65.5-103. C.R.S. § 24-
65.5-103 requires that an applicant notify a mineral estate owner who either (1) is identified as such
by the county tax assessor’s records; or (2) has filed in the Clerk and Recorder a request for
notification. If such records do not identify any mineral estate owners, including their addresses of
record, “the applicant shall be deemed to have acted in good faith and shall not be subject to further
obligations….” On January 10, 2023 we conducted the following tasks for Parcel No. 218506100042
(214 Center Drive, Glenwood Springs):
1. We researched the Garfield County Clerk and Recorder’s index of mineral owner requests
for notification per C.R.S. § 24-65.5-103(1)(a)(I)(B) and confirmed that no mineral owner
for the subject property has filed a request for notification; and
2. We spoke with Casey at the Garfield County Assessor’s office and he said to the County’s
knowledge there are no mineral tax accounts for the subject property. We also confirmed
that the Assessor’s records for Section 6, Township 6 South, Range 89 West do not list
any active or inactive mineral owners.
Additionally, there are 2 references to mineral reservations in Schedule B-2 of the title
commitment included in the application. Exception 11 is a reservation by Helen Gilstrap of ½ of the
mineral rights in 1957. However, that interest was later consolidated back with the surface estate when
it was conveyed back to Floyd Diemoz, as Managing Member of the Diemoz Family Partnership in
that certain Deed recorded August 19, 1977 at Book 499, Page 968 (attached).
Exception 15 also referenced a mineral reservation, but has been stricken by the title company.
This reservation occurred in a deed to the County for an additional 15 foot right of way for Storm
King Road. However, this additional 15 feet was later quitclaimed to the County in that certain Deed
recorded December 28, 1981 as Reception No. 323034, and therefore, is no longer within the
A Mountain Law Firm
PO Box 878, Glenwood Springs, CO 81602
P. 970.922.2122 F. 970.315.4107
2
boundaries of the Property and was deleted from the exceptions. As a result, no mineral owners are
required to be notified of this land use application.
JOHNSTON | VAN ARSDALE | MARTIN, PLLC
__________________________
Chad J. Lee, Esq.
Parcel Id Owner Name Owner Address Owner City St Zip
R020259 ALVAREZ, PEDRO MANUEL 461 COUNTY ROAD 130 GLENWOOD SPRINGS CO 81601
R020195 ARBANEY FAMILY TRUST DTD 4/23/2015 JOHN 201 MEL REY ROAD GLENWOOD SPRINGS CO 81601
R010186 ARMSTRONG, RACHEL MARYE 1433 W 1100 N PROVO UT 846046018
R020068 ARNESEN, NATALLIA & JOHN JORDAN 290 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020386 BIMBO BAKERIES USA INC 13155 NOEL ROAD #100 LB73 DALLAS TX 75240
R020010 CHICOINE, DANIEL BERNARD & PENELOPE L 501 W CASTLE COURT GLENWOOD SPRINGS CO 81601‐2857
R020269 CORRAL LOYA, FRANCISCO J & MIRIAM 571 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020396 CROSBY, JOAN P 518 BENTON ROAD ALBION ME 04910
R020036 DARIEN, ROBERT S & JAMIE RAE 19 CHAPPARRAL CIRCLE GLENWOOD SPRINGS CO 81601‐2601
R020067 DELGADO LEAL, ESTEBAN 80 PONDEROSA CIRCLE GLENWOOD SPRINGS CO 81601
R020324 DERBY, SHANNON 57 PONDEROSA GLENWOOD SPRINGS CO 81601
R020156 DIAZ, NANCI & ONECIMO 529 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020083 ELWELL, BERNITA C68 PONDEROSA DRIVE GLENWOOD SPRINGS CO 81601‐2633
R020070 ENRIQUEZ, HUGO R & YARELI 262 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020106 ESCOBAR, ARTURO HERNANDEZ & NORA ALICIA 349 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020199 GIBSON, MARK E 381 COUNTY ROAD 130 GLENWOOD SPRINGS CO 81601
R020404 GLENWOOD PARTNERSHIP LLLP 214 CENTER DRIVE GLENWOOD SPRINGS CO 81601‐2564
R020439 GLENWOOD SPRINGS MALL LLLP 51027 HIGHWAY 6 & 24, SUITE 100 GLENWOOD SPRINGS CO 816012576
R020485 GORE, CHRISTINA 1250 SAINT HELENA AVENUE SANTA ROSA CA 95404
R020260 GROSS, MICHAEL BURTON & KATHERINE KIM 479 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020227 HAMBURG, KENNETH J & SCHMITZ, SUSAN M 194 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020234 HEISEL TRUST 3201 COUNTY ROAD 117 GLENWOOD SPRINGS CO 81601
R020292 HURST, TODD 547 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020251 KING, DAVID J & LACY M 206 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R530045 KIP HAMPDEN LLLP 1212 MOTOR CITY DRIVE COLORADO SPRINGS CO 80905
R020011 LAW, JEROME CHRISTY & LAURA KATHLEEN AS 335 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R010185 LEE, BRIAN JOSEPH & NICOLE 1471 WALZ AVENUE GLENWOOD SPRINGS CO 81601
R530046 LOT 2B LLC 55 STORM KING ROAD GLENWOOD SPRINGS CO 81601
R020296 MAGANA, JESUS GODINEZ & GODINEZ, ANGELIN 0100 CHAPPAREL GLENWOOD SPRINGS CO 81601
R020157 MELIA, SALLY JO 98 PONDEROSA CIRCLE GLENWOOD SPRINGS CO 81601
R084559 MELRAY OZF LLC 375 OAK RUN ROAD CARBONDALE CO 81623
R020368 MONDRAGON CARRILLO, ROBERTO 58 CHAPPARRAL CIRCLE GLENWOOD SPRINGS CO 81601
Names and Mailing Addresses of Property Owners Within 200 ft. of the Subject Property
Parcel Id Owner Name Owner Address Owner City St Zip
R020220 MONDRAGON, VICTOR ALEJANDRO & ANDRADE GU 559 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020096 MONTANEZ, EDNA Z 170 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020033 MORELLI, THOMAS & TERRI 367 DONEGAN ROAD GLENWOOD SPRINGS CO 81601‐2600
R020218 MOSER, MICHAEL J & JENNIFER C 319 COUNTY ROAD 130 GLENWOOD SPRINGS CO 81601
R020039 OLP, JERALD W SR 301 MEL REY ROAD GLENWOOD SPRINGS CO 816012643
R020362 PATRICK, JOHN MICHAEL & JILLENE MARIE 913 RED MOUNTAIN DRIVE GLENWOOD SPRINGS CO 81601
R020250 PORTER, GWENDOLYN M60 PONDEROSA CIRCLE GLENWOOD SPRINGS CO 816012629
R020276 RUIZ, LAMBERTO & CRUZ, IRMA 0227 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020307 SALAM, H A72 CHAPPARRAL CIRCLE GLENWOOD SPRINGS CO 81601‐2602
R020285 SHUSTER, PATRICK LEE & TONI MARIE 301 COUNTY ROAD 130 GLENWOOD SPRINGS CO 816012768
R084560 SUNRAY OZF LLC 375 OAK RUN ROAD CARBONDALE CO 81623
R020321 TAYLOR, VICKI RAY & WAGNER, CONRAD LESTE 228 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R530083 TWO RIVERS BUILDING CORPORATION 195 CENTER DRIVE CARBONDALE CO 81623
R020074 VIGIL AYALA, JUAN & FABELA, CECILIA E 449 DONEGAN ROAD GLENWOOD SPRINGS CO 81601
R020054 WARD, KEVIN B & KELLY J 0191 MEL RAY ROAD GLENWOOD SPRINGS CO 81601
R020375 WARD, LEWIS B JR & CHARLSEY J 281 PONDEROSA DRIVE GLENWOOD SPRINGS CO 81601‐2634
R020302 WAREHAM, WALLY TRAVIS 435 JUIPER COURT GLENWOOD SPRINGS CO 81601
R020192 WILLIAMS, DENNIS ROBERT & ANNA MAE 447 COUNTY ROAD 130 GLENWOOD SPRINGS CO 81601‐2766
R020484 WJ ENTERPRISES LLC 151 PONDEROSA DRIVE GLENWOOD SPRINGS CO 81601
R020438 WOOD KING LLLP 51027 HIGHWAY 6 & 24, SUITE 100 GLENWOOD SPRINGS CO 81601
R020367 ZWICKL, DENNIS LEE & MICHELLE PO BOX 1209 GLENWOOD SPRINGS CO 816021209
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(970) 945-8212
www.garfield-county.com
PRE-APPLICATION
CONFERENCE SUMMARY
TAX PARCEL NUMBER: 2185-061-00-042 DATE: 9/15/22 & 11/28/22
(updates highlighted in yellow)
OWNER/APPLICANT: Glenwood Partnership LLLP
REPRESENTATIVES: Haley Carmer (Attorney), Chad Lee (Attorney),
ENGINEER: Yancy Nichol (Engineer)
PRACTICAL LOCATION: 214 Center Dr., Glenwood Springs, CO 81601
TYPE OF APPLICATION: Minor Subdivision
ZONING: Commercial Limited (C/L)
SIZE: 15.8 Acres
I. GENERAL PROJECT DESCRIPTION
The applicant is proposing a minor subdivision to split the 15.8-acre property into three lots.
An updated proposed site plan has been provided that shows Lot 1 at 3.192 acres, Lot 2
increasing to 7.916 acres, and the remainder Lot 3 (future Development Parcel) at 4.711
acres.
Lot 1 would continue to be operated as a commercial lot under the existing Special Use
Permit for the property. Two buildings current exist on the proposed lot, with the revised site
plan showing no additional structures on Lot 1.
Lot 2 would be developed for an Indoor Self Storage - Mini Storage Facility. Storage, Mini,
is a Permitted Use in the Commercial Limited Zone District. The development on Lot 2 is
now shown with 3 potential buildings including a Building C which has been added to the
plan which would be a limited access secured storage building. More conventional mini-
storage facilities would be developed in proposed Buildings A and B located on the northerly
portion of the lot.
Lot 3 would continue to be other future development to be determined.
The Applicant has provided previous emails indicating that new buildings would be 25 ft. of
less in height, that traffic generation was being analyzed with a preliminary estimate of 15 -
35 vehicles per 12-hour day (7 a.m. – 7 p.m.) for the previous site plan configuration. The
new site plan reflects an increase in storage square footage going from approximately
110,000 sq.ft. to 145,000 sq.ft. It also includes removal of a previously proposed new building
on Lot 1.
Key considerations discussed with the Applicant’s Representative included:
- Updating utility service for the proposed lots including will serve letters from the City
of Glenwood Springs and the Sanitation District.
- Demonstration of compliance with the utility providers standards/engineering will need
to be provided.
- Provision of legal and physical access to all lots.
- Existing Special Use Permit conditions of approval – representations.
- How future development including the Mini Storage Facility will be handled in relation
to the existing Special Use Permit.
- Character of future Mini Storage Facility in terms of building size (square footage),
configuration of buildings, circulation/access and building heights.
- Overall circulation and access including potential additional sidewalk improvements.
- Preliminary layout of off-street parking.
- Glenwood Springs Comprehensive Plan designations and review procedures
including referrals to the City of Glenwood Springs.
- Sign Code considerations.
Updated discussions included
- Access road alignment and intersection on Donegan Rd.
- Traffic implications of the revised site plan.
- Building height and visual impacts of buildings. Also covered the reduced
grade/elevation of the site from Donegan Rd.
- Proposed inclusion of curb and gutter and sidewalks along Donegan Rd.
- Existing sidewalks on Storm King Road.
- Adjacent land uses including the Two River’s Community School.
MINOR SUBDIVISION PROCESS
The Minor Subdivision submittal requirements included but are not limited to Site Plans,
Vicinity Map, Water Supply Plan, Wastewater Management Plan, Final Plat, Covenants, and
Preliminary Engineering. The Minor Subdivision, review criteria in Section 5-301 contains a
number of requirements including demonstration of legal and adequate water for all three of
the proposed lots. Will serve letters and related engineering documentation in the form of a
Water Supply Plan is required. Access needs to be addressed through any expanded access
permits that may be required. Wastewater Management Plan should also include will serve
letters and related engineering documentation. Cost estimates for required infrastructure
improvements are also required.
The applicant will need to create a plat for the subdivision including all required certificates
and signature blocks. The plat will need to include all information as described in Section 5-
402(F), including the name and addresses of the surface owners and mineral estate. T he
applicant will also need to submit a title commitment for the subject property and ensure that
all easements and encumbrances identified in the commitment are accurately shown on the
plat. Proof of ownership is required to process the application. The p roperty owner, per
County assessor records, will need to sign the application or provide a letter of authorization
for anyone else who will be working on the Application.
The subdivision process and plat will also need to address any necessary easements for
access and utilities (such as water, sewer, electric). Shared private road agreements that
address maintenance are often required along with security for required improvements or a
plan to complete required improvements prior to filing the Minor Subdivision Plat.
ORIGINAL SUBDIVISION EXEMPTION
Additional Staff Research indicates that the Applicant’s property or an earlier configuration
of said property was created through a Subdivision Exemption granted by Resolution No. 80-
254 for the Glenwood Partnership. Any current proposal for Minor Subdivision would be a
re-subdivision of a Tract created by the original subdivision exemption. The minor
subdivision would need to address this through plat notes and general conformance with
conditions of the original approvals. It is likely that the Minor Subdivision title will also include
reference to amendment of the original subdivision exemption.
EXISTING SPECIAL USE PERMIT
Any Application for Minor Subdivision needs to demonstrate compliance with the existing
Special Use Permit. Staff is still evaluating whether the subdivision will trigger the need to
update/amend the Special Use Permit. If the dimensions of the Special Use Permit (i.e.
acreage – area) is being revised that likely will require an update/amendment.
Staff is also still evaluating how to address the extended period of time since the original
Special Use Permit approvals. Key considerations for Special Use Permits including but not
limited to utilities, access, traffic generation and roadway needs have not be en reassessed
since original approval in 1981 and will likely need to be updated.
A determination on whether an amendment to the existing Special Use Permit is required or
is a minor modification or a substantial modification can be referred to the Board of County
Commissioners for their determination. Additional pre-application meetings on existing
Special Use Permit topics may be necessary. Changes to conditions of approval or previous
representations in the Special Use Approvals will also likely require an update/amendment.
An amendment to the Special Use Permit could be heard concurrently with a Mi nor
Subdivision Application.
II. REGULATORY PROVISIONS – MINOR SUBDIVISION
• Garfield County Comprehensive Plan 2030 as amended
• Garfield County Land Use and Development Code as amended
o Section 5-301 – Minor Subdivision Review
o Table 5-103 Common Review Procedures and Required Notice
o Section 5-401 and Table 5-401 Submittal Requirements including preliminary
engineering reports.
o Section 5-402 Description of Submittal Requirements including Final Plat
o Section 4-101 Common Review Procedures
o Section 4-103 Administrative Review including Public Notice
o Article 7, Divisions 1, 2, 3, and 4 as applicable
o Section 4-118 Waiver from Standards & Section 4-202 Waiver from Submittal
Requirements
III. SUBMITTAL REQUIREMENTS – MINOR SUBDIVISION
As a convenience, a summary of the submittal requirements for a Minor Subdivision
Application is outlined below. These items are fully described as referenced in Table 5 -401
of the Land Use and Development Code.
General Application Materials
o Signed Application Form
o Signed Payment Agreement Form and application fees
o Proof of Ownership including the deed and updated Title Commitments for all
properties and any information on lien holders
A narrative describing the request and related information.
The Application shall demonstrate that it meets the Review Criteria requirements set
forth in Section 5-301 (section attached).
Mineral rights ownership for the subject property (demonstrated through a search of
Clerk and Recorders database and/or Assessor database, memo attached).
Names and mailing addresses of property owners within 200 ft. of the subject property.
Vicinity Map.
The Proposed Minor Subdivision Plat showing the proposed lot lines, all easements
and required certificates. Final Plat will need to meet the standards in Section 5-402(F)
and all required certificates.
Site Plan and related information (some may be shown on the proposed plat) including
topography, existing improvements, roads/driveways, infrastructure, irrigation ditches,
and significant features. The site plan should include information on location of
existing and proposed improvements on the property adequate to confirm that no
nonconforming conditions will result from the proposed subdivision.
Water Supply Plan needs to include d etails on legal, physical, and adequate water
including will serve letters, tap agreements, and any engineering plans.
Wastewater Treatment Plan needs to include details on proposed connection to
central sewer services including will serve letters, tap agreements, and any
engineering plans.
A waiver request from submittal of an Improvements Agreement , with reference to
section 4-202.C of the LUDC.
Copies of any covenants affecting the property need to be provided, if applicable.
Information as applicable to demonstrate compliance with provisions of Article 7
Standards. It is recommended that a format that responds to each section be utilized
for this section of the Application (see attached).
Provide documentation of legal, physical, and adequate access to the overall property
and proposed lots including any easements on the plat to provide access.
Provide a demonstration from a qualified professional that the existing and proposed
access meets Roadway requirements as detailed in Article 7-107 of the Land Use
Code.
Form and payment for the Colorado Geological Survey (CGS) review. The payment
check for this referral should be made out to the Colorado Geo logical Survey
Engineering Reports, as applicable per Table 5 -401, Minor Subdivision, A) Roads,
Trails, Walkways, and Bikeways, C) Sewage Collection and Water Supply and
Distribution System, E) Groundwater Drainage, and H) Preliminary Cost Estimates for
Improvements
A copy of this pre-application conference summary
While a traffic study is not included on the submittal listing for Minor Subdivisions,
information on traffic generation, impacts on and adequacy of adjoining roadways
needs to be provided.
The Application submittal needs to include 3 hard copies of the entire Application and 1 digital
PDF copy of the entire Application (on a CD or USB Memory Stick). Both the paper and
digital copies should be split into individual sections. Please refer to this pre-application
summary for submittal requirements, listed above, that are appropriate for your Application.
IV. REVIEW PROCESS – MINOR SUBDIVISION
The review process shall follow the steps contained in Table 5-103 and Section 4-103 for a
Minor Subdivision Administrative Review and outlined in the following summary. Minor
Subdivisions can be referred up to the Board of County Comm issioners by the Community
Development Director which would result in public hearing with 15 days mailed public notice.
Public Hearing(s): _X No Public Hearing (Minor Subdivision is a Directors
Decision with notice per code, unless referred up to the Board of
County Commissioners)
___ Planning Commission
___ Board of County Commissioners
___ Board of Adjustment
Referral Agencies: May include but is not limited to: Garfield County Surveyor,
Garfield County Attorney, Garfield County Building Department,
Garfield County Road and Bridge, Colorado Geological Survey,
Garfield County Environmental Health, Garfield County
Vegetation Management, City of Glenwood Springs (including
Public Works, Water and Electric Departments, West Glenwood
Sanitation District (if applicable) and any other affected utility
providers, Glenwood Springs Fire Protection District, CDOT.
V. APPLICATION REVIEW FEES
Planning Review Fees: $400
Referral Agency Fees: $ TBD ($600 Colorado Geological Survey, separate check
- others To Be Determined)
Total Deposit: $1,000 (additional hours are billed at hourly rate of $40.50)
Disclaimer
The foregoing summary is advisory in nature only and is not binding on the County. The
summary is based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. This summary does not create a legal or
vested right. The summary is valid for a six-month period, after which an update should be
requested. The Applicant is advised that the Application submittal once accepted by the
County becomes public information and will be available (including electronically) for review
by the public. Proprietary information can be redacted from documents prior to submittal.
Pre-application Summary Prepared by:
______________________________ 12/22/22
Glenn Hartmann, Principal Planner Date
APPLICANT’S SITE
Guffield Coulnty
Community Development Department
April3, 2023
Haley Carmer, Garfield & Hecht PC
910 GrandAve., Suite 201
Glenwood Springs, CO 81601
RE: Completeness Review Cooper Minor Subdivision (MISA-02-23-8948)
Dear Haley
Thank you for the detailed submittals that you have provided for the Cooper Minor Subdivision.
Our completeness review includes input form the County Attorney's Office, review of our Pre-
Application meeting, and pre-existing approvals on the property. Our review has determined the
following items need to be addressed prior to a determination of technical completeness.
Amended Special Use Permit
An Application for an Amended Special Use Permit needs to be submitted to address
changes in the area contained with the Commercial Park.
The Application may request consideration as a Minor Modification. Staff can make the
determination if can be reviewed as a Minor Modification or that determination can be
referred to the BOCC.
The Application package needs to include a narrative description of the proposed
change to the area and how it affects existing structures. The narrative should be
consistent with an updated narrative included in the Cooper Minor Subdivision submittal.
The Application needs to include copies of past resolutions and permits, including the
permitted uses language.
The Application needs to clearly indicate what elements of the existing permit will remain
unchanged and which will change or be revised. lnitial Staff review has identified access
and access improvements that need to be addressed.
The Application needs to address the phasing representations previously included in the
original applications and how they relate to the current development proposals.
A revised legal description, mapping showing the proposed new area, and an
lmprovement Location Certificate showing the existing structures and improvements
need to be provided.
The Application needs to contain representations/documentation reflecting that the
development is currently in compliance with all previous conditions of approval.
Cooper Minor Subdivision
3
1
2
6
7
4
5
8.
1 An Application for an Amended Special Use Permit needs to be submitted as outlined
above.
2.
3.
4.
5.
Þ.
7.
8.
9.
The narrative needs to include the history of the lot creation and that the Minor
Subdivision will be an amendment to the original Subdivision Exemption and will correct
any past boundary line adjustments or lot modifications.
The Statement of Authority included in the submittals needs to be recorded.
Copies of past approvals for Subdivision Exemption and Special Use Permits need to be
included in the submittals.
The site plan needs to include improvement location information for the existing
structures on Lot 1.
The Application needs to include a draft Subdivision lmprovements Agreement including
details on timing for required improvements and proposed security for the submitted cost
estimates.
Access Permit information needs to be provided including the proposed access onto
County Road 130, Donegan Rd.
lnformation on access driveways is needed including documentation/demonstration of
compliance with Table 7-107 as part of your Engineering Report.
A draft of the reciprocal access easement agreement (for internal roadways) needs to be
provided along with additional details on how the Minor Subdivision will manage and
maintain other common improvements including drainage and stormwater
improvements.
Draft covenants need to be provided.
A summary of any waiver requests is needed along with references to criteria contained
in Section 4-118 for Waivers from Standards and 4-202 for submittalwaivers.
10
11
Some key issues that are not technically completeness items but that are anticipated to
important parts of the review process are noted below:
A. The Traffic Study and other off-site impacts including the Mel Rey Road Roundabout and a
means for estimating traffic for "Flex Spaces" and future development including Lot 3.
B. Details on Lighting Compliance and mitigation for off-site and glare impacts.
C. Consistency of parking and circulation layout with code requirements
D. Architectural illustrations are not a required submittal but will be part of the review process
based their inclusion in the Application submittals. Dimensional standards including building
heights will likely also be part of the review process.
Once the above completeness topics (#1 - #8 and #1 - #11) are addressed, we can proceed
with your review process. Please note that your Application may be referred up to the Board of
County Commissioners for concurrent review of the Special Use Permit Amendment and Minor
Subdivision. Please note that the Garfield County Land Use and Development Code requires
that the technical completeness issues be resolved within 60-days of the date of this letter,
otherwise the application will be deemed withdrawn unless a request for extension is submitted
and approved. Please feel free to contact me with any questions on the completeness topics
noted above or if you need clarification on any of the items.
Sincerely,
f?.u lL
Glenn Hartmann
Principal Planner
1620 Grand Avenue, Suite B
Glenwood Springs, CO 81601
Phone: 970-945-1169 Fax: 844-269-2759
www.titlecorockies.com
Commitment Ordered By:
Bob Hinkey
Bullock & Hinkey Real Estate
3110 A Blake Avenue
Glenwood Springs, CO 81601
Phone: 970-384-2030 Fax:
email: b.hinkey@comcast.net; krmckee@sopris.net
Inquiries should be directed to:
Becky Blanchard
Title Company of the Rockies
1620 Grand Avenue, Suite B
Glenwood Springs, CO 81601
Phone: 970-945-1169 Fax: 844-269-2759
email: BBlanchard@TitleCoRockies.com
Commitment Number:0603918-C2
Buyer's Name(s):214 Center Drive, LLC, a Colorado limited liability company
Seller's Name(s):Glenwood Partnership, LLLP, a Colorado limited liability limited partnership
Property:214 Center Drive, Parcel A, Glenwood Springs, CO 81601
Section: 6 Township: 6 Range: 89, County of Garfield, State of Colorado.
TITLE CHARGES
These charges are based on issuance of the policy or policies described in the attached Commitment for Title Insurance, and includes premiums
for the proposed coverage amount(s) and endorsement(s) referred to therein, and may also include additional work and/or third party charges
related thereto.
If applicable, the designation of “Buyer” and “Seller” shown below may be based on traditional settlement practices in Garfield County,
Colorado, and/or certain terms of any contract, or other information provided with the Application for Title Insurance.
Owner’s Policy Premium:
Loan Policy Premium:
Additional Lender Charge(s):
Additional Other Charge(s):
Tax Certificate:
Total Endorsement Charge(s):
TBD Charge(s):
TOTAL CHARGES:
Service Beyond Expectation in Colorado for: Eagle, Garfield, Grand, Pitkin and Summit Counties. (Limited Coverage: Jackson, Lake, Park and Routt Counties)
Locations In: Avon/Beaver Creek, Basalt, Breckenridge, Grand Lake and Winter Park. (Closing Services available in Aspen and Glenwood Springs).
ALTA COMMITMENT FOR TITLE INSURANCE
issued by
WESTCOR LAND TITLE INSURANCE COMPANY
(ALTA Adopted 07-01-2021)
NOTICE
IMPORTANT—READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE TITLE
INSURANCE POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE
CONTENT OF THIS COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT.
THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE, LEGAL
OPINION, OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE. THE
PROCEDURES USED BY THE COMPANY TO DETERMINE INSURABILITY OF THE TITLE, INCLUDING ANY
SEARCH AND EXAMINATION, ARE PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR
THE BENEFIT OF THE COMPANY, AND CREATE NO EXTRACONTRACTUAL LIABILITY TO ANY PERSON,
INCLUDING A PROPOSED INSURED.
THE COMPANY ’S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED
INSURED IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS
COMMITMENT. THE COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS
COMMITMENT TO ANY OTHER PERSON.
COMMITMENT TO ISSUE POLICY
Subject to the Notice; Schedule B, Part I—Requirements; Schedule B, Part II—Exceptions; and the Commitment
Conditions, Westcor Land Title Insurance Company, a South Carolina Corporation (the “Company”), commits to issue
the Policy according to the terms and provisions of this Commitment. This Commitment is effective as of the
Commitment Date shown in Schedule A for each Policy described in Schedule A, only when the Company has entered in
Schedule A both the specified dollar amount as the Proposed Amount of Insurance and the name of the Proposed Insured.
If all of the Schedule B, Part I—Requirements have not been met within (6) months after the Commitment Date, this
Commitment terminates and the Company’s liability and obligation end.
Issued By:
Title Company of the Rockies, LLC
322 Harrison Avenue
Leadville, CO 80461
Phone: (719) 486-2688
WESTCOR LAND TITLE INSURANCE
COMPANY
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part
II-Exceptions; and a counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
COMMITMENT CONDITIONS
DEFINITIONS1.
a.“Discriminatory Covenant”: Any covenant, condition, restriction, or limitation that is
unenforceable under applicable law because it illegally discriminates against a class of
individuals based on personal characteristics such as race, color, religion, sex, sexual
orientation, gender identity, familial status, disability, national origin, or other legally
protected class.
b.“Knowledge” or “Known”: Actual knowledge or actual notice, but not constructive notice
imparted by the Public Records.
c.“Land”: The land described in Item 5 of Schedule A and improvements located on that land
that by State law constitute real property. The term “Land” does not include any property
beyond that described in Schedule A, nor any right, title, interest, estate, or easement in any
abutting street, road, avenue, alley, lane, right-of-way, body of water, or waterway, but does
not modify or limit the extent that a right of access to and from the Land is to be insured by
the Policy.
d.“Mortgage”: A mortgage, deed of trust, trust deed, security deed, or other real property
security instrument, including one evidenced by electronic means authorized by law.
e.“Policy”: Each contract of title insurance, in a form adopted by the American Land Title
Association, issued or to be issued by the Company pursuant to this Commitment.
f.“Proposed Amount of Insurance ”: Each dollar amount specified in Schedule A as the
Proposed Amount of Insurance of each Policy to be issued pursuant to this Commitment.
g.“Proposed Insured ”: Each person identified in Schedule A as the Proposed Insured of each
Policy to be issued pursuant to this Commitment.
h.“Public Records ”: The recording or filing system established under State statutes in effect at
the Commitment Date under which a document must be recorded or filed to impart
constructive notice of matters relating to the Title to a purchaser for value without
Knowledge. The term “Public Records ” does not include any other recording or filing
system, including any pertaining to environmental remediation or protection, planning,
permitting, zoning, licensing, building, health, public safety, or national security matters.
i.“State”: The state or commonwealth of the United States within whose exterior boundaries
the Land is located. The term “State” also includes the District of Columbia, the
Commonwealth of Puerto Rico, the U.S. Virgin Islands, and Guam.
j.“Title”: The estate or interest in the Land identified in Item 3 of Schedule A.
2.If all of the Schedule B, Part I —Requirements have not been met within the time period specified
in the Commitment to Issue Policy, this Commitment terminates and the Company ’s liability and
obligation end.
3.The Company’s liability and obligation is limited by and this Commitment is not valid without:
a. the Notice;
b. the Commitment to Issue Policy;
c. the Commitment Conditions;
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
d. Schedule A;
e. Schedule B, Part I—Requirements; and
f. Schedule B, Part II—Exceptions; and
g. a signature by the Company or its issuing agent that may be in electronic form.
4. COMPANY’S RIGHT TO AMEND
The Company may amend this Commitment at any time. If the Company amends this Commitment
to add a defect, lien, encumbrance, adverse claim, or other matter recorded in the Public Records
prior to the Commitment Date, any liability of the Company is limited by Commitment Condition
5. The Company is not liable for any other amendment to this Commitment.
5. LIMITATIONS OF LIABILITY
a. The Company’s liability under Commitment Condition 4 is limited to the Proposed Insured’s
actual expense incurred in the interval between the Company ’s delivery to the Proposed
Insured of the Commitment and the delivery of the amended Commitment, resulting from the
Proposed Insured’s good faith reliance to:
i. comply with the Schedule B, Part I —Requirements;
ii. eliminate, with the Company ’s written consent, any Schedule B, Part II —Exceptions;
or
iii. acquire the Title or create the Mortgage covered by this Commitment.
b. The Company is not liable under Commitment Condition 5.a. if the Proposed Insured
requested the amendment or had Knowledge of the matter and did not notify the Company
about it in writing.
c. The Company is only liable under Commitment Condition 4 if the Proposed Insured would
not have incurred the expense had the Commitment included the added matter when the
Commitment was first delivered to the Proposed Insured.
d. The Company’s liability does not exceed the lesser of the Proposed Insured’s actual expense
incurred in good faith and described in Commitment Condition 5.a. or the Proposed Amount
of Insurance.
e. The Company is not liable for the content of the Transaction Identification Data, if any.
f. The Company is not obligated to issue the Policy referred to in this Commitment unless all of
the Schedule B, Part I—Requirements have been met to the satisfaction of the Company.
g. The Company ’s liability is further limited by the terms and provisions of the Policy to be
issued to the Proposed Insured.
6. LIABILITY OF THE COMPANY MUST BE BASED ON THIS COMMITMENT; CHOICE
OF LAW AND CHOICE OF FORUM
a. Only a Proposed Insured identified in Schedule A, and no other person, may make a claim
under this Commitment.
b. Any claim must be based in contract under the State law of the State where the Land is
located and is restricted to the terms and provisions of this Commitment. Any litigation or
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
other proceeding brought by the Proposed Insured against the Company must be filed only in
a State or federal court having jurisdiction.
c. This Commitment, as last revised, is the exclusive and entire agreement between the parties
with respect to the subject matter of this Commitment and supersedes all prior commitment
negotiations, representations, and proposals of any kind, whether written or oral, express or
implied, relating to the subject matter of this Commitment.
d. The deletion or modification of any Schedule B, Part II —Exception does not constitute an
agreement or obligation to provide coverage beyond the terms and provisions of this
Commitment or the Policy.
e. Any amendment or endorsement to this Commitment must be in writing and authenticated by
a person authorized by the Company.
f. When the Policy is issued, all liability and obligation under this Commitment will end and
the Company’s only liability will be under the Policy.
7. IF THIS COMMITMENT IS ISSUED BY AN ISSUING AGENT
The issuing agent is the Company ’s agent only for the limited purpose of issuing title insurance
commitments and policies. The issuing agent is not the Company ’s agent for closing, settlement,
escrow, or any other purpose.
8. PRO-FORMA POLICY
The Company may provide, at the request of a Proposed Insured, a pro-forma policy illustrating the
coverage that the Company may provide. A pro-forma policy neither reflects the status of Title at
the time that the pro-forma policy is delivered to a Proposed Insured, nor is it a commitment to
insure.
9. CLAIMS PROCEDURES
This Commitment incorporates by reference all Conditions for making a claim in the Policy to be
issued to the Proposed Insured. Commitment Condition 9 does not modify the limitations of
liability in Commitment Conditions 5 and 6.
10. CLASS ACTION
ALL CLAIMS AND DISPUTES ARISING OUT OF OR RELATING TO THIS COMMITMENT,
INCLUDING ANY SERVICE OR OTHER MATTER IN CONNECTION WITH ISSUING THIS
COMMITMENT, ANY BREACH OF A COMMITMENT PROVISION, OR ANY OTHER
CLAIM OR DISPUTE ARISING OUT OF OR RELATING TO THE TRANSACTION GIVING
RISE TO THIS COMMITMENT, MUST BE BROUGHT IN AN INDIVIDUAL CAPACITY. NO
PARTY MAY SERVE AS PLAINTIFF, CLASS MEMBER, OR PARTICIPANT IN ANY CLASS
OR REPRESENTATIVE PROCEEDING. ANY POLICY ISSUED PURSUANT TO THIS
COMMITMENT WILL CONTAIN A CLASS ACTION CONDITION.
11. ARBITRATION
The Policy contains an arbitration clause. All arbitrable matters when the Proposed Amount of
Insurance is $2,000,000 or less may be arbitrated at the election of either the Company or the
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Proposed Insured as the exclusive remedy of the parties. A Proposed Insured may review a copy of
the arbitration rules at http://www.alta.org/arbitration .
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
ALTA Commitment For Title Insurance
(Adopted 06-17-06) (Revised 08-01-2016)
COMMITMENT FOR TITLE INSURANCE
ISSUED BY
WESTCOR LAND TITLE INSURANCE COMPANY
NOTICE
IMPORTANT-READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE TITLE INSURANCE
POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE CONTENT OF THIS
COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT.
THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE, LEGAL OPINION,
OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE. THE PROCEDURES USED BY THE
COMPANY TO DETERMINE INSURABILITY OF THE TITLE, INCLUDING ANY SEARCH AND EXAMINATION, ARE
PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE
NO EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED.
THE COMPANY'S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED INSURED
IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS COMMITMENT. THE
COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER
PERSON.
COMMITMENT TO ISSUE POLICY
Subject to the Notice; Schedule B, Part I-Requirements; Schedule B, Part II-Exceptions; and the Commitment Conditions,
WESTCOR LAND TITLE INSURANCE COMPANY, a South Carolina Corporation (the “Company”), commits to issue the Policy
according to the terms and provisions of this Commitment. This Commitment is effective as of the Commitment Date shown in
Schedule A for each Policy described in Schedule A, only when the Company has entered in Schedule A both the specified
dollar amount as the Proposed Policy Amount and the name of the Proposed Insured.
If all of the Schedule B, Part I-Requirements have not been met within six (6) months after the Commitment Date, this
Commitment terminates and the Company's liability and obligation end.
IN WITNESS WHEREOF, WESTCOR LAND TITLE INSURANCE COMPANY has caused its corporate name and seal to be
hereunto affixed and by these presents to be signed in facsimile under authority of its by-laws, effective as of the date of
Commitment shown in Schedule A.
Issued By:
CM-2 (ALTA Commitment for Title Insurance (6-17-06)(WLTIC Edition (9/26/07)
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Title Company of the Rockies, LLC
322 Harrison Avenue
Leadville, CO 80461
Phone: (719) 486-2688
WESTCOR LAND TITLE INSURANCE COMPANY
Westcor Land Title Insurance Company
ALTA Commitment -2006 (6-17-06)
(Reverse side of Cover)
CONDITIONS
The term mortgage, when used herein, shall include deed of trust, trust deed, or other security instrument.1.
If the proposed Insured has or acquired actual knowledge of any defect, lien, encumbrance, adverse claim2.
or other matter affecting the estate or interest or mortgage thereon covered by this Commitment other
than those shown in Schedule B hereof, and shall fail to disclose such knowledge to the Company in
writing, the Company shall be relieved from liability for any loss or damage resulting from any act of
reliance hereon to the extent the Company is prejudiced by failure to so disclose such knowledge. If the
proposed Insured shall disclose such knowledge to the Company, or if the Company otherwise acquires
actual knowledge of any such defect, lien, encumbrance, adverse claim or other matter, the Company at
its option may amend Schedule B of this Commitment accordingly, but such amendment shall not relieve
the Company from liability previously incurred pursuant to paragraph 3 of these Conditions and
Stipulations.
Liability of the Company under this Commitment shall be only to the named proposed Insured and such3.
parties included under the definition of Insured in the form of policy or policies committed for and only for
actual loss incurred in reliance hereon in undertaking in good faith (a) to comply with the requirements
hereof, or (b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate or interest
or mortgage thereon covered by this Commitment. In no event shall such liability exceed the amount
stated in Schedule A for the policy or policies committed for and such liability is subject to the insuring
provisions and Conditions and Stipulations and the Exclusions from Coverage of the form of policy or
policies committed for in favor of the proposed Insured which are hereby incorporated by reference and
are made a part of this Commitment except as expressly modified herein.
This Commitment is a contract to issue one or more title insurance policies and is not an abstract of title4.
or a report of the condition of title. Any action or actions or rights of action that the proposed Insured may
have or may bring against the Company arising out of the status of the title to the estate or interest or the
status of the mortgage thereon covered by this Commitment must be based on and are subject to the
provisions of this Commitment.
The policy to be issued contains an arbitration clause. All arbitrable matters when the Amount of5.
Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or the Insured as
the exclusive remedy of the parties. You may review a copy of the arbitration rules at<
http://www.alta.org/>.
(Reverse side of Cover)
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Westcor Land Title Insurance Company
Joint Notice of Privacy Policy
of
Westcor Land Title Insurance Company
and
Title Company of the Rockies, LLC
Westcor Land Title Insurance Company (“WLTIC”) and Title Company of the Rockies, LLC value their customers and are
committed to protecting the privacy of personal information. In keeping with that philosophy, we each have developed a Privacy
Policy, set out below, that will endure the continued protection of your nonpublic personal information and inform you about the
measures WLTIC and Title Company of the Rockies, LLC take to safeguard that information. This notice is issued jointly as a
means of paperwork reduction and is not intended to create a joint privacy policy. Each company's privacy policy is separately
instituted, executed, and maintained.
Who is Covered
We provide our Privacy Policy to each customer when they purchase a WLTIC title insurance policy. Generally, this means that the
Privacy Policy is provided to the customer at the closing of the real estate transaction.
Information Collected
In the normal course of business and to provide the necessary services to our customers, we may obtain nonpublic personal
information directly from the customer, from customer-related transactions, or from third parties such as our title insurance agent,
lenders, appraisers, surveyors and other similar entities.
Access to Information
Access to all nonpublic personal information is limited to those employees who have a need to know in order to perform their jobs.
These employees include, but are not limited to, those in departments such as closing, legal, underwriting, claims and
administration and accounting.
Information Sharing
Generally, neither WLTIC nor Title Company of the Rockies, LLC shares nonpublic personal information that it collects with
anyone other than those individuals necessary needed to complete the real estate settlement services and issue its title insurance
policy as requested by the consumer. WLTIC or Title Company of the Rockies, LLC may share nonpublic personal information
as permitted by law with entities with whom WLTIC or Title Company of the Rockies, LLC has a joint marketing agreement.
Entities with whom WLTIC or Title Company of the Rockies, LLC have a joint marketing agreement have agreed to protect the
privacy of our customer's nonpublic personal information by utilizing similar precautions and security measures as WLTIC and Title
Company of the Rockies, LLC use to protect this information and to use the information for lawful purposes. WLTIC or Title
Company of the Rockies, LLC , however, may share information as required by law in response to a subpoena, to a government
regulatory agency or to prevent fraud.
Information Security
WLTIC and Title Company of the Rockies, LLC , at all times, strive to maintain the confidentiality and integrity of the personal
information in its possession and has instituted measures to guard against its unauthorized access. We maintain physical,
electronic and procedural safeguards in compliance with federal standards to protect that information.
The WLTIC Privacy Policy can be found on WLTIC's website at www.wltic.com
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
COMMITMENT FOR TITLE INSURANCE
Issued by
as agent for
Westcor Land Title Insurance Company
SCHEDULE A
Reference:Commitment Number: 0603918-C2
1.Effective Date: January 17, 2023, 7:00
am
Issue Date: January 25, 2023
2. Policy (or Policies) to be issued:
ALTA® 2021 Owner's Policy Policy
Amount:
Premium:
Proposed Insured:214 Center Drive, LLC, a Colorado limited liability company
3.The estate or interest in the Land at the Commitment Date is Fee Simple.
4. The Title is, at the Commitment Date, vested in:
Glenwood Partnership, LLLP, a Colorado limited liability limited partnership
5. The Land is described as follows:
FOR LEGAL DESCRIPTION SEE SCHEDULE A CONTINUED ON NEXT PAGE
For Informational Purposes Only - APN: R020404
Countersigned
Title Company of the Rockies, LLC
By:
Mike Mulligan
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
SCHEDULE A (continued)
LEGAL DESCRIPTION
The Land referred to herein is located in the County of Garfield, State of Colorado, and described as follows:
A PORTION OF THE FOLLOWING DESCRIBED PROPERTY:
A TRACT OF LAND SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH, RANGE 89 WEST OF THE
6TH P.M. BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT ON THE NORTH LINE OF THE GLENWOOD SPRINGS MALL
SUBDIVISION WHENCE THE WITNESS CORNER TO THE S1/4 CORNER OF SECTION 34,
TOWNSHIP 5 SOUTH, RANGE 89 WEST OF THE 6TH P.M. BEARS N 89° 13' 08" E 866.63 FEET
SAID POINT OF BEGINNING ALSO BEING THE SOUTHEAST CORNER OF THAT PARCEL
DESCRIBED AS PARCEL C IN BOOK 1205 AT PAGE 589 IN THE OFFICE OF THE GARFIELD
COUNTY CLERK AND RECORDER;
THENCE ALONG THE EAST LINE OF SAID PARCEL C N 2° 44' 00" E 605.64 FEET TO THE
SOUTH RIGHT-OF-WAY LINE OF COUNTY ROAD NO. 130;
THENCE ALONG SAID RIGHT-OF-WAY N 89° 52' 00" E 312.68 FEET;
THENCE N 89° 49' 18" E 860.83 FEET TO THE WEST LINE OF THE MEL-RAY SUBDIVISION;
THENCE ALONG SAID WEST LINE S 1° 52' 00" W 575.96 FEET;
THENCE DEPARTING SAID EAST LINE AND ALONG THE NORTH LINE OF SAID GLENWOOD
SPRINGS MALL N 87° 18' 00" W 615.36 FEET;
THENCE S 47° 42' 00" W 125.06 FEET;
THENCE N 87° 18' 00" W 476.98 FEET TO THE POINT OF BEGINNING.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
COMMITMENT FOR TITLE INSURANCE
Issued by
Westcor Land Title Insurance Company
SCHEDULE B, PART I
Requirements
All of the following Requirements must be met:
1. The Proposed Insured must notify the Company in writing of the name of any party not referred
to in this Commitment who will obtain an interest in the Land or who will make a loan on the
Land. The Company may then make additional Requirements or Exceptions.
2. Pay the agreed amount for the estate or interest to be insured.
3. Pay the premiums, fees, and charges for the Policy to the Company.
4. Documents satisfactory to the Company that convey the Title or create the Mortgage to be
insured, or both, must be properly authorized, executed, delivered, and recorded in the Public
Records.
Registration Statement from the Secretary of State for Glenwood Partnership, LLLP, and Articles5.
of Association for Glenwood Partnership, LLLP, disclosing the names of all Managers of said
limited liability limited partnership and otherwise complying with C.R.S. 7-60-144, et seq., and
evidencing the existence of said limited liability limited partnership, must be filed in the office of
the Secretary of State for the State of Colorado, but need not be recorded.
Resolution or Statement of Authority by 214 Center Drive, LLC, a Colorado limited liability6.
company, authorizing the transaction, executed by the managers or members set forth in the
Operating Agreement.
NOTE: Review Operating Agreement for authority of party(ies) to act on behalf of said limited
liability company and complete the transaction contemplated herein.
NOTE: Please be advised that our search did not disclose any open Deeds of Trust of
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
record. If you should have knowledge of any outstanding obligation, please contact the Title
Department immediately for further review prior to closing.
Recordation of properly executed plat, prepared and certified by a Colorado Registered Land7.
Surveyor, with approval by the proper governing authorities noted thereon. Schedule A, Item No.
5 will be amended upon receipt thereof.
NOTE: The company reserves the right to make additional requirements and/or exceptions upon
review of the same.
Deed from Glenwood Partnership, LLLP, a Colorado limited liability limited partnership to 2148.
Center Drive, LLC, a Colorado limited liability company.
NOTE: Duly executed real property transfer declaration, executed by either the Grantor or
Grantee, to accompany the Deed mentioned above, pursuant to Article 14 of House Bill No.
1288-CRA 39-14-102.
The Owner's Policy, when issued, will not contain Exceptions No. 1, 2, 3 and 4, provided that:
(A) The enclosed form of indemnity agreement or final affidavit and agreement is
properly executed and acknowledged by the party(ies) indicated and returned to the
Company or its duly authorized agent,
(B) The Company or its duly authorized agent receives and approves a Land Survey Plat,
Improvement Survey Plat or ALTA survey properly certified by a registered surveyor or
engineer, and
(C) Applicable scheduled charges in the amount of $90.00 are paid to the Company or its
duly authorized agent.
NOTE: EXCEPTION NO. 5 UNDER SCHEDULE B, SECTION 2 OF THIS COMMITMENT
WILL NOT APPEAR IN THE POLICY OR POLICIES TO BE ISSUED PURSUANT HERETO,
PROVIDED THAT (A) THE DOCUMENTS CONTEMPLATED BY THE REQUIREMENTS
SET FORTH IN SCHEDULE B, SECTION 1 OF THIS COMMITMENT ARE SUBMITTED TO
AND APPROVED AND RECORDED BY THE COMPANY OR ITS DULY AUTHORIZED
AGENT, AND (B) AN EXAMINATION OF THE RECORDS IN THE OFFICE OF THE CLERK
AND RECORDER FOR GARFIELD COUNTY, COLORADO BY THE COMPANY OR ITS
DULY AUTHORIZED AGENT DISCLOSES THAT NO DEFECTS, LIENS,
ENCUMBRANCES, ADVERSE CLAIMS OR OTHER MATTERS HAVE BEEN RECORDED
IN SUCH RECORDS SUBSEQUENT TO THE EFFECTIVE DATE HEREOF.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
SCHEDULE B, PART II
Exceptions
Some historical land records contain Discriminatory Covenants that are illegal and unenforceable
by law. This Commitment and the Policy treat any Discriminatory Covenant in a document
referenced in Schedule B as if each Discriminatory Covenant is redacted, repudiated, removed,
and not republished or recirculated. Only the remaining provisions of the document will be
excepted from coverage.
The Policy will not insure against loss or damage resulting from the terms and conditions of any lease or
easement identified in Schedule A, and will include the following Exceptions unless cleared to the
satisfaction of the Company:
Any facts, right, interests, or claims which are not shown by the Public Records but which could1.
be ascertained by an inspection of said Land or by making inquiry of persons in possession
thereof.
Easements or claims of easements, not shown by the Public Records.2.
Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the3.
Title that would be disclosed by an accurate and complete land survey of the Land.
4. Any lien, or right to a lien for services, labor or material heretofore or hereafter furnished,
imposed by law and not shown by the Public Records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any created, first appearing in
the Public Records or attaching subsequent to the effective date hereof, but prior to the date of
the proposed insured acquires of record for value the estate or interest or mortgage thereon
covered by this Commitment.
6. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing
authority that levies taxes or assessments on real property or by the Public Records; (b)
proceedings by a public agency that may result in taxes or assessments, or notices of such
proceedings, whether or not shown by the records of such agency or by the Public Records.
Right of the Proprietor of a vein or lode to extract and remove his ore therefrom, should the same7.
be found to penetrate or intersect the premises hereby granted, as reserved in United States Patent
recorded February 26, 1894 in Book 12 at Page 298 and July 20, 1894 in Book 12 at Page 328.
Right of way for ditches or canals constructed by the authority of the United States, as reserved in8.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
United States Patent recorded February 26, 1894 in Book 12 at Page 298 and July 20, 1894 in
Book 12 at Page 328.
Any and all water and water rights, reservoir and reservoir rights, ditches and ditch rights, and the9.
enlargements and extensions thereof, and all laterals, flumes and headgates used in connection
therewith.
Any rights, interests or easements in favor of the State of Colorado, the United States of America,10.
or the general public, which exist or are claimed to exist in, over, under and/or across the waters
and present and past bed and banks of the Reynolds-Cain, Gilmore, Oasis Creek and Mesa
Irrigating Ditches River.
An undivided one-half (1/2) interest in all oil, gas and other mineral rights, as conveyed to11.
Charles W. Banta by Deed recorded December 20, 1957 in Book 306 at Page 138, and any and
all assignments thereof or interests therein.
Easement and right of way for Ditch purposes, as reserved by Helen G. Gilstrap to Charles W.12.
Banta by Deed recorded December 20, 1957 in Book 306 at Page 138, said easement being more
particularly described therein.
Easement and right of way for pipeline, electric and telephone line purposes, as reserved by T.13.
W. Wheeler and J. F. Gregory, Charles W. Banta, Willis E. Parkison and Charles F. Stewart to
Adolph Diemoz, by instrument recorded April 20, 1960 in Book 325 at Page 337, said easement
being more particularly described therein.
Terms, agreements, provisions, conditions and obligations as contained in Resolution No. 80-25414.
recorded October 28, 1980 in Book 558 at Page 737.
Inhtentionally Deleted All oil, gas and other mineral rights, as reserved by Helen Gregory 15.
Wheeler and Ann (Wheeler) Teague as Co-Trustees of Trust created by Article II of the last will
and testament of T, W, Wheeler, Helen Gregory Wheeler and Ann W. Teague, Trustees U/T/A
created January 16, 1980 By Helen Gregory Wheeler, Ralph Dodo, and Willis E. Parkison in the
Deed to Glenwood Partnership, recorded February 17, 1982 in Book 592 at Page 923, and any
and all assignments thereof or interests therein.
Terms, agreements, provisions, conditions and obligations as contained in Easements Agreement16.
recorded January 21, 1993 at Reception No. 443451.
Terms, agreements, provisions, conditions and obligations as contained in Special Use Permit17.
recorded October 9, 2014 at Reception No. 854599.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
American Land Title Association Commitment for Title Insurance
2021 v.01.00 (07-01-2021)
Commitment No: 0603918-C2
Right of way for County roads 181 and 130.18.
Any and all leases and or tenancies and any and all parties claiming by, through, or under such19.
leases and or tenancies.
This page is only a part of a 2021 ALTA Short Form Commitment for Title Insurance issued by Westcor
Land Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to
Issue Policy; Schedule A; Schedule B, Part I-Requirements; and Schedule B, Part II-Exceptions; and a
counter-signature by the Company or its issuing agent that may be in electronic form.
Copyright 2021 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Commitment No: 0603918-C2
DISCLOSURE STATEMENTS
Note 1: Colorado Division of Insurance Regulations 3-5-1, Paragraph C of Article VII, requires that
"Every Title entity shall be responsible for all matters which appear of record prior to the time of
recording whenever the Title entity conducts the closing and is responsible for recording or filing of legal
documents resulting from the transaction which was closed.” (Gap Protection)
Note 2: Exception No. 4 of Schedule B, Section 2 of this Commitment may be deleted from the Owner's
Policy to be issued hereunder upon compliance with the following conditions:
The Land described in Schedule A of this commitment must be a single-family residence, which1.
includes a condominium or townhouse unit.
No labor or materials may have been furnished by mechanics or materialmen for purpose of2.
construction on the Land described in Schedule A of this Commitment within the past 13
months.
The Company must receive an appropriate affidavit indemnifying the Company against unfiled3.
mechanic's and materialmen's liens.
Any deviation from conditions A though C above is subject to such additional requirements or4.
Information as the Company may deem necessary, or, at its option, the Company may refuse to
delete the exception.
Payment of the premium for said coverage.5.
Note 3: The following disclosures are hereby made pursuant to §10-11-122, C.R.S.:
The subject real property may be located in a special taxing district;(i)
A certificate of taxes due listing each taxing jurisdiction shall be obtained from the County(ii)
Treasurer or the County Treasurer's authorized agent; and
Information regarding special districts and the boundaries of such districts may be obtained from(iii)
the County Commissioners, the County Clerk and Recorder, or the County Assessor.
Note 4: If the sales price of the subject property exceeds $100,000.00, the seller shall be required to
comply with the disclosure or withholding provisions of C.R.S. §39-22-604.5 (Non-resident
withholding).
Note 5: Pursuant to C.R.S. §10-11-123 Notice is hereby given:
(a) If there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed
from the surface estate then there is a substantial likelihood that a third party holds some or all
interest in oil, gas, other minerals, or geothermal energy in the property, and
(b) That such mineral estate may include the right to enter and use the property without the surface
owner's permission.
Note 6: Effective September 1, 1997, C.R.S. §30-10-406 requires that all documents received for
recording or filing in the clerk and recorder's office shall contain a top margin of at least one inch and a
left, right and bottom margin of at least one-half inch the clerk and recorder may refuse to record or file
any document that does not conform.
Note 7: Our Privacy Policy:
We will not reveal nonpublic personal customer information to any external non-affiliated organization
unless we have been authorized by the customer, or are required by law.
Note 8: Records:
Regulation 3-5-1 Section 7 (N) provides that each title entity shall maintain adequate documentation and
Page 9
Commitment No: 0603918-C2
records sufficient to show compliance with this regulation and Title 10 of the Colorado Revised Statutes
for a period of not less than seven (7) years, except as otherwise permitted by law.
Note 9: Pursuant Regulation 3-5-1 Section 9 (F) notice is hereby given that “A title entity shall not earn
interest on fiduciary funds unless disclosure is made to all necessary parties to a transaction that interest
is or has been earned. Said disclosure must offer the opportunity to receive payment of any interest
earned on such funds beyond any administrative fees as may be on file with the division. Said disclosure
must be clear and conspicuous, and may be made at any time up to and including closing.”
Be advised that the closing agent will or could charge an Administrative Fee for processing such an
additional services request and any resulting payee will also be subjected to a W-9 or other required tax
documentation for such purpose(s).
Be further advised that, for many transactions, the imposed Administrative Fee associated with such an
additional service may exceed any such interest earned.
Therefore, you may have the right to some of the interest earned over and above the Administrative Fee,
if applicable (e.g., any money over any administrative fees involved in figuring the amounts earned).
Note 10: Pursuant to Regulation 3-5-1 Section 9 (G) notice is hereby given that “Until a title entity
receives written instructions pertaining to the holding of fiduciary funds, in a form agreeable to the title
entity, it shall comply with the following:
The title entity shall deposit funds into an escrow, trust, or other fiduciary account and hold them1.
in a fiduciary capacity.
The title entity shall use any funds designated as “earnest money ” for the consummation of the2.
transaction as evidenced by the contract to buy and sell real estate applicable to said transaction,
except as otherwise provided in this section. If the transaction does not close, the title entity
shall:
Release the earnest money funds as directed by written instructions signed by both the buyer(a)
and seller; or
If acceptable written instructions are not received, uncontested funds shall be held by the title(b)
entity for 180 days from the scheduled date of closing, after which the title entity shall return
said funds to the payor.
In the event of any controversy regarding the funds held by the title entity (notwithstanding any3.
termination of the contract), the title entity shall not be required to take any action unless and
until such controversy is resolved. At its option and discretion, the title entity may:
Await any proceeding; or(a)
Interplead all parties and deposit such funds into a court of competent jurisdiction, and(b)
recover court costs and reasonable attorney and legal fees; or
Deliver written notice to the buyer and seller that unless the title entity receives a copy of a(c)
summons and complaint or claim (between buyer and seller), containing the case number of
the lawsuit or lawsuits, within 120 days of the title entity's written notice delivered to the
parties, title entity shall return the funds to the depositing party.”
Page 10
Commitment No: 0603918-C2
Title Company of the Rockies
Disclosures
All documents received for recording or filing in the Clerk and Recorder's office shall contain a top
margin of at least one inch and a left, right and bottom margin of at least one half of an inch. The Clerkand Recorder will refuse to record or file any document that does not conform to the requirements of this
section. Pursuant to C.R.S. 30-10-406(3)(a).
The company will not issue its policy or policies of title insurance contemplated by this commitment
until it has been provided a Certificate of Taxes due or other equivalent documentation from the CountyTreasurer or the County Treasurer's authorized agent: or until the Proposed Insured has notified or
instructed the company in writing to the contrary. Pursuant to C.R.S. 10-11-122.
No person or entity that provides closing and settlement services for a real estate transaction shalldisburse funds as a part of such services until those funds have been received and are available forimmediate withdrawals as a matter of right. Pursuant to C.R.S. 38-35-125(2).
The Company hereby notifies the proposed buyer in the current transaction that there may be recorded
evidence that the mineral estate, or portion thereof, has been severed, leased, or otherwise conveyed fromthe surface estate. If so, there is a substantial likelihood that a third party holds some or all interest in the
oil, gas, other minerals, or geothermal energy in the subject property. Such mineral estate may include
the right to enter and use the property without the surface owner's permission. Pursuant to C.R.S.
10-11-123.
If this transaction includes a sale of property and the sales price exceeds $100,000.00, the seller mustcomply with the disclosure/withholding requirements of said section. (Nonresident withholding)Pursuant to C.R.S. 39-22-604.5.
Notice is hereby given that: The subject property may be located in a special taxing district. A Certificate
of Taxes due listing each taxing jurisdiction shall be obtained from the County Treasurer or the County
Treasurer's authorized agent. Information regarding special districts and the boundaries of such districts
may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the
County Assessor. Pursuant to C.R.S. 10-11-122.
Notice is hereby given that: Pursuant to Colorado Division of Insurance Regulation 8-1-2;
"Gap Protection" -When this Company conducts the closing and is responsible for recording or filing
the legal documents resulting from the transaction, the Company shall be responsible for all matters
which appear on the record prior to such time or recording or filing; and
"Mechanic's Lien Protection" - If you are the buyer of a single family residence, you may request
mechanic's lien coverage to be issued on your policy of Insurance. If the property being purchased
has not been the subject of construction, improvements or repairs in the last six months prior to the
date of this commitment, the requirements will be payment of the appropriate premium and the
completion of an Affidavit and Indemnity by the seller. If the property being purchased was
constructed, improved or repaired within six months prior to the date of this commitment the
requirements may involve disclosure of certain financial information, payment of premiums, and
indemnity, among others. The general requirements stated above are subject to revision and approval
by the Company. Pursuant to C.R.S. 10-11-122.
Notice is hereby given that an ALTA Closing Protection Letter is available, upon request, to certain
parties to the transaction as noted in the title commitment. Pursuant to Colorado Division of Insurance
Regulation 8-1.
Nothing herein contained will be deemed to obligate the Company to provide any of the coverages
referred to herein unless the above conditions are fully satisfied.
Page 11
>
>
PSD
PSD PSD
PS
D
PS
D
PS
D
ST PSD PSDPSDPSD
CHAPPARAL CIRCLE
ME
L
R
A
Y
R
O
A
D
GLENWOOD SPRINGS MALL
ST
O
R
M
K
I
N
G
R
O
A
D
PONDEROSA CIRCLE
WESTERN HILLS
SUBDIVISION
CENTER DR
JU
N
I
P
E
R
C
T
DONEGAN ROAD
LOT 1
LOT 2
LOT 3
CENTER DR CENTER DR
CH
A
P
P
A
R
A
L
D
R
I
V
E
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
0
0
-
C
O
V
E
R
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
:
0
9
p
m
GLENWOOD BUSINESS CENTER
MINOR SUBDIVISION CIVIL PLANS: 04/26/2023
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
VICINITY MAP
SCALE: 1" = 2000'
SITE
COLORADO RIVER
MI
T
C
H
E
L
L
C
R
E
E
K
INTERSTATE 70
MIDLAND
A
V
E
C0.0 - COVER SHEET
C1.0 - SITE PLAN
C2.0 - GRADING & DRAINAGE PLAN
C2.1 - ROAD PLAN/PROFILE 1
C2.2 - ROAD PLAN/PROFILE 2
C2.5 - OFFSITE DRAINAGE PLAN
C2.6 - ONSITE DRAINAGE PLAN
C3.0 - UTILITY PLAN
PLAN INDEX
SOPRIS ENGINEERING LLC
502 MAIN STREET SUITE A3 CARBONDALE CO 81623
(970) 704 0311 soprisengineering.com
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
xxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK
STBK
ST
B
K
ST
B
K
STBK
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
6''WL
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK
STBK
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
>>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
>>
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XS
D
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD
X
S
D
X
S
D
ou
ou
100' STORAGE SETBACK
FROM RESIDENTIALPROPERTY LINE
10' SIDE SETBACK
40' ACCESS EASEMENT
7.5' REAR SETBACK (COMMERCIAL)
340'
100'
30'
32'
30'
32'
180'
285'
40' ACCESS EASEMENTRE: PRELIMINARY PLAT
275'
75'
25'
25'
30'
28'
28'
28'
28'
25'
53'
25' FRONT
10' SIDE
40'
7.50' REAR (COMMERCIAL)
28'
CLOSE ENTRANCE
EXTEND ISLAND
DRAINAGE SWALE + 5' WIDE SIDEWALK.
70 L.F. - 3' HIGH BOULDER WALL
6' SIDEWALK
10' SIDEWALK
8 PARKING SPACES FOR EMPLOYEE HOUSING
28' DRIVE WIDTH
101'
5.0'
8.2'
HANDICAP RAMPSTEPS UP
4' SIDEWALK
UPPER LEVEL
LOWER LEVEL
DONEGAN ROAD
ST
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
WEST GLENWOOD MALL
LOT 1
AREA=3.192 AC.
30
LOT 3: FUTURE
DEVELOPMENT.
AREA=4.748 AC.
12
BUILDING A: 2 STORY STORAGE97,500 SF STORAGE + 3 RESIDENTIAL UNIT
S
BUILDING B: FLEX, 1 STORY100x340' = 34,000 SF
LOT 2: STORAGE, FLEX,
EMPLOYEE UNITS.
AREA=7.879 AC.
26
24
BUILDING C: FLEX, 1 STORY75x275' = 20,625 SF
20% office space and 80% warehouse
(Rates conservative per SUP approval, not current code)
20,625x.2 = 4125 / 200 = 20.6 = 21
20,625x.8 = 16500 / 1000 = 16.5 = 17REQUIRED = 38PROVIDED = 54
8
11 11
20% office space and 80% warehouse
(Rates conservative per SUP approval, not current code)
34,000x.2 = 6800 / 200 = 34
34,000x.8 = 27200 / 1000 = 27.2 = 28
REQUIRED = 62
PROVIDED = 69
LOADING ZONE
21
CH
A
P
P
A
R
A
L
D
R
I
V
E
R25'
R30'
R30.00'
R25'
R30'
R30'
R25'
R25'
R25'
ME
L
R
A
Y
R
O
A
D
25' FOR PARKING & SIDEWALK
BUILDING D: FLEX, 1 STORY
100x270' = 27,000 SFAssumed 50% office space and 50% warehouse
(Rates conservative per SUP approval, not current code)
27,000x.5 = 13,500 / 200 = 67.5
27,000x.5 = 13,500 / 1000 = 13.5
REQUIRED = 81
PROVIDED = 81
BUILDING E: FLEX, 1 STORY
75x280' = 21,000 SFAssumed 50% office space and 50% warehouse
(Rates conservative per SUP approval, not current code)
21,000x.5 = 10,500 / 200 = 52.5
21,000x.5 = 10,500 / 1000 = 10.5
REQUIRED = 63
PROVIDED = 71
26
28
12
30
26
30
270'
100'
280'
75'
R25'
R25'
28'
28'
LOADING ZONE
7.5' REAR SETBACK (COMMERCIAL)
10' SIDE SETBACK
45.30'
32.70'
34.72'
85.47'
113.58'
CENTER DRIVE
DATE REVISION
C-1.0
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
1
0
-
S
I
T
E
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
1
:
5
9
a
m
NO
R
T
H
PROPOSED ASPHALT
SITE PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
050 50 100
50
20025
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING LEGEND
EXISTING STORM INLET
EXISTING STORM SEWERXSDXSD
EXISTING EASEMENT
EXISTING PROPERTY LINE
EXISTING ASPHALT
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
STBK
EXISTING WIRE FENCExx
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE BUILDING LOCATION, USES, AND SITE LAYOUT OF LOT 3 ARE
CONCEPTUAL PENDING FUTURE DEVELOPMENT OF LOT 3. SEE
APPLICATION NARRATIVE FOR ADDITIONAL DETAILS.
2. THE EXISTING BOUNDARY AND TOPOGRAPHIC SURVEY WAS PERFORMED
BY SOPRIS ENGINEERING, LLC. THE EXISTING CONTOUR INTERVAL IS ONE
(1) FOOT (DASHED).
3. THE PROPOSED CONTOUR INTERVAL IS ONE (1) FOOT.
4. REFER TO THE ARCHITECT'S PLANS FOR BUILDING INFORMATION.
5. REFER TO THE LANDSCAPE ARCHITECT'S PLANS REGARDING THE SITE
LANDSCAPE IMPROVEMENTS.
6. ALL GEOTECHNICAL ENGINEERING RECOMMENDATIONS SHALL BE
ADHERED TO.
SITE NOTES:
PROPOSED SNOW STORAGE
PROPOSED CHAPPARAL DRIVE STREET SECTION
LOOKING NORTHN.T.S.
2%
STANDARD CATCH CURB
AND GUTTER PER DETAIL
2%
14.0' LANE 14.0' LANE 8.5'± DRAINAGE SWALE 5.0' SIDEWALK
40.0' EASEMENT (MIN.)
1.0'
SHOULDER
1.0'
SHOULDER
2'H:1'V MAX SLOPE TO
MATCH EXISTING GRADE9" CLASS 6 BASE COURSE COMPACTED TO
95% OF MAX. STD. PROCTOR DENSITY
4" ASPHALTSITE GRADING PER PLAN
NOTES:
1. STRIP ALL TOPSOIL SCARIFY AND RECOMPACT SUBGRADE A MINIMUM OF 8" DEPTH TO 95% STANDARD PROCTOR.
2. CONFIRM FILL SOILS (WHERE APPLICABLE) AND ROAD SECTION WITH SOILS ENGINEER PRIOR TO CONSTRUCTION
PROPOSED CENTER DRIVE STREET SECTION
LOOKING EASTN.T.S.
2%
STANDARD CATCH CURB
AND GUTTER PER DETAIL
14.0' LANE 14.0' LANE
40.0' EASEMENT (MIN.)
1.0'
SHOULDER
1.0'
SHOULDER
2'H:1'V MAX SLOPE TO
MATCH EXISTING GRADE9" CLASS 6 BASE COURSE COMPACTED TO
95% OF MAX. STD. PROCTOR DENSITY
4" ASPHALTSITE GRADING
PER PLAN
NOTES:
1. REFER TO PLAN FOR PARKING LOCATIONS.
2. STRIP ALL TOPSOIL SCARIFY AND RECOMPACT SUBGRADE A MINIMUM OF 8" DEPTH TO 95% STANDARD PROCTOR.
3. CONFIRM FILL SOILS (WHERE APPLICABLE) AND ROAD SECTION WITH SOILS ENGINEER PRIOR TO CONSTRUCTION
2%
STANDARD SPILL CURB
AND GUTTER PER DETAIL
PROPOSED DONEGAN SIDEWALK & DRAINAGE SECTION
LOOKING EASTN.T.S.
60'± ROW
EX.EX.
PSD
RE: STANDARD DETAIL
SLOPE PER PLAN (TYP.)
STORM SEWER PER PLAN
>>
>>
XS
D
XSD XSD XSD XSD
XS
D
XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
X
S
D
X
S
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ou
XI
R
R
XI
R
R
ME: 22.0'±
ME: 20.0'±
ME: 25.0'±
ME: 32.0'±
5720
572
5
5730
5735
5740
5745
5721
572
2
5723
5724
5726
5727
5728
5729
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
5744
5746
5747
572
0
5
7
2
5
573
0
5735
5740
57
4
5
571657
1
7
571
8
5719
5721
5722
572
3
5
7
2
4
5
7
2
6
57
2
7
5728
5
7
2
9
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
5748
5720
5
7
1
6
57
1
7
5718
5719
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
xxxxxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
FO
FO
FO
FO
FO
FO
FO
s
s
s
PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PSD
ST
ST
PSD
PSD
PSD PSD PSD PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PS
D
PS
D
PS
D
P
S
D
P
S
D
P
S
D
P
S
D
P
S
D
PSD PSD PSD PSD PSD PSD PSD PSD PSD
ST
PS
D
PSD PSD PSD PSD PSD PSD PSD PSD
P
S
D
>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
PS
D
PS
D
PS
D
PSD
PS
D
PS
D
PS
D
F
O
F
O
F
O
F
O
FO FO
FO
FO
FO FO FO FO FO FO FO FO FO FO
FO
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>
PS
D
PS
D
PS
D
PS
D
PS
D
R26.5
6''WL
PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
P
S
D
PS
D
PS
D
PS
D
PS
D
ST PSD PSD PSD PSD PSDPSDPSDPSDPSDPSDPSDPSD
LOT 1
LOT 3
BUILDING A: 2 STORY STORAGE
BUILDING B:
LOT 2
BUILDING C:
LOWER FF=5731.5'
UPPER FF=5744.5'
5748
574
8 57495749
5720
57
2
5
5717
57185719
5721
57
2
2
5723
57
2
4
57
2
6
572
7
572
8
5730
5727
57285729
573
1
57285728
572
9
5
7
2
9
CURB OPENING
CURB OPENING
CURB OPENING
CURB OPENING
STORM MANHOLE
DRAIANGE SWALE
DRAINAGE SWALE
DETENTION
STORM MANHOLE
DRAIANGE SWALE
DETENTION
WATER QUALITY SEPARATOR
WATER QUALITY SEPARATOR
WATER QUALITY SEPARATOR
VALLEY PAN INLET
FOUNDATION WALL 2' ABOVE FF
FF=5732.0'
FF=5729.0'
FOUNDATION WALL 2' ABOVE FF
105 L.F. RETAINING WALL
DRAINAGE SWALESTORM INLET STORM INLET TO CONNECT TO EX. STORM
CURB INLET
VALLEY PAN INLET
DETENTION
STORM MANHOLE
ROOF DRAIN STORM (TYP.)
ROOF DRAIN STORM (TYP.)
ROOF DRAIN STORM (TYP.)
5730
5735
5740
5745
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
573
1
5
7
3
2
5
7
3
3
5
7
3
4
5
7
3
6
5728
5728
572
8
5725
5722
5728
572
8
572
8
572
8
57
2
5
0.9%0.6%0.0%0.1%0.5%0.4%
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
574
4
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
5741
5
7
4
2
57
4
3
5744
574
4
5.
8
%
1.
8
%
5.5%
9.
5
%
4.
6
%
1.
5
%
6.
6
%
6.
0
%
1.
0
%
7
.
1
%
5.7%
6
.
3
%
3.
0
%
0.7%0.6%0.5%0.6%0.5%0.5%0.6%0.8%0.8%
2.
0
%
4.
1
%
2.
0
%
4.
1
%
2.0%
2.0%
3.
2
%
2.
0
%
3.
7
%
2.
0
%
3.
7
%
2.0%
2.0%
3.
0
%
0.5%
0.9%0.9%
1.0%1.0%1.0%
1.0%2.3%
3.
0
%
1.0%1.0%1.0%1.0%2.1%
2.
0
%
2.
0
%
2.
0
%
5.
7
%
2.
1
%
5.
3
%
5.
3
%
2.
1
%
5.
4
%
4.
8
%
1.
9
%
5.
2
%
1.
9
%
5.
2
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
4.1%
1.0%1.0%1.0%1.0%
0
.
8
%
2.0%
1.0%
2.0%
0.7%
1.3%
2
.
0
%
1.0%
3.
0
%
3.
4
%
2.6%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
-3
.
0
:
1
-3
.
0
:
1
-3.0:1
-2
.
2
:
1
-5
.
2
:
1
-2.7:1
-2.
1
:
1
-2
.
9
:
1
-4
.
3
:
1
-5.
2
:
1
11.5%
13.4%
6.
7
%
7
.
6
%
7.
2
%
9.9%
7.0%
-3
.
0
:
1
-3
.
0
:
1
-3
.
0
:
1
-3.0:1
FL: 46.96 FL: 47.14 FL: 47.91 FL: 47.74FL: 46.61
EA: 47.27 EA: 47.45 EA: 48.13
FL: 48.75
EA: 48.90
FL: 48.08
EA: 48.52 FL: 47.00
FL: 42.90 FL: 41.93 FL: 41.40
FL: 36.86
FL: 34.05
FL: 32.50
FL: 30.50
FL: 30.50
FL: 28.30
FL: 32.50
FG: 33.50
FG: 32.00
TC: 32.00
TC: 32.00
TC: 32.00
TC: 32.00
TC: 32.00 TC: 32.00
TC: 28.91
TC: 29.11 TC: 29.42TC: 28.92TC: 29.43TC: 28.86
TC: 29.00
TC: 28.99
TC: 29.00
TC: 29.00TC: 29.00
TC: 29.00
FL: 27.20 FL: 27.87 FL: 27.70
FL: 27.23FL: 27.87
FL: 27.20 FL: 27.78 FL: 27.20
FL: 27.78
FL: 27.20
EA: 28.23 EA: 28.23 EA: 28.23
EA: 28.23 EA: 28.23
EA: 28.25EA: 28.78EA: 28.26EA: 28.78
EA: 28.20EA: 28.45
EA: 31.91 EA: 31.53
EA: 32.30
EA: 33.85 EA: 34.08
EA: 31.75
EA: 32.58 EA: 32.02 EA: 32.22 EA: 36.13EA: 32.68
EA: 35.62
EA: 31.23
FL: 31.28
FL: 30.60 FL: 31.34 FL: 30.60
FL: 31.30 FL: 31.08EA: 31.80
EA: 31.80 EA: 31.80
FG: 33.50
FG: 31.50
FG: 31.50
FG: 28.30FG: 27.30
FG: 29.00
FL: 27.36FL: 27.48
FL: 28.05
FL: 29.26FL: 30.37
FL: 30.74
FL: 31.19
EA: 30.87
FL: 29.68
FL: 29.67
FL: 29.67
EA: 30.38 EA: 30.89 EA: 30.38 EA: 30.89
TC: 31.50
TC: 31.50
TC: 31.50
EA: 30.50
EA: 28.71
EA: 27.84
EA: 28.78
FL: 29.23
FL: 37.06
FL: 29.90
FL: 30.53
FL: 43.16FL: 43.16
FL: 43.77
FL: 44.00
FL: 43.77
1.0%1.0%1.0%
1.0%
3.
8
%
3.2%
3.
4
%
573
1
5732
5733
5733
57
3
5
574
0
5745
5749
5740
5
7
3
5
5739
5734
574
0
5748
5742
5748
5744
57475747
5722
5728
57
2
3
57
3
0
57
3
5
57
4
0
5744
TC: 44.50 TC: 44.50
TC: 44.50
BW: 32.48TW: 35.49
TW: 34.92BW: 32.00
70 L.F. BOULDER WALL
CURB OPENING
CURB OPENING
1.5%
1.1%
0.5%
UPPER LEVEL
LOWER LEVEL
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP: 8+48.15
PC: 3+87.11
PC: 5+00.23
PT: 4+57.01
PT: 5+70.13
0+
0
0
1+
0
0
2+
0
0
3+
0
0
4+
0
0
4+
7
6
BP: 0+00.00
PC: 0+67.66
PT: 0+82.16
EP: 4+76.32
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.70
PC: 4+45.08
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54PT: 6+64.41
PT: 8+59.09
0+001+002+003+003+84
EA: 48.91
FL: 48.46
EA: 47.47 EA: 47.36 EA: 47.63
BUILDING D:
(FUTURE GRADING)
BUILDING E:
(FUTURE GRADING)
LI
M
I
T
O
F
L
O
T
2
G
R
A
D
I
N
G
BOW = BOTTOM OF WALL
EOA = EDGE OF ASPHALT
EX = EXISTING GRADE
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE
FL = FLOW LINE
HP = HIGH POINT
LP = LOW POINT
ME = MATCH EXISTING
RIM = RIM ELEVATION
TBC = TOP BACK OF CURB
TOC = TOP OF CONCRETE
SPOT ELEVATION LEGEND
GRADING LEGEND:
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL
PROPOSED SLOPE
PROPOSED SPOT ELEVATION
PROPOSED STORM SEWER
PROPOSED STORM INLET
7900
7900
PSD PSD
FL: 32.0
2.0%
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
STBK
DATE REVISION
C-2.0
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
2
:
0
5
p
m
NO
R
T
H
GRADING PLAN
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
I
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE BUILDING LOCATION, USES, AND SITE LAYOUT OF LOT 3 ARE CONCEPTUAL
PENDING FUTURE DEVELOPMENT OF LOT 3. SEE APPLICATION NARRATIVE FOR
ADDITIONAL DETAILS.
2. THE EXISTING CONTOUR INTERVAL IS ONE (1) FOOT (DASHED) FROM A SURVEY
PERFORMED BY SOPRIS ENGINEERING.
3. THE PROPOSED CONTOUR INTERVAL IS ONE (1) FOOT.
4. ALL GEOTECHNICAL ENGINEERING RECOMMENDATIONS SHALL BE ADHERED TO.
5. ALL STORM SEWER PIPES 8" DIAMETER AND SMALLER SHALL BE SDR 35 GASKETED
PIPE OR APPROVED EQUAL. STORM SEWER PIPES LARGER THAN 8" SHALL BE ADS
N12 WATER TIGHT OR APPROVED EQUAL. MINIMUM STORM SEWER PIPE SLOPE IS
1.0% UNLESS NOTED OTHERWISE.
6. ROOF DRAINS SHALL BE ROUTED DIRECT TO BELOW GRADE STORM SEWER WITH
HEAT TRACE WIRE.
GENERAL GRADING NOTES:
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
>>
>>
XS
D
XS
D
XS
D
XW
L
XW
L
XW
L
ME: 32.0'±
572
5
5730
5724
5726
5727
5728
5729
5731
5732
573
0
5735
5
7
2
9
573
1
5732
573
3
573
4
5736
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
ST
B
K
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
A
S
G
A
S
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
FO
FO
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD
PSD
ST
IR
R
IR
R
IR
R
IR
R
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PS
D
PS
D
P
S
D
P
S
D
ST
PS
D
PSD PSD PSD PSD PSD PSD PSD PSD
P
S
D
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
PS
D
PSD
PS
D
PS
D
F
O
F
O
F
O
F
O
FO FO
FO
FO
FO FO FO FO FO FO FO FO FO FO
FO
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>
PS
D
8''WL 8''WL 8''WL 8''WL 8''
6''SA
PSD PSD PSD
LOT 1
BUILDING B:
BUILDING C:
LOWER FF=5731.5'
572
8
5730
5727
57285729
573
1
57285728
572
9
5
7
2
9
CURB OPENING
CURB OPENING
STORM MANHOLE
DRAIANGE SWALE DETENTION
WATER QUALITY SEPARATOR
FF=5732.0'
FF=5729.0'
CURB INLET
VALLEY PAN INLET
DETENTION
STORM MANHOLE
ROOF DRAIN STORM (TYP.)
5730
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5728
5728
572
8
572
8
5730
5731
5732
5733
5731
5732
5733 4.
6
%
1.
5
%
1.
0
%
6
.
3
%
2.0%
3.
2
%
2.
0
%
3.
7
%
2.
0
%
3.
7
%
3.
0
%
0.5%
0.9%0.9%
1.0%1.0%1.0%
1.0%2.3%
3.
0
%
1.0%1.0%1.0%1.0%2.1%
2.
0
%
2.
0
%
2.
0
%
5.
7
%
2.
1
%
5.
3
%
5.
3
%
2.
1
%
5.
4
%
1.0%
2.0%
0.7%
1.3%
2
.
0
%
1.0%
3.
0
%
3.
4
%
2.6%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
7.0%FL: 30.50
FL: 30.50
FL: 28.30
TC: 32.00
TC: 32.00 TC: 32.00
TC: 28.91
TC: 29.11 TC: 29.42TC: 28.92TC: 29.43TC: 28.86
TC: 29.00
TC: 28.99
TC: 29.00
FL: 27.20 FL: 27.78 FL: 27.20
FL: 27.78
FL: 27.20
EA: 28.23 EA: 28.23 EA: 28.23
EA: 28.23 EA: 28.23
EA: 28.25EA: 28.78EA: 28.26EA: 28.78
EA: 28.20EA: 28.45
FG: 31.50
FG: 31.50
FG: 28.30FG: 27.30
FG: 29.00
FL: 27.36FL: 27.48
FL: 28.05
FL: 29.26FL: 30.37
FL: 30.74
FL: 31.19
EA: 30.87
FL: 29.68
FL: 29.67
FL: 29.67
EA: 30.38 EA: 30.89 EA: 30.38 EA: 30.89
TC: 31.50
TC: 31.50
TC: 31.50
EA: 30.50
EA: 28.71
EA: 27.84
EA: 28.78
FL: 29.23
FL: 29.90
FL: 30.53
3.
4
%
57
3
0
1.5%
1.1%
0.5%
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP: 8+48.15
PC: 3+87.11
PC: 5+00.23
PT: 4+57.01
PT: 5+70.13
3+
0
0
4+
0
0
0
+
0
0
BP: 0+00.00
PC: 0+24.70
PT: 0+42.17
0+
0
0
1+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PT: 8+59.09
BUILDING E:
LI
M
I
T
O
F
L
O
T
2
G
R
A
D
I
N
G
AL-CENTER DRIVE PROFILE
5726
5728
5730
5732
5726
5728
5730
5732
0+00
57
3
1
.
0
57
3
0
.
8
0+50
57
3
1
.
3
57
3
0
.
7
1+00
57
3
0
.
6
57
3
0
.
6
1+50
57
3
0
.
5
57
3
0
.
3
2+00
57
3
0
.
0
57
2
9
.
7
2+50
57
2
9
.
2
57
2
8
.
9
3+00
57
2
8
.
5
57
2
8
.
2
3+50
57
2
7
.
9
57
2
7
.
6
4+00
57
2
7
.
5
57
2
7
.
5
4+50
57
2
7
.
6
57
2
7
.
7
8
57
2
8
.
3
57
2
8
.
0
1
5+00
57
2
8
.
1
57
2
8
.
1
8
57
2
8
.
5
57
2
8
.
1
1
5+50
57
2
8
.
6
57
2
7
.
8
1
57
2
8
.
5
57
2
7
.
6
2
6+00
57
2
8
.
5
57
2
7
.
8
7
57
2
8
.
2
57
2
8
.
1
2
6+50
57
2
8
.
1
57
2
7
.
9
3
57
2
8
.
1
57
2
7
.
6
8
7+00
57
2
8
.
0
57
2
7
.
7
1
57
2
7
.
6
57
2
7
.
9
6
7+50
57
2
7
.
7
57
2
8
.
0
9
57
2
7
.
4
57
2
7
.
8
4
8+00
57
2
7
.
2
57
2
7
.
5
9
57
2
7
.
0
57
2
7
.
9
1
8+48
57
2
6
.
2
57
2
8
.
3
5
2.00%1.00%-1.00%1.00%-1.00%-1.18%1.77%1.57%0.67%
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
3
3
.
0
1
EL
E
V
=
5
7
2
7
.
5
1
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
7
.
0
9
EL
E
V
=
5
7
2
7
.
8
9
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
2
.
2
8
EL
E
V
=
5
7
2
8
.
2
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
7
0
.
1
3
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
2
7
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
8
5
.
6
5
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
4
3
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
0
4
.
1
5
EL
E
V
=
5
7
2
7
.
5
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
3
6
.
1
5
EL
E
V
=
5
7
2
8
.
1
1
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
2
8
.
3
5
STA: 4+99.35
ELEV= 5728.12'
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
AL-CHAPPARAL DR PROFILE
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
0+00
57
4
7
.
9
57
4
5
.
0
57
4
6
.
9
2
0+50
57
4
2
.
2
57
4
5
.
7
5
57
4
0
.
3
57
4
3
.
4
0
1+00
57
3
8
.
3
57
4
1
.
0
2
57
3
6
.
9
57
3
8
.
6
9
1+50
57
3
6
.
0
57
3
7
.
4
1
57
3
4
.
3
57
3
6
.
4
1
2+00
57
3
3
.
1
57
3
5
.
2
5
57
3
1
.
6
57
3
4
.
1
0
2+50
57
3
0
.
5
57
3
2
.
9
4
57
2
9
.
3
57
3
1
.
7
9
3+00
57
2
8
.
2
57
3
0
.
6
3
57
2
7
.
0
57
2
9
.
4
7
3+50
57
2
6
.
2
57
2
8
.
3
4
57
2
6
.
0
57
2
7
.
9
6
4+00
57
2
5
.
0
57
2
7
.
5
9
57
2
4
.
3
57
2
7
.
2
1
4+50
57
2
3
.
5
57
2
6
.
8
4
57
2
3
.
0
57
2
6
.
7
0
4+76
57
2
2
.
9
57
2
6
.
7
2
-3.00%
-9.50%
-4.00%
-4.62%
-1.50%1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
1
.
0
8
EL
E
V
=
5
7
4
7
.
3
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
7
4
.
3
0
EL
E
V
=
5
7
3
6
.
4
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
4
9
.
3
2
EL
E
V
=
5
7
2
8
.
3
5
GRADE BREAK STA = 4+67.32ELEV = 5726.58
GRADE BREAK STA = 4+76.32
ELEV = 5726.72
PVI STA: 1+29.30PVI ELEV: 5738.24
K: 3.64
LVC: 20.00BVCS: 1+19.30BVCE: 5739.19
EVCS: 1+39.30
EVCE: 5737.84
PVI STA: 0+43.97
PVI ELEV: 5746.35K: 3.08LVC: 20.00
BVCS: 0+33.97
BVCE: 5746.65EVCS: 0+53.97EVCE: 5745.40
STA: 1+54.30ELEV= 5737.24'
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
XSD
XS
D
XS
D
XS
D
XS
D
XSD
XSD
XSD
5716
571
7
ST
B
K
ST
B
K
x
x
x
x
x
x
x
x
x
x IR
R
IR
R
IR
R
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
GA
S
GA
S
GA
S
GAS GAS GAS GAS GASFOFOFOFOFOFO FO
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
8'
'
WL
8'
'
WL
8'
'
WL
6'
'
SA
6'
'
SA
8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA s 8''SA 8''SA 8''SA s
EUEL PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PSD PSD
PSD
ST
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD
PSD
>
>
>
>
>>>>>>>>>>
>
>
>
>
>
PSD PSD PSD
FO
FO
FO
FO
8'
'
WL
8'
'
WL
8'
'
WL
R2
6
.
5
6'
'
SA 6'
'
SA
6'
'
WL
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
574
8
ST
O
R
M
M
A
N
H
O
L
E
WA
T
E
R
Q
U
A
L
I
T
Y
S
E
P
A
R
A
T
O
R
FO
U
N
D
A
T
I
O
N
W
A
L
L
2
'
A
B
O
V
E
F
F
10
5
L
.
F
.
R
E
T
A
I
N
I
N
G
W
A
L
L
CU
R
B
I
N
L
E
T
573
0
573
5
57
4
0
57
4
5
5727
5728
572
9
573
1
573
2
573
3
573
4
573
6
573
7
57
3
8
57
3
9
57
4
1
57
4
2
57
4
3
57
4
4
57
4
6
5735
5732
5733
5734
5736
57
2
5
57
2
2
0.
4
%
5.
5
%
9.5%
4.6%
1.5%
3.0%
0.
8
%
1.
0
%
2.
1
%
5.4%4.8%2.0%
4.
1
%
1.
0
%
2.0%
2.0%
-3.0:1
-3.0:1
-3.0
:
1
FL: 47.00
FL
:
3
0
.
5
0
FL
:
2
8
.
3
0
FL
:
3
2
.
5
0
TC: 32.00
TC: 32.00
TC
:
2
8
.
9
1
TC
:
2
9
.
4
2
TC
:
2
9
.
0
0
TC: 29.00
FL
:
2
7
.
2
3
FL
:
2
7
.
8
7
FL
:
2
7
.
7
8
FL: 27.20
EA
:
2
8
.
2
3
EA
:
2
8
.
2
3
EA
:
2
8
.
2
5
EA
:
2
8
.
7
8
EA
:
3
6
.
1
3
EA
:
3
2
.
6
8
EA
:
3
5
.
6
2
FL: 31.08
EA: 31.80
FG: 33.50
FG: 31.50
5723
5730 5735
5740
5
7
4
4
CU
R
B
O
P
E
N
I
N
G
8+
0
0
8+
4
8
EP: 8+48.15
0+001+002+003+004+004+76
BP
:
0
+
0
0
.
0
0
PC
:
0
+
6
7
.
6
6
PT
:
0
+
8
2
.
1
6
EP
:
4
+
7
6
.
3
2
4+
0
0
4+89
EP: 4+89.35
PC: 4+45.08
PT: 4+84.35
0+
0
0
1+
0
0
EA: 47.47
EA: 47.36
EA: 47.63
BU
I
L
D
I
N
G
E
:
(F
U
T
U
R
E
G
R
A
D
I
N
G
)
LIMIT OF LOT 2 GRADING
DATE REVISION
C-2.1
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
2
:
0
5
p
m
NO
R
T
H
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
I
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
ROAD
PLAN/PROFILE 1
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
NORTH
>>
XS
D
XS
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ME: 32.0'±
573
0
5735
5740
57
4
5
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x
x x x x x x x x x x x
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
A
S
G
A
S
GAS
8''WL 8''WL
U
E
L
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
ST
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
PS
D
PS
D
PS
D
PS
D
P
S
D
P
S
D
PSD PSD PSD PSD PSD PSD PSD PSD PSD
ST
PS
D
PSD PSD PSD PSD PSD PSD PSD PSD
>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
PS
D
PS
D
PS
D
F
O
F
O
F
O
F
O
FO FO
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>
PS
D
PS
D
PS
D
PS
D
PS
D
BUILDING A: 2 STORY STORAGE
LOWER FF=5731.5'
UPPER FF=5744.5'
5730
5727
57285729
573
1
CURB OPENING
CURB OPENING
CURB OPENING
CURB OPENING
STORM MANHOLE
DRAIANGE SWALE
DRAINAGE SWALE
DETENTION
DETENTION
STORM MANHOLE
ROOF DRAIN STORM (TYP.)
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
574
4
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
5741
5
7
4
2
57
4
3
5744
574
4
6.
6
%
6.
0
%
7
.
1
%
5.7%
6
.
3
%
0.7%0.6%0.5%0.6%0.8%
2.
0
%
4.
1
%
2.
0
%
4.
1
%
2.0%
2.0%
3.
2
%
2.
0
%
3.
7
%
2.
0
%
3.
7
%
2.0%
2.0%
3.
0
%
0.5%
0.9%0.9%
1.0%1.0%1.0%
1.0%2.3%
3.
0
%
1.0%
3.
0
%
3.
4
%
2.6%
2.
0
%
2.
0
%
-2.7:1
-2.
1
:
1
-2
.
9
:
1
-4
.
3
:
1
-5.
2
:
1
11.5%
13.4%
6.
7
%
7
.
6
%
7.
2
%
9.9%
7.0%
FL: 46.96 FL: 47.14 FL: 47.91 FL: 47.74FL: 46.61
FL: 42.90 FL: 41.93 FL: 41.40
FL: 36.86
FL: 34.05
FL: 32.50
FL: 30.50
FG: 33.50 TC: 32.00
TC: 32.00
EA: 31.91
EA: 31.80
FG: 31.50
FG: 28.30FG: 27.30
FG: 29.00
FL: 27.36FL: 27.48
FL: 28.05
FL: 29.26FL: 30.37
FL: 30.74
FL: 31.19
EA: 30.87
FL: 29.68
FL: 29.67
FL: 29.67
EA: 30.38 EA: 30.89 EA: 30.38 EA: 30.89
TC: 31.50
TC: 31.50
TC: 31.50
EA: 30.50
EA: 28.71
EA: 27.84
EA: 28.78
FL: 29.23
FL: 37.06
FL: 29.90
FL: 30.53
FL: 43.16FL: 43.16
FL: 43.77
FL: 44.00
FL: 43.77
1.0%1.0%1.0%1.0%
3
.
8
%
3.2%
3.
4
%
574
0
5748
5742
5748
5744
57475747
TC: 44.50 TC: 44.50
TC: 44.50
BW: 32.48TW: 35.49
TW: 34.92BW: 32.00
1.5%
1.1%
0.5%
UPPER LEVEL
LOWER LEVEL
0+00 1+00 2+00 3+00 4+00
BP
:
0
+
0
0
.
0
0
PC: 3+87.11
PC: 5+00.23
PT: 4+57.01
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54PT: 6+64.41
PT: 8+59.09
3+84
AL-BLDG A LOOP PROFILE
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
0+00
57
2
7
.
5
57
2
8
.
0
57
2
8
.
0
9
0+50
57
2
9
.
0
57
2
8
.
9
5
57
2
9
.
6
57
2
9
.
8
0
1+00
57
3
0
.
5
57
3
1
.
3
3
57
3
1
.
0
57
3
2
.
9
8
1+50
57
3
1
.
8
57
3
4
.
6
4
57
3
2
.
6
57
3
6
.
2
9
2+00
57
3
3
.
8
57
3
7
.
9
4
57
3
5
.
1
57
3
9
.
6
0
2+50
57
3
6
.
4
57
4
1
.
2
2
57
3
7
.
8
57
4
2
.
4
5
3+00
57
3
8
.
0
57
4
3
.
6
9
57
3
7
.
9
57
4
4
.
1
5
3+50
57
3
7
.
9
57
4
4
.
0
4
57
3
7
.
9
57
4
3
.
9
2
4+00
57
3
8
.
4
57
4
3
.
8
9
57
3
8
.
9
57
4
4
.
0
1
4+50
57
3
9
.
4
57
4
4
.
1
4
57
3
9
.
7
57
4
4
.
0
6
5+00
57
3
9
.
9
57
4
3
.
9
3
57
4
0
.
4
57
4
3
.
8
7
5+50
57
4
1
.
0
57
4
4
.
0
0
57
4
1
.
6
57
4
4
.
1
2
6+00
57
4
1
.
3
57
4
4
.
0
2
57
4
0
.
5
57
4
3
.
0
1
6+50
57
4
0
.
2
57
4
2
.
0
1
57
3
8
.
4
57
4
0
.
8
0
7+00
57
3
7
.
0
57
3
9
.
3
1
57
3
6
.
1
57
3
7
.
8
2
7+50
57
3
4
.
8
57
3
6
.
3
4
57
3
3
.
4
57
3
4
.
8
5
8+00
57
3
2
.
4
57
3
3
.
5
4
57
3
1
.
9
57
3
2
.
4
4
8+50
57
3
1
.
6
57
3
1
.
3
5
57
3
1
.
4
57
3
1
.
0
3
9+00
57
3
0
.
6
57
3
0
.
8
6
57
3
0
.
0
57
3
0
.
9
8
9+50
57
3
0
.
0
57
3
1
.
1
3
57
3
0
.
0
57
3
1
.
0
5
10+00
57
3
0
.
0
57
3
0
.
9
1
57
3
0
.
0
57
3
0
.
9
3
10+50
57
3
0
.
0
57
3
1
.
0
6
57
3
0
.
0
57
3
1
.
1
2
11+00
57
3
0
.
0
57
3
0
.
9
9
57
3
0
.
0
57
3
0
.
8
6
11+50
57
2
9
.
6
57
3
0
.
6
9
57
2
9
.
6
57
3
0
.
0
7
11+82
57
2
9
.
7
57
2
9
.
9
3
3.00%3.41%
6.61%
4.94%-4.02%
-5.95%
-4.39%
0.50%-0.50%0.50%-0.50%0.50%-0.50%
-0.65%0.57%-0.57%0.53%-0.53%0.50%-2.68%-2.00%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
0
.
0
5
EL
E
V
=
5
7
2
7
.
6
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
2
5
.
0
0
EL
E
V
=
5
7
2
8
.
0
9
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
7
8
.
8
3
EL
E
V
=
5
7
2
9
.
9
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
8
.
1
2
EL
E
V
=
5
7
4
1
.
1
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
0
7
.
6
3
EL
E
V
=
5
7
4
4
.
0
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
2
6
.
2
2
EL
E
V
=
5
7
4
4
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
9
0
.
2
2
EL
E
V
=
5
7
4
3
.
8
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
4
.
2
2
EL
E
V
=
5
7
4
4
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
8
.
2
2
EL
E
V
=
5
7
4
3
.
8
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
8
2
.
2
2
EL
E
V
=
5
7
4
4
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
9
8
.
5
2
EL
E
V
=
5
7
4
4
.
0
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
6
4
.
4
1
EL
E
V
=
5
7
4
1
.
4
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
8
8
.
4
1
EL
E
V
=
5
7
3
4
.
0
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
5
4
.
2
9
EL
E
V
=
5
7
3
1
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
9
+
0
2
.
0
0
EL
E
V
=
5
7
3
0
.
8
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
9
+
5
6
.
0
0
EL
E
V
=
5
7
3
1
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
0
+
1
0
.
0
0
EL
E
V
=
5
7
3
0
.
8
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
0
+
6
8
.
0
0
EL
E
V
=
5
7
3
1
.
1
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
2
6
.
0
0
EL
E
V
=
5
7
3
0
.
8
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
4
1
.
0
9
EL
E
V
=
5
7
3
0
.
9
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
6
7
.
0
4
EL
E
V
=
5
7
3
0
.
2
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
8
2
.
0
4
EL
E
V
=
5
7
2
9
.
9
3
EXISTING GRADE PROPOSED GRADE
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
AL-BLDG C-LOOP PROFILE
5722
5724
5726
5728
5730
5722
5724
5726
5728
5730
0+00
57
2
8
.
2
57
2
8
.
1
2
57
2
7
.
6
57
2
7
.
7
3
0+50
57
2
6
.
7
57
2
7
.
6
1
57
2
5
.
5
57
2
7
.
8
7
1+00
57
2
4
.
6
57
2
8
.
1
2
57
2
4
.
0
57
2
8
.
0
3
1+50
57
2
3
.
3
57
2
7
.
7
2
57
2
3
.
0
57
2
7
.
7
0
2+00
57
2
3
.
0
57
2
7
.
9
5
57
2
3
.
1
57
2
8
.
2
0
2+50
57
2
3
.
2
57
2
8
.
0
4
57
2
3
.
1
57
2
7
.
7
9
3+00
57
2
3
.
0
57
2
7
.
6
0
57
2
3
.
0
57
2
7
.
8
5
3+50
57
2
2
.
9
57
2
8
.
1
0
57
2
3
.
0
57
2
8
.
1
3
4+00
57
2
2
.
7
57
2
7
.
8
8
57
2
2
.
3
57
2
7
.
6
3
4+50
57
2
2
.
3
57
2
7
.
3
3
57
2
2
.
5
57
2
6
.
9
5
4+89
57
2
2
.
9
57
2
6
.
7
4
-2.00%-1.26%1.00%-1.00%1.00%-1.01%1.02%-1.20%-1.50%-1.14%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
2
8
.
1
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
2
.
5
0
EL
E
V
=
5
7
2
7
.
8
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
4
2
.
1
7
EL
E
V
=
5
7
2
7
.
5
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
0
9
.
8
1
EL
E
V
=
5
7
2
8
.
2
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
1
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
2
9
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
9
6
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
6
4
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
3
1
.
0
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
4
5
.
0
8
EL
E
V
=
5
7
2
7
.
4
0
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
>>
XS
D
XS
D
XS
D
XS
D
ME: 25.0'±
STBK
STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
G
A
S
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
FO
FO
FO
FO
FO
FO
8'
'
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
E
6''SA
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
ST
ST
IR
R
PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
P
S
D
P
S
D
P
S
D
P
S
D
P
S
D
P
S
D
>>>>>>>>>>>>>>>>>>>>
>
PS
D
PS
D
PS
D
PSD
F
O
FO FO
FO
FO
FO FO FO FO FO FO FO FO FO FO
FO
8''WL 8''WL
6''SA
PSD
PSD PSD PSD PSD
BUILDING C:
57
2
5
5723
57
2
4
57
2
6
572
7
DRAIANGE SWALE
DETENTION
WATER QUALITY SEPARATOR
WATER QUALITY SEPARATOR
FF=5729.0'
CURB INLET
VALLEY PAN INLET
STORM MANHOLE
ROOF DRAIN STORM (TYP.)
5
7
2
7
5
7
2
8
5729
5728
5728
572
8
5725
5722
5728
572
8
572
8
572
8
57
2
5
1.
5
%
1.
0
%
1.0%1.0%1.0%1.0%2.1%
2.
0
%
2.
0
%
5.
7
%
2.
1
%
5.
3
%
5.
3
%
2.
1
%
5.
4
%
4.
8
%
1.
9
%
5.
2
%
1.
9
%
5.
2
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
4.1%
1.0%1.0%1.0%1.0%
0
.
8
%
2.0%
1.0%
2.0%
0.7%
1.3%
2
.
0
%
1.0%
3.
0
%
-3
.
0
:
1
-3
.
0
:
1
-3
.
0
:
1
-3.0:1
FL: 28.30
TC: 29.00
TC: 28.99
TC: 29.00
TC: 29.00TC: 29.00
TC: 29.00
FL: 27.20 FL: 27.87 FL: 27.70
FL: 27.23FL: 27.87
FL: 27.20 FL: 27.78 FL: 27.20
FL: 27.78
FL: 27.20
EA: 28.23 EA: 28.23 EA: 28.23
EA: 28.23 EA: 28.23
FL: 27.36 EA: 28.71
5722
5728
57
2
3
CURB OPENING
CURB OPENING
5+00
6+00 7+00 8+00 8+48
EP: 8+48.15PC: 5+00.23
PT: 4+57.01
PT: 5+70.13
4+
0
0
4+
7
6
EP: 4+76.32
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.70
PC: 4+45.08
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
0+
0
0
BP: 0+00.00
BUILDING E:
(FUTURE GRADING)
STBK STBK STBK STBK STBK STBK STBK STBK
x x x x x x x x x x x x
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
SA
8'
'
SA
8'
'
SA
s
U
E
L
U
E
L
U
E
L
E
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD
PS
D
PS
D
PS
D
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
PSD
PSD
PSD PSD PSD PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
> >> > >>
PS
D
PS
D
R26.5
6''WL
BUILDING B:
LOT 2
WATER QUALITY SEPARATOR
VALLEY PAN INLET
FOUNDATION WALL 2' ABOVE FF
FF=5732.0'
FOUNDATION WALL 2' ABOVE FF
105 L.F. RETAINING WALL 5735
5740
5745
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
57
3
1
5
7
3
2
5
7
3
3
5
7
3
4
5
7
3
6
5735
5740
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
5.
8
%
1.
8
%
5.5%
9.
5
%
4.
6
%
6.
6
%
2.0%
2.0%
2.
0
%
2.
0
%
-3
.
0
:
1
-3
.
0
:
1
-3.0:1
-2
.
2
:
1
-5
.
2
:
1
-2.7:1
9.9%
FL: 36.86
FL: 34.05
FL: 32.50
FL: 32.50
FG: 33.50
FG: 32.00
TC: 32.00
TC: 32.00
TC: 32.00
EA: 31.91 EA: 31.53
EA: 32.30
EA: 33.85 EA: 34.08
EA: 31.75
EA: 32.58 EA: 32.02 EA: 32.22 EA: 36.13EA: 32.68
EA: 35.62
EA: 31.23
FL: 31.28
FL: 30.60 FL: 31.34 FL: 30.60
FL: 31.30 FL: 31.08EA: 31.80
EA: 31.80 EA: 31.80
FG: 33.50
FL: 37.06
3
.
8
%
573
1
5732
5733
5733
57
3
5
574
0
5745
5749
5740
5
7
3
5
5739
5734
574
0
5748
57
3
0
57
3
5
57
4
0
5744
BW: 32.48TW: 35.49
TW: 34.92BW: 32.00
70 L.F. BOULDER WALL
1+
0
0
2+
0
0
PC: 0+67.66
PT: 0+82.16
2+
0
0
0+001+002+003+003+84
LI
M
I
T
O
F
L
O
T
2
G
R
A
D
I
N
G
AL-BLDG B-BACK PROFILE
5730
5732
5734
5736
5738
5740
5730
5732
5734
5736
5738
5740
0+00
57
3
5
.
7
57
3
7
.
2
4
57
3
6
.
2
57
3
6
.
5
9
0+50
57
3
6
.
5
57
3
5
.
2
6
57
3
6
.
4
57
3
3
.
8
8
1+00
57
3
6
.
4
57
3
2
.
5
1
57
3
6
.
3
57
3
1
.
5
1
1+50
57
3
6
.
3
57
3
1
.
2
0
57
3
6
.
4
57
3
1
.
0
6
2+00
57
3
6
.
4
57
3
1
.
3
1
57
3
7
.
2
57
3
1
.
5
6
2+50
57
3
7
.
7
57
3
1
.
6
3
57
3
7
.
9
57
3
1
.
3
8
3+00
57
3
8
.
0
57
3
1
.
1
3
57
3
8
.
1
57
3
1
.
0
9
3+50
57
3
7
.
9
57
3
1
.
3
6
57
3
7
.
8
57
3
1
.
6
2
3+84
57
3
8
.
0
-2.00%
-5.51%
-1.27%1.00%-1.00%1.07%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
3
7
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
7
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
1
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
1
5
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
8
4
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
PVI STA: 1+15.94
PVI ELEV: 5731.63
K: 4.72LVC: 20.00BVCS: 1+05.94
BVCE: 5732.18
EVCS: 1+25.94EVCE: 5731.50
PVI STA: 0+22.00
PVI ELEV: 5736.80
K: 5.70LVC: 20.00BVCS: 0+12.00
BVCE: 5737.00
EVCS: 0+32.00EVCE: 5736.25
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
STA: 1+15.94ELEV= 5731.73'STA: 1+25.94
ELEV= 5731.50'
DATE REVISION
C-2.2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
2
:
0
5
p
m
NO
R
T
H
ROAD
PLAN/PROFILE 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
I
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
NO
R
T
H
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
xxxxxxxxxxxxx
x
x
IRR IRR IRR IRR IRR IRR IRR IRR IRR
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
GAS GAS GAS GAS GAS GAS GAS GAS
G
A
S
G
A
S
GAS
GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
FO
FO
FO
FO
FO
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
s
E
U
E
L
U
E
L
U
E
L
E
s
6
'
'
S
A
6''SA
PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD
PSD
PSD PSD PSD PSD
PSD
PSD
PSD
PS
D
ST
ST
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
PSD PSD
PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD
PS
D
PS
D
P
S
D
P
S
D
P
S
D
PSD PSD PSD PSD PSD PSD PSD
ST
PS
D
PSD PSD PSD PSD PSD PSD
P
S
D
PS
D
PS
D
PSD
PS
D
PS
D
F
O
F
O
F
O
FO FO
FO
FO FO FO FO FO FO FO FO FO
PS
D
PS
D
PS
D
PS
D
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
8''
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
6''WL
E
PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
ST PSD PSD PSD PSDPSDPSDPSDPSDPSD
XU
T
XUT XUT XUT XUT XUT XUT
XUT XUT
XU
T
XUT
XUT
XUT
XU
T
XUTXUT
X
U
T
XUT XUT XUT XUT XUT XUT
XUT XUT XUT XUT XUT
XE
L
XE
L
XEL XEL XEL XEL XEL XEL
XE
L
XEL
X
G
A
S
XEL XEL XEL XEL XEL XEL
XEL
XEL
X
E
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL
XG
A
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGA
S
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
XU
T
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XU
T
XU
T
XU
T
XU
T
XE
L
XE
L
XE
L
X
E
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
>>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
TXWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XE
L
XE
L
XEL
XE
L
XWL XWL
XWL
XW
L
XW
L
XW
L
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XEL XEL
XEL
XEL XEL XEL
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL
XG
A
S
XEL
XE
L
XE
L
XEL
XEL XEL XEL
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XW
L
XW
L
XEL
XG
A
S
XG
A
S
XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XE
L
XEL XEL XEL XEL XE
L
XG
A
S
XE
L
XE
L
XE
L
X
E
L
XE
L
>>
OE
L
OE
L
OE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XS
D
XSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA
XSA
XSA
XSA
XSA XSA XSA XSA XSA XSA
XS
A
XSA XSA XSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSD XSD
XSD
XSD XSD XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD
X
S
D
X
S
D
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL ou
ou
XI
R
R
EXISTING UTILITY EASEMENT (TYP.)
DONEGAN ROAD
ST
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
WEST GLENWOOD MALL
LOT 1
CENTER DRIVE
LOT 3
BUILDING A
BUILDING B
LOT 2
BUILDING C
UPPER LEVEL
LOWER LEVEL
CH
A
P
P
A
R
A
L
D
R
I
V
E
EX. HYDRANT
EX. HYDRANT
EX. SMH
RIM=5718.19
8"I-I(N)=5712.36
8"I-O(E)=5712.26
NEW GAS SERVICE TEE
EX. ELECTRIC
EXISTING GRAVITY AND 6" PVCPRESSURIZED IRRIGATION MAIN
CONNECT TO EX. WATER MAIN
CONNECT TO EX. SEWERINV=5720.1'±
XX"x8" TEE & 8" GATE VALVE
EX. HYDRANT TO BE RELOCATED
EX. HYDRANT
PROPOSED FIRE HYDRANT
770 L.F. 8" C900 PVC WATER MAIN
SEWER MH 'A1'RIM=5728.80'
8"I-O(S)=5720.40'
SEWER MH 'C1'
RIM=5731.26
8"I-I(N)=5722.46
8"I-O(S)=5722.26
SEWER MH 'C2'RIM=5737.43
8"I-O(S)=5728.40
PROPOSED UTILITY
EASEMENT RE: PLAT
313 L.F. 8" SDR35 PVC SEWER @ 3.16%
134 L.F. 8" SDR35 PVC SEWER @ 4.47%
EXTEND GRAVITY AND PRESSURIZED
IRRIGATION MAIN TO LOT 3.
NEW 6" PRESSURIZED IRRIGATION MAIN
ELECTRIC TRANSFORMER
FOR BUILDING A & B
ELECTRIC TRANSFORMER
FOR BUILDING C
FIBER OPTIC SERVICE LINE. FINALALIGNMENT COORDINATED WITH
CITY OF GLENWOOD SPRINGS.
NATURAL GAS MAIN. FINAL ALIGNMENT
COORDINATED WITH BLACK HILLS ENERGY.
NEW GAS SERVICE TEE
SEWER SERVICE
FIRE HYDRANT
SEWER SERVICE
8" WATER MAIN STUBBED W/ LOT 2
SEWER SERVICE
BUILDING D
BUILDING E
SEWER SERVICE
FUTURE 568 L.F. 8" C900 PVC WATER MAIN
DETAILED & CONSTRUCTED W/ LOT 3
FUTURE LOT 3 WATERMAIN CONNECTION.
FUTURE BUILDING E SHALLOWUTILITY SERVICES
FUTURE BUILDING D SHALLOWUTILITY SERVICES
RAISE EXISTING OVERHEAD TELEPHONE/ COMMUNICATION
UTILITIES TO PROVIDE A MINIMUM OF 16' CLEARANCE
ABOVE ROAD ELEVATION. COORDINATE SCOPE W/RESPECTIVE UTILITY PROVIDER.
EX. HYDRANT
DATE REVISION
C-3.0
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
3
0
-
U
T
I
L
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
2
:
0
6
p
m
NO
R
T
H
UTILITY PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
050 50 100
50
20025
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
EXISTING ELECTRIC MANHOLE
EXISTING DRAINAGE DRY-WELL
EXISTING SEWER MANHOLE
EXISTING TELEPHONE MANHOLE
EXISTING GUY WIRE
EXISTING POWER POLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING GAS METER
EXISTING ELECTRIC TRANSFORMER
EXISTING ELECTRIC METER
EXISTING TELEPHONE PEDESTAL
EXISTING CATV PEDESTAL
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING LEGEND
EXISTING STORM INLET
EXISTING STORM SEWERXSDXSD
EXISTING EASEMENT
EXISTING PROPERTY LINE
EXISTING 8" SANITARY SEWER MAIN
EXISTING GAS
EXISTING TELEPHONE
XGAS XGAS XGAS
EXISTING UNDERGROUND ELECTRIC
EXISTING CABLE
EXISTING FIBER OPTIC
XUT XUT XUT
XEL XEL XEL
XTV XTV XTV
XFO XFO XFO
EXISTING OVERHEAD ELECTRICOELOEL
EXISTING IRRIGATION PIPEXIRRXIRR
EXISTING SWALE OR DITCH>>>>
XSA XSA
EXISTING 8" WATER MAINXWLXWL
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
EXISTING WIRE FENCExx
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE BUILDING LOCATION, USES, AND SITE LAYOUT OF LOT 3 ARE
CONCEPTUAL PENDING FUTURE DEVELOPMENT OF LOT 3. SEE
APPLICATION NARRATIVE FOR ADDITIONAL DETAILS.
2. THE LOCATIONS OF UNDERGROUND UTILITIES HAVE BEEN PLOTTED BASED
ON UTILITY MAPS, CONSTRUCTION/DESIGN PLANS, OTHER INFORMATION
PROVIDED BY UTILITY COMPANIES AND ACTUAL FIELD LOCATIONS IN SOME
INSTANCES. THESE UTILITIES, AS SHOWN, MAY NOT REPRESENT ACTUAL
FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATION OF UTILITIES
PRIOR TO CONSTRUCTION.
3. SHALLOW UTILITY LINEWORK MUST BE COORDINATED WITH THE UTILITY
PROVIDER. THE UTILITY PROVIDER IS TO PERFORM ALL UTILITY LINEWORK
NECESSARY. CONTRACTOR TO PROVIDE ALL TRENCHING, BEDDING AND
BACKFILL NECESSARY FOR LINEWORK.
4. THE SITE SANITARY SEWER SHALL BE CONSTRUCTED ACCORDING TO THE
WEST GLENWOOD SPRINGS SANITATION DISTRICT. EXISTING SANITARY
SEWER SERVICES SHALL BE ABANDONED AT THE MAIN ACCORDING TO
THE DISTRICT STANDARDS USING A WATER-TIGHT PLUG.
5. THE SITE WATER MAIN SHALL BE CONSTRUCTED ACCORDING TO THE CITY
OF GLENWOOD SPRINGS STANDARD DETAILS AND SPECIFICATIONS.
6. THE SITE WILL MAINTAIN THE EXISTING PRESSURIZED IRRIGATION SYSTEM
THAT CURRENTLY SERVES LOT 1. THE IRRIGATION SYSTEM
IMPROVEMENTS WILL BE DETAILED FOR MAJOR SITE PLAN.
7. REFER TO PRELIMINARY PLAT FOR PROPOSED UTILITY EASEMENTS.
UTILITY NOTES:
PROPOSED SEWER MANHOLE
PROPOSED FIRE HYDRANT
PROPOSED WATER VALVE
PROPOSED ELECTRIC TRANSFORMER
PROPOSED STORM INLET
PROPOSED 8" WATER MAIN8'' WL 8'' WL
PROPOSED 8" SANITARY SEWER MAIN
PROPOSED ELECTRICUELUEL
PROPOSED GASGASGAS
PROPOSED STORM SEWERPSDPSD
8'' SA 8'' SA
E
PROPOSED WATER SERVICE
PROPOSED SANITARY SERVICEsasvcsasvc
WL SVC
TRACT "F"
TRACT "E"
POINT OF BEGINNING
N89° 52' 00"E ͛312.68'
N87° 18' 00"W ͛476.98'S47°
4
2
'
0
0
"
W
͛
1
2
5
.
0
6
'
N87° 18' 00"W ͛615.36'24.0
30.0
LOT 1BLOCK 4
LOT 2BLOCK 4
LOT 7BLOCK 1
LOT 6BLOCK 1
LOT 5BLOCK 1
LOT 4BLOCK 1
LOT 3BLOCK 1
LOT 2BLOCK 1
LOT 1BLOCK 1
5.0
10' WIDE UTILITY EASEMENTBK. 325 PG. 337
AREA STORM SEWER PIPELINE
(BENEFITS SUBJECT PROPERTY)PARAGRAPH C.2
BK. 852 PG. 861
30' WIDE ACCESS EASEMENT
(BENEFITS SUBJECT PROPERTY)PARAGRAPH C.2
BK. 852 PG. 861
AREA OF STORM SEWER PIPELINE
(BENEFITS SUBJECT PROPERTY)PARAGRAPH C.2BK. 852 PG. 861
30' WIDE UTILITY EASEMENTREC. #316244
22' WIDE DRIVEWAYEASEMENT
REC. #336102
POINT OF BEGINNING
(TITLE DESCRIPTION)FOUND MAGNETIC NAIL IN
CONCRETEFLUSH
FOUND #5 REBAR & 1.25"YELLOW PLASTIC CAPFLUSH
L.S.13501
SOUTH QUARTER CORNERSEC 34
FOUND #5 REBAR3" UNDER ASPHALT
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
FLUSHL.S. 13501
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP4" ABOVE GROUNDL.S. 13501
GLENWOOD SPRINGS MALL LLLP 336102
PARCEL 218506106009WOOD KING LLLP 336102PARCEL 218506106008
M & N ASSOCIATES LTDPARCEL 218506209001
LOT 2B LLLPPARCEL 218506209012
KIP HAMPDEN LLLPPARCEL 218506209011
TWO RIVERS BUILDING CORPORATIONPARCEL 218506209009
FOUND #6 REBARWITNESS CORNER
NO CAP FOUND #5 REBARNO CAPBENT
FOUND #5 REBAR
& 1.25" YELLOWPLASTIC CAPFLUSH
L.S. 19598
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
FLUSHILLEGIBLE
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
HCE L.S. ILLEGIBLE
FOUND #5 REBAR
NO CAP
FOUND #5 REBAR
& ALUMINUM CAP1" UNDER GROUND
SURVEY TECH L.S. 13174
FOUND #5 REBARNO CAP
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
FLUSHILLEGIBLE
FOUND #5 REBAR
& 1.25" RED PLASTIC CAPILLEGIBLE
MEL RAY SUBDIVISION 170138
BOOK 245 PAGE 515
WESTERN HILLS SUBDIVISION REC. #203826
LOT 14BLOCK 2
LOT 13BLOCK 2
LOT 12BLOCK 2 LOT 11BLOCK 2
LOT 10
BLOCK 2 LOT 9BLOCK 2
LOT 7BLOCK 3
LOT 8BLOCK 3 LOT 13BLOCK 3
LOT 14BLOCK 3 LOT 1BLOCK 5 LOT 12
BLOCK 5
LOT 11
BLOCK 5 LOT 10BLOCK 5
LOT 9
BLOCK 5
LOT 8BLOCK 5
SEC. 34SEC. 6
FOUND #5 REBARNO CAP
FOUND #5 REBAR & 1.25"ORANGE PLASTIC CAPFLUSHL.S. 28643
FOUND #5 REBAR &1.25"ORANGE PLASTIC CAPFLUSHL.S. 28643
FOUND 2' WITNESS CORNER
#5 REBAR & 1.25"RED PLASTIC CAPFLUSH
L.S. 28643
FOUND #5 REBAR & 1.25"
(BROKEN) CAP "KKBNA"FOUND #5 REBAR (BENT)
CHRISTINA GORE
PARCEL 218506101008
WJ ENTERPRISES LLCPARCEL 218506101007
LAMBERTO RUIZ & IRMA CRUZPARCEL 218506101004
ARBANEY FAMILY TRUST
DTD 4/23/2015PARCEL 218506101003
KEVIN B WARD
& KELLY J WARDPARCEL 218506101002
SUNRAY OZF LLC
PARCEL 218506101010
MELRAY OZF LLCPARCEL 218506101009
DONEGAN ROAD60' RIGHT OF WAY
FOUND #5 REBARNO CAP0.3' ABOVE GROUND
FOUND #5 REBAR & 1.25"ALUMINUM CAP0.1' ABOVE GROUNDL.S. 14060
ST
O
R
M
K
I
N
G
R
O
A
D
60
'
R
I
G
H
T
O
F
W
A
Y
ME
L
R
A
Y
R
O
A
D
30
'
R
I
G
H
T
O
F
W
A
Y
PARCEL 218506100042GLENWOOD PARTNERSHIP LLLP
689,060 SQ FT±
15.819 ACRES±REC. #568864
TIE:
N
3
8
°
4
0
'
5
3
"
E
͛
8
5
3
.
4
5
'
N2
°
4
4
'
0
0
"
E
͛
6
0
5
.
6
4
'
N89° 49' 18"E ͛860.83'
S1
°
5
2
'
0
0
"
W
͛
5
7
5
.
9
6
'
S89° 50' 05"W ͛2628.18'(BASIS OF BEARING) N89° 49' 59"E ͛2623.99'
..\External References\MSB-STAMP COLOR TRANSPARENT.jpg
NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. 2/22/2023 - 30017- G:\2020\30017\SURVEY\Survey DWGs\30017.04 Plat 2023\30017.04 PLAT.dwg
FINAL PLAT OF:COOPER SUBDIVISION
BEING SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH,
RANGE 89 WEST OF THE 6TH P.M.
COUNTY OF GARFIELD, STATE OF COLORADO.
SHEET 1 OF 2
NOTES
1) DATE OF FIELDWORK: OCTOBER 7-28, DECEMBER 15-18, 2020, JANUARY 5, 8, 14, 2021, ANDAPRIL 2022.
2) DATE OF PREPARATION: OCTOBER - DECEMBER, 2020; JANUARY, 2021 AND FEBRUARY,2023.
3) BASIS OF BEARING: A BEARING OF N 89 49'59" E ALONG THE SOUTH EAST SECTION LINE OFSECTION 34, ESTABLISHED BY THE FOUND MONUMENTS.
4) THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY SOPRIS ENGINEERING, LLC (SE) TODETERMINE OWNERSHIP OR EASEMENTS OF RECORD. FOR ALL INFORMATION REGARDINGEASEMENTS, RIGHTS OF WAY AND/OR TITLE OF RECORD, SE RELIED UPON THE TITLECOMMITMENT PREPARED BY TITLE COMPANY OF THE ROCKIES, COMMITMENT NO.0603918-C2, EFFECTIVE JANUARY 17, 2023, VARIOUS DOCUMENTS AND PLATS OF RECORDAND THE FOUND MONUMENTS SHOWN HEREON.
5) THE LINEAR UNIT USED IN THE PREPARATION OF THIS PLAT IS THE U.S. SURVEY FOOT ASDEFINED BY THE UNITED STATES DEPARTMENT OF COMMERCE, NATIONAL INSTITUTE OFSTANDARDS AND TECHNOLOGY.
VICINITY MAP
SCALE: 1" = 2000'
SITE
SURVEYOR'S CERTIFICATE
I, MARK S. BECKLER, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR
LICENSED UNDER THE LAWS OF THE STATE OF COLORADO, THAT THIS PLAT IS A TRUE,
CORRECT AND COMPLETE FINAL PLAT OF COOPER SUBDIVISION, AS LAID OUT, PLATTED,
DEDICATED AND SHOWN HEREON, THAT SUCH PLAT WAS MADE FROM AN ACCURATE SURVEY
OF SAID PROPERTY BY ME OR UNDER MY SUPERVISION, AND CORRECTLY SHOWS THE
LOCATION AND DIMENSIONS OF THE LOTS, EASEMENTS AND STREETS OF SAID FINAL PLAT OF
AS THE SAME ARE STAKED UPON THE GROUND IN COMPLIANCE WITH APPLICABLE
REGULATIONS GOVERNING THE SUBDIVISION OF LAND.
IN WITNESS WHEREOF, I HAVE SET MY HAND AND SEAL THIS _____ DAY OF _____________,
A.D., 2023.
_______________________________________
MARK S. BECKLER, P.L.S. #28643
CLERK AND RECORDER'S CERTIFICATE
THIS PLAT WAS FILED FOR RECORD IN THE OFFICE OF THE CLERK AND RECORDER OF GARFIELD
COUNTY, COLORADO, AT ___________ O'CLOCK ___, ON THIS ______ DAY OF
___________________, 2023, AND IS DULY RECORDED AS RECEPTION NO.
_________________________.
________________________________
CLERK AND RECORDER
BY: _____________________________
DEPUTY
CERTIFICATE OF TAXES PAID
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT THE ENTIRE AMOUNT OF TAXES AND
ASSESSMENTS DUE AND PAYABLE AS OF ___________________________ 2023, UPON ALL
PARCELS OF REAL ESTATE DESCRIBED ON THIS PLAT ARE PAID IN FULL.
DATED THIS ______ DAY OF ______________________, A.D., 2023.
____________________________________
TREASURER OF GARFIELD COUNTY
COUNTY SURVEYOR'S CERTIFICATE
APPROVED FOR CONTENT AND FORM ONLY AND NOT THE ACCURACY OF
SURVEYS, CALCULATIONS OR DRAFTING, PURSUANT TO C.R.S.§38-51-101 AND
102, ET SEQ,
DATED THIS _________ DAY OF _______________________, A.D., 2023.
_______________________________
GARFIELD COUNTY SURVEYOR
COUNTY COMMISSIONERS' CERTIFICATE
BASED UPON THE REVIEW AND RECOMMENDATION OF GARFIELD COUNTY DIRECTOR OF
COMMUNITY DEVELOPMENT, THE BOARD OF COUNTY COMMISSIONERS OF GARFIELD
COUNTY, COLORADO, HEREBY APPROVES THIS AMENDED PLAT THIS ___ DAY OF
_______________, A.D., 2023, FOR FILING WITH THE CLERK AND RECORDER OF GARFIELD
COUNTY AND FOR CONVEYANCE TO THE COUNTY OF THE PUBLIC DEDICATIONS SHOWN
HEREON, SUBJECT TO THE PROVISIONS THAT APPROVAL IN NO WAY OBLIGATES GARFIELD
COUNTY FOR THE FINANCING OR CONSTRUCTION OF IMPROVEMENTS ON LANDS, PUBLIC
ROADS, HIGHWAYS OR EASEMENTS DEDICATED TO THE PUBLIC, EXCEPT AS SPECIFICALLY
AGREED TO BY THE BOARD OF COUNTY COMMISSIONERS BY SUBSEQUENT RESOLUTION. THIS
APPROVAL SHALL IN NO WAY OBLIGATE GARFIELD COUNTY FOR THE CONSTRUCTION, REPAIR
OR MAINTENANCE OF PUBLIC ROADS, HIGHWAYS OR ANY OTHER PUBLIC DEDICATIONS
SHOWN HEREON.
___________________________________
JOHN MARTIN, CHAIRMAN, BOARD OF COUNTY COMMISSIONERS
GARFIELD COUNTY, COLORADO
WITNESS MY HAND AND SEAL OF THE COUNTY OF GARFIELD.
ATTEST:__________________________________
COUNTY CLERK
MINERAL OWNERSHIP
TO BE PROVIDED BY APPLICANT'S ATTORNEY
CERTIFICATE OF DEDICATION AND OWNERSHIP
THE UNDERSIGNED, BEING SOLE OWNER IN FEE SIMPLE OF ALL THAT REAL PROPERTY SITUATED IN
GARFIELD COUNTY, DESCRIBED AS FOLLOWS:
PROPERTY DESCRIPTION
A TRACT OF LAND SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH, RANGE 89 WEST OF THE 6TH P.M.
BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT ON THE NORTH LINE OF THE GLENWOOD SPRINGS MALL SUBDIVISION WHENCE
THE WITNESS CORNER TO THE S1/4 CORNER OF SECTION 34, TOWNSHIP 5 SOUTH, RANGE 89 WEST OF
THE 6TH P.M. BEARS N89°13'08"E 866.63 FEET (N38°40'53"E 853.45 FEET FIELD) SAID POINT OF
BEGINNING ALSO BEING THE SOUTHEAST CORNER OF THAT PARCEL DESCRIBED AS PARCEL C IN BOOK
1205 AT PAGE 589 IN THE OFFICE OF THE GARFIELD COUNTY CLERK AND RECORDER; THENCE ALONG
THE EAST LINE OF SAID PARCEL C N2°44'00"E 605.64 FEET TO THE SOUTH RIGHT-OF-WAY LINE OF
COUNTY ROAD NO. 130; THENCE ALONG SAID RIGHT-OF-WAY N89°52'00"E 312.68 FEET; THENCE
(CONTINUING ALONG SAID RIGHT-OF-WAY) N89°49'18"E 860.83 FEET TO THE WEST LINE OF THE
MEL-RAY SUBDIVISION; THENCE ALONG SAID WEST LINE S1°52'00"W 575.96 FEET; THENCE DEPARTING
SAID EAST (WEST) LINE AND ALONG THE NORTH LINE OF SAID GLENWOOD SPRINGS MALL N87°18'00"W
615.36 FEET; THENCE (CONTINUING ALONG SAID NORTH LINE) S47°42'00"W 125.06 FEET; THENCE
(CONTINUING ALONG SAID NORTH LINE) N87°18'00"W 476.98 FEET TO THE POINT OF BEGINNING.
CONTAINING 689,060 SQUARE FEET, OR 15.819 ACRES, MORE OR LESS
COUNTY OF GARFIELD
STATE OF COLORADO
HAS CAUSED THE DESCRIBED REAL PROPERTY TO BE SURVEYED, LAID OUT, PLATTED AND SUBDIVIDED
INTO LOTS AND BLOCKS AS SHOWN ON THIS PLAT UNDER THE NAME AND STYLE OF COOPER
SUBDIVISION. THE OWNER DOES HEREBY DEDICATE AS PRIVATE EASEMENTS TO THE PRIVATE USE OF
THE OWNERS OF THE LOTS OF SAID SUBDIVISION, THEIR HEIRS AND ASSIGNS, THE EASEMENTS AS
SHOWN HEREON; THAT THERE IS ALSO INCLUDED IN THIS DEDICATION, THE RIGHT AND PRIVILEGE TO
USE SAID EASEMENTS AS SHOWN ON THIS PLAT TO INSTALL, CONSTRUCT, RECONSTRUCT AND
MAINTAIN UTILITIES WITHIN THE WIDTH OF SAID EASEMENTS FOR THE PURPOSE OF SERVING THE LOTS
IN SAID SUBDIVISION. SUCH EASEMENT AND RIGHTS SHALL BE UTILIZED IN A REASONABLE AND
PRUDENT MANNER. ALL EXPENSE FOR STREET PAVING OR IMPROVEMENTS SHALL BE FURNISHED BY
THE SELLER OR PURCHASER, NOT BY THE COUNTY OF GARFIELD;
AND OWNER FURTHER DEDICATES THOSE EASEMENTS, AS SHOWN AND DIMENSIONED ON THIS PLAT,
AS FOLLOWS:
1. TO THE CITY OF GLENWOOD SPRINGS, COLORADO THOSE EASEMENTS SHOWN AND DESCRIBED
HEREON AS "ELECTRIC EASEMENT," "FIBER OPTIC EASEMENT" AND "HYDRANT AND HYDRANT ACCESS
EASEMENT" FOR CONSTRUCTION, USE AND MAINTENANCE OF UTILITY INFRASTRUCTURE;
2. TO THE OWNERS OF LOT 1, LOT 2, AND LOT 3, COOPER SUBDIVISION, THAT "PRIVATE ACCESS
EASEMENT" SHOWN AND DESCRIBED HEREON, FOR CONSTRUCTION, USE AND MAINTENANCE OF A
ROADWAY, SUBJECT TO THAT AGREEMENT RECORDED ___________________, 2023 AS RECEPTION No.
______________; SAID "PRIVATE ACCESS EASEMENT" IS HEREBY DEDICATED TO PUBLIC EMERGENCY
SERVICES FOR EMERGENCY ACCESS;
3. TO PUBLIC UTILITY PROVIDERS, THOSE EASEMENTS SHOWN AND DESCRIBED HEREON AS
"PUBLIC UTILITY EASEMENT" FOR CONSTRUCTION, USE AND MAINTENANCE OF ABOVE GROUND AND
UNDERGROUND PUBLIC UTILITIES;
4. TO THE OWNERS OF LOT 1, LOT 2, AND LOT 3, COOPER SUBDIVISION, THOSE EASEMENTS
SHOWN AND DESCRIBED HEREON AS "IRRIGATION EASEMENT", FOR CONSTRUCTION, USE AND
MAINTENANCE OF ON-SITE IRRIGATION INFRASTRUCTURE, SUBJECT TO THAT AGREEMENT RECORDED
___________________, 2023 AS RECEPTION No. ______________;
5. TO GARFIELD COUNTY, THOSE EASEMENTS SHOWN AND DESCRIBED HEREON AS "DRAINAGE
EASEMENT" FOR CONSTRUCTION, USE AND MAINTENANCE OF STORM DRAINAGE INFRASTRUCTURE;
6. TO THE OWNERS OF LOT 1, LOT 2 AND LOT 3 COOPER SUBDIVISION, THOSE EASEMENTS SHOWN
AND DESCRIBED HEREON AS "PRIVATE WATERLINE EASEMENT" FOR CONSTRUCTION, USE AND
MAINTENANCE OF WATERLINE INFRASTRUCTURE, SUBJECT TO THAT AGREEMENT RECORDED
___________________, 2023 AS RECEPTION No. ______________;
7. TO WEST GLENWOOD SANITATION DISTRICT, THOSE EASEMENTS SHOWN AND DESCRIBED
HEREON AS "SANITARY SEWER EASEMENT" FOR CONSTRUCTION, USE AND MAINTENANCE OF SANITARY
SEWER INFRASTRUCTURE, SUBJECT TO THAT AGREEMENT RECORDED ___________________, 2023 AS
RECEPTION No. ______________.
EXECUTED THIS ___ DAY OF __________________, A.D., 2023.
OWNER: GLENWOOD PARTNERSHIP LLLP
BY:
__________________________________________
__________ _____, AS ______
STATE OF COLORADO )
)SS
COUNTY OF GARFIELD )
THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME
THIS ______ DAY OF ___________, A.D., 2023, BY ___________________ AS _________________ OF
OF GLENWOOD PARTNERSHIP LLLP.
MY COMMISSION EXPIRES: _____________________________
WITNESS MY HAND AND OFFICIAL SEAL.
______________________________
NOTARY PUBLIC
TITLE CERTIFICATE
I, , AN AGENT AUTHORIZED BY TITLE COMPANY OF THEROCKIES, DO HEREBY CERTIFY THAT I HAVE EXAMINED THE TITLE TO ALL LANDSSHOWN UPON THIS PLAT AND THAT TITLE TO SUCH LANDS IS VESTED IN GLENWOODPARTNERSHIP LLLP, FREE AND CLEAR OF ALL LIENS AND ENCUMBRANCES (INCLUDINGMORTGAGES, DEEDS OF TRUST, JUDGMENTS, EASEMENTS, CONTRACTS ANDAGREEMENTS OF RECORD AFFECTING THE REAL PROPERTY IN THIS PLAT), EXCEPT ASFOLLOWS:______________________________________________________________
___________________________________________________________.
DATED THIS _____ DAY OF ___________________, A.D., 2023.
TITLE COMPANY:TITLE COMPANY OF THE ROCKIES1620 GRAND AVE., SUITE BGLENWOOD SPRINGS, CO 81601
__________________________________________AUTHORIZED AGENT
PLAT NOTES:
1) THE PROPERTIES SHOWN HEREON ARE SUBJECT TO THE PROTECTIVE COVENANTS FOR
COOPER SUBDIVISION, RECORDED _______________, ______ AS RECEPTION NO.
____________, OF THE GARFIELD COUNTY RECORDS.
SOPRIS ENGINEERING LLC
502 MAIN STREET SUITE A3 CARBONDALE CO 81623
(970) 704 0311 soprisengineering.com
1 inch = ft.
( IN U.S. SURVEY FEET )
GRAPHIC SCALE
0100 100 200
100
40050
LIENHOLDER'S SUBORDINATION
TO BE PROVIDED IF APPLICABLE
CENTER RD.
ME
L
R
A
Y
R
D
.
N2
°
4
4
'
0
0
"
E
͛
6
0
5
.
6
4
'
S47°
4
2
'
0
0
"
W
͛
1
2
5
.
0
6
'
N87° 18' 00"W ͛615.36'
LOT 7BLOCK 1
LOT 6BLOCK 1
LOT 5BLOCK 1
LOT 4BLOCK 1
LOT 3BLOCK 1
LOT 2BLOCK 1
LOT 1
BLOCK 1
S89° 50' 05"W ͛2628.18'
N89° 49' 18"E ͛860.83'
N87° 18' 00"W ͛476.98'
(BASIS OF BEARING) N89° 49' 59"E ͛2623.99'
N89° 52' 00"E ͛312.68'
S1
°
5
2
'
0
0
"
W
͛
5
7
5
.
9
6
'
LOT 1139,038 SQ FT±
3.192 ACRES±
PER THIS PLAT
LOT 2
343,213 SQ FT±
7.879 ACRES±PER THIS PLAT
LOT 3
206,809 SQ FT±
4.748 ACRES±PER THIS PLAT
LOT 5BLOCK 1
LOT 4BLOCK 1
LOT 2BLOCK 1
LOT 1
BLOCK 1
AREA OF STORM SEWER PIPELINE
(BENEFITS SUBJECT PROPERTY)
PARAGRAPH C.2BK. 852 PG. 861
AREA OF STORM SEWER PIPELINE
(BENEFITS SUBJECT PROPERTY)
PARAGRAPH C.2BK. 852 PG. 861 30' WIDE UTILITY EASEMENT
(NORTHERLY 30' OF MALL PROPERTY)REC. #316244
22' WIDE DRIVEWAY
EASEMENT (HATCHED)
REC. #336102
FOUND MAGNETIC NAIL IN CONCRETEFLUSH
FOUND #5 REBAR & 1.25"YELLOW PLASTIC CAPFLUSHL.S.13501
SOUTH QUARTER CORNERSEC 34FOUND #5 REBAR3" UNDER ASPHALT
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSHL.S. 13501
FOUND #5 REBARNO CAPBENT
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSH
L.S. 19598
FOUND #5 REBAR
& ALUMINUM CAP
1" UNDER GROUND
SURVEY TECH L.S. 13174
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSHILLEGIBLE
FOUND #5 REBAR
& 1.25" RED PLASTIC CAPILLEGIBLE
FOUND #5 REBAR & 1.25"
ORANGE PLASTIC CAPFLUSHL.S. 28643
FOUND 2' WITNESS CORNER
#5 REBAR & 1.25"RED PLASTIC CAPFLUSH
L.S. 28643
FOUND #5 REBAR & 1.25"
(BROKEN) CAP "KKBNA"
FOUND #5 REBAR (BENT)
DONEGAN ROAD60' RIGHT OF WAY
ST
O
R
M
K
I
N
G
R
O
A
D
60
'
R
I
G
H
T
O
F
W
A
Y
ME
L
R
A
Y
R
O
A
D
30
'
R
I
G
H
T
O
F
W
A
Y
LOT 7BLOCK 1
LOT 6BLOCK 1
LOT 3BLOCK 1
30' WIDE ACCESS EASEMENT
(BENEFITS SUBJECT PROPERTY)
PARAGRAPH C.2BK. 852 PG. 861
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
4" ABOVE GROUND
L.S. 13501
GLENWOOD SPRINGS MALL LLLP 336102PARCEL 218506106009WOOD KING LLLP REC. #336102
PARCEL 218506106008
KIP HAMPDEN LLLPPARCEL 218506209011
TWO RIVERS BUILDING CORPORATIONPARCEL 218506209009
FOUND #6 REBARWITNESS CORNERNO CAP
FOUND #5 REBARNO CAP
MEL RAY SUBDIVISION 170138BOOK 245 PAGE 515
WESTERN HILLS SUBDIVISION REC. #203826
LOT 14
BLOCK 2
LOT 13BLOCK 2
LOT 12BLOCK 2 LOT 11BLOCK 2
LOT 10
BLOCK 2 LOT 9
BLOCK 2
LOT 7BLOCK 3
LOT 8BLOCK 3
LOT 13BLOCK 3
LOT 14BLOCK 3 LOT 1BLOCK 5 LOT 12
BLOCK 5
LOT 11BLOCK 5 LOT 10BLOCK 5
LOT 9BLOCK 5
LOT 8BLOCK 5
SEC. 34SEC. 6
FOUND #5 REBAR &1.25"
ORANGE PLASTIC CAPFLUSHL.S. 28643
CHRISTINA GOREPARCEL 218506101008
WJ ENTERPRISES LLCPARCEL 218506101007
LAMBERTO RUIZ & IRMA CRUZPARCEL 218506101004
ARBANEY FAMILY TRUST DTD 4/23/2015
PARCEL 218506101003
KEVIN B WARD
& KELLY J WARDPARCEL 218506101002
SUNRAY OZF LLCPARCEL 218506101010
MELRAY OZF LLCPARCEL 218506101009
FOUND #5 REBARNO CAP0.3' ABOVE GROUND
FOUND #5 REBAR & 1.25"ALUMINUM CAP0.1' ABOVE GROUNDL.S. 14060
N2
°
3
5
'
3
0
"
E
͛
5
0
2
.
6
8
'
Delta=2°46'12"R=300.00'
L=14.50'
Ch Brg=N01°13'00"E
Ch Dist=14.50'
N0° 10' 42"W ͛40.50'
N87° 17' 33"W ͛105.91'
N2
°
4
2
'
2
7
"
E
͛
1
6
6
.
0
0
'
N87° 24' 30"W ͛459.36'
247.02'
368.34'
30.0'
30.0'
22.0'
30.0'
20.0'24.0'
19'.0
N2° 42' 27"E ͛29.87'
28
3
.
4
4
'
32
2
.
2
1
'
PRIVATE ACCESS AND EMERGENCYVEHICLE ACCESS EASEMENTPER THIS PLAT
(SEE DEDICATION PARAGRAPH 2)
15' WIDE HYDRANT AND HYDRANT ACCESS EASEMENT
GRANTED TO THE CITY OF GLENWOOD SPRINGS
PER THIS PLAT (SEE DEDICATION PARAGRAPH 1)
15' WIDE ELECTRIC EASEMENTGRANTED TO THE CITY OFGLENWOOD SPRINGS
PER THIS PLAT (SEE
DEDICATION PARAGRAPH 1)
PRIVATE ACCESS AND EMERGENCYVEHICLE ACCESS EASEMENT
PER THIS PLAT
(SEE DEDICATION PARAGRAPH 2)
PRIVATE ACCESS ANDEMERGENCY VEHICLEACCESS EASEMENT
PER THIS PLAT
(SEE DEDICATION
PARAGRAPH 2)
10' PUBLIC UTILITY EASEMENT PER
THIS PLAT (SEE DEDICATION
PARAGRAPH 3)
10' WIDE PRIVATE IRRIGATION
EASEMENT GRANTED TO THEOWNERS OF LOT 3
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 4)
20.0'20.0'
PUBLIC UTILITY EASEMENTPER THIS PLAT
(WIDTH VARIES)
(SEE DEDICATION PARAGRAPH 3)
10' WIDE PUBLIC UTILITY EASEMENT
PER THIS PLAT
(SEE DEDICATION PARAGRAPH 3)
25' WIDE SANITARY SEWER EASEMENTGRANTED TO WEST GLENWOOD
SANITATION DISTRICT
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 7)
20' WIDE DRAINAGE EASEMENT GRANTEDTO GARFIELD COUNTY
(SEE DEDICATION PARAGRAPH 5)
PER THIS PLAT
20' WIDE DRAINAGE EASEMENT GRANTEDTO GARFIELD COUNTY
(SEE DEDICATION PARAGRAPH 5)PER THIS PLAT
10' WIDE PRIVATEIRRIGATION EASEMENT
GRANTED TO THE OWNERSOF LOT 1 AND LOT 2
PER THIS PLAT (SEE
DEDICATION PARAGRAPH 4)
15' WIDE HYDRANT AND HYDRANT ACCESS EASEMENTGRANTED TO THE CITY OF GLENWOOD SPRINGS
PER THIS PLAT (SEE DEDICATION PARAGRAPH 1)
25' WIDE PRIVATE WATERLINE EASEMENT
GRANTED TO THE OWNERS OF LOT 1, LOT 2, AND LOT 3
PER THIS PLAT (SEE DEDICATION PARAGRAPH 6)
5.5'
19.5'
15' WIDE ELECTRIC EASEMENT
GRANTED TO THE CITY OFGLENWOOD SPRINGSPER THIS PLAT
(SEE DEDICATION PARAGRAPH 1)
10' FIBER OPTICEASEMENT GRANTED
TO THE CITY OFGLENWOOD SPRINGSPER THIS PLAT
(SEE DEDICATION
PARAGRAPH 1)
10' FIBER OPTIC EASEMENTGRANTED TO THE CITY OFGLENWOOD SPRINGS
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 1)
30' WIDE UTILITY EASEMENT
(NORTHERLY 30' OF WOOD KING PROPERTY)
REC. #316244
10' PUBLIC UTILITY EASEMENT PER
THIS PLAT (SEE DEDICATION
PARAGRAPH 3)
15' WIDE HYDRANT AND HYDRANT ACCESS EASEMENTGRANTED TO THE CITY OF GLENWOOD SPRINGS
PER THIS PLAT (SEE DEDICATION PARAGRAPH 1)
25' WIDE SANITARY SEWER EASEMENT
GRANTED TO WEST GLENWOODSANITATION DISTRICT
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 7)
25' WIDE SANITARY SEWER EASEMENTGRANTED TO WEST GLENWOODSANITATION DISTRICT
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 7)
25' WIDE PRIVATE WATERLINE EASEMENT
GRANTED TO THE OWNERS OF LOT 1, LOT 2,AND LOT 3
PER THIS PLAT (SEE DEDICATION PARAGRAPH 6)
10' FIBER OPTICEASEMENT GRANTEDTO THE CITY OFGLENWOOD SPRINGS
PER THIS PLAT
(SEE DEDICATION
PARAGRAPH 1)
10' PUBLIC UTILITY EASEMENT PER
THIS PLAT (SEE DEDICATION
PARAGRAPH 3)
15' WIDE HYDRANT AND
HYDRANT ACCESS EASEMENTGRANTED TO THE CITY OFGLENWOOD SPRINGS
PER THIS PLAT (SEE DEDICATION
PARAGRAPH 1)
PRIVATE ACCESS AND EMERGENCYVEHICLE ACCESS EASEMENTPER THIS PLAT
(SEE DEDICATION PARAGRAPH 2)
25' WIDE PRIVATE WATERLINE EASEMENTGRANTED TO THE OWNERS OF LOT 1, LOT 2, AND LOT 3
PER THIS PLAT (SEE DEDICATION PARAGRAPH 6)
10' WIDE PUBLIC UTILITY EASEMENTPER THIS PLAT
(SEE DEDICATION PARAGRAPH 3)
..\External References\MSB-STAMP COLOR TRANSPARENT.jpg
NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. 2/22/2023 - 30017- G:\2020\30017\SURVEY\Survey DWGs\30017.04 Plat 2023\30017.04 PLAT2.dwg
PLAT OF:COOPER SUBDIVISION
BEING SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH,
RANGE 89 WEST OF THE 6TH P.M.
COUNTY OF GARFIELD, STATE OF COLORADO.
SHEET 2 OF 2
SOPRIS ENGINEERING LLC
502 MAIN STREET SUITE A3 CARBONDALE CO 81623
(970) 704 0311 soprisengineering.com
1 inch = ft.
( IN U.S. SURVEY FEET )
GRAPHIC SCALE
050 50 100
50
20025LAND USE TABLE EASEMENT LEGEND
PRIVATE ACCESS EASEMENT (SEE DEDICATION PARAGRAPH 2)
STORM EASEMENT (SEE DEDICATION PARAGRAPH 5)
GLENWOOD SPRINGS UTILITY EASEMENTS (SEE DEDICATION PARAGRAPH 1)
PRIVATE WATER EASEMENT (SEE DEDICATION PARAGRAPH 6)
SANITARY SEWER EASEMENT (SEE DEDICATION PARAGRAPH 7)
PUBLIC UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 3)
PRIVATE IRRIGATION EASEMENT (SEE DEDICATION PARAGRAPH 4)
skaufman@cox.net
Kaufman
SHEET TITLE
SHEET NUMBER
ARCHITECTURE
Design
Group
OF SHEETS
(316) 618-0448
(316) 618-0048 fax
WICHITA,KS 67207
12371 E. LINCOLN CT.
ISSUE DATE
5730
5730
5735
5740
5745
5731
5731
5732
5733
5734
5736
5737
5738
5739
5741
574257435744
57465747
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
XUT X
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
100' STORAGE SETBACK
FROM RESIDENTIAL
PROPERTY LINE
DONEGAN ROAD
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x
S
T
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
735
40
5
5731
732
733
734
736
737
38
39
41
42
3
4
6
7
5748
5749
CENTER DRIVE
12
BUILDING A: 2 STORY STORAGE
285'X180'=51,300 X 2 = 102,600 SF
STORM WATER STORAGE & LANDSCAPING
L O T 2 : S
E M P L
A R E A
R25'
3' TALL WALL±
R25'
R25'
30'
8
25' FRONT
40'
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK
x
x
xxxxxx
x
x
x
xxxx
x
x
x
x
>
>
>
>
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XUT X
>>>>>
>
>
>
>
>
>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
x
x
x
x
x
x
x
x x x x x x x x x x x x x x x x
x
O
E
L
O
E
L
OE
L
XWL XWL XWL XWL XWL
xxx
x
x
X
S
D
XSA XSA XSA XSA XSA XSA XSA
XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
D
XS
D
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
AVG NATURAL GRADE
=103' - 2 1/2" +/-
LOW EAVE: 124'
HEIGHT TO LOW
EVE: 20' 9 1/2"
ROOF RIDGE (PEAK):
127' 9"
NOT VISIBLE DUE TO .5/12
SLOPE
HEIGHT TO MAIN ROOF
RIDGE: 24' 6 1/2"
MAIN ROOF MIDPOINT:
125' 10 1/2"
HEIGHT TO MAIN ROOF
MIDPOINT: 22' 8"
MAIN ROOF ANALYSIS: THE MAIN ROOF IS A .5/12 SLOPED ROOF WITH A
ROOF RIDGE BISECTING THE BUILDING (SHEDDING WATER N AND S)
HEIGHT FROM NATURAL GRADE TO MIDPOINT OF THE MAIN ROOF IS
22' 8" WHICH COMPLIES WITH SUP MAX 25' BUILDING HEIGHT
HEIGHT = 24' 9/2"HEIGHT = 23'9"HEIGHT = 24' 3 1/2"
AVG NATURAL GRADE =
103' - 2 1/2" +/-
ANALYSIS FOR COMPLIANCE TO MAX 25' BUILDING HEIGHT
TO MID POINT OF EACH DECORATIVE SLOPED ROOF
CALCULATIONS AND TEXT NOTES
Calculation for Average grade (using current existing grade:
NE Corner Elevation: 5736.9
SE Corner Elevation: 5730
NW Corner Elevation: 5740
SW Corner Elevation: 5732
Average Elevation: 5734.72; which translates to 103' 2 1/2"
grade shown on plans
5720
5725
5718
5719
5721
5722
5723
5724
5726
5730
5730
5735
5740
5745
5731
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
5744
57465747
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
STBK STBK STBK STBK STBK STBK STBK
5
7
2
5
57
3
0
5735
5740
5745
572
3
5
7
2
4
57
2
6
5
7
2
7
57
2
8
57
2
9
5731
5732
573
3
57
3
4
5736
5737
573
8
573
9
5741
574
2
57
4
3
57
4
4
5746
5747
5748
5748 57495749
>>
>
>
>
>>
>>>>>>
>
>>>>>>>>>>>>>>>
>
>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>>
>
>
>
>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
LOE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XS
D
XSD XSD XSD XSD
XSD
XS
D
XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
X
S
D
X
S
D
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
8'
'
SA
s
E
UE
L
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
E
U
E
L
U
E
L
U
E
L
U
E
L
E
IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR
ST
ST
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
ST
>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>
BUILDING A, 2-STORY STORAGE
102,600 S.F.
BUILDING B : FLEX, 1 STORY
34,000 S.F.
BUILDING C : FLEX, 1 STORY
20,625 S.F.
LOT 3 : FUTURE
DEVELOPMENT
4.748 AC.
LOT 2 : STORAGE,
FLEX, EMPLOYEE
UNITS.
7.879 AC.
LOT 1
3.192 AC.
0'40'
Scale: 1"=40'
N
piñon sage
landscape architects
carbondale, CO, 81623
devin@pinonsage.com
(970) 379.0816
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
PS job# - 240drawn - DG ckd - DG
revisions
description#date
L1.0
LANDSCAPE
PLAN
80'
SHRUB AND
EVERGREEN
SCREEN
PLANTING PLAN KEY
LANDSCAPE KEY
EXISTING DECIDUOUS TREE
PROPOSED MAPLE TREE
EXISTING EVERGREEN TREE
PROPOSED MALUS SPP. TREE
PROPOSED EVERGREEN TREE
PROPOSED SHRUBS
CONCRETE PATHS
DROUGHT TOLERANT NATIVE
GRASS/WILDFLOWER MIX
DECORATIVE STONE GRAVEL
ISSUE DATE - 2/14/23
MINOR
SUBDIVISION
REVIEW
DECIDUOUS TREES (total # of deciduous trees 53)
BOTANICAL NAME COMMON NAME QTY.SIZEABBR.PLANTING SCHEDULETREE LIST
14Malus species TBD Flowering Crabapple 2.0" cal402.0" calAcer species TBD Maple
EVERGREEN TREES (total # of evergreen trees 13)
12 8' hgt.Pinus species TBD Pine
1. IF ACTUAL SITE CONDITIONS VARY FROM WHAT IS SHOWN ON THE PLANS, CONTACT
THE LANDSCAPE ARCHITECT FOR DIRECTION AS TO HOW TO PROCEED.
2. VERIFY PLANT COUNTS AND SQUARE FOOTAGES: QUANTITIES ARE PROVIDED AS
OWNER INFORMATION ONLY. IF QUANTITIES ON PLANT LIST DIFFER FROM GRAPHIC
INDICATIONS, THEN GRAPHICS SHALL PREVAIL.
3. CONTACT THE LOCAL UNDERGROUND UTILITY SERVICES FOR UTILITY LOCATION AND
IDENTIFICATION.
4. PERFORM EXCAVATION IN THE VICINITY OF UNDERGROUND UTILITIES WITH CARE
AND IF NECESSARY, BY HAND. THE CONTRACTOR BEARS FULL RESPONSIBILITY FOR
THIS WORK AND DISRUPTION OR DAMAGE TO UTILITIES SHALL BE REPAIRED
IMMEDIATELY AT NO EXPENSE TO THE OWNER.
5. PROVIDE MATCHING FORMS AND SIZES FOR PLANT MATERIALS WITHIN EACH SPECIES
AND SIZE DESIGNATED ON THE DRAWINGS.
6. SEE IRRIGATION NOTES FOR TYPES OF IRRIGATION.
7. CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL.
8. SMALL BARK ORGANIC MULCH SHALL BE APPLIED AT A DEPTH OF THREE (3) INCHES, AND AS
APPROPRIATE TO EACH SPECIES. SHALL BE APPLIED TO THE SOIL SURFACE, NOT AGAINST THE
PLANT STEM OR HIGH AGAINST THE BASE OF TRUNKS TO MINIMIZE DISEASE. MULCH TO BE MIX OF
50% SOIL PEP / 50% SMALL NUGGET.
PLANTING NOTES
WILDFLOWER
PAWNEE BUTTE SEED MIXES
(7.0%) Perennial Lupine
(6.0%) Sweet Williams Pink
(6.0%) Blue Flax
(5.0%) Annual Baby's Breath
(8.0%) Tall Blue Cornflower
(9.0%) California Poppy
(8.0%) Iceland Poppy
(3.0%) Western Yarrow
(12.0%) Rocky Mountain Penstemon
(6.0%) Blanketflower
(14.0%) Wild Geranium
(8.0%) Arrowleaf Balsamroot
(8.0%) California Bluebell
LANDSCAPE SEED MIXES
WILDFLOWER SEED MIX - CUSTOM PER MANUFACTURER
NATIVE
PAWNEE BUTTE DRY NATIVE MTN MIX
Mountain Bromegrass
Streambank Wheatgrass
Thickspike Wheatgrass
Slender Wheatgrass
Arizona Fescue
Beardless Bluebunch Wheatgrass
Sandberg Bluegrass
Prairie Junegrass
Bottlebrush Squirreltail
DECORATIVE
STONE GRAVEL
BORDERS
STORM WATER DRAIN
STORM WATER DRAIN
STORM WATER DRAIN
STREET TREES AND
EVERGREENS PLANTED SOUTH
OF SIDEWALK TO ALLOW FOR
BETTER GROWTH
ROW PLANTING BETWEEN CURB
AND SIDEWALK TO BE NATIVE
GRASS
EXISTING STREET TREES TO
REMAIN
EXISTING VEGETATION
SCREENING TO REMAIN
DECORATIVE STONE GRAVEL -
SNOW STORAGE AREA
NATIVE SEED RE-VEGETATION TO
BE PLACED WHERE
DISTURBANCE OCCURS
BOULDER
RETAINING
April 26, 2023
Haley M. Carmer, Esq.
Garfield & Hecht, P.C.
hcarmer@garfieldhecht.com
RE: Cooper Subdivision of Glenwood Business Center, Garfield County, CO – Minor Subdivision Submission
SE Job # 30017.04
Haley,
Sopris Engineering, LLC (SE) has prepared the following Engineering Letter for the Minor Subdivision Submission
for the proposed Cooper Subdivision (site) in Garfield County, CO. The site will subdivide the existing Glenwood
Business Center site into 3 lots. The site is being developed in compliance with the existing Special Use Permit
(SUP) conditions approved by the county in 1981.
The subject property is located directly north of the West Glenwood Mall, north of State Highway 6, east of Storm
King Road, south of Donegan Road, and west of the residential units along the west side of Mel Ray Road. The
current parcel area is approximately 15.82 acres. Proposed Lot 1 is the 3.192 acre developed site in the southwest
corner. Lot 1 includes two existing commercial office/warehouse buildings and associated parking which will
remain. Proposed Lot 2 is 7.879 acres and will include a self-storage and two commercial office/warehouse
buildings. Proposed Lot 3 is 4.748 acres and is reserved for future commercial office/warehouse use. The civil
plans show a preliminary layout on Lot 3 for review but Lot 3 will currently remain as undeveloped land.
This engineering report has been divided consistent with the Article 7 Standards of the Garfield County Land Use
and Development Code (code). The applicable Article 5-301.C. Review Criteria items addressed here are also
noted. The proposed improvements are shown on the civil plans included with this application.
Existing Conditions
SE has prepared an Improvement Survey Plat (ISP) of the subject property which is included in the application. For
the ISP, SE researched the referenced Title Commitment to show easements on and off site that benefit or
encumber this property.
Note that a recorded easement document for the existing utilities along the east and south property line was not
found. Proposed utility easements are shown on the preliminary plat included with this submission. The plat shows
the necessary easements per Article 5-301.C.5
7-104. SOURCE OF WATER (5-301.C.3):
The City of Glenwood Springs water system currently serves Lot 1. Lot 2 & 3 will be served by the city potable
water system. The City Public Works department has provided a September 14, 2022 will serve letter for proposed
development on Lot 2 and 3 which is included in the appendix to this letter.
The existing city water main lines exist; on the north side of Donegan north of the site, under Storm King Road to
the west, on the mall property adjacent to the south property line, and on the north side of Center drive onsite.
There are currently two existing hydrants on the south side of Lot 1, one hydrant on the south side near the Lot
2/Lot3 line, and two hydrants on the north side of Center Drive on Lot 2. Per the survey and as-builts prepared by
Lot 1, there are several existing water service tees at several locations on the south side of Lot 2.
As noted in the will serve letter, this site owns water shares in the Reynolds & Cain ditch. The water shares will be
transferred to city in proportion to the percentage of area developed. Water shares will then be leased back to the
development to be used for raw water irrigation.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 2
The City will serve letter estimates water usage at 60.26 EQRs for lots 2 & 3 based on the anticipated commercial
use build out areas from the County SUP. Our estimate of Lot 2 water usage is summarized in Table 1 below.
Note that Self-Storage uses are very low water uses that are not listed in the City of Glenwood Springs EQR
schedule. The self-storage EQR rate included below is from rates SE has used on other self-storage projects in
other municipalities. Final EQRs will be confirmed with the City of Glenwood Springs.
TABLE 1 - WATER USAGE SUMMARY
Lot 2 Use # Baths SF+/- # Units EQR/Unit* # EQRs GPD/EQR GPD
-Storage N/A 97,500 1,000 SF 0.050 4.88 350 1,708
-3 Bed 2 N/A 3 1.000 3.00 350 1,050
-Commercial N/A 54,625 1,000 SF 0.300 16.39 350 5,737
Subtotal = 152,125 Subtotal = 24.27 Subtotal= 8,495
Lot 3 Use # Baths SF+/- # Units EQR/Unit* # EQRs GPD/EQR GPD
-Commercial N/A 48,500 1,000 SF 0.300 14.55 350 5,093
TOTAL = 200,625 TOTAL = 38.82 TOTAL = 13,587
50% Raw Water Irrigation Reduction = 19.41 6,794
*EQRs calculated per GW EQR schedule except for self storage uses. EQRs will be confirmed with City for
building permit.
7-105-A. CENTRAL WATER DISTRIBUTION
Potable Water:
The proposed connection locations, onsite water mains, water services and fire hydrants are shown on Sheet C3.0.
With Lot 2, the water main will be extended in Center Drive and up to Donegan on Chapparal Drive. With future Lot
3 improvements, the water main will be extended in Center Drive and down the east property line to the existing
main at the SE corner of the site. The three connections to the existing potable water main will provide redundancy
and increased flows onsite and offsite. SE will confirm the final fire hydrant and building water service size and
locations during the building permit process.
Irrigation Water
SE has walked the existing irrigation system for this site with the owner. The existing site has irrigation water rights
from the Reynolds and Cain Ditch. An existing pump station is north of Lot 2 on the piped main ditch alignment. A
6” pressurized irrigation line and a gravity line extend to the site under Donegan Road to the north property line.
In the City will serve letter ditch shares will be deeded to the City and then will be leased back to the site for site
irrigation. A summary of the Reynolds and Cain ditch shares is summarized below.
# Shares CFS GPM GPM/SHARE
8,420 4.21 1,889.45 0.2244
Lot 1 uses this irrigation system to irrigate the existing landscape areas onsite. The existing irrigation system also
irrigates the landscape area in the Storm King Road right-of-way that adjoins this property.
Lot 2 will use the existing pressurized irrigated system.
Lot 3 will continue to be flood irrigatied with the gravity system from the Reynolds and Cain Ditch. The existing
gravity irrigation enters the site on Lot 2, and will be extended east along the north boundary line to Lot 3. The
assumed irrigated area equals the percentage of Lot 2 that is proposed as landscaping.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 3
The preliminary site irrigation calculations are included in Table 2 below. Based on this preliminary analysis the site
will require 365 shares to provide irrigation for the site landscaping. The approximate irrigation areas will be
confirmed based on the final site plans and will be final coordinated with the City of Glenwood Springs.
Table 2: Irrigation Summary Lot 1 Lot 2 Lot 3** Total
Irrigation Area (SF)= 42,170 91,226 55,011 188,407
Irrigation Area (AC)= 0.97 2.09 1.26 4
Peak Irrigation depth/day (in) = 0.25 0.25 0.25 0.25
Peak Irrigation depth/day (ft)= 0.0208 0.0208 0.0208 0.0208
Volume (CF/day) = 879 1,901 1,146 3,925
Volume (gpd) = 6,572 14,217 8,573 29,362
Irrigation period (hr) 8 8 8 8
Irr flow rate (gph) 821 1,777 1,072 3,670
Irr flow rate (gpm) 13.69 29.62 17.86 61
Assumed irrigation efficiency 75% 75% 75% 75%
Adjusted, Final Irr flow rate (gph) 1,095 2,370 1,429 4,894
Adjusted, Final Irr flow rate (gpm) 18.26 39.49 23.81 82
# of Ditch Shares* 82 176 107 365
Notes:
*= 1 Share = 0.2244 gpm
** Lot 3 irrigated area is assumed equal to the percentage of irrigation on Lot 2
The pump station will be evaluated and will be used until demands exceed the pump ability or the pump needs to
be replaced. The pump station will also be upgraded as necessary to meet the build out demands. Irrigation water
flowing in the gravity line will daylight at the northwest corner of Lot 3 until that lot develops. The gravity line will
then be eliminated as flood irrigation will no longer be needed.
The irrigation system will be shared for the entire site, and an agreement for maintenance will be put in place.
Additional irrigation details will be provided for the final building permit submittal.
7-105-B. CENTRAL WASTEWATER DISTRIBUTION (5-301.C.6)
Lot 1 is currently served by the West Glenwood Sanitation District (WGSD). Lot 2 will also be served by the WGSD.
The WGSD has provided an August 25, 2022 will serve letter which is included in the appendix to this letter
The existing sewer main on the north side of the mall is owned and maintained by the WGSD. This main line
extends from the mall to the south-central portion of Lot 2. There is also an existing private sanitary sewer main
line which extends onsite from the WGSD main line through Lot 1. This line was TV inspected in October of 2020,
and at that time the WGSD indicated that this line was in good condition and could be added to the district.
The WGSD will serve letter estimates water usage at 50.22 EQRs based on the anticipated commercial use build
out areas from the County SUP. The estimate of sewer usage for Lot 2 is summarized in Table 3 below. Note that
Self Storage uses are very low water uses that are not listed in the WGSD EQR schedule. The self-storage EQR
rate included below is from rates SE has used on other self-storage projects in other municipalities.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 4
TABLE 2 - SEWER USAGE SUMMARY
Lot 2 Use # Baths SF+/- # Units EQR/Unit* # EQRs GPD/EQR GPD
-Storage N/A 97,500 1,000 SF 0.050 4.88 300 1,464
-3 Bed 2 N/A 3 1.000 3.00 300 900
-Comm-Office (20%) N/A 10,925 1,000 SF 0.300 3.28 300 984
-Comm-Warehouse (80%) N/A 43,700 1,000 SF 0.200 8.74 300 2,622
Subtotal = 152,125 Subtotal = 19.90 Subtotal= 5,970
Lot 3 Use # Baths SF+/- # Units EQR/Unit* # EQRs GPD/EQR GPD
-Comm-Office (50%) N/A 24,250 1,000 SF 0.300 7.28 300 2,184
-Comm-Warehouse (50%) N/A 24,250 1,000 SF 0.200 4.85 300 1,455
Subtotal = 48,500 Subtotal = 12.13 Subtotal= 3,639
TOTAL = 200,625 TOTAL = 32.03 TOTAL = 9,609
*EQRs calculated per WGSD EQR schedule except for self storage uses. EQRs will be confirmed with WGSD
for building permit.
The proposed connection locations, onsite sanitary sewer mains, and services are shown on C3.0. The existing
sewer main on Lot 1 will provide for sanitary sewer services to be extended to Building A and B on Lot 2. A new
sewer main will extend from the terminal sewer manhole on the mall property north under Chapparal Drive to serve
Building B and C on Lot 2. This sewer main will also provide for future sewer service to Lot 3. SE will coordinate
the sanitary service connection and EQR rate with the WGSD during the building permit process.
7-106. PUBLIC UTILITIES
The existing site utilities are shown on the existing condition base map. Based on our research to date it is our
understanding that all utilities have capacity and will serve the proposed site. Proposed utility improvements are
discussed here and will be final detailed for the building permit submittal. The proposed utility improvements are
shown on Sheet C3.0.
Electric:
Lot 1 is currently served by the City of Glenwood Springs electric department. City electric mains exist on the north,
south, and east side of Lot 2. The City Public Works department has provided a September 14, 2022 will serve
letter which is included in the appendix to this letter.
The proposed electric main lines and transformers will extend from the existing infrastructure to serve each building
on Lot 2. The locations and infrastructure details will be coordinated further during the building permit process with
electrical building load calculations.
Fiber Optic:
City of Glenwood Springs fiber optic lines exist adjacent to the site. Fiber optic service is included in the City’s will
serve letter. Per the utility locates performed for the existing conditions survey, fiber lines exist along the east and
south property line, and extend onsite on the south side of Lot 1 to serve the existing onsite office buildings. The
fiber optic line is shown extending from the south along the Lot2/3 line, west along Center Drive and north to
Building A. SE will continue coordination with City Public Works to confirm the existing fiber line locations and the
proposed alignment onsite.
Telephone/Cable:
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 5
SE has had limited communication with telephone and cable. The ISP utility locates show that communications
utilities are directly adjacent to the site. The telephone and cable alignments are not shown specifically on sheet
C3.0. We anticipate the alignments will generally follow the electric alignment onsite.
Natural Gas:
SE coordinated and received a natural gas will serve letter from Black Hills Energy during development proposals in
2020. The proposed development is in line with existing uses onsite. Existing gas lines are on the north, west, and
south sides of the site. The proposed natural gas main lines will connect to existing in Storm King Road, extend
east onsite to Chapparal Drive and extend south to the existing main line on the mall property. SE will coordinate
the connection locations, main lines, and services with Black Hills Energy as the design progresses.
B. Approval of Utility Easement by Utility Company
Utility easements have been drafted on the Preliminary Plat. Final utility easements will be coordinated with final
design and with the respective utility provider prior to final site design.
7-107. ACCESS AND ROADWAYS (5-301.C.4):
A. Access to Public Right-of-Way / B. Safe Access
The site is directly adjacent to Storm King Road and Donegan Road which are both owned and maintained by
Garfield County. The adjacent roads are part of the larger street network with direct connection to State Highway 6
and Interstate 70.
The site has two existing accesses to Storm King Road which will be maintained. Lot 1 has an existing access at
the south west corner of the site. No improvements are proposed to this access. The subdivision will share the
Center Drive access to Storm King Road, which is the existing street on the north side of Lot 1. In coordination with
Lot 1, the island at the Center Drive intersection will be lengthened to the east and the first parking intersection on
the south side will be removed and replaced with curb and landscaping. This change will improve the traffic flow on
Lot 1 and at the Center Drive intersection with Storm King Road.
The subdivision has a second primary access connection to Donegan Road across from Chaparral Circle. A new
driveway permit for the Lot 2 access at Chapparal Drive will be obtained.
Offsite Improvements:
In addition to the onsite improvements, the development will provide drainage and sidewalk improvements along
the south side of Donegan Road. SE has studied the existing conditions of Donegan Road and the areas north of
the site in detail. The longitudinal grade of Donegan Road adjacent to the site is very flat east to west north of Lot
2. Because of this a detached sidewalk section with an 8.5’+/- wide borrow/drainage swale has been proposed.
The existing sheet flow storm water runoff condition is thus maintained. Drainage swales are proposed to direct
storm water to storm sewer inlets, and is discussed in more detail in section 7-204 below. The detached sidewalk
maintains the current snow plow condition, improves the drainage, provides for water quality swales, and would
allow for future parallel parking and curb and gutter condition.
C. Adequate Capacity / E. Impacts Mitigated
Refer to the separate traffic Study prepared by Kimley Horn.
D. Road Dedications.
Center Drive and Chapparal Road will be owned and maintained by the Cooper Subdivision lot owners. The
preliminary plat shows the proposed access and utility easement which covers the road and intersection
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 6
improvements. The remaining road improvements provide access for offsite parking, loading, and emergency
vehicles as necessary.
F. Design Standards
The design standards and improvements are shown on the civil plans. The road intersections at Storm King and
Donegan are aligned with existing roads. The road widths and intersection geometry will provide for larger delivery
vehicles throughout the site. The roads are looped or provide for hammer head turnarounds. Center Drive and
Chapparal Drive will be private roads with 400+/- average daily trips. We have compared the proposed road
improvements to the Garfield County secondary access road standards from table 7-107 below.
Comparison to Table 7-107: Roadway Standards
Design Standards Secondary Access Site Access
Design Capacity (ADT) 201 – 400 400+/-
Minimum ROW Width 50 N/A
Lane Width (Feet) 11 12.5
Shoulder Width (Feet) 6 N/A, Curb
Ditch Width (Feet) 6 N/A
Cross Slope 2% 2%
Shoulder Slope 5% N/A
Design Speed N/A N/A
Minimum Radius (Feet) 80 200
Maximum % Grade 10% 10%
Surface Chip/Seal or Gravel Asphalt
Street lights, signage, and striping will all be coordinated with the County prior to building permit.
7-109. FIRE PROTECTION (5-301.C.7)
The site will have good emergency access from Storm King Road and from Donegan Road. The internal streets
and parking access aisles have been designed to provide access to all fire trucks and other emergency vehicles.
SE will coordinate with the Glenwood Springs Fire District during the building permit approval process to confirm
access, staging, and fire protection hydrant and connection requirements.
The existing and proposed water mains and fire hydrants will provide water for fire protection. As discussed above
the main line size and looped connection will maximize the flow rates onsite and provide redundancy with two
connections to the existing main lines.
7-204 DRAINAGE AND EROSION
The grading and drainage concept will comply with the Garfield County code requirements. The proposed onsite
street and parking improvements will be treated for water quality. Offsite runoff which flows onsite will be routed
through the site. Refer to the civil grading and drainage plan for preliminary design and details. The final grading
and drainage plan and details will be provided for the building permit submittal.
A. Erosion and Sedimentation
The site improvements proposed will disturb more than one acre. Appropriate permits will be obtained from the
Colorado Department of Public Health and Environments (CDPHE) National Pollutant Discharge Elimination
System.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 7
Standard erosion and sedimentation best management practices (BMP’s) will be applied to this site. These BMP’s
are primarily grouped for two stages of the development; the construction phase and the post development phase.
The main emphasis for both stages is on soil erosion and sediment transport controls. The proposed BMPs are
noted and detailed on the civil plan set.
B. Drainage
The site grading and drainage has been developed to provide positive drainage away from all structures, and in
coordination with the area storm drainage pattern. The offsite and existing conditions are described below followed
by the proposed drainage improvements.
The existing site is directly connected to the existing storm sewer main lines on the mall property. These storm
sewer lines flow down to State Highway 6 and then flow west to daylight in the Mitchell Creek culvert under
Highway 6. This pipe termination is approximately 400 feet upstream of the Mitchell creek confluence with the
Colorado River. The Glenwood Business Center has agreements with the mall site that indicates the existing storm
sewer system was designed for and will accept the developed 5 year storm event from onsite. At a minimum the
site storm water runoff will be detained to the 5 year developed storm.
Offsite:
SE has walked the drainage areas above and below the site, researched storm water as-builts and reviewed old
drainage reports. From this research we have prepared a preliminary drainage model in order to understand
drainage impacts and to approximate the storm water infrastructure necessary. As described below, the majority of
the offsite storm water runoff flows around the site in Storm King Road and Mel Ray Road. The small drainage
basin directly north of the site will be routed through the site. Offsite drainage is shown on Sheets C2.5.
The drainage basins above the site are complicated by the existing streets and residential development. Prior to
development, the drainage basins followed the natural topography. With development, the storm water runoff flows
around structures down to the streets. Each street has a local high point. The storm water runoff flows east and
west in drainage channels and in the curb & gutter. There is evidence of reactionary drainage infrastructure
including low berms and walls on the downstream side of the street. These apparently have responded to flood
events to divert flow around individual properties. The majority of storm water above the site ends up in the streets
which generally direct storm water east and west.
West of the site and north of Donegan Road, storm water runoff flows down to Donegan Road and then is carried
east in the street curb section to the intersection with Storm King Road. If the curb does not have capacity, the
storm water will overtop and flow south through residential properties and the Two Rivers Community School. The
offsite storm water runoff from this point will flow down Storm King Road following existing patterns. Storm water
from this part of the offsite basin doesn’t enter the subject site.
East of the site and north of Donegan Road, storm water flows down to the Donegan Road and Mel Ray Road
intersection. A large offsite basin extends to the north, northeast up to an elevation of 9,200+/-. With the existing
residential development, the exact storm water runoff pattern is not readily discernible. Storm water runoff from this
basin does appear to concentrate at Mel Ray Road. During larger storm events some storm water runoff may reach
the east end of the site on Lot 3. With future development Lot 3 will accommodate storm water runoff along the
east end. This matches the existing condition.
Directly north of the site, the offsite storm water is limited to the runoff from the residential lots directly adjacent to
Donegan Road or the residential lots above that. As noted above, the streets above the site consistently direct
runoff east and west. Runoff that hits Donegan Road generally appears to stage up to the crown of Donegan Road
and sheet flow south on to the subject site. Donegan Road has local high and low points with very flat grades east
and west.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 8
The existing office buildings on Lot 1 in the Southwest corner of the overall site are modeled as offsite drainage.
Storm water runoff is directed to curb inlets and storm sewer pipe which flows to the south to connect to existing
storm sewer infrastructure on the north side of the mall.
South of the site, SE has reviewed drainage as-builts prepared for the Lot 1 office buildings. The as-builts detail the
storm sewer infrastructure on Lot 1 and on the north side of the mall. Two 24” storm sewer pipes were extended to
service the proposed Lot 2 and Lot 3. Per the the agreement with the mall property mentioned above, the
development onsite can connect to the storm drain system up to the 5 year developed storm.
On the mall property, roof runoff and parking lot runoff is directed to curb inlets and storm sewer pipes which
increase in size as runoff flows to the west. The storm sewer turns south in a manhole adjacent to Storm King Road
and flows in a 42” pipe (per the as-builts) to the northeast corner of the intersection Storm King Road and Highway
6. The storm sewer pipe then turns to the west under Highway 6 and tees into the 72” Mitchell Creek culvert
approximately 20’ downstream of the 72” upstream pipe inlet. SE has confirmed the alignment of the storm sewer
in the field and also confirmed pipe sizes where possible.
Onsite Existing:
The existing undeveloped site generally slopes down from north to south at moderate slopes. Two concrete storm
sewer inlets extend to Lot 2; one at the west central portion of Lot 2 north of the existing office building
development, and the second at the east central portion on the south side of Lot 2. The existing site appears to be
in good condition with no evidence of flooding or erosion.
C. Stormwater Run-Off
Offsite Existing:
The storm water runoff from the large offsite basins do not flow onsite as described above. Offsite basins have
been analyzed and included in this report for reference and general sizing of drainage infrastructure.
The peak runoff rates for the offsite basin were analyzed for the 25 year- 24 hour storm event using the Soil
Conservation Service (SCS) TR-55 hydrologic method. Time of Concentration calculations were performed using
the TR-55 method. Hydraulic routing of sub basins was calculated using hydrodynamic link routing. All calculations
and analysis were accomplished using the Autodesk Storm and Sanitary Analysis program.
Drainage basin soil information was obtained from the Natural Resource Conservation Service (NRCS) soil survey.
Composite curve numbers (CN) for the TR-55 method considered the existing soil conditions and the proposed
impervious and landscape areas. The existing offsite 25 year drainage conditions are summarized on civil sheet
C2.5. Calculations are included in Appendix B of this report.
Developed Onsite:
Onsite and offsite drainage basins directly north of the site were analyzed using the Rational Method (Equation 1),
as the cumulative total of tributary offsite and onsite basins are less than 90 acres.
Equation 1: Q = C* I * A
Q = Runoff Flow Rate (cfs); C = Runoff Coefficient
I = Rainfall Intensity (in/hr); A= Area of Basin (acres)
The runoff coefficient (C) is a variable that represents the ratio of runoff to rainfall volumes during a storm event.
The determination of C mainly depends on the soil type, watershed impervious and storm event frequency.
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 9
The soil type was determined from the soil survey provided by the National Resource Conservation Service
(NRCS). The onsite soils consist of Type ‘C’ Hydrologic Soils. Type 'C' soils have a slow infiltration rates with
moderately fine or fine textured soils.
Each drainage basin was studied to determine the percent of impervious area. The Mile High Flood District
(MHFD)(formerly UDFCD) out of Denver, CO has developed runoff coefficient tables in Chapter 6 of Volume 1 of
their Urban Storm Drainage Criteria Manual. Table 6-5 is included for reference in Appendix B of this report. This
table was used to determine the corresponding 5 and 25-year weighted average runoff coefficients based on a
Type C hydrologic soil classification.
The design rainfall duration used in the Rational Method is referred to as the time of concentration. The time of
concentration is the cumulative travel time, including overland flow and channelized flow, for runoff to get from the
furthest point upstream of a basin to a designated design point. The existing basins' time of concentration was
calculated using the TR-55 method. A minimum time of concentration of 10 minutes was used for all developed
basins given the size of the basins, the percent impervious, and the relatively short travel distances.
The rainfall intensity was derived from the NOAA 14 Intensity Duration Frequency (IDF) Curve for Glenwood
Springs, CO.
The site has been analyzed for the existing and developed peak rainfall runoff for storm water system sizing. As
mentioned above the mall site has storm sewer infrastructure that can accept the 5 year developed storm from this
site. The rate of runoff for the 25 year event will be restricted to the 5 year developed rate by an orifice outflow.
The runoff rates are summarized on civil sheet C2.6. Calculations are included in Appendix B of this report.
Storm water runoff will be routed on the surface via sheet flow and in drainage swales, and then will be routed in
storm sewer pipes to detention ponds.
The proposed Lot 2 and the future Lot 3 improvements will provide water quality treatment for the street and parking
improvements. Roof runoff and storm water runoff from landscape and park areas are not contaminated by
hydrocarbons and will have separate storm sewer pipes that bypass the water quality treatment to flow direct to the
detention system. Water Quality treatment will include drainage swales and water quality manholes. The storm
water runoff patterns and water quality treatment are described more fully below.
Basin DE-02A: includes most of Building A on Lot 2. Storm water runoff from the streets will flow through curb
openings to drainage swales, or will be collected in curb inlets to flow to the storm manhole in the detention basin
on the south side of the building. The stormwater around Building A has short travel paths to vegetated areas, and
minimizes directly connected impervious areas.
Roof runoff will be collected in small diameter pipes and will be routed separate from the street runoff to the storm
manhole on the south side of the site. The storm manhole will provide an orifice bleed off to control the outflow to
the existing storm.
Basin DE-02B: includes the landscape areas north of building A and B, the north side of Building B, a small portion
of Chapparal Drive, and the west half of building B on Lot 2. Storm water runoff will be treated primarily by water
quality treatment manholes which are described as vortex hydrodynamic separators. These manholes are
designed to remove at least 80 percent of Total Suspended Solids (TSS) while capable of carrying 100 percent of
the design peak flow. The north side of building B has higher grades on all sides. Multiple storm structures provide
redundant inlet locations. The landscape areas on the west side of the building has a drainage swale which direct
storm water to the detention pond.
Roof runoff will be collected in small diameter pipes and will connect to the storm sewer downstream of the
treatment manholes. The combined storm water will then flow to the storm manhole and detention south west of
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 10
building B. The storm manhole will provide an orifice bleed off to control the outflow to the downstream storm
sewer.
Basin DE-02C: includes Center Drive, the east half of Building B roof runoff, Building C roof runoff, Chapparal Drive,
and the south side of building C. Street runoff from Center Drive and Chapparal Drive will be treated by water
quality treatment manholes. The street and parking south of Building C will flow through curb openings to the
drainage swale and detention on the south side of the basin. Storm water runoff from the upper portions of the
basin will be routed in storm sewer pipes down to the detention basin.
Roof runoff will be collected in small diameter pipes and will be routed separate from the street runoff or will connect
to the storm sewer downstream of the treatment manholes. The storm water will then flow to the storm manhole or
daylight in the drainage swales. The storm manhole will provide an orifice bleed off to control the outflow to the
existing storm.
Basin DE-03 is the future development parcel east of Chapparal Drive. The existing site will remain undeveloped
and the existing drainage conditions will remain. With future development storm sewer, water quality, and detention
infrastructure will be detailed as necessary in compliance with the site storm water requirements. A draft of the
drainage improvements is shown on the site and grading plans which is consistent with the Lot 1 and Lot 2
improvements. Storm water runoff from future development will be routed to the detention basin on the south side
of Building C.
As described above, offsite storm water runoff from Donegan Road and the residential area directly north of the site
enters the site. This storm water runoff will be captured in storm inlets constructed within Donegan Road, and will
routed through the site maintaining the historic flow path. The east portion of the runoff will flow onto Lot 3
maintaining the existing condition. With development on Lot 3 the offsite storm will be routed around the Lot 3
improvements. The new landscape strip and storm inlets will collect the storm water runoff from the area north of
Lot 2 and route it to the existing storm sewer infrastructure south of the site.
Final details and calculations for drainage and water quality will be provided with the building permit submittal.
7-302. OFF-STREET PARKING AND LOADING STANDARDS
Parking: Refer to sheet C1.0 for the parking layout and breakdown by type. Lot 1 has a total of 112 parking spaces
with 4 handicap parking spaces. Lot 2 parking is summarized on Sheet C1.0. Final parking counts will be
performed for each building permit submittal. Note for building A, the self-storage parking number provided is
based on the storage company’s experience with multiple storage units across the country. Note also for building B
and C the parking calculation is per the rate required at the time of the existing SUP approval. The current code
requirements would require less parking.
Loading: The building A road widths at the storage units and the building entrances is 32’ wide. This provides for
an 8’ wide loading zone. Building B and C have wide access aisles and parking spaces assigned to specific units
will allow for vehicles to be moved as necessary for loading/unloading. Final details will be provided for each
building permit submittal.
5-301.C.7. Hazards
Fire: addressed above in section 7-109.
Flooding: The site is not located within any designated flood plain, and is not subject to the risk of flooding or
mudslides.
Steep Slopes / Rockfall Hazards: The site does not have steep slopes or rockfall hazards, with the ground surface
generally sloping from north to south with grades of less than 5 percent
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 04/26/2023
Page 11
Soils: Refer to the soils report prepared by CTL Thompson Inc. dated August 22, 2022. The existing developed
portion of the site has performed exceptionally well over a 40 year time period. All geotechnical recommendations
will be followed during the proposed construction.
Conclusion
The proposed site has good access to Storm King Road and Donegan Road, which provides direct access to the
arterial road network. The existing utilities are directly adjacent and adequate to service the site. Utility Service will
be extended to serve lot 2 as well as future development on lot 3. Will serve letters have been provided. The
offsite drainage primarily flows around the site. Storm water runoff that enters the site will be routed around and
through the site. Lot 2 will provide water quality and detention before connecting to the storm sewer pipes that
directs flow direct to Mitchell Creek and the Colorado River.
If you have any questions or need any additional information, please call.
Sincerely,
SOPRIS ENGINEERING, LLC
John Petaisto, PE
Project Engineer
Yancy Nichol, PE
Principal
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 02/22/2023
Page 1
APPENDIX-A
Will Serve Letters
Matthew Langhorst, DPW 101 West 8th Street
(970) 384‐6438 (o) Glenwood Springs, CO 81601
September 14th, 2022
Mr. John Diemoz
Glenwood Partnership, LLLP
214 Center Drive
Glenwood Springs, CO 81601
RE: Can and Will Serve letter for proposed Commercial Development on Parcel #218506100042
Dear Mr. Diemoz:
The purpose of this letter is to provide confirmation that the City of Glenwood Springs can and will serve
your parcel of land located at 214 Center Drive of a size of approximately 15 acres, in West Glenwood
parcel # 218506100042, with domestic water, electrical power and broadband internet. It is our
understanding that the proposed development to be a mix of office and warehouse space with a
projected water requirement of 60.26EQRs. The city will require the use of Reynold’s and Cain Ditch
water for all irrigation uses on the property. The property owner will be required to deed their
proportionate amount of owner ditch shares to the city as the property develops. The applicant has
notified the city that the property holds 614 shares of Reynold’s and Cain ditch rights. Ex, if 50% of the
property area is to be developed and domestic water provided, 307 shares will be transferred to the
city. At the time of full development, all 614 shares will have been deeded to the City. The city will
negotiate the lease back of the ditch rights required to provide irrigation water with the owner at the
time of development. The cost of any necessary extensions or taps to provide these services are the
sole responsibility of the applicant.
Normally, a request for water service outside the corporate limits would require a pre‐annexation
agreement. However, this parcel is located within what was the West Glenwood Springs Water District.
When the West Glenwood Springs Water District was dissolved in 1988, the Glenwood Springs City
Council adopted Resolution #88‐3, which removed this pre‐annexation requirement for parcels within
the district as it existed on that date. Prior to final approval of the water service and associated tap, the
following conditions must be met:
1. Applicant must submit a plan, for the City’s review and approval, indicating the proposed tap
location, the tap size, and any other water infrastructure to be constructed on the site to
provide domestic, irrigation or fire flow. This can‐and‐will serve letter is an approval for
approximately 200,000SF of commercial space at a 50/50 ratio of warehouse to office space. If a
larger development or a change in the use ratio is proposed, an updated plan set will be
required for review by the city and this Can and Will Serve letter will need to be updated.
2. All applicable tap and system improvements fees, as calculated by the City’s Community
Development Department, shall become due and payable prior to the any taps being made on
the City’s mains.
3. All water and electrical uses must be metered, with the meters being inspected by the
appropriate department. Accounts must be set up with the Finance Department prior to the
services being energized.
4. Following completion of project, an as‐built drawing preferably in an AutoCAD drawing file
format (.dwg) and PDF format of the designed system and associated appurtenances shall be
submitted for review and approval by the City.
5. Prior to final permitting on the property an electrical load calculation form will be filled out and
approved by the City of Glenwood Springs Electrical Department.
6. The City can and will provide broadband internet to the site if the applicant would like that
service.
7. When the applicant has received approval of the planning action with Garfield County, kindly
contact us for the details of the actual installation and the associated fees.
8. Water services must meet all applicable Municipal Code, Water Department and Engineering
Department Rules and Regulations
If you have any questions regarding this matter, please contact me.
Matthew Langhorst
Director of Public Works
970‐384‐6438
cc:
Steve Boyd, Chief Organizational Officer
Mike Hoffman, W/WW Field Superintendent
Matthew Langhorst, Public Works Director
1
John Diemoz
From:wgssanitation@gmail.com
Sent:Thursday, August 25, 2022 1:52 PM
To:John Diemoz
Cc:'Josh Hamel'; Floyd Diemoz; Jim Neu
Subject:RE: Glenwood Partnership/ Glenwood Business Center (GBC)- Office/ Warehouse - Can
and Will Serve Letter
Attachments:20220825 Can and Will Serve_214 Center Dr_Glenwood Business Center.pdf
Hi John,
Please see the attached Can and Will Serve Letter for your Glenwood Business Center project.
I cannot confirm if you have the ability to prepay to reserve these taps. That’d would be at the Board’s discretion and
their next meeting is Monday, September 12, 2022 at 5:15 p.m. I’d be happy to place the matter on the Agenda, if you
would like to attend or call-in to the meeting to discuss the matter. Please let me know.
Thank you and have a great day!
Kelly Mullane, District Administrator
West Glenwood Springs Sanitation District
51 Riverine Rd.
Glenwood Springs, CO 81601
tel 970.618.5147
wgssanitation@gmail.com
www.wgssanitation.org
From: John Diemoz <John@diemoz.net>
Sent: Wednesday, August 24, 2022 3:21 PM
To: Kelly Mullane (wgssanitation@gmail.com) <wgssanitation@gmail.com>
Cc: Josh Hamel (jtwgsd@outlook.com) <jtwgsd@outlook.com>; Floyd Diemoz <Floyd@diemoz.net>
Subject: Glenwood Partnership/ Glenwood Business Center (GBC)- Office/ Warehouse commercial park- Sewer Future
Demand EQR's
Hello Kelly,
Josh and I met today to discuss the future sewer demand for the build-out of our Glenwood Business Center-
Office/Warehouse commercial park, based upon our 1981 permitted plan with Garfield County (see attached).
2
We have not yet constructed, 200,876 SF of floor area. In 1981, we anticipated our office/warehouse ratio of 50% office
and 50% warehouse. Using the West Glenwood Springs Sanitation District’s (WGSSD) Appendix A, II, we are coming up
with 50.22 EQR’s as our future sewer demand (see attached).
We will need to provide the County a confirmation of sewer service from the West Glenwood Springs Sanitation District.
Can you please provide us with a will serve letter for the 200,876 SF of future office/warehouse?
Also, can you confirm if we have the ability to prepay to reserve these taps.
Thank you,
John Diemoz
Glenwood Partnership, LLLP
Glenwood Business Center
214 Center Dr.
Glenwood Springs, CO 81601
970-945-6712 office
970-379-4182 cell
S
0
1
°
5
2
'
0
0
"
W
5
7
5
.
9
6
'
N 47
°
4
2
'
0
0
"
E
1
2
5
.
0
6
'
S 87°18'00" E 615.36'
S 87°18'00" E 476.98'
S 89°49'18" W 860.83'
S 89°52'00" W 312.68'
S
0
2
°
4
4
'
0
0
"
W
6
0
5
.
6
4
'
ST
O
R
M
K
I
N
G
R
O
A
D
DONEGAN ROAD
CO
U
N
T
Y
R
O
A
D
1
8
1
COUNTY ROAD 130
COUNTY ROAD 130
ST
O
R
M
K
I
N
G
R
O
A
D
CO
U
N
T
Y
R
O
A
D
1
8
1
SITE MASTER PLAN- COMMERCIAL PARK
DONEGAN ROAD
CENTER DRIVE
CENTER DRIVE
CE
N
T
E
R
D
R
I
V
E
PHASE 1
BUILDING 2
BLDG. 1
GENERAL NOTES:
1.IN 1981, GARFIELD COUNTY (GARCO) ISSUED TO GLENWOOD PARTNERSHIP A SPECIAL USE
PERMIT FOR A COMMERCIAL PARK WITH UP TO 15 BUILDINGS. 711 PARKING SPACES WERE
ANTICIPATED AT FULL BUILD OUT.
2.IN 1981/ 1982, THE ADJACENT STORM KING ROAD IS BUILT BY GLENWOOD PARTNERSHIP AND DEEDED
TO GARFIELD COUNTY.
3.IN 1981, WATER, SEWER, SANITARY SEWER, GAS, ELECTRIC AND PHONE LINES ARE INSTALLED TO
SERVICE ALL OF THE PROPERTIES FUTURE DEVELOPMENT.
4.IN 1982, GARCO ISSUES THE BUILDING 1 CERTIFICATE OF OCCUPANY.
5.IN 2007, GARCO ISSUES THE BUILDING 2 CERTIFICATE OF OCCUPANCY.
OFFICE
WAREHOUSE
GLENWOOD BUSINESS CENTER
FUTURE EQR CALCULATIONS FROM WEST GLEN. SPRINGS SANITATION DISTRICT, APPENDIX A, II
A.1981, GARFIELD COUNTY TOTAL BUILDING AREAS:231,100 SF
B.BUILDING AREAS CONSTRUCTED (BLDG 1- 14,980 SF; BLDG 2- 15,244 SF) (30,224 SF)
REMAINING AREA TO BE CONSTRUCTED 200,876 SF
C.ANTICIPATED USE- 50% OFFICE/ 50% WAREHOUSE
1. OFFICE 200,876 SF X .50= 100,438 SF / 1,000 SF = 100.438 X .30 EQR OFFICE=30.13 EQR'S
2. WAREHOUSE 200,876 SF X .50= 100,438 SF / 1,000 SF = 100.438 X .20 EQR WAREHOUSE20.09 EQR'S
TOTAL 50.22 EQR'S
File Name:
C-1
Sheet No.
GLENPARTNERSHIP
Date:
Drawn By:
J.R.D.
08-24-2022
#4-
Job No.
-01
Revisions:
#3-#2-#1-
Glenwood Partnership, LLLP214 Center DriveGlenwood Springs, CO 81601
GL
E
N
W
O
O
D
P
A
R
T
N
E
R
S
H
I
P
,
L
L
L
P
-
M
A
S
T
E
R
P
L
A
N
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
21
4
C
E
N
T
E
R
D
R
I
V
E
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
8
1
6
0
1
August 18, 2022
Re: Glenwood Partnership, LLLP/ Glenwood Business Center (GBC)- Office/Warehouse- Future Sewer
Demand EQR’s
1. Our 1981 Special Use Permit with Garfield County allowed 231,100 SF of building floor area.
The anticipated office to warehouse ratio was assumed to be 50% Office, 50% Warehouse,
dependent upon market demand.
2. We have constructed two office/warehouse buildings as follows:
a) GBC Building 1, Constructed in 1982 14,980 SF
b) GBC Building 2, Constructed in 2007 15,244 SF
Total Floor Area Constructed 30,224 SF
3. Area of Office/ Warehouse Remaining as follows:
a) 1981 Permit floor area allows 231,100 SF
b) Less, floor area constructed (30,224 SF)
Total Floor Area Remaining to be Constructed 200,876 SF
4. Office- EQR Calculation from West Glenwood Springs Sanitation District Appendix A, II-
a) 200,876 SF x .50= 100,438 SF / 1,000 SF = 100.438 x .30 = 30.13 EQR’S
5. Warehouse- EQR Calculation from West Glenwood Springs Sanitation District Appendix A, II-
a) 200,876 SF x .50= 100,438 SF / 1,000 SF = 100.438 x .20 = 20.09 EQR’S
6. Office and Warehouse Anticipated Sewer EQR’s
a) Office 30.13 EQR’S
b) Warehouse 20.09 EQR’S
Total 50.22 EQR’S
xxxxxxxxxxxxx
x
x
xx
x
x
x
x
x
xxx
x
x
xxx
x
x
XU
T
XUT XUT XUT XUT XUT XUT
XUT XUT
XUT
XUT
XUT
XUT
XU
T
XUTXUT
X
U
T
XUT XUT XUT XUT XUT XUT
XUT XUT XUT XUT XUT
XE
L
XE
L
XEL XEL XEL XEL XEL XEL
XE
L
XEL
XFOX
F
O
XF
O
XFO XFO XFO XFO XFO X
F
O
XFO XFO
XFO
XFO
XFO
X
G
A
S
XEL XEL XEL XEL XEL XEL
XEL
XEL
X
E
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL
XG
A
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGA
S
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XU
T
XF
O
XF
O
XF
O
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
X
F
O
X
F
O
XF
O
XSA
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
X
F
O
X
F
O
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XU
T
XU
T
XU
T
XU
T
XE
L
XE
L
XE
L
X
E
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
>
>
>
>
>
>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
TXWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XE
L
XE
L
XEL
XE
L
XWL XWL XWL XWL
XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XEL XEL
XEL
XEL XEL XEL
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL
XG
A
S
XEL
XE
L
XE
L
XEL
XEL XEL XEL
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XW
L
XW
L
XEL
XG
A
S
XG
A
S
XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XE
L
XEL XEL XEL XEL XE
L
XG
A
S
XE
L
XE
L
XE
L
XE
L
XE
L
>>>>>
>>>>>>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OEL
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
OE
L
OE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSA XSA XSA XSA XSA XSA
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSAXSAXSAXSA
XS
A
XSA XSA XSA XSA XSA XSA
XSA
XSA
XSA
XSA XSA XSA XSA XSA XSA
XSDXSDXSD
XS
D
XSD
1 23
4
5
6 7
8
9
10 1112
13
14
15 16 17 18
1920212223
24
2526272829
30
3132
33
3435
363738394041
42
43
44
45 46
47
48
49
50
51
52
>
53
54
55
56
57
58
XW
L
XW
L
X
S
D
X
S
D
X
S
D
XS
D
XS
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ST
O
R
M
K
I
N
G
R
D
.
ASPHALT SURFACE
CONCRETE
SURFACE
DONEGAN RD.
CENTER RD.
SINGLE STORY BUILDING
GLENWOOD SPRINGS MALL
SINGLE STORY
BUILDING
SINGLE STORY BUILDING
SUN SHELTER &
PLAY GROUND ME
L
R
A
Y
R
D
.
15' UTILITY EASEMENT
20' UTILITY EASEMENT
60.0' RIGHT OF WAY
145.6
14
5
.
7
79.6
96
.
0
66.0
49
.
8
73.8
20
6
.
1
73.8
20
6
.
1
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (N)= 5740.43'
INV IN ELEV (E)= 5739.64'
INV OUT ELEV (W)= 5739.65'
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (N)= 5738.57'
INV IN ELEV (E)= 5738.53'
INV OUT ELEV (W)= 5738.47'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (E)= 5737.40'
INV OUT ELEV (W)= 5737.36'SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (N)= 5739.61'
INV IN ELEV (E)=5739.05'
INV OUT ELEV (W)=5738.96'
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (W)= 5737.84'
INV IN ELEV (E)= 5738.0'
INV OUT ELEV (S)= 5737.72'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (N)= 5723.07'
INV OUT ELEV (S)= 5723.01'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (W)= 5721.69'
INV IN ELEV (N)= 5721.68'
INV OUT (S)= 5721.54'
15IN CMPINV OUT ELEV = 5745.47'
6IN PVC PIPEINV IN ELEV = 5745.66'
6IN PVC PIPEPOL ELEV = 5745.32'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (N)= 5717.31'
INV IN ELEV (E)= 5717.26'
INV OUT ELEV (W)= 5717.23'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (N)= 5715.79'
INV IN ELEV (E)= 5715.89'
INV OUT ELEV (W)= 5715.69'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (E)= 5710.1'
INV IN ELEV (N)= 5714.43'
INV OUT ELEV (W)= 5710.05'
EXISTING STORM INLETRIM ELEV = 5724.38'
SUMP ELEV = 5719.58'
6" PVC INV IN (N) = 5720.18'
18" CMP INV OUT (W) = 5719.73'
8" PVC PIPE
SEWER CLEANOUT EXISTING STORM INLET
RIM ELEV = 5727.70'
18" CMP INV OUT (S) = 5723.40'
EXISTING STORM INLETRIM ELEV = 5726.41'SUMP ELEV = 5722.12'
6" PVC INV IN (E) = 5722.24'
6" PVC INV IN (W) = 5722.11'
18" CMP INV IN (N) = 5722.16'
18" CMP INV OUT (S) = 5722.10'
EXISTING STORM INLET
RIM ELEV = 5723.33'
SUMP ELEV = 5716.53'
60.0' R.O.W.
6.0'
SIDEWALKWIDTH
5.0'SIDEWALK
WIDTH
5720
572
5
5730
5735
5740
5717
5718
5719
572
1
5722
5723
5724
5726
5727
5728
5729
5731
5732
5733
5734
5736
5737
5738
5739
5741
5720
57
2
5
573
0
5735
5740
57
4
5
5750
5718
5719
5721
5722
5723
5724
5726
5727
57
2
8
5729
5731
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
574
4
5746
5747
5748
574957495749
ASPHALT SURFACE
EXISTING STORM INLET
RIM ELEV = 5715.62'SUMP ELEV = 5709.42'
15IN CMPINV IN ELEV = 5746.18'
15IN CMPINV OUT ELEV = 5744.74'
30' UTILITY EASEMENT
ACCESS EASEMENTRECORDED REC No. 443451
8" WATER LINE STUB
6" WATER LINE STUB
8" WATER LINE STUB
NOTE: PER RECEPTION NO. 443451 THE
SUBJECT PROPERTY HAS THE RIGHT TO TIE
ONTO EXISTING UTILITY STUBS ALONG IT'S
COMMON BOUNDARY WITH THEGLENWOOD SPRINGS MALL PROPERTY
22' DRIVEWAY EASMENT
30' DRIVEWAY EASMENT
5742
5743
5745
5747
57485748
57495750
5751
24.0
30.0
LOT 1
BLOCK 4
LOT 1BLOCK 1
LOT 2BLOCK 1
LOT 3
BLOCK 1
LOT 4BLOCK 1
LOT 5BLOCK 1
LOT 6
BLOCK 1
LOT 7BLOCK 1
NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON.
SOPRIS ENGINEERING - LLC
CIVIL CONSULTANTS
502 MAIN STREET, SUITE A3
CARBONDALE, COLORADO 81623
(970) 704-0311 SOPRISENG@SOPRISENG.COM 1/25/2021 - 30017 - G:\2020\30017\SURVEY\Survey DWGs\PLAT 2020\30017 PLAT.dwg
GENERAL UTILITY NOTES:
The locations of underground utilities have been plotted based on utility maps,
construction/design plans, other information provided by utility companies and actual
field locations in some instances. These utilities, as shown, may not represent actual
field conditions. It is the responsibility of the contractor to contact all utility
companies for field location of utilities prior to construction.
IMPROVEMENT SURVEY PLAT OF480 DONEGAN
BEING SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH,
RANGE 89 WEST OF THE 6TH P.M.
CITY OF GLENWOOD SPRINGS, COUNTY OF GARFIELD, STATE OF COLORADO.
SHEET 2 OF 2
1 inch = ft.
( IN U.S. SURVEY FEET )
GRAPHIC SCALE
050 50 100
50
20025
ELECTRIC TRANSFORMER
ELECTRIC METER
TELEPHONE PEDESTAL
CATV PEDESTAL
EXISTING CONDITIONS LEGEND
GAS METER
EXISTING WOODEN FENCESIGN
PVC PIPE
DECIDUOUS TREE
CONIFEROUS TREE
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL
EXISTING STORM SEWERXSDXSDXSDXSD
7900
EXISTING GAS
EXISTING TELEPHONE
XGAS XGAS XGAS
EXISTING UNDERGROUND ELECTRIC
EXISTING CABLE
XUT XUT XUT
XEL XEL XEL
XTV XTV XTV
WATER SHUTOFF
EXISTING WIRE FENCExx
EXISTING 8" WATER MAINXWLXWL
EXISTING 8" SANITARY SEWER MAIN
EXISTING FIBER OPTICXFOXFOXFO
EXISTING SWALE OR DITCH>>>>XSA XSA
DRAINAGE DRY-WELL
SEWER MANHOLE
GUY WIRE
POWER POLE
FIRE HYDRANT
WATER VALVE
GAS METER
SEWER CLEANOUT
LIGHT POLE
IRRIGATION VALVE
SIDEWALK
ROOFLINE
80'-0"
40'-0"40'-0"
55
'
-
0
"
25
'
-
4
"
29
'
-
8
"
80'-0"
40'-0"40'-0"
55
'
-
0
"
25
'
-
4
"
29
'
-
8
"
W
M
FIRE SP.RISERROOM
11
'
-
7
"
K
A-0.2
1
Scale: 1/8 = 1'-0"
GBC BUILDING 1- EXISTING FLOOR PLAN
1 4 8
K
J
G
J
G
E E
C C
25
'
-
0
"
31
'
-
1
0
"
30
'
-
0
"
4 81
VERTICAL DESIGN210 CENTER DRIVE
GLENWOOD BUSINESSS CENTERDIEMOZ CONSTRUCTION CO.214 CENTER DRIVE
COLO DIVISION OFWATER RESOURCES202 CENTER DRIVE
COLO DIVISION OFWATER RESOURCES202 CENTER DRIVE
BLDG. ELECTRIC/ PHONE/
DATA/FIRE ALARM PANEL/ROOF ACCESS
25
'
-
0
"
OFFICE 1 OFFICE 2 OFFICE 3 OFFICE 4 OFFICE 5 OFFICE 6
OFFICE 7 OFFICE 8 OFFICE 9 OFFICE 10
OFFICE 11
OFFICE 12
WORK AREA W/OWNER FURNITURE
CONFERENCE ROOM MEETING AREA
RECEPTION
OFFICE 1 OFFICE 2 OFFICE 3
OFFICE 4
PHONE/ DATA
EMPLOYEEBREAK ROOM
WAREHOUSE
OFFICE 1 OFFICE 2DRAFTING
RECEPTION
RECEPTION
WAREHOUSE
GARAGEDOOR
GARAGEDOOR
SKYLIGHT
SKYLIGHT
7'-4" HIGH STORAGE ROOM
ACC.
PLANS/RECORDS
8'-0" HIGH STORAGE ROOM
GARAGEDOOR GARAGEDOOR GARAGEDOOR
25'-012"
10 11
18'-1112"
12
22'-0"
10 11 12
D
B
A
16
'
-
0
"
96
'
-
0
"
50
'
-
0
"
25
'
-
0
"
25
'
-
0
"
9
66'-0"
B
9
22'-0"
3'-012"
18'-1112"22'-0"
24
'
-
3
"
11
'
-
7
"
11
'
-
7
"
7
4"
12'-8"
B
11
'
-
0
"
25
'
-
0
"
12'-8"26'-4"28'-0"
66'-0"
14
6
'
-
0
"
SKYLIGHT
SKYLIGHT
THE SOFTWARE STORE230 CENTER DRIVE
OFFICE
SKYLIGHT SKYLIGHT SKYLIGHT
OFFICE
CTL/THOMPSON, INC.234 CENTER DRIVE
OFFICE
OFFICE FILES
OFFICE
FILES
SOILS LAB WAREHOUSE
RECEPTION
CTL/THOMPSON, INC.234 CENTER DRIVE CTL/THOMPSON, INC.234 CENTER DRIVE
UP
OFFICE
OFFICE
OFFICE
JULY 31, 2014
BUILDING 1 FLOOR AREAS:OFFICE 10,522 SFWAREHOUSE 2,716 SFSOILS LAB 959 SF
ELECT. MECH. ROOMS 99 SF
EXT. COVERED CANOPIES 684 SF TOTAL 14,980 SF
SOILS LAB
226 CENTER DRIVEJJNJ, INC.222 CENTER DRIVE
RUIZ INSURANCE,AGENT OF ALLSTATE218 CENTER DRIVE OFFICE
OFFICE OFFICE
OFFICE
OFFICE
File Name:
A-1.0
Sheet No.
GBCBLDG1
Date:
Drawn By:
J.R.D.
08-04-22
#4-
Job No.
2010-07
Revisions:
#3-#2-#1-
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
B
U
I
L
D
I
N
G
1
T
E
N
A
N
T
F
I
N
I
S
H
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
8
1
6
0
1
Glenwood Partnership LLLP
214 Center Drive
Glenwood Spgs., CO 81601
(970) 945-6712
(970) 945-7460 Fax
31'-9"
206'-0"
31'-9"
206'-0"
31'-9"
A B
18
'
-
0
"
37
'
-
0
"
74
'
-
0
"
12
'
-
1
0
"
37
'
-
0
"
1
15
'
-
2
"
2
15
'
-
2
"
12
'
-
1
0
"
3
31'-9"
A B
28'-6"28'-6"28'-6"
C
A-6.0
1
D
Scale: 1/8 = 1'-0"
TENANT FINISH PLAN
28'-6"
E F
28'-6"
G H
28'-6"
UTILITYRM
28'-6"28'-6"
C D
28'-6"
E F
34
'
-
8
"
12
'
-
1
0
"
15
'
-
2
"
37
'
-
0
"
74
'
-
0
"
37
'
-
0
"
1
2
3
28'-6"
G H
WAREHOUSE WAREHOUSE WAREHOUSE WAREHOUSE WAREHOUSE
UNIT HEATERABOVE (TYP)
SKYLIGHT SKYLIGHT SKYLIGHT
SKYLIGHT
GASMETERS
27.60' F.F.
SKYLIGHT
SKYLIGHT
266 270 274 278 282
11
'
-
4
"
SMART START270 CENTER DRIVE
WESTERN STATES FIREPROTECTION COMPANY274 CENTER DRIVE
S2M CONSTRUCTION282 CENTER DRIVE
28.10' F.F.SKYLIGHT
WOMEN'SRESTROOM
MEN'SRESTROOM
LAUNDRY SINK
SKYLIGHTSKYLIGHT
SKYLIGHT
U.S. DEPT. OF AGRICULTURAL SERVICECENTER- DIV. 5258 CENTER DRIVE
266 CENTER DRIVE
BUILDING 2 FLOOR AREAS:OFFICE 8,410 SFWAREHOUSE6,091 SF
ELECT. RM/ GAS METER 110 SFEXTERIOR CANOPIES 633 SFTOTAL 15,244 SF
File Name:
A-6.0
Sheet No.
GBCBLDG2
Date:
Drawn By:
J.R.D.
08-04-2022
#4-
Job No.
2004-08
Revisions:
#3-#2-
#1-
Glenwood Partnership, LLLP214 Center DriveGlenwood Spgs., CO 81601(970) 945-6712(970) 945-7460 Fax
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
-
B
U
I
L
D
I
N
G
2
25
0
t
o
2
8
2
C
E
N
T
E
R
D
R
I
V
E
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
8
1
6
0
1
SE#. 30017: Cooper Subdivision – Minor Subdivision Engineering Report 02/22/2023
Page 2
APPENDIX-B
Drainage Data & Calculations
Hydrologic Soil Group—Rifle Area, Colorado, Parts of Garfield and Mesa Counties
(30017 NRCS Soils)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/6/2020
Page 1 of 4
43
8
1
6
0
0
43
8
1
8
0
0
43
8
2
0
0
0
43
8
2
2
0
0
43
8
2
4
0
0
43
8
2
6
0
0
43
8
2
8
0
0
43
8
3
0
0
0
43
8
3
2
0
0
43
8
3
4
0
0
43
8
3
6
0
0
43
8
1
6
0
0
43
8
1
8
0
0
43
8
2
0
0
0
43
8
2
2
0
0
43
8
2
4
0
0
43
8
2
6
0
0
43
8
2
8
0
0
43
8
3
0
0
0
43
8
3
2
0
0
43
8
3
4
0
0
43
8
3
6
0
0
296300 296500 296700 296900 297100 297300 297500 297700
296100 296300 296500 296700 296900 297100 297300 297500 297700
39° 34' 44'' N
10
7
°
2
2
'
2
5
'
'
W
39° 34' 44'' N
10
7
°
2
1
'
1
7
'
'
W
39° 33' 34'' N
10
7
°
2
2
'
2
5
'
'
W
39° 33' 34'' N
10
7
°
2
1
'
1
7
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 500 1000 2000 3000Feet
0 150 300 600 900Meters
Map Scale: 1:10,600 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Rifle Area, Colorado, Parts of Garfield and
Mesa Counties
Survey Area Data: Version 13, Jun 5, 2020
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Sep 24, 2015—Nov
2, 2015
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Rifle Area, Colorado, Parts of Garfield and Mesa Counties
(30017 NRCS Soils)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/6/2020
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon-Pena complex,
6 to 25 percent slopes
B 48.1 14.8%
8 Atencio-Azeltine
complex, 1 to 3
percent slopes
B 89.6 27.6%
39 Jerry loam, 12 to 50
percent slopes
C 9.5 2.9%
67 Torriorthents-Rock
outcrop complex,
steep
D 177.1 54.6%
Totals for Area of Interest 324.4 100.0%
Hydrologic Soil Group—Rifle Area, Colorado, Parts of Garfield and Mesa Counties 30017 NRCS Soils
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/6/2020
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Rifle Area, Colorado, Parts of Garfield and Mesa Counties 30017 NRCS Soils
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/6/2020
Page 4 of 4
NO AA Atlas 14, Volume 8, Version 2
Location name: Glenwood Springs, Colorado,
USA*
Latitude: 39.5181°, Longitude: -107.3172°
Elevation: 5898.09 ft**
* source: ESRI Maps
** source: USGS
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale
Unruh, Michael Yekta, Geoffery Bonnin
NOAA, National Weather Service, Silver Spring, Maryland
PF_tabular | PF_graphical | Maps_&_aerials
PF tabular
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1
Dur ation
Average recurrence interval (years)
1 2 5 10 25 50 100 200 500 1000
5-min 1.39
(1.10‑1.80)
2.11
(1.67‑2.74)
3.22
(2.54‑4.18)
4.07
(3.19‑5.32)
5.16
(3.84‑6.88)
5.93
(4.32‑8.05)
6.64
(4.66‑9.28)
7.28
(4.90‑10.5)
8.04
(5.18‑12.0)
8.54
(5.41‑13.1)
10-min 1.02
(0.810‑1.32)
1.55
(1.22‑2.00)
2.35
(1.86‑3.05)
2.98
(2.34‑3.89)
3.78
(2.81‑5.03)
4.34
(3.16‑5.90)
4.85
(3.41‑6.79)
5.33
(3.58‑7.69)
5.89
(3.80‑8.79)
6.26
(3.96‑9.62)
15-min 0.832
(0.660‑1.08)
1.26
(0.996‑1.63)
1.92
(1.51‑2.48)
2.42
(1.90‑3.16)
3.07
(2.28‑4.09)
3.53
(2.57‑4.79)
3.95
(2.78‑5.52)
4.34
(2.91‑6.26)
4.79
(3.09‑7.14)
5.09
(3.22‑7.82)
30-min 0.570
(0.452‑0.738)
0.822
(0.652‑1.06)
1.21
(0.954‑1.57)
1.51
(1.18‑1.96)
1.88
(1.40‑2.50)
2.14
(1.56‑2.91)
2.38
(1.67‑3.32)
2.59
(1.74‑3.74)
2.84
(1.83‑4.24)
3.00
(1.90‑4.61)
60-min 0.381
(0.303‑0.493)
0.510
(0.404‑0.660)
0.707
(0.559‑0.918)
0.860
(0.675‑1.12)
1.05
(0.784‑1.40)
1.19
(0.867‑1.61)
1.31
(0.923‑1.83)
1.43
(0.959‑2.06)
1.56
(1.00‑2.32)
1.64
(1.04‑2.52)
2-hr 0.239
(0.192‑0.304)
0.304
(0.244‑0.388)
0.405
(0.324‑0.518)
0.484
(0.384‑0.622)
0.583
(0.440‑0.766)
0.653
(0.483‑0.874)
0.718
(0.512‑0.988)
0.777
(0.529‑1.10)
0.846
(0.552‑1.24)
0.892
(0.570‑1.35)
3-hr 0.186
(0.151‑0.235)
0.226
(0.183‑0.286)
0.288
(0.232‑0.365)
0.336
(0.269‑0.429)
0.399
(0.305‑0.521)
0.445
(0.332‑0.592)
0.488
(0.351‑0.667)
0.528
(0.363‑0.746)
0.577
(0.380‑0.843)
0.611
(0.393‑0.916)
6-hr 0.122
(0.100‑0.152)
0.139
(0.114‑0.173)
0.167
(0.136‑0.208)
0.190
(0.154‑0.238)
0.222
(0.174‑0.289)
0.247
(0.188‑0.326)
0.272
(0.199‑0.370)
0.298
(0.208‑0.418)
0.332
(0.222‑0.480)
0.358
(0.233‑0.528)
12-hr 0.075
(0.063‑0.092)
0.086
(0.071‑0.105)
0.104
(0.086‑0.127)
0.119
(0.098‑0.147)
0.140
(0.111‑0.180)
0.157
(0.121‑0.204)
0.174
(0.129‑0.233)
0.192
(0.136‑0.265)
0.216
(0.146‑0.308)
0.234
(0.154‑0.340)
24-hr 0.046
(0.039‑0.055)
0.053
(0.044‑0.063)
0.064
(0.054‑0.078)
0.074
(0.062‑0.090)
0.088
(0.071‑0.112)
0.100
(0.078‑0.128)
0.111
(0.083‑0.147)
0.123
(0.088‑0.168)
0.139
(0.095‑0.196)
0.152
(0.101‑0.217)
2-day 0.027
(0.023‑0.032)
0.031
(0.027‑0.037)
0.038
(0.032‑0.045)
0.044
(0.037‑0.052)
0.052
(0.043‑0.065)
0.059
(0.047‑0.075)
0.066
(0.050‑0.086)
0.073
(0.053‑0.098)
0.084
(0.058‑0.116)
0.092
(0.061‑0.129)
3-day 0.020
(0.018‑0.024)
0.023
(0.020‑0.027)
0.028
(0.024‑0.033)
0.033
(0.028‑0.039)
0.039
(0.032‑0.048)
0.044
(0.035‑0.055)
0.049
(0.037‑0.063)
0.054
(0.039‑0.072)
0.061
(0.043‑0.084)
0.067
(0.045‑0.093)
4-day 0.017
(0.014‑0.019)
0.019
(0.016‑0.022)
0.023
(0.020‑0.027)
0.026
(0.023‑0.031)
0.031
(0.026‑0.038)
0.035
(0.028‑0.043)
0.039
(0.030‑0.050)
0.043
(0.032‑0.057)
0.049
(0.034‑0.066)
0.053
(0.036‑0.073)
7-day 0.011
(0.010‑0.013)
0.013
(0.011‑0.015)
0.015
(0.013‑0.018)
0.017
(0.015‑0.020)
0.020
(0.017‑0.024)
0.023
(0.018‑0.028)
0.025
(0.019‑0.031)
0.027
(0.020‑0.035)
0.030
(0.022‑0.041)
0.033
(0.023‑0.045)
10-day 0.009
(0.008‑0.010)
0.010
(0.009‑0.012)
0.012
(0.011‑0.014)
0.014
(0.012‑0.016)
0.016
(0.013‑0.019)
0.017
(0.014‑0.021)
0.019
(0.015‑0.024)
0.021
(0.015‑0.027)
0.023
(0.016‑0.031)
0.025
(0.017‑0.034)
20-day 0.006
(0.006‑0.007)
0.007
(0.006‑0.008)
0.008
(0.007‑0.009)
0.009
(0.008‑0.010)
0.010
(0.009‑0.012)
0.011
(0.009‑0.013)
0.012
(0.010‑0.015)
0.013
(0.010‑0.017)
0.014
(0.010‑0.019)
0.015
(0.011‑0.021)
30-day 0.005
(0.005‑0.006)
0.006
(0.005‑0.006)
0.007
(0.006‑0.007)
0.007
(0.006‑0.008)
0.008
(0.007‑0.010)
0.009
(0.008‑0.011)
0.010
(0.008‑0.012)
0.011
(0.008‑0.013)
0.011
(0.008‑0.015)
0.012
(0.009‑0.016)
45-day 0.004
(0.004‑0.005)
0.005
(0.004‑0.005)
0.005
(0.005‑0.006)
0.006
(0.005‑0.007)
0.007
(0.006‑0.008)
0.007
(0.006‑0.009)
0.008
(0.006‑0.010)
0.009
(0.007‑0.011)
0.009
(0.007‑0.012)
0.010
(0.007‑0.013)
60-day 0.004
(0.003‑0.004)
0.004
(0.004‑0.004)
0.005
(0.004‑0.005)
0.005
(0.005‑0.006)
0.006
(0.005‑0.007)
0.007
(0.005‑0.008)
0.007
(0.006‑0.008)
0.007
(0.006‑0.009)
0.008
(0.006‑0.010)
0.008
(0.006‑0.011)
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for
a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not
checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.
Please refer to NOAA Atlas 14 document for more information.
Back to Top
PF gr aphical
Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.5181&lo...
1 of 4 9/3/2020, 12:39 PM
Back to Top
Maps & aerials
Small scale terrain
Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.5181&lo...
2 of 4 9/3/2020, 12:39 PM
Large scale terrain
Large scale map
Large scale aerial
+
–
3km
2mi
+
–
100km
60mi
+
–
100km
60mi
Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.5181&lo...
3 of 4 9/3/2020, 12:39 PM
Back to Top
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: HDSC.Questions@noaa.gov
Disclaimer
Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.5181&lo...
4 of 4 9/3/2020, 12:39 PM
Runoff Chapter 6
6-10 Urban Drainage and Flood Control District August 2018
Urban Storm Drainage Criteria Manual Volume 1
Table 6-5. Runoff coefficients, c
2-Year 5-Year 10-Year 25-Year 50-Year 100-Year 500-Year
2%0.01 0.01 0.01 0.01 0.04 0.13 0.27
5% 0.02 0.02 0.02 0.03 0.07 0.15 0.29
10% 0.04 0.05 0.05 0.07 0.11 0.19 0.32
15% 0.07 0.08 0.08 0.1 0.15 0.23 0.35
20% 0.1 0.11 0.12 0.14 0.2 0.27 0.38
25% 0.14 0.15 0.16 0.19 0.24 0.3 0.42
30% 0.18 0.19 0.2 0.23 0.28 0.34 0.45
35% 0.21 0.23 0.24 0.27 0.32 0.38 0.48
40% 0.25 0.27 0.28 0.32 0.37 0.42 0.51
45% 0.3 0.31 0.33 0.36 0.41 0.46 0.54
50% 0.34 0.36 0.37 0.41 0.45 0.5 0.58
55% 0.39 0.4 0.42 0.45 0.49 0.54 0.61
60% 0.43 0.45 0.47 0.5 0.54 0.58 0.64
65% 0.48 0.5 0.51 0.54 0.58 0.62 0.67
70% 0.53 0.55 0.56 0.59 0.62 0.65 0.71
75% 0.58 0.6 0.61 0.64 0.66 0.69 0.74
80% 0.63 0.65 0.66 0.69 0.71 0.73 0.77
85% 0.68 0.7 0.71 0.74 0.75 0.77 0.8
90% 0.73 0.75 0.77 0.79 0.79 0.81 0.84
95% 0.79 0.81 0.82 0.83 0.84 0.85 0.87
100% 0.84 0.86 0.87 0.88 0.88 0.89 0.9
2-Year 5-Year 10-Year 25-Year 50-Year 100-Year 500-Year
2% 0.01 0.01 0.07 0.26 0.34 0.44 0.54
5% 0.03 0.03 0.1 0.28 0.36 0.45 0.55
10% 0.06 0.07 0.14 0.31 0.38 0.47 0.57
15% 0.09 0.11 0.18 0.34 0.41 0.5 0.59
20% 0.13 0.15 0.22 0.38 0.44 0.52 0.61
25% 0.17 0.19 0.26 0.41 0.47 0.54 0.63
30% 0.2 0.23 0.3 0.44 0.49 0.57 0.65
35% 0.24 0.27 0.34 0.47 0.52 0.59 0.66
40% 0.29 0.32 0.38 0.5 0.55 0.61 0.68
45% 0.33 0.36 0.42 0.53 0.58 0.64 0.7
50% 0.37 0.4 0.46 0.56 0.61 0.66 0.72
55% 0.42 0.45 0.5 0.6 0.63 0.68 0.74
60% 0.46 0.49 0.54 0.63 0.66 0.71 0.76
65% 0.5 0.54 0.58 0.66 0.69 0.73 0.77
70% 0.55 0.58 0.62 0.69 0.72 0.75 0.79
75% 0.6 0.63 0.66 0.72 0.75 0.78 0.81
80% 0.64 0.67 0.7 0.75 0.77 0.8 0.83
85% 0.69 0.72 0.74 0.78 0.8 0.82 0.85
90% 0.74 0.76 0.78 0.81 0.83 0.84 0.87
95% 0.79 0.81 0.82 0.85 0.86 0.87 0.88
100% 0.84 0.86 0.86 0.88 0.89 0.89 0.9
Total or Effective
% Impervious
NRCS Hydrologic Soil Group A
Total or Effective
% Impervious
NRCS Hydrologic Soil Group B
Chapter 6 Runoff
August 2018 Urban Drainage and Flood Control District 6-11
Urban Storm Drainage Criteria Manual Volume 1
Table 6-5. Runoff coefficients, c (continued)
Figure 6-1. Runoff coefficient vs. watershed imperviousness NRCS HSG A
2-Year 5-Year 10-Year 25-Year 50-Year 100-Year 500-Year
2%0.01 0.05 0.15 0.33 0.40 0.49 0.59
5% 0.03 0.08 0.17 0.35 0.42 0.5 0.6
10% 0.06 0.12 0.21 0.37 0.44 0.52 0.62
15% 0.1 0.16 0.24 0.4 0.47 0.55 0.64
20% 0.14 0.2 0.28 0.43 0.49 0.57 0.65
25% 0.18 0.24 0.32 0.46 0.52 0.59 0.67
30% 0.22 0.28 0.35 0.49 0.54 0.61 0.68
35% 0.26 0.32 0.39 0.51 0.57 0.63 0.7
40% 0.3 0.36 0.43 0.54 0.59 0.65 0.71
45% 0.34 0.4 0.46 0.57 0.62 0.67 0.73
50% 0.38 0.44 0.5 0.6 0.64 0.69 0.75
55% 0.43 0.48 0.54 0.63 0.66 0.71 0.76
60% 0.47 0.52 0.57 0.65 0.69 0.73 0.78
65% 0.51 0.56 0.61 0.68 0.71 0.75 0.79
70% 0.56 0.61 0.65 0.71 0.74 0.77 0.81
75% 0.6 0.65 0.68 0.74 0.76 0.79 0.82
80% 0.65 0.69 0.72 0.77 0.79 0.81 0.84
85% 0.7 0.73 0.76 0.79 0.81 0.83 0.86
90% 0.74 0.77 0.79 0.82 0.84 0.85 0.87
95% 0.79 0.81 0.83 0.85 0.86 0.87 0.89
100% 0.83 0.85 0.87 0.88 0.89 0.89 0.9
Total or Effective
% Impervious
NRCS Hydrologic Soil Group C
Autodesk® Storm and Sanitary Analysis 2016 - Version 13.4.254 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 30017-EX DRG.SPF
Description ............... 30017 EXISTING DRAINAGE
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. SCS TR-55
Time of Concentration...... SCS TR-55
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. SEP-11-2020 00:00:00
Ending Date ............... SEP-12-2020 06:00:00
Report Time Step .......... 00:05:00
*************
Element Count
*************
Number of rain gages ...... 2
Number of subbasins ....... 16
Number of nodes ........... 20
Number of links ........... 17
****************
Raingage Summary
****************
Gage Data Data Recording
ID Source Type Interval
min
------------------------------------------------------------
GW-100Y-24H GW-100Y-24H CUMULATIVE 6.00
GW-25Y-24H GW-25Y-24H CUMULATIVE 6.00
****************
Subbasin Summary
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
****************
Subbasin Total Peak Rate
Area Factor
ID acres
------------------------------------------
EX-02A 3.04 0.00
EX-02B 4.89 0.00
EX-03 4.49 0.00
OS-E 459.00 0.00
OS-E1 8.95 0.00
OS-E2 33.70 0.00
OS-N1A 5.37 0.00
OS-N1B 5.53 0.00
OS-N1C 4.65 0.00
OS-S1 3.43 0.00
OS-S2 9.21 0.00
OS-W1 7.39 0.00
OS-W2 32.77 0.00
OS-W3 6.01 0.00
OS-W4 16.76 0.00
OS-W5 65.29 0.00
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
DP-2A JUNCTION 5724.80 5728.80 0.00
DP-2B JUNCTION 5714.41 5719.31 0.00
DP-3 JUNCTION 5720.00 5721.00 0.00
DP-E0 JUNCTION 5785.00 5786.00 0.00
DP-E1 JUNCTION 5795.00 5796.00 0.00
DP-E2 JUNCTION 5840.00 5841.00 0.00
DP-N1A JUNCTION 5748.00 5749.00 0.00
DP-N1B JUNCTION 5748.00 5749.00 0.00
DP-N1C JUNCTION 5748.00 5749.00 0.00
DP-S1 JUNCTION 5709.83 5715.63 0.00
DP-S2 JUNCTION 5710.47 5715.07 0.00
DP-W JUNCTION 5747.50 5748.50 0.00
DP-W1 JUNCTION 5750.00 5751.00 0.00
DP-W3 JUNCTION 5783.00 5784.00 0.00
DP-W4 JUNCTION 5807.00 5809.00 0.00
MH-Down1 JUNCTION 5708.09 5722.24 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Mh-Down2 JUNCTION 5706.00 5712.00 0.00
OUT-E OUTFALL 5745.00 5746.00 0.00
OUT-MC OUTFALL 5704.00 5707.00 0.00
OUT-W-SK OUTFALL 5733.00 5733.60 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
L-DOWN1-2 MH-Down1 Mh-Down2 CONDUIT 651.0 0.3210 0.0150
L-DOWN2-MITCHELLMh-Down2 OUT-MC CONDUIT 386.0 0.5181 0.0150
L-DP3-S2 DP-3 DP-S2 CHANNEL 349.4 2.7271 0.0200
L-E0-E DP-E0 OUT-E CHANNEL 578.1 6.9197 0.0320
L-E1-E0 DP-E1 DP-E0 CHANNEL 241.4 4.1425 0.0320
L-E2-E DP-E2 DP-E0 CHANNEL 471.9 11.6560 0.0320
L-EX01-S1 DP-2A DP-S1 CONDUIT 400.0 3.7425 0.0150
L-EX02-S2 DP-2B DP-S2 CONDUIT 86.0 3.4186 0.0150
L-N1A-2A DP-N1A DP-2A CHANNEL 306.3 7.5755 0.0320
L-N1B-2B DP-N1B DP-2B CHANNEL 536.6 6.2603 0.0320
L-N1C-3 DP-N1C DP-3 CHANNEL 615.1 4.5518 0.0320
L-S1-DOWN1 DP-S1 MH-Down1 CONDUIT 320.0 0.5437 0.0150
L-S2-S1 DP-S2 DP-S1 CONDUIT 264.1 0.2424 0.0150
L-STORM-KING DP-W OUT-W-SK CHANNEL 290.4 4.9929 0.0200
L-W1-W DP-W1 DP-W CHANNEL 442.9 0.5644 0.0320
L-W3-W DP-W3 DP-W CHANNEL 669.1 5.3060 0.0320
L-W4-W3 DP-W4 DP-W3 CHANNEL 281.8 8.5167 0.0320
*********************
Cross Section Summary
*********************
Link Shape Depth/ Width No. of Cross Full Flow Design
ID Diameter Barrels Sectional Hydraulic Flow
Area Radius Capacity
ft ft ft² ft cfs
----------------------------------------------------------------------------------------------------------
L-DOWN1-2 CIRCULAR 3.00 3.00 1 7.07 0.75 32.75
L-DOWN2-MITCHELL CIRCULAR 3.00 3.00 1 7.07 0.75 41.61
L-DP3-S2 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 186.86
L-E0-E TRAPEZOIDAL 1.00 23.00 1 13.00 0.56 108.25
L-E1-E0 TRAPEZOIDAL 0.50 18.25 1 5.31 0.29 21.80
L-E2-E TRAPEZOIDAL 1.00 23.00 1 13.00 0.56 140.49
L-EX01-S1 CIRCULAR 1.50 1.50 1 1.77 0.38 17.61
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
L-EX02-S2 CIRCULAR 2.00 2.00 1 3.14 0.50 36.25
L-N1A-2A TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 194.65
L-N1B-2B TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 176.95
L-N1C-3 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 150.88
L-S1-DOWN1 CIRCULAR 3.00 3.00 1 7.07 0.75 42.63
L-S2-S1 CIRCULAR 3.00 3.00 1 7.07 0.75 28.46
L-STORM-KING IRREGULAR 0.60 38.50 1 10.96 0.28 77.41
L-W1-W TRAPEZOIDAL 0.50 22.25 1 6.06 0.27 8.81
L-W3-W TRAPEZOIDAL 1.00 23.00 1 13.00 0.56 94.79
L-W4-W3 TRAPEZOIDAL 1.00 23.00 1 13.00 0.56 120.09
****************
Transect Summary
****************
Transect XS-ST-C-G
Area:
0.0002 0.0007 0.0015 0.0027 0.0042
0.0060 0.0082 0.0107 0.0135 0.0167
0.0207 0.0260 0.0326 0.0406 0.0499
0.0605 0.0724 0.0856 0.1001 0.1160
0.1332 0.1517 0.1715 0.1927 0.2151
0.2389 0.2640 0.2905 0.3182 0.3473
0.3770 0.4067 0.4364 0.4662 0.4959
0.5257 0.5554 0.5852 0.6149 0.6447
0.6745 0.7048 0.7371 0.7707 0.8057
0.8419 0.8795 0.9183 0.9585 1.0000
Hrad:
0.0202 0.0403 0.0605 0.0807 0.1008
0.1210 0.1412 0.1614 0.1815 0.2017
0.1816 0.1793 0.1853 0.1958 0.2091
0.2243 0.2407 0.2580 0.2759 0.2944
0.3133 0.3324 0.3519 0.3715 0.3914
0.4113 0.4314 0.4516 0.4719 0.4923
0.5339 0.5755 0.6171 0.6585 0.6999
0.7413 0.7825 0.8237 0.8649 0.9060
0.9470 0.9324 0.9373 0.9435 0.9507
0.9589 0.9681 0.9780 0.9887 1.0000
Width:
0.0079 0.0158 0.0238 0.0317 0.0396
0.0475 0.0554 0.0633 0.0713 0.0792
0.1105 0.1418 0.1730 0.2043 0.2356
0.2669 0.2982 0.3295 0.3608 0.3921
0.4234 0.4547 0.4860 0.5173 0.5486
0.5799 0.6112 0.6425 0.6737 0.7050
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
0.7052 0.7053 0.7054 0.7055 0.7057
0.7058 0.7059 0.7060 0.7062 0.7063
0.7064 0.7506 0.7818 0.8130 0.8442
0.8753 0.9065 0.9377 0.9688 1.0000
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 119.576 2.140
Surface Runoff ........... 2.258 0.040
Continuity Error (%) ..... -0.000
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 22.581 7.358
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.003 0.001
Continuity Error (%) ..... -0.000
******************************************
Composite Curve Number Computations Report
******************************************
------------------
Subbasin EX-02A
------------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pasture, grassland, or range, Fair 3.04 B 69.00
Composite Area & Weighted CN 3.04 69.00
------------------
Subbasin EX-02B
------------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pasture, grassland, or range, Fair 4.89 B 69.00
Composite Area & Weighted CN 4.89 69.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------
Subbasin EX-03
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pasture, grassland, or range, Fair 4.49 B 69.00
Composite Area & Weighted CN 4.49 69.00
----------------
Subbasin OS-E
----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Fair 206.55 D 80.00
Sagebrush range, Fair 45.90 D 70.00
Oak & Aspen range, Fair 183.60 C 57.00
1/4 acre lots, 38% impervious 22.95 B 75.00
Composite Area & Weighted CN 459.00 69.55
-----------------
Subbasin OS-E1
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Fair 3.58 D 80.00
1/4 acre lots, 38% impervious 5.37 B 75.00
Composite Area & Weighted CN 8.95 77.00
-----------------
Subbasin OS-E2
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Fair 32.02 D 80.00
1/4 acre lots, 38% impervious 1.69 B 75.00
Composite Area & Weighted CN 33.70 79.75
------------------
Subbasin OS-N1A
------------------
Area Soil
Soil/Surface Description (acres) Group CN
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
----------------------------------------------------------------------------------------
- 4.74 - 72.00
Composite Area & Weighted CN 4.74 72.00
------------------
Subbasin OS-N1B
------------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
1/4 acre lots, 38% impervious 14.78 B 75.00
Paved parking & roofs 0.78 B 98.00
Composite Area & Weighted CN 15.56 76.15
------------------
Subbasin OS-N1C
------------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
- 4.65 - 72.00
Composite Area & Weighted CN 4.65 72.00
-----------------
Subbasin OS-S1
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Urban commercial, 85% imp 3.43 B 92.00
Composite Area & Weighted CN 3.43 92.00
-----------------
Subbasin OS-S2
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Paved parking & roofs 9.21 B 98.00
Composite Area & Weighted CN 9.21 98.00
-----------------
Subbasin OS-W1
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Poor 4.43 D 89.00
1/4 acre lots, 38% impervious 2.96 B 75.00
Composite Area & Weighted CN 7.39 83.40
-----------------
Subbasin OS-W2
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Poor 9.83 D 89.00
1/4 acre lots, 38% impervious 9.83 B 75.00
Pinyon & Juniper range, Fair 13.11 D 80.00
Composite Area & Weighted CN 32.77 81.20
-----------------
Subbasin OS-W3
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
1/4 acre lots, 38% impervious 5.71 B 75.00
Paved parking & roofs 0.30 B 98.00
Composite Area & Weighted CN 6.01 76.15
-----------------
Subbasin OS-W4
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Fair 8.38 D 80.00
1/4 acre lots, 38% impervious 1.68 B 75.00
Pinyon & Juniper range, Poor 6.71 D 89.00
Composite Area & Weighted CN 16.76 83.10
-----------------
Subbasin OS-W5
-----------------
Area Soil
Soil/Surface Description (acres) Group CN
----------------------------------------------------------------------------------------
Pinyon & Juniper range, Fair 45.70 D 80.00
1/4 acre lots, 38% impervious 6.53 B 75.00
Pinyon & Juniper range, Poor 13.06 D 89.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Composite Area & Weighted CN 65.29 81.30
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's Roughness
------------------
Subbasin EX-02A
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 2.12 0.00 0.00
================================================================================================
Total TOC (minutes): 34.55
================================================================================================
------------------
Subbasin EX-02B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 3.18 0.00 0.00
================================================================================================
Total TOC (minutes): 35.61
================================================================================================
-----------------
Subbasin EX-03
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 3.18 0.00 0.00
================================================================================================
Total TOC (minutes): 35.61
================================================================================================
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
----------------
Subbasin OS-E
----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 20.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.19 0.00 0.00
Computed Flow Time (minutes): 25.76 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 700.00 0.00 0.00
Slope (%): 20.00 0.00 0.00
Surface Type: Forest Unpaved Unpaved
Velocity (ft/sec): 1.12 0.00 0.00
Computed Flow Time (minutes): 10.42 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.04 0.03
Flow Length (ft): 4600.00 7200.00 1100.00
Channel Slope (%): 34.00 22.00 10.00
Cross Section Area (ft²): 2.00 2.00 2.00
Wetted Perimeter (ft): 10.00 10.00 10.00
Velocity (ft/sec): 7.43 5.97 5.37
Computed Flow Time (minutes): 10.32 20.08 3.41
================================================================================================
Total TOC (minutes): 69.99
================================================================================================
-----------------
Subbasin OS-E1
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 150.00 0.00 0.00
Slope (%): 18.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.16 0.00 0.00
Computed Flow Time (minutes): 15.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 150.00 503.00 0.00
Slope (%): 18.00 8.70 0.00
Surface Type: Woodland Woodland Unpaved
Velocity (ft/sec): 2.12 1.47 0.00
Computed Flow Time (minutes): 1.18 5.70 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.03 0.03
Flow Length (ft): 316.00 200.00 605.00
Channel Slope (%): 14.20 2.00 7.80
Cross Section Area (ft²): 2.00 2.00 2.00
Wetted Perimeter (ft): 10.00 10.00 10.00
Velocity (ft/sec): 4.80 2.40 4.74
Computed Flow Time (minutes): 1.10 1.39 2.13
================================================================================================
Total TOC (minutes): 26.92
================================================================================================
-----------------
Subbasin OS-E2
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 31.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.23 0.00 0.00
Computed Flow Time (minutes): 21.62 0.00 0.00
Shallow Concentrated Flow Computations
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 315.00 0.00 0.00
Slope (%): 52.00 0.00 0.00
Surface Type: Woodland Unpaved Unpaved
Velocity (ft/sec): 3.61 0.00 0.00
Computed Flow Time (minutes): 1.45 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.04 0.00
Flow Length (ft): 1256.00 1150.00 0.00
Channel Slope (%): 45.00 15.20 0.00
Cross Section Area (ft²): 2.00 2.00 0.00
Wetted Perimeter (ft): 10.00 10.00 0.00
Velocity (ft/sec): 8.55 4.97 0.00
Computed Flow Time (minutes): 2.45 3.86 0.00
================================================================================================
Total TOC (minutes): 29.38
================================================================================================
------------------
Subbasin OS-N1A
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1C
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
-----------------
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Subbasin OS-S1
-----------------
User-Defined TOC override (minutes): 10.00
-----------------
Subbasin OS-S2
-----------------
User-Defined TOC override (minutes): 10.00
-----------------
Subbasin OS-W1
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 150.00 0.00 0.00
Slope (%): 60.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.26 0.00 0.00
Computed Flow Time (minutes): 9.53 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 150.00 230.00 0.00
Slope (%): 56.00 30.00 0.00
Surface Type: Woodland Woodland Unpaved
Velocity (ft/sec): 3.74 2.74 0.00
Computed Flow Time (minutes): 0.67 1.40 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.03 0.00
Flow Length (ft): 680.00 420.00 0.00
Channel Slope (%): 8.00 1.50 0.00
Cross Section Area (ft²): 3.00 2.00 0.00
Wetted Perimeter (ft): 7.00 10.00 0.00
Velocity (ft/sec): 5.99 2.08 0.00
Computed Flow Time (minutes): 1.89 3.37 0.00
================================================================================================
Total TOC (minutes): 16.86
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
================================================================================================
-----------------
Subbasin OS-W2
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 222.00 0.00 0.00
Slope (%): 62.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.29 0.00 0.00
Computed Flow Time (minutes): 12.88 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 370.00 0.00 0.00
Slope (%): 69.00 0.00 0.00
Surface Type: Woodland Unpaved Unpaved
Velocity (ft/sec): 4.15 0.00 0.00
Computed Flow Time (minutes): 1.49 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.03 0.03
Flow Length (ft): 765.00 1400.00 418.00
Channel Slope (%): 38.00 5.60 1.00
Cross Section Area (ft²): 3.00 2.00 2.00
Wetted Perimeter (ft): 7.00 10.00 10.00
Velocity (ft/sec): 13.05 4.02 1.70
Computed Flow Time (minutes): 0.98 5.81 4.10
================================================================================================
Total TOC (minutes): 25.25
================================================================================================
-----------------
Subbasin OS-W3
-----------------
Sheet Flow Computations
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.02 0.00 0.00
Flow Length (ft): 206.00 0.00 0.00
Slope (%): 7.30 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 1.05 0.00 0.00
Computed Flow Time (minutes): 3.27 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 405.00 0.00 0.00
Slope (%): 10.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 2.21 0.00 0.00
Computed Flow Time (minutes): 3.05 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.02 0.00 0.00
Flow Length (ft): 752.00 0.00 0.00
Channel Slope (%): 1.70 0.00 0.00
Cross Section Area (ft²): 2.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 3.32 0.00 0.00
Computed Flow Time (minutes): 3.77 0.00 0.00
================================================================================================
Total TOC (minutes): 10.10
================================================================================================
-----------------
Subbasin OS-W4
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 60.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.30 0.00 0.00
Computed Flow Time (minutes): 16.60 0.00 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 263.00 0.00 0.00
Slope (%): 70.00 0.00 0.00
Surface Type: Woodland Unpaved Unpaved
Velocity (ft/sec): 4.18 0.00 0.00
Computed Flow Time (minutes): 1.05 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.04 0.00
Flow Length (ft): 1000.00 326.00 0.00
Channel Slope (%): 50.00 14.00 0.00
Cross Section Area (ft²): 2.00 2.00 0.00
Wetted Perimeter (ft): 10.00 10.00 0.00
Velocity (ft/sec): 9.01 4.77 0.00
Computed Flow Time (minutes): 1.85 1.14 0.00
================================================================================================
Total TOC (minutes): 20.64
================================================================================================
-----------------
Subbasin OS-W5
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 28.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.22 0.00 0.00
Computed Flow Time (minutes): 22.52 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 303.00 0.00 0.00
Slope (%): 50.00 0.00 0.00
Surface Type: Woodland Unpaved Unpaved
Velocity (ft/sec): 3.54 0.00 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Computed Flow Time (minutes): 1.43 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.04 0.04 0.03
Flow Length (ft): 1464.00 1770.00 343.00
Channel Slope (%): 41.00 14.30 5.80
Cross Section Area (ft²): 2.00 2.00 2.00
Wetted Perimeter (ft): 10.00 10.00 10.00
Velocity (ft/sec): 8.16 4.82 4.09
Computed Flow Time (minutes): 2.99 6.12 1.40
================================================================================================
Total TOC (minutes): 34.45
================================================================================================
***********************
Subbasin Runoff Summary
***********************
--------------------------------------------------------------------------
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
in in cfs Number days hh:mm:ss
--------------------------------------------------------------------------
EX-02A 2.11 0.26 0.37 69.000 0 00:34:33
EX-02B 2.11 0.26 0.59 69.000 0 00:35:36
EX-03 2.11 0.26 0.54 69.000 0 00:35:36
OS-E 2.11 0.27 38.61 69.550 0 01:09:59
OS-E1 2.11 0.51 3.72 77.000 0 00:26:55
OS-E2 2.11 0.62 17.12 79.750 0 00:29:22
OS-N1A 2.11 0.34 1.24 72.000 0 00:26:50
OS-N1B 2.11 0.48 2.11 76.150 0 00:26:50
OS-N1C 2.11 0.34 1.08 72.000 0 00:26:50
OS-S1 2.11 1.34 6.31 92.000 0 00:10:00
OS-S2 2.11 1.89 21.86 98.000 0 00:10:00
OS-W1 2.11 0.79 6.83 83.400 0 00:16:51
OS-W2 2.11 0.69 20.70 81.200 0 00:25:15
OS-W3 2.11 0.48 3.65 76.150 0 00:10:06
OS-W4 2.11 0.78 13.75 83.100 0 00:20:38
OS-W5 2.11 0.69 34.04 81.300 0 00:34:27
--------------------------------------------------------------------------
******************
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Node Depth Summary
******************
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
DP-2A 0.05 0.29 5725.09 0 12:25 0 0 0:00:00
DP-2B 0.06 0.35 5714.76 0 12:27 0 0 0:00:00
DP-3 0.01 0.07 5720.07 0 12:24 0 0 0:00:00
DP-E0 0.07 0.48 5785.48 0 12:18 0 0 0:00:00
DP-E1 0.03 0.22 5795.22 0 12:15 0 0 0:00:00
DP-E2 0.05 0.39 5840.39 0 12:15 0 0 0:00:00
DP-N1A 0.01 0.06 5748.06 0 12:19 0 0 0:00:00
DP-N1B 0.01 0.09 5748.09 0 12:16 0 0 0:00:00
DP-N1C 0.01 0.06 5748.06 0 12:18 0 0 0:00:00
DP-S1 0.27 1.73 5711.56 0 12:07 0 0 0:00:00
DP-S2 0.31 1.94 5712.41 0 12:08 0 0 0:00:00
DP-W 0.13 0.59 5748.09 0 12:16 0 0 0:00:00
DP-W1 0.06 0.44 5750.44 0 12:11 0 0 0:00:00
DP-W3 0.12 0.77 5783.77 0 12:16 0 0 0:00:00
DP-W4 0.10 0.65 5807.65 0 12:15 0 0 0:00:00
MH-Down1 0.32 2.06 5710.15 0 12:09 0 0 0:00:00
Mh-Down2 0.28 1.77 5707.77 0 12:10 0 0 0:00:00
OUT-E 0.07 0.48 5745.48 0 12:19 0 0 0:00:00
OUT-MC 0.27 1.62 5705.62 0 12:10 0 0 0:00:00
OUT-W-SK 0.13 0.58 5733.58 0 12:16 0 0 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
DP-2A JUNCTION 0.37 1.56 0 12:20 0.00
DP-2B JUNCTION 0.59 2.56 0 12:19 0.00
DP-3 JUNCTION 0.54 1.55 0 12:20 0.00
DP-E0 JUNCTION 0.00 20.47 0 12:15 0.00
DP-E1 JUNCTION 3.68 3.68 0 12:15 0.00
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
DP-E2 JUNCTION 16.82 16.82 0 12:15 0.00
DP-N1A JUNCTION 1.21 1.21 0 12:19 0.00
DP-N1B JUNCTION 2.09 2.09 0 12:15 0.00
DP-N1C JUNCTION 1.05 1.05 0 12:19 0.00
DP-S1 JUNCTION 6.25 23.79 0 12:07 0.00
DP-S2 JUNCTION 21.34 21.44 0 12:04 0.00
DP-W JUNCTION 20.61 71.23 0 12:15 0.00
DP-W1 JUNCTION 6.79 6.79 0 12:09 0.00
DP-W3 JUNCTION 3.53 45.81 0 12:15 0.00
DP-W4 JUNCTION 44.22 44.22 0 12:15 0.00
MH-Down1 JUNCTION 0.00 23.78 0 12:07 0.00
Mh-Down2 JUNCTION 0.00 23.67 0 12:09 0.00
OUT-E OUTFALL 38.51 45.43 0 12:45 0.00
OUT-MC OUTFALL 0.00 23.56 0 12:10 0.00
OUT-W-SK OUTFALL 0.00 70.97 0 12:16 0.00
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
OUT-E 55.18 11.30 45.43
OUT-MC 90.61 1.69 23.56
OUT-W-SK 62.67 7.78 70.97
-----------------------------------------------
System 69.49 20.77 121.77
*****************
Link Flow Summary
*****************
--------------------------------------------------------------------------------------------------------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition
Occurrence Attained Analysis Capacity /Design Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
--------------------------------------------------------------------------------------------------------------------------------
L-DOWN1-2 CONDUIT 0 12:09 4.99 1.00 23.67 32.75 0.72 0.64 0 Calculated
L-DOWN2-MITCHELL CONDUIT 0 12:10 5.74 1.00 23.56 41.61 0.57 0.56 0 Calculated
L-DP3-S2 CHANNEL 0 12:24 0.18 1.00 1.50 186.86 0.01 0.54 0 Calculated
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
L-E0-E CHANNEL 0 12:19 5.41 1.00 20.27 108.25 0.19 0.48 0 Calculated
L-E1-E0 CHANNEL 0 12:15 1.27 1.00 3.66 21.80 0.17 0.70 0 Calculated
L-E2-E CHANNEL 0 12:15 5.33 1.00 16.81 140.49 0.12 0.43 0 Calculated
L-EX01-S1 CONDUIT 0 12:25 1.85 1.00 1.44 17.61 0.08 0.57 0 Calculated
L-EX02-S2 CONDUIT 0 12:27 6.08 1.00 2.19 36.25 0.06 0.27 0 Calculated
L-N1A-2A CHANNEL 0 12:20 0.95 1.00 1.21 194.65 0.01 0.17 0 Calculated
L-N1B-2B CHANNEL 0 12:17 1.31 1.00 2.05 176.95 0.01 0.22 0 Calculated
L-N1C-3 CHANNEL 0 12:19 1.57 1.00 1.05 150.88 0.01 0.07 0 Calculated
L-S1-DOWN1 CONDUIT 0 12:07 5.09 1.00 23.78 42.63 0.56 0.63 0 Calculated
L-S2-S1 CONDUIT 0 12:08 4.03 1.00 18.22 28.46 0.64 0.61 0 Calculated
L-STORM-KING CHANNEL 0 12:16 6.88 1.00 70.97 77.41 0.92 0.97 0 Calculated
L-W1-W CHANNEL 0 12:11 1.20 1.00 6.49 8.81 0.74 0.94 0 Calculated
L-W3-W CHANNEL 0 12:16 6.90 1.00 45.43 94.79 0.48 0.68 0 Calculated
L-W4-W3 CHANNEL 0 12:15 6.22 1.00 44.25 120.09 0.37 0.71 0 Calculated
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
Analysis began on: Tue Feb 21 16:08:17 2023
Analysis ended on: Tue Feb 21 16:08:19 2023
Total elapsed time: 00:00:02
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING DRAINAGE
Autodesk Storm and Sanitary Analysis
Autodesk® Storm and Sanitary Analysis 2016 - Version 13.4.254 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 30017-SITE-EX DRG-RATIONAL-25YR.SPF
Description ............... 30017 EXISTING 25YR DRAINAGE
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. Rational
Time of Concentration...... SCS TR-55
Return Period.............. 25 years
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. JAN-01-2021 00:00:00
Ending Date ............... JAN-01-2021 02:00:00
Report Time Step .......... 00:00:10
*************
Element Count
*************
Number of subbasins ....... 10
Number of nodes ........... 11
Number of links ........... 10
****************
Subbasin Summary
****************
Subbasin Total
Area
ID acres
------------------------------
EX-02A 3.04
EX-02B 4.89
EX-03 4.49
OS-N1A 5.37
OS-N1B 5.53
OS-N1C 4.65
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
OS-S1 3.43
OS-S21 1.92
OS-S22 3.39
OS-S23 3.91
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
DP-2A JUNCTION 5724.80 5729.80 0.00
DP-2B JUNCTION 5714.41 5720.31 0.00
DP-3 JUNCTION 5720.00 5721.00 0.00
DP-N1A JUNCTION 5748.00 5749.00 0.00
DP-N1B JUNCTION 5748.00 5749.00 0.00
DP-N1C JUNCTION 5748.00 5749.00 0.00
DP-S1 JUNCTION 5709.83 5715.63 0.00
DP-S2 JUNCTION 5710.47 5715.07 0.00
MH-Down1 JUNCTION 5708.09 5722.24 0.00
Mh-Down2 JUNCTION 5706.00 5712.00 0.00
OUT-MC OUTFALL 5704.00 5707.00 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
L-DOWN1-2 MH-Down1 Mh-Down2 CONDUIT 651.0 0.3210 0.0150
L-DOWN2-MITCHELLMh-Down2 OUT-MC CONDUIT 386.0 0.5181 0.0150
L-DP2A-S1 DP-2A DP-S1 CONDUIT 400.0 3.7425 0.0150
L-DP2B-S2 DP-2B DP-S2 CONDUIT 86.0 3.4186 0.0150
L-DP3-S2 DP-3 DP-S2 CHANNEL 329.3 2.8937 0.0200
L-N1A-2A DP-N1A DP-2A CHANNEL 308.9 6.2152 0.0320
L-N1B-2B DP-N1B DP-2B CHANNEL 536.6 5.3470 0.0320
L-N1C-DP3 DP-N1C DP-3 CHANNEL 559.7 5.0029 0.0320
L-S1-DOWN1 DP-S1 MH-Down1 CONDUIT 320.0 0.5437 0.0150
L-S2-S1 DP-S2 DP-S1 CONDUIT 264.1 0.2424 0.0150
*********************
Cross Section Summary
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
*********************
Link Shape Depth/ Width No. of Cross Full Flow Design
ID Diameter Barrels Sectional Hydraulic Flow
Area Radius Capacity
ft ft ft² ft cfs
----------------------------------------------------------------------------------------------------------
L-DOWN1-2 CIRCULAR 3.00 3.00 1 7.07 0.75 32.75
L-DOWN2-MITCHELL CIRCULAR 3.00 3.00 1 7.07 0.75 41.61
L-DP2A-S1 CIRCULAR 1.50 1.50 1 1.77 0.38 17.61
L-DP2B-S2 CIRCULAR 2.00 2.00 1 3.14 0.50 36.25
L-DP3-S2 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 192.48
L-N1A-2A TRAPEZOIDAL 1.00 3.00 1 2.00 0.52 15.02
L-N1B-2B TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 163.53
L-N1C-DP3 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 158.18
L-S1-DOWN1 CIRCULAR 3.00 3.00 1 7.07 0.75 42.63
L-S2-S1 CIRCULAR 3.00 3.00 1 7.07 0.75 28.46
****************
Transect Summary
****************
Transect XS-ST-C-G
Area:
0.0002 0.0007 0.0015 0.0027 0.0042
0.0060 0.0082 0.0107 0.0135 0.0167
0.0207 0.0260 0.0326 0.0406 0.0499
0.0605 0.0724 0.0856 0.1001 0.1160
0.1332 0.1517 0.1715 0.1927 0.2151
0.2389 0.2640 0.2905 0.3182 0.3473
0.3770 0.4067 0.4364 0.4662 0.4959
0.5257 0.5554 0.5852 0.6149 0.6447
0.6745 0.7048 0.7371 0.7707 0.8057
0.8419 0.8795 0.9183 0.9585 1.0000
Hrad:
0.0202 0.0403 0.0605 0.0807 0.1008
0.1210 0.1412 0.1614 0.1815 0.2017
0.1816 0.1793 0.1853 0.1958 0.2091
0.2243 0.2407 0.2580 0.2759 0.2944
0.3133 0.3324 0.3519 0.3715 0.3914
0.4113 0.4314 0.4516 0.4719 0.4923
0.5339 0.5755 0.6171 0.6585 0.6999
0.7413 0.7825 0.8237 0.8649 0.9060
0.9470 0.9324 0.9373 0.9435 0.9507
0.9589 0.9681 0.9780 0.9887 1.0000
Width:
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
0.0079 0.0158 0.0238 0.0317 0.0396
0.0475 0.0554 0.0633 0.0713 0.0792
0.1105 0.1418 0.1730 0.2043 0.2356
0.2669 0.2982 0.3295 0.3608 0.3921
0.4234 0.4547 0.4860 0.5173 0.5486
0.5799 0.6112 0.6425 0.6737 0.7050
0.7052 0.7053 0.7054 0.7055 0.7057
0.7058 0.7059 0.7060 0.7062 0.7063
0.7064 0.7506 0.7818 0.8130 0.8442
0.8753 0.9065 0.9377 0.9688 1.0000
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 2.843 0.840
Continuity Error (%) ..... 0.485
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 1.886 0.615
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.016 0.005
Continuity Error (%) ..... -0.001
**************************************
Runoff Coefficient Computations Report
**************************************
------------------
Subbasin EX-02A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_2%IMPERV 3.04 C 0.33
Composite Area & Weighted Runoff Coeff. 3.04 0.33
------------------
Subbasin EX-02B
------------------
Area Soil Runoff
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_2%IMPERV 4.89 C 0.33
Composite Area & Weighted Runoff Coeff. 4.89 0.33
-----------------
Subbasin EX-03
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_2%IMPERV 4.49 C 0.33
Composite Area & Weighted Runoff Coeff. 4.49 0.33
------------------
Subbasin OS-N1A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_30%IMPERV 5.37 C 0.49
Composite Area & Weighted Runoff Coeff. 5.37 0.49
------------------
Subbasin OS-N1B
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_30%IMPERV 5.53 C 0.49
Composite Area & Weighted Runoff Coeff. 5.53 0.49
------------------
Subbasin OS-N1C
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_30%IMPERV 4.65 C 0.49
Composite Area & Weighted Runoff Coeff. 4.65 0.49
-----------------
Subbasin OS-S1
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------------------------------------------------------------------------
MHFD 25YR 85%IMP 3.43 C 0.79
Composite Area & Weighted Runoff Coeff. 3.43 0.79
------------------
Subbasin OS-S21
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 1.92 B 0.88
Composite Area & Weighted Runoff Coeff. 1.92 0.88
------------------
Subbasin OS-S22
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 3.39 B 0.88
Composite Area & Weighted Runoff Coeff. 3.39 0.88
------------------
Subbasin OS-S23
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 3.91 B 0.88
Composite Area & Weighted Runoff Coeff. 3.91 0.88
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's Roughness
------------------
Subbasin EX-02A
------------------
Sheet Flow Computations
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 2.12 0.00 0.00
================================================================================================
Total TOC (minutes): 34.55
================================================================================================
------------------
Subbasin EX-02B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 3.18 0.00 0.00
================================================================================================
Total TOC (minutes): 35.61
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
================================================================================================
-----------------
Subbasin EX-03
-----------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.10 0.00 0.00
Computed Flow Time (minutes): 32.43 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 300.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grass pasture Unpaved Unpaved
Velocity (ft/sec): 1.57 0.00 0.00
Computed Flow Time (minutes): 3.18 0.00 0.00
================================================================================================
Total TOC (minutes): 35.61
================================================================================================
------------------
Subbasin OS-N1A
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1C
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
-----------------
Subbasin OS-S1
-----------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S21
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S22
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S23
------------------
User-Defined TOC override (minutes): 10.00
***********************
Subbasin Runoff Summary
***********************
---------------------------------------------------------------------------------------
Subbasin Accumulated Rainfall Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
---------------------------------------------------------------------------------------
EX-02A 0.96 1.67 0.32 1.68 0.330 0 00:34:33
EX-02B 0.97 1.63 0.32 2.63 0.330 0 00:35:36
EX-03 0.97 1.63 0.32 2.41 0.330 0 00:35:36
OS-N1A 0.91 2.03 0.45 5.35 0.490 0 00:26:50
OS-N1B 0.91 2.03 0.45 5.52 0.490 0 00:26:50
OS-N1C 0.91 2.03 0.45 4.64 0.490 0 00:26:50
OS-S1 0.63 3.78 0.50 10.25 0.790 0 00:10:00
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
OS-S21 0.63 3.78 0.55 6.39 0.880 0 00:10:00
OS-S22 0.63 3.78 0.55 11.27 0.880 0 00:10:00
OS-S23 0.63 3.78 0.55 13.01 0.880 0 00:10:00
---------------------------------------------------------------------------------------
******************
Node Depth Summary
******************
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
DP-2A 0.28 0.64 5725.44 0 00:28 0 0 0:00:00
DP-2B 0.32 0.69 5715.10 0 00:30 0 0 0:00:00
DP-3 0.07 0.16 5720.16 0 00:31 0 0 0:00:00
DP-N1A 0.22 0.59 5748.59 0 00:27 0 0 0:00:00
DP-N1B 0.06 0.16 5748.16 0 00:28 0 0 0:00:00
DP-N1C 0.06 0.15 5748.15 0 00:28 0 0 0:00:00
DP-S1 0.96 2.08 5711.91 0 00:16 0 0 0:00:00
DP-S2 0.96 1.79 5712.26 0 00:19 0 0 0:00:00
MH-Down1 1.20 2.80 5710.89 0 00:16 0 0 0:00:00
Mh-Down2 1.03 2.28 5708.28 0 00:17 0 0 0:00:00
OUT-MC 0.96 2.02 5706.02 0 00:17 0 0 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
DP-2A JUNCTION 1.68 6.61 0 00:27 0.00
DP-2B JUNCTION 2.63 7.43 0 00:30 0.00
DP-3 JUNCTION 2.41 6.43 0 00:29 0.00
DP-N1A JUNCTION 5.35 5.35 0 00:26 0.00
DP-N1B JUNCTION 5.51 5.51 0 00:26 0.00
DP-N1C JUNCTION 4.64 4.64 0 00:26 0.00
DP-S1 JUNCTION 21.50 29.53 0 00:14 0.00
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
DP-S2 JUNCTION 13.00 16.12 0 00:10 0.00
MH-Down1 JUNCTION 6.38 33.67 0 00:14 0.00
Mh-Down2 JUNCTION 0.00 33.31 0 00:16 0.00
OUT-MC OUTFALL 0.00 33.13 0 00:17 0.00
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
OUT-MC 98.61 11.57 33.13
-----------------------------------------------
System 98.61 11.57 33.13
*****************
Link Flow Summary
*****************
--------------------------------------------------------------------------------------------------------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition
Occurrence Attained Analysis Capacity /Design Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
--------------------------------------------------------------------------------------------------------------------------------
L-DOWN1-2 CONDUIT 0 00:16 5.31 1.00 33.31 32.75 1.02 0.85 0 > CAPACITY
L-DOWN2-MITCHELL CONDUIT 0 00:17 6.10 1.00 33.13 41.61 0.80 0.72 0 Calculated
L-DP2A-S1 CONDUIT 0 00:28 4.91 1.00 6.60 17.61 0.37 0.71 0 Calculated
L-DP2B-S2 CONDUIT 0 00:30 8.19 1.00 7.43 36.25 0.20 0.33 0 Calculated
L-DP3-S2 CHANNEL 0 00:31 0.69 1.00 6.37 192.48 0.03 0.58 0 Calculated
L-N1A-2A CHANNEL 0 00:27 5.69 1.00 5.27 15.02 0.35 0.58 0 Calculated
L-N1B-2B CHANNEL 0 00:28 2.87 1.00 5.25 163.53 0.03 0.16 0 Calculated
L-N1C-DP3 CHANNEL 0 00:28 2.59 1.00 4.51 158.18 0.03 0.15 0 Calculated
L-S1-DOWN1 CONDUIT 0 00:16 4.91 1.00 29.26 42.63 0.69 0.81 0 Calculated
L-S2-S1 CONDUIT 0 00:22 3.67 1.00 14.88 28.46 0.52 0.64 0 Calculated
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2A.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2B.
Analysis began on: Tue Feb 21 18:27:40 2023
Analysis ended on: Tue Feb 21 18:27:40 2023
Total elapsed time: < 1 sec
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 EXISTING 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Autodesk® Storm and Sanitary Analysis 2016 - Version 13.4.254 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 30017-SITE-DE DRG-RATIONAL-05YR.SPF
Description ............... 30017 DEVELOPED 5YR DRAINAGE
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. Rational
Time of Concentration...... SCS TR-55
Return Period.............. 5 years
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. JAN-01-2021 00:00:00
Ending Date ............... JAN-01-2021 02:00:00
Report Time Step .......... 00:00:10
*************
Element Count
*************
Number of subbasins ....... 10
Number of nodes ........... 11
Number of links ........... 10
****************
Subbasin Summary
****************
Subbasin Total
Area
ID acres
------------------------------
DE-02A 2.56
DE-02B 5.26
DE-03 4.61
OS-N1A 5.37
OS-N1B 5.53
OS-N1C 4.65
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
OS-S1 3.43
OS-S21 1.92
OS-S22 3.39
OS-S23 3.91
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
DP-2A JUNCTION 5724.80 5730.30 0.00
DP-2B JUNCTION 5714.41 5720.81 0.00
DP-3 JUNCTION 5720.00 5721.00 0.00
DP-N1A JUNCTION 5748.00 5749.50 0.00
DP-N1B JUNCTION 5748.00 5749.50 0.00
DP-N1C JUNCTION 5748.00 5749.00 0.00
DP-S1 JUNCTION 5709.83 5715.63 0.00
DP-S2 JUNCTION 5710.47 5715.07 0.00
MH-Down1 JUNCTION 5708.09 5722.24 0.00
Mh-Down2 JUNCTION 5706.00 5712.00 0.00
OUT-MC OUTFALL 5704.00 5707.00 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
L-2B-S2 DP-2B DP-S2 CONDUIT 86.0 3.4186 0.0150
L-DOWN1-2 MH-Down1 Mh-Down2 CONDUIT 651.0 0.3210 0.0150
L-DOWN2-MITCHELLMh-Down2 OUT-MC CONDUIT 386.0 0.5181 0.0150
L-DP2A-S1 DP-2A DP-S1 CONDUIT 400.0 3.7425 0.0150
L-DP3-S2 DP-3 DP-S2 CHANNEL 329.3 2.8937 0.0200
L-N1A-2A DP-N1A DP-2A CONDUIT 308.9 6.2152 0.0120
L-N1B-2B DP-N1B DP-2B CONDUIT 536.6 5.3470 0.0120
L-N1C-3 DP-N1C DP-3 CHANNEL 559.7 5.0029 0.0320
L-S1-DOWN1 DP-S1 MH-Down1 CONDUIT 320.0 0.5437 0.0150
L-S2-S1 DP-S2 DP-S1 CONDUIT 264.1 0.2424 0.0150
*********************
Cross Section Summary
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
*********************
Link Shape Depth/ Width No. of Cross Full Flow Design
ID Diameter Barrels Sectional Hydraulic Flow
Area Radius Capacity
ft ft ft² ft cfs
----------------------------------------------------------------------------------------------------------
L-2B-S2 CIRCULAR 2.00 2.00 1 3.14 0.50 36.25
L-DOWN1-2 CIRCULAR 3.00 3.00 1 7.07 0.75 32.75
L-DOWN2-MITCHELL CIRCULAR 3.00 3.00 1 7.07 0.75 41.61
L-DP2A-S1 CIRCULAR 1.50 1.50 1 1.77 0.38 17.61
L-DP3-S2 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 192.48
L-N1A-2A CIRCULAR 1.50 1.50 1 1.77 0.38 28.37
L-N1B-2B CIRCULAR 1.50 1.50 1 1.77 0.38 26.31
L-N1C-3 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 158.18
L-S1-DOWN1 CIRCULAR 3.00 3.00 1 7.07 0.75 42.63
L-S2-S1 CIRCULAR 3.00 3.00 1 7.07 0.75 28.46
****************
Transect Summary
****************
Transect XS-ST-C-G
Area:
0.0002 0.0007 0.0015 0.0027 0.0042
0.0060 0.0082 0.0107 0.0135 0.0167
0.0207 0.0260 0.0326 0.0406 0.0499
0.0605 0.0724 0.0856 0.1001 0.1160
0.1332 0.1517 0.1715 0.1927 0.2151
0.2389 0.2640 0.2905 0.3182 0.3473
0.3770 0.4067 0.4364 0.4662 0.4959
0.5257 0.5554 0.5852 0.6149 0.6447
0.6745 0.7048 0.7371 0.7707 0.8057
0.8419 0.8795 0.9183 0.9585 1.0000
Hrad:
0.0202 0.0403 0.0605 0.0807 0.1008
0.1210 0.1412 0.1614 0.1815 0.2017
0.1816 0.1793 0.1853 0.1958 0.2091
0.2243 0.2407 0.2580 0.2759 0.2944
0.3133 0.3324 0.3519 0.3715 0.3914
0.4113 0.4314 0.4516 0.4719 0.4923
0.5339 0.5755 0.6171 0.6585 0.6999
0.7413 0.7825 0.8237 0.8649 0.9060
0.9470 0.9324 0.9373 0.9435 0.9507
0.9589 0.9681 0.9780 0.9887 1.0000
Width:
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
0.0079 0.0158 0.0238 0.0317 0.0396
0.0475 0.0554 0.0633 0.0713 0.0792
0.1105 0.1418 0.1730 0.2043 0.2356
0.2669 0.2982 0.3295 0.3608 0.3921
0.4234 0.4547 0.4860 0.5173 0.5486
0.5799 0.6112 0.6425 0.6737 0.7050
0.7052 0.7053 0.7054 0.7055 0.7057
0.7058 0.7059 0.7060 0.7062 0.7063
0.7064 0.7506 0.7818 0.8130 0.8442
0.8753 0.9065 0.9377 0.9688 1.0000
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 1.574 0.465
Continuity Error (%) ..... 0.498
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 1.017 0.332
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.009 0.003
Continuity Error (%) ..... 0.000
**************************************
Runoff Coefficient Computations Report
**************************************
------------------
Subbasin DE-02A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_05YR_75%IMPERV 2.56 C 0.65
Composite Area & Weighted Runoff Coeff. 2.56 0.65
------------------
Subbasin DE-02B
------------------
Area Soil Runoff
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_05YR_65%IMPERV 5.26 C 0.56
Composite Area & Weighted Runoff Coeff. 5.26 0.56
-----------------
Subbasin DE-03
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_05YR_75%IMPERV 4.61 C 0.65
Composite Area & Weighted Runoff Coeff. 4.61 0.65
------------------
Subbasin OS-N1A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_5YR_30%IMPERV 5.37 C 0.28
Composite Area & Weighted Runoff Coeff. 5.37 0.28
------------------
Subbasin OS-N1B
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_05YR_30%IMPERV 5.53 C 0.28
Composite Area & Weighted Runoff Coeff. 5.53 0.28
------------------
Subbasin OS-N1C
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_05YR_30%IMPERV 4.65 C 0.28
Composite Area & Weighted Runoff Coeff. 4.65 0.28
-----------------
Subbasin OS-S1
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------------------------------------------------------------------------
MHFD 05YR 85%IMP 3.43 C 0.73
Composite Area & Weighted Runoff Coeff. 3.43 0.73
------------------
Subbasin OS-S21
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 05YR 100%IMP 1.92 B 0.85
Composite Area & Weighted Runoff Coeff. 1.92 0.85
------------------
Subbasin OS-S22
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 05YR 100%IMP 3.39 B 0.85
Composite Area & Weighted Runoff Coeff. 3.39 0.85
------------------
Subbasin OS-S23
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 05YR 100%IMP 3.91 B 0.85
Composite Area & Weighted Runoff Coeff. 3.91 0.85
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's Roughness
------------------
Subbasin DE-02A
------------------
User-Defined TOC override (minutes): 10.00
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
------------------
Subbasin DE-02B
------------------
User-Defined TOC override (minutes): 10.00
-----------------
Subbasin DE-03
-----------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-N1A
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1C
------------------
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
-----------------
Subbasin OS-S1
-----------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S21
------------------
User-Defined TOC override (minutes): 10.00
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
------------------
Subbasin OS-S22
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S23
------------------
User-Defined TOC override (minutes): 10.00
***********************
Subbasin Runoff Summary
***********************
---------------------------------------------------------------------------------------
Subbasin Accumulated Rainfall Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
---------------------------------------------------------------------------------------
DE-02A 0.39 2.35 0.25 3.91 0.650 0 00:10:00
DE-02B 0.39 2.35 0.22 6.92 0.560 0 00:10:00
DE-03 0.39 2.35 0.25 7.04 0.650 0 00:10:00
OS-N1A 0.58 1.30 0.16 1.96 0.280 0 00:26:50
OS-N1B 0.58 1.30 0.16 2.02 0.280 0 00:26:50
OS-N1C 0.58 1.30 0.16 1.70 0.280 0 00:26:50
OS-S1 0.39 2.35 0.29 5.89 0.730 0 00:10:00
OS-S21 0.39 2.35 0.33 3.84 0.850 0 00:10:00
OS-S22 0.39 2.35 0.33 6.77 0.850 0 00:10:00
OS-S23 0.39 2.35 0.33 7.81 0.850 0 00:10:00
---------------------------------------------------------------------------------------
******************
Node Depth Summary
******************
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
DP-2A 0.18 0.52 5725.32 0 00:10 0 0 0:00:00
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
DP-2B 0.19 0.70 5715.11 0 00:10 0 0 0:00:00
DP-3 0.05 0.17 5720.17 0 00:12 0 0 0:00:00
DP-N1A 0.11 0.27 5748.27 0 00:27 0 0 0:00:00
DP-N1B 0.11 0.28 5748.28 0 00:27 0 0 0:00:00
DP-N1C 0.03 0.08 5748.08 0 00:28 0 0 0:00:00
DP-S1 0.61 1.92 5711.75 0 00:15 0 0 0:00:00
DP-S2 0.62 1.81 5712.28 0 00:16 0 0 0:00:00
MH-Down1 0.77 2.49 5710.58 0 00:15 0 0 0:00:00
Mh-Down2 0.66 2.08 5708.08 0 00:17 0 0 0:00:00
OUT-MC 0.63 1.87 5705.87 0 00:17 0 0 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
DP-2A JUNCTION 3.91 4.60 0 00:10 0.00
DP-2B JUNCTION 6.91 7.59 0 00:10 0.00
DP-3 JUNCTION 7.04 7.46 0 00:10 0.00
DP-N1A JUNCTION 1.96 1.96 0 00:26 0.00
DP-N1B JUNCTION 2.02 2.02 0 00:26 0.00
DP-N1C JUNCTION 1.70 1.70 0 00:26 0.00
DP-S1 JUNCTION 12.65 27.54 0 00:14 0.00
DP-S2 JUNCTION 7.81 21.55 0 00:10 0.00
MH-Down1 JUNCTION 3.83 30.07 0 00:14 0.00
Mh-Down2 JUNCTION 0.00 29.78 0 00:16 0.00
OUT-MC OUTFALL 0.00 29.56 0 00:17 0.00
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
OUT-MC 98.40 6.25 29.56
-----------------------------------------------
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
System 98.40 6.25 29.56
*****************
Link Flow Summary
*****************
--------------------------------------------------------------------------------------------------------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition
Occurrence Attained Analysis Capacity /Design Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
--------------------------------------------------------------------------------------------------------------------------------
L-2B-S2 CONDUIT 0 00:10 8.37 1.00 7.55 36.25 0.21 0.34 0 Calculated
L-DOWN1-2 CONDUIT 0 00:16 5.23 1.00 29.78 32.75 0.91 0.76 0 Calculated
L-DOWN2-MITCHELL CONDUIT 0 00:17 5.99 1.00 29.56 41.61 0.71 0.66 0 Calculated
L-DP2A-S1 CONDUIT 0 00:10 3.59 1.00 4.54 17.61 0.26 0.67 0 Calculated
L-DP3-S2 CHANNEL 0 00:12 0.73 1.00 6.78 192.48 0.04 0.58 0 Calculated
L-N1A-2A CONDUIT 0 00:27 9.00 1.00 1.94 28.37 0.07 0.18 0 Calculated
L-N1B-2B CONDUIT 0 00:27 8.69 1.00 1.98 26.31 0.08 0.19 0 Calculated
L-N1C-3 CHANNEL 0 00:28 1.89 1.00 1.62 158.18 0.01 0.11 0 Calculated
L-S1-DOWN1 CONDUIT 0 00:15 4.99 1.00 27.36 42.63 0.64 0.73 0 Calculated
L-S2-S1 CONDUIT 0 00:17 3.63 1.00 15.56 28.46 0.55 0.62 0 Calculated
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2A.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2B.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-N1A.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-N1B.
Analysis began on: Tue Feb 21 18:37:48 2023
Analysis ended on: Tue Feb 21 18:37:48 2023
Total elapsed time: < 1 sec
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DEVELOPED 5YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Autodesk® Storm and Sanitary Analysis 2016 - Version 13.4.254 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 30017-SITE-DE DRG-RATIONAL-25YR-DET.SPF
Description ............... 30017 DETENTION 25YR DRAINAGE
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. Rational
Time of Concentration...... SCS TR-55
Return Period.............. 25 years
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. JAN-01-2021 00:00:00
Ending Date ............... JAN-01-2021 02:00:00
Report Time Step .......... 00:00:10
*************
Element Count
*************
Number of subbasins ....... 10
Number of nodes ........... 13
Number of links ........... 14
****************
Subbasin Summary
****************
Subbasin Total
Area
ID acres
------------------------------
DE-02A 2.56
DE-02B 5.26
DE-03 4.61
OS-N1A 5.37
OS-N1B 5.53
OS-N1C 4.65
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
OS-S1 3.43
OS-S21 1.92
OS-S22 3.39
OS-S23 3.91
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
DP-2A JUNCTION 5724.80 5730.30 0.00
DP-2B JUNCTION 5714.41 5720.81 0.00
DP-3 JUNCTION 5720.00 5721.00 0.00
DP-N1A JUNCTION 5748.00 5749.50 0.00
DP-N1B JUNCTION 5748.00 5749.50 0.00
DP-N1C JUNCTION 5748.00 5749.00 0.00
DP-S1 JUNCTION 5709.83 5715.63 0.00
DP-S2 JUNCTION 5710.47 5715.07 0.00
MH-Down1 JUNCTION 5708.09 5722.24 0.00
Mh-Down2 JUNCTION 5706.00 5712.00 0.00
OUT-MC OUTFALL 5704.00 5707.00 0.00
DET-02A STORAGE 5724.80 5729.00 0.00
DET-02B STORAGE 5715.40 5721.00 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
L-DET-02A DET-02A DP-2A CONDUIT 32.5 12.9072 0.0120
L-DET-02B DET-02B DP-2B CONDUIT 27.5 23.9811 0.0150
L-DOWN1-2 MH-Down1 Mh-Down2 CONDUIT 651.0 0.3210 0.0150
L-DOWN2-MITCHELLMh-Down2 OUT-MC CONDUIT 386.0 0.5181 0.0150
L-DP2A-S1 DP-2A DP-S1 CONDUIT 400.0 3.7425 0.0150
L-DP2B-S2 DP-2B DP-S2 CONDUIT 86.0 3.4186 0.0150
L-DP3-S2 DP-3 DP-S2 CHANNEL 329.3 2.8937 0.0200
L-N1A-2A DP-N1A DP-2A CONDUIT 308.9 6.2152 0.0120
L-N1B-2B DP-N1B DP-2B CONDUIT 536.6 5.3470 0.0120
L-N1C-3 DP-N1C DP-3 CHANNEL 559.7 5.0029 0.0320
L-S1-DOWN1 DP-S1 MH-Down1 CONDUIT 320.0 0.5437 0.0150
L-S2-S1 DP-S2 DP-S1 CONDUIT 264.1 0.2424 0.0150
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
ORIF-02A DET-02A DP-2A ORIFICE
ORIF-02B DET-02B DP-2B ORIFICE
*********************
Cross Section Summary
*********************
Link Shape Depth/ Width No. of Cross Full Flow Design
ID Diameter Barrels Sectional Hydraulic Flow
Area Radius Capacity
ft ft ft² ft cfs
----------------------------------------------------------------------------------------------------------
L-DET-02A CIRCULAR 1.00 1.00 1 0.79 0.25 13.87
L-DET-02B CIRCULAR 1.00 1.00 1 0.79 0.25 15.12
L-DOWN1-2 CIRCULAR 3.00 3.00 1 7.07 0.75 32.75
L-DOWN2-MITCHELL CIRCULAR 3.00 3.00 1 7.07 0.75 41.61
L-DP2A-S1 CIRCULAR 1.50 1.50 1 1.77 0.38 17.61
L-DP2B-S2 CIRCULAR 2.00 2.00 1 3.14 0.50 36.25
L-DP3-S2 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 192.48
L-N1A-2A CIRCULAR 1.50 1.50 1 1.77 0.38 28.37
L-N1B-2B CIRCULAR 1.50 1.50 1 1.77 0.38 26.31
L-N1C-3 TRAPEZOIDAL 1.00 30.00 1 20.00 0.66 158.18
L-S1-DOWN1 CIRCULAR 3.00 3.00 1 7.07 0.75 42.63
L-S2-S1 CIRCULAR 3.00 3.00 1 7.07 0.75 28.46
****************
Transect Summary
****************
Transect XS-ST-C-G
Area:
0.0002 0.0007 0.0015 0.0027 0.0042
0.0060 0.0082 0.0107 0.0135 0.0167
0.0207 0.0260 0.0326 0.0406 0.0499
0.0605 0.0724 0.0856 0.1001 0.1160
0.1332 0.1517 0.1715 0.1927 0.2151
0.2389 0.2640 0.2905 0.3182 0.3473
0.3770 0.4067 0.4364 0.4662 0.4959
0.5257 0.5554 0.5852 0.6149 0.6447
0.6745 0.7048 0.7371 0.7707 0.8057
0.8419 0.8795 0.9183 0.9585 1.0000
Hrad:
0.0202 0.0403 0.0605 0.0807 0.1008
0.1210 0.1412 0.1614 0.1815 0.2017
0.1816 0.1793 0.1853 0.1958 0.2091
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
0.2243 0.2407 0.2580 0.2759 0.2944
0.3133 0.3324 0.3519 0.3715 0.3914
0.4113 0.4314 0.4516 0.4719 0.4923
0.5339 0.5755 0.6171 0.6585 0.6999
0.7413 0.7825 0.8237 0.8649 0.9060
0.9470 0.9324 0.9373 0.9435 0.9507
0.9589 0.9681 0.9780 0.9887 1.0000
Width:
0.0079 0.0158 0.0238 0.0317 0.0396
0.0475 0.0554 0.0633 0.0713 0.0792
0.1105 0.1418 0.1730 0.2043 0.2356
0.2669 0.2982 0.3295 0.3608 0.3921
0.4234 0.4547 0.4860 0.5173 0.5486
0.5799 0.6112 0.6425 0.6737 0.7050
0.7052 0.7053 0.7054 0.7055 0.7057
0.7058 0.7059 0.7060 0.7062 0.7063
0.7064 0.7506 0.7818 0.8130 0.8442
0.8753 0.9065 0.9377 0.9688 1.0000
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 2.496 0.737
Continuity Error (%) ..... 0.399
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 1.934 0.630
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.011 0.003
Continuity Error (%) ..... -0.002
**************************************
Runoff Coefficient Computations Report
**************************************
------------------
Subbasin DE-02A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------------------------------------------------------------------------
MHFD_25YR_75%IMPERV 2.56 C 0.74
Composite Area & Weighted Runoff Coeff. 2.56 0.74
------------------
Subbasin DE-02B
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_65%IMPERV 5.26 C 0.68
Composite Area & Weighted Runoff Coeff. 5.26 0.68
-----------------
Subbasin DE-03
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_2%IMPERV 4.61 C 0.33
Composite Area & Weighted Runoff Coeff. 4.61 0.33
------------------
Subbasin OS-N1A
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_30%IMPERV 5.37 C 0.49
Composite Area & Weighted Runoff Coeff. 5.37 0.49
------------------
Subbasin OS-N1B
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD_25YR_30%IMPERV 5.53 C 0.49
Composite Area & Weighted Runoff Coeff. 5.53 0.49
------------------
Subbasin OS-N1C
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
MHFD_25YR_30%IMPERV 4.65 C 0.49
Composite Area & Weighted Runoff Coeff. 4.65 0.49
-----------------
Subbasin OS-S1
-----------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 85%IMP 3.43 C 0.79
Composite Area & Weighted Runoff Coeff. 3.43 0.79
------------------
Subbasin OS-S21
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 1.92 B 0.88
Composite Area & Weighted Runoff Coeff. 1.92 0.88
------------------
Subbasin OS-S22
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 3.39 B 0.88
Composite Area & Weighted Runoff Coeff. 3.39 0.88
------------------
Subbasin OS-S23
------------------
Area Soil Runoff
Soil/Surface Description (acres) Group Coeff.
-----------------------------------------------------------------------------------------
MHFD 25YR 100%IMP 3.91 B 0.88
Composite Area & Weighted Runoff Coeff. 3.91 0.88
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Sf = Slope (ft/ft)
n = Manning's Roughness
------------------
Subbasin DE-02A
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin DE-02B
------------------
User-Defined TOC override (minutes): 10.00
-----------------
Subbasin DE-03
-----------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-N1A
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1B
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
------------------
Subbasin OS-N1C
------------------
Sheet Flow Computations
-----------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.30 0.00 0.00
Flow Length (ft): 200.00 0.00 0.00
Slope (%): 11.00 0.00 0.00
2 yr, 24 hr Rainfall (in): 1.29 0.00 0.00
Velocity (ft/sec): 0.14 0.00 0.00
Computed Flow Time (minutes): 23.65 0.00 0.00
Shallow Concentrated Flow Computations
--------------------------------------
Subarea A Subarea B Subarea C
Flow Length (ft): 220.00 0.00 0.00
Slope (%): 5.00 0.00 0.00
Surface Type: Grassed waterway Unpaved Unpaved
Velocity (ft/sec): 3.35 0.00 0.00
Computed Flow Time (minutes): 1.09 0.00 0.00
Channel Flow Computations
-------------------------
Subarea A Subarea B Subarea C
Manning's Roughness: 0.03 0.00 0.00
Flow Length (ft): 300.00 0.00 0.00
Channel Slope (%): 5.00 0.00 0.00
Cross Section Area (ft²): 1.00 0.00 0.00
Wetted Perimeter (ft): 10.00 0.00 0.00
Velocity (ft/sec): 2.39 0.00 0.00
Computed Flow Time (minutes): 2.09 0.00 0.00
================================================================================================
Total TOC (minutes): 26.84
================================================================================================
-----------------
Subbasin OS-S1
-----------------
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S21
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S22
------------------
User-Defined TOC override (minutes): 10.00
------------------
Subbasin OS-S23
------------------
User-Defined TOC override (minutes): 10.00
***********************
Subbasin Runoff Summary
***********************
---------------------------------------------------------------------------------------
Subbasin Accumulated Rainfall Total Peak Weighted Time of
ID Precip Intensity Runoff Runoff Runoff Concentration
in in/hr in cfs Coeff days hh:mm:ss
---------------------------------------------------------------------------------------
DE-02A 0.63 3.78 0.47 7.16 0.740 0 00:10:00
DE-02B 0.63 3.78 0.43 13.51 0.680 0 00:10:00
DE-03 0.63 3.78 0.21 5.75 0.330 0 00:10:00
OS-N1A 0.91 2.03 0.45 5.35 0.490 0 00:26:50
OS-N1B 0.91 2.03 0.45 5.52 0.490 0 00:26:50
OS-N1C 0.91 2.03 0.45 4.64 0.490 0 00:26:50
OS-S1 0.63 3.78 0.50 10.25 0.790 0 00:10:00
OS-S21 0.63 3.78 0.55 6.39 0.880 0 00:10:00
OS-S22 0.63 3.78 0.55 11.27 0.880 0 00:10:00
OS-S23 0.63 3.78 0.55 13.01 0.880 0 00:10:00
---------------------------------------------------------------------------------------
******************
Node Depth Summary
******************
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
DP-2A 0.28 0.74 5725.54 0 00:23 0 0 0:00:00
DP-2B 0.34 2.27 5716.68 0 00:16 0 0 0:00:00
DP-3 0.06 0.16 5720.16 0 00:13 0 0 0:00:00
DP-N1A 0.18 0.46 5748.46 0 00:27 0 0 0:00:00
DP-N1B 0.19 0.47 5748.47 0 00:27 0 0 0:00:00
DP-N1C 0.06 0.15 5748.15 0 00:28 0 0 0:00:00
DP-S1 1.14 6.67 5716.50 0 00:17 0.00 0 0:00:00
DP-S2 1.12 5.53 5716.00 0 00:16 0.10 3 0:00:00
MH-Down1 1.30 7.36 5715.45 0 00:17 0 0 0:00:00
Mh-Down2 1.04 6.00 5712.00 0 00:17 0.00 0 0:00:00
OUT-MC 0.94 3.00 5707.00 0 00:17 0 0 0:00:00
DET-02A 0.72 3.49 5728.29 0 00:16 0 0 0:00:00
DET-02B 1.05 5.42 5720.82 0 00:18 0 0 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
DP-2A JUNCTION 0.00 8.64 0 00:23 0.00
DP-2B JUNCTION 0.00 12.09 0 00:26 0.00
DP-3 JUNCTION 5.75 7.13 0 00:10 0.00
DP-N1A JUNCTION 5.35 5.35 0 00:27 0.00
DP-N1B JUNCTION 5.51 5.51 0 00:27 0.00
DP-N1C JUNCTION 4.64 4.64 0 00:27 0.00
DP-S1 JUNCTION 21.50 42.18 0 00:17 0.04 0 00:17
DP-S2 JUNCTION 13.00 27.68 0 00:10 9.95 0 00:16
MH-Down1 JUNCTION 6.38 45.82 0 00:17 0.00
Mh-Down2 JUNCTION 0.00 45.82 0 00:17 3.30 0 00:17
OUT-MC OUTFALL 0.00 43.75 0 00:17 0.00
DET-02A STORAGE 7.16 7.16 0 00:10 0.00
DET-02B STORAGE 13.51 13.51 0 00:10 0.00
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
********************
Storage Node Summary
********************
-------------------------------------------------------------------------------------------------------------------------------------
Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow Rate Rate Volume
1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs cfm hh:mm:ss 1000 ft³
-------------------------------------------------------------------------------------------------------------------------------------
DET-02A 0.922 30 0 00:16 0.091 3 4.50 0.00 0:00:00 0.000
DET-02B 2.592 75 0 00:18 0.303 9 7.23 0.00 0:00:00 0.000
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
OUT-MC 98.61 11.90 43.75
-----------------------------------------------
System 98.61 11.90 43.75
*****************
Link Flow Summary
*****************
--------------------------------------------------------------------------------------------------------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition
Occurrence Attained Analysis Capacity /Design Flow Surcharged
days hh:mm ft/sec cfs cfs Flow Depth minutes
--------------------------------------------------------------------------------------------------------------------------------
L-DET-02A CONDUIT 0 00:00 0.00 1.00 0.00 13.87 0.00 0.37 0 Calculated
L-DET-02B CONDUIT 0 00:00 0.00 1.00 0.00 15.12 0.00 0.50 0 Calculated
L-DOWN1-2 CONDUIT 0 00:17 6.52 1.00 45.82 32.75 1.40 1.00 4 SURCHARGED
L-DOWN2-MITCHELL CONDUIT 0 00:17 6.24 1.00 43.75 41.61 1.05 1.00 2 SURCHARGED
L-DP2A-S1 CONDUIT 0 00:23 6.10 1.00 8.64 17.61 0.49 0.75 0 Calculated
L-DP2B-S2 CONDUIT 0 00:20 8.62 1.00 12.71 36.25 0.35 1.00 2 SURCHARGED
L-DP3-S2 CHANNEL 0 00:13 0.72 1.00 6.65 192.48 0.03 0.58 0 Calculated
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
L-N1A-2A CONDUIT 0 00:27 11.98 1.00 5.31 28.37 0.19 0.30 0 Calculated
L-N1B-2B CONDUIT 0 00:27 11.55 1.00 5.45 26.31 0.21 0.31 0 Calculated
L-N1C-3 CHANNEL 0 00:28 2.80 1.00 4.48 158.18 0.03 0.14 0 Calculated
L-S1-DOWN1 CONDUIT 0 00:17 5.97 1.00 42.18 42.63 0.99 1.00 11 SURCHARGED
L-S2-S1 CONDUIT 0 00:26 4.16 1.00 27.06 28.46 0.95 1.00 8 SURCHARGED
ORIF-02A ORIFICE 0 00:15 4.50 1.00
ORIF-02B ORIFICE 0 00:16 7.23 1.00
********************************
Highest Flow Instability Indexes
********************************
Link ORIF-02A (50)
WARNING 118 : Orifice crest elevation defined for Orifice ORIF-02A is below upstream node invert elevation.
Assumed orifice crest elevation equal to upstream node invert elevation.
WARNING 118 : Orifice crest elevation defined for Orifice ORIF-02B is below upstream node invert elevation.
Assumed orifice crest elevation equal to upstream node invert elevation.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2A.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-2B.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-N1A.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node DP-N1B.
Analysis began on: Tue Feb 21 18:28:19 2023
Analysis ended on: Tue Feb 21 18:28:19 2023
Total elapsed time: < 1 sec
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
30017 DETENTION 25YR DRAINAGE
Autodesk Storm and Sanitary Analysis
Traffic Impact Study
Glenwood Business Center
Garfield County, Colorado
Prepared for:
Sopris Engineering, LLC
TRAFFIC IMPACT STUDY
Glenwood Business Center
Garfield County, Colorado
Prepared for
Sopris Engineering, LLC
502 Main Street
Suite A-3
Carbondale, Colorado 81623
Prepared by
Kimley-Horn and Associates, Inc.
4582 South Ulster Street
Suite 1500
Denver, Colorado 80237
(303) 228-2300
February 2023
This document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared. Reuse of
and improper reliance on this document without written authorization and adaptation by
Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
02/15/2023
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page i
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................... i
LIST OF TABLES .............................................................................................................ii
LIST OF FIGURES ...........................................................................................................ii
1.0 EXECUTIVE SUMMARY ........................................................................................... 1
2.0 INTRODUCTION ....................................................................................................... 3
3.0 EXISTING AND FUTURE CONDITIONS .................................................................. 5
3.1 Existing Study Area ...........................................................................................................5
3.2 Existing Roadway Network ................................................................................................5
3.3 Existing Traffic Volumes ..................................................................................................11
3.4 Unspecified Development Traffic Growth .........................................................................11
4.0 PROJECT TRAFFIC CHARACTERISTICS ............................................................. 16
4.1 Trip Generation................................................................................................................16
4.2 Trip Distribution ...............................................................................................................17
4.3 Traffic Assignment ...........................................................................................................17
4.4 Total (Background Plus Project) Traffic............................................................................17
5.0 TRAFFIC OPERATIONS ANALYSIS ...................................................................... 22
5.1 Analysis Methodology ......................................................................................................22
5.2 Key Intersection Operational Analysis .............................................................................23
5.3 CDOT Access Permit Need Analysis ...............................................................................27
5.4 Improvement Summary ...................................................................................................27
6.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................... 29
APPENDICES
Appendix A – Intersection Count Sheets
Appendix B – Future Traffic Projections
Appendix C – Trip Generation Worksheets
Appendix D – Intersection Analysis Worksheets
Appendix E – Conceptual Site Plan
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page ii
LIST OF TABLES
Table 1 – Glenwood Business Center Traffic Generation ..........................................................16
Table 2 – Level of Service Definitions .......................................................................................22
Table 3 – Donegan Road & Storm King Road LOS Results ......................................................23
Table 4 – Donegan Road & Mel Ray Road LOS Results ...........................................................24
Table 5 – Center Drive & Storm King Road LOS Results ..........................................................25
Table 6 – Highway 6 & Storm King Road LOS Results .............................................................26
Table 7 – Project Access Level of Service Results ....................................................................27
LIST OF FIGURES
Figure 1 – Vicinity Map ................................................................................................................4
Figure 2 – Existing Geometry and Control .................................................................................10
Figure 3 – Existing Traffic Volumes ...........................................................................................12
Figure 4 – 2023 Existing Traffic Volumes ..................................................................................13
Figure 5 – 2025 Background Traffic Volumes............................................................................14
Figure 6 – 2045 Background Traffic Volumes............................................................................15
Figure 7 – Project Trip Distribution ............................................................................................18
Figure 8 – Project Traffic Assignment .......................................................................................19
Figure 9 – 2025 Total Traffic Volumes ......................................................................................20
Figure 10 – 2045 Total Traffic Volumes.....................................................................................21
Figure 11 – Recommended Geometry and Control ...................................................................28
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 1
1.0 EXECUTIVE SUMMARY
Glenwood Business Center is proposed to be located on the southeast corner of the Donegan
Road and Storm King Road intersection in Garfield County, Colorado. Lot 1 is currently developed
with existing commercial/office uses within the southwest portion of Glenwood Business Center
whereas the remining Lots 2 and 3 are proposed to include an approximate 97,750 square foot
self-storage facility, three (3) residential units, 35,175 square feet of office space, and
approximately 67,950 square feet of warehouse uses, as evaluated in this traffic study. It is
expected that Glenwood Business Center will be completed in the next several years. Therefore,
analysis was conducted for the 2025 short-term buildout horizon as well as the 2045 long-term
twenty-year planning horizon.
The purpose of this traffic study is to identify project traffic generation characteristics to determine
potential project traffic related impacts on the local street system and to develop the necessary
mitigation measures required for the identified traffic impacts. The following intersections were
incorporated into this traffic study in accordance with Garfield County and CDOT standards and
requirements:
• Donegan Road and Storm King Road (Intersection #1)
• Donegan Road and Mel Ray Road (#2)
• Center Drive and Storm King Road (#3)
• Highway 6 and Storm King Road (#4)
In addition, the full movement access proposed to align with Chapparal Circle along Donegan
Road was evaluated.
Regional access to the project will be provided by Interstate 70 (I-70), State Highway 82 (SH-82),
and Highway 6 (US-6). Primary access will be provided by Donegan Road, Storm King Road and
Mel Ray Road. Direct access to the site will be provided by one full movement project access
along the east side of Storm King Road as well as one full movement access along the south side
of Donegan Road. The access along Storm King Road aligns with Center Drive while the access
along Donegan Road is proposed to align with Chapparal Circle.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 2
Glenwood Business Center is expected to generate approximately 664 weekday daily trips, with
75 of these trips occurring during the morning peak hour and 81 of these trips occurring during
the afternoon peak hour. The original development generated 2,236 trips per day whereas the
remaining Lots 2 and 3 generate 664 trips per day. Lot 1 currently generates 12 afternoon peak
hour trips and assuming a K-factor of 10, the daily trips are 120 per day. Therefore, the new
development program provided today generates 1,452 less trips than previously studied with the
1980 development program. This equates to approximately 65 percent less trips proposed to be
on the roadway network with this new proposal compared to the original development.
Based on the analysis presented in this report, Kimley-Horn believes Glenwood Business Center
will be successfully incorporated into the existing and future roadway network. Analysis of the
existing street network, the proposed project development, and expected traffic volumes resulted
in the following recommendations:
• With completion of the Glenwood Business Center project, an additional access to the
development area is proposed along Donegan Road to align with Chapparal Circle. It is
recommended that a R1 -1 “STOP” sign be installed on the northbound approach exiting the
development. A single northbound approach lane for shared movements is all that is needed
for this access.
• The Glenwood Business Center Traffic Impact Report prepared by David W Grounds in 1980
assumed 231,100 square feet of Business Park uses split between office and non-office
space. The original development generated 2,236 trips per day whereas the remaining Lots 2
and 3 generate 664 trips per day. Lot 1 currently generates 12 afternoon peak hour trips and
assuming a K-factor of 10, the daily trips are 120 per day. Therefore, the new development
program provided today generates 1,452 less trips than previously studied with the 1980
development program.
• Any onsite or offsite improvements should be incorporated into the Civil Drawings and conform
to standards of the Garfield County, CDOT, and the Manual on Uniform Traffic Control
Devices (MUTCD) – 2009 Edition.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 3
2.0 INTRODUCTION
Kimley-Horn and Associates, Inc. has prepared this report to document the results of a Traffic
Impact Study for Glenwood Business Center proposed to be located on the southeast corner of
the Donegan Road and Storm King Road intersection in Garfield County, Colorado. A vicinity map
illustrating the Glenwood Business Center location is shown in Figure 1. Lot 1 is currently
developed with existing commercial/office uses within the southwest portion of Glenwood
Business Center whereas the remining Lots 2 and 3 are proposed to include a n approximate
97,750 square foot self-storage facility, three (3) residential units, 35,175 square feet of office
space, and approximately 67,950 square feet of warehouse uses, as evaluated in this traffic study.
A conceptual site plan is attached in Appendix E. It is expected that Glenwood Business Center
will be completed in the next couple of years; therefore, analysis was conducted for the 2025
short-term buildout horizon as well as the 2045 long-term twenty-year planning horizon.
The purpose of this traffic study is to identify project traffic generation characteristics to determine
potential project traffic related impacts on the local street system and to develop the necessary
mitigation measures required for the identified traffic impacts. The following intersections were
incorporated into this traffic study in accordance with Garfield County and CDOT standards and
requirements:
• Donegan Road and Storm King Road (Intersection #1)
• Donegan Road and Mel Ray Road (#2)
• Center Drive and Storm King Road (#3)
• Highway 6 and Storm King Road (#4)
In addition, the full movement access proposed to align with Chapparal Circle along Donegan
Road was evaluated.
Regional access to the project will be provided by Interstate 70 (I-70), State Highway 82 (SH-82),
and Highway 6 (US-6). Primary access will be provided by Donegan Road, Storm King Road and
Mel Ray Road. Direct access to the site will be provided by one full movement project access
along the east side of Storm King Road as well as one full movement access along the south side
of Donegan Road. The access along Storm King Road aligns with Center Drive while the access
along Donegan Road is proposed to align with Chapparal Circle.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 5
3.0 EXISTING AND FUTURE CONDITIONS
3.1 Existing Study Area
The existing site is currently vacant land. To the east of the site are existing residences, a church,
and Glenwood Springs Middle School. To the west of the site are existing residences, auto
dealerships, and Two Rivers Community School. The area to the north of the project is primarily
residential. To the south of the project is the Glenwood Springs Mall.
3.2 Existing Roadway Network
Donegan Road is a two-lane roadway with one through lane in each direction, eastbound and
westbound within the project study area. The roadway has a posted speed limit of 25 miles per
hour in the vicinity of the site.
Storm King Road and Mel Ray Road are both two-lane roadways with one through lane in each
direction, northbound and southbound, within the project study area. These roadways have a
posted speed limit of 25 miles per hour in the vicinity of the site and in the study area.
Highway 6 is a two-lane roadway with one through lane in each direction, eastbound and
westbound, within the project limits. The roadway has a posted speed limit of 40 miles per hour
in the project study area.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 6
The existing T-intersection of Donegan Road and Storm King Road (#1) is unsignalized with stop
control on the northbound approach of Storm King Road. The three approaches of this
intersection all provide a single lane for shared movements. An aerial photo of the existing
intersection configuration is below (north is up - typical).
Donegan Road and Storm King Road (#1)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 7
The intersection of Donegan Road and Mel Ray Road (#2) is a four-leg, all-way stop controlled
intersection. This intersection currently has one lane for all movements on the
northbound/southbound approaches of Mel Ray Road and the eastbound/westbound approaches
of Donegan Road. An aerial photo of the existing intersection configuration is below.
Donegan Road and Mel Ray Road (#2)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 8
The intersection of Center Drive and Storm King Road (#3) is an unsignalized four-leg intersection
with stop control on the eastbound Center Drive and westbound project access approaches. This
intersection currently has a single lane for shared movements at all approaches. Of note, a bus
only lane is designated along southbound Storm King Road adjacent to Two Rivers Community
School. With construction of this project, the east leg will also provide shared access to buildout
of this development area. An aerial photo of the existing intersection configuration is below.
Center Drive and Storm King Road (#3)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 9
The intersection of Highway 6 and Storm King Road (#4) is an unsignalized three-leg intersection
with stop control on the southbound approach of Storm King Road. The westbound approach of
Highway 6 consists of a through lane and a right turn lane. The eastbound Highway 6 and
southbound Storm King Road approaches consist of a single lane for shared movements. An
aerial photo of the existing intersection configuration is below.
Highway 6 and Storm King Road (#4)
The intersection lane configuration and control for the study area intersections are shown in
Figure 2.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 11
3.3 Existing Traffic Volumes
Existing turning movement counts were conducted at the study intersections on Wednesday,
March 3, 2021 during the weekday morning and afternoon peak hours. The counts were
conducted during the morning and afternoon peak hours of adjacent street traffic in 15-minute
intervals from 7:00 AM to 9:00 AM and 2:00 PM to 6:00 PM on this count date. The afternoon
peak period includes the Two Rivers Community School and Glenwood Springs Middle School
dismissal times The existing intersection traffic volumes are shown in Figure 3.
These counts were collected during the COVID-19 pandemic. Counts at Highway 6 and Mel Ray
Avenue roundabout intersection were recently collected on Thursday, October 20, 2022 and
depict the new normal traffic conditions. These 2022 counts were compared to the previously
used 2021 counts for an appropriate COVID-19 adjustment. From the comparison, the 2021
volumes for the west leg of Highway 6 during the morning peak hour were actually higher than
the 2022 volumes while the 2021 afternoon peak hour volumes were 30 percent lower than the
2022 volumes. The 2021 volumes for the north leg of Mel Ray Road were 30 percent less in the
morning peak hour and were 10 percent less in the afternoon peak hour compared to the 2022
volumes. Therefore, to provide a conservative analysis, a 1.3 factor to increase traffic volumes by
30 percent wa s applied to all the study intersections to represent the new normal traffic conditions
without the impact of the COVID 19 pandemic. The volumes were grown by the CDOT 20-year
growth rate of 0.7 percent per year to estimate 2023 traffic volumes. These adjusted turning
movement counts are shown in Figure 4 with COVID-19 adjustments. The count sheets for the
study intersections and the COVID-19 comparison intersection are provided in Appendix A.
3.4 Unspecified Development Traffic Growth
According to information provided on the website for the Colorado Department of Transportation
(CDOT), the 20-year growth factor along Highway 6 in the vicinity of the site is 1.15. The 20-year
growth factor equates to annual growth rate of 0.7 percent. Traffic information from the CDOT
Online Transportation Information System (OTIS) website is included in Appendix B. This annual
growth rate was used to estimate near term 2025 and long term 2045 traffic volume projections
at the key intersections. Background traffic volumes for 2025 and 2045 are shown in Figures 4
and 5, respectively.
37(19)
16(20)
32(18)
19(28)
16
(
1
2
)
13
(
2
2
)
1
31(27)
17(27)
5(7)
28(20)
17(17)
1(1)
4(
3
)
24
(
1
4
)
1(
4
)
15
(
2
6
)
10
(
3
9
)
25
(
2
5
)
2
7(4)
1(1)
1(4)
55(48)
2(0)
14(14)
4(
0
)
35
(
2
8
)
22
(
1
6
)
11
(
5
)
18
(
1
8
)
11
3
(
4
2
)
3
105(120)
197(73)
167(127)
12(7)
10
5
(
1
2
8
)
6(
1
4
)
4
48(25)
21(26)
42(24)
25(37)
21
(
1
6
)
17
(
2
9
)
1
41(35)
22(35)
7(9)
37(26)
22(22)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
1
)
33
(
3
3
)
2
9(5)
1(1)
1(5)
72(63)
3(0)
18(18)
5(
0
)
46
(
3
7
)
29
(
2
1
)
14
(
7
)
24
(
2
4
)
14
8
(
5
5
)
3
137(157)
258(96)
219(166)
16(9)
13
7
(
1
6
8
)
8(
1
8
)
4
49(25)
21(26)
43(24)
25(38)
21
(
1
6
)
17
(
2
9
)
1
42(35)
22(35)
7(9)
38(26)
22(22)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
2
)
33
(
3
3
)
2
9(5)
1(1)
1(5)
73(64)
3(0)
18(18)
5(
0
)
47
(
3
8
)
29
(
2
1
)
14
(
7
)
24
(
2
4
)
15
0
(
5
6
)
3
139(159)
262(97)
222(168)
16(9)
13
9
(
1
7
0
)
8(
1
8
)
4
56(29)
24(30)
49(28)
29(43)
24
(
1
9
)
20
(
3
4
)
1
48(41)
26(41)
8(10)
43(30)
26(26)
1(1)
6(
5
)
36
(
2
1
)
1(
6
)
23
(
4
0
)
15
(
5
9
)
38
(
3
8
)
2
10(6)
1(1)
1(6)
84(73)
3(0)
21(21)
6(
0
)
54
(
4
3
)
34
(
2
4
)
16
(
8
)
28
(
2
8
)
17
3
(
6
4
)
3
160(183)
301(112)
255(194)
19(10)
16
0
(
1
9
6
)
9(
2
1
)
4
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 16
4.0 PROJECT TRAFFIC CHARACTERISTICS
4.1 Trip Generation
Site-generated traffic estimates are determined through a process known as trip generation.
Rates and equations are applied to the proposed land use to estimate traffic generated by the
development during a specific time interval. The acknowledged source for trip generation rates is
the Trip Generation Manual1 published by the Institute of Transportation Engineers (ITE). ITE has
established trip rates in nationwide studies of similar land uses. For this study, Kimley-Horn used
the ITE Trip Generation Report average rates that apply to Warehousing (ITE Land Use Code
150), Mini-Warehouse (ITE 151), Multifamily Low-Rise Housing (ITE 220), and General Office
Building (ITE 710) for traffic associated with the development.
Glenwood Business Center is expected to generate approximately 664 weekday daily trips, with
75 of these trips occurring during the morning peak hour and 81 of these trips occurring during
the afternoon peak hour. Calculations were based on the procedure and information provided in
the ITE Trip Generation Manual, 11th Edition – Volume 1: User’s Guide and Handbook, 2021.
Table 1 summarizes the estimated trip generation for the Glenwood Business Center. The trip
generation worksheets are included in Appendix C.
Table 1 – Glenwood Business Center Traffic Generation
Land Use and Size
Weekday Vehicle Trips
Daily AM Peak Hour PM Peak Hour
In Out Total In Out Total
Warehousing (ITE 150) –
67,950 Square Feet 118 9 3 12 4 9 13
Mini Warehouse (ITE 151) –
97,750 Square Feet 142 5 4 9 7 8 15
Multifamily Low-Rise Housing (ITE 220) –
3 Dwelling Units 22 0 1 1 1 1 2
General Office Building (ITE 710) –
35,175 Square Feet 382 47 6 53 9 42 51
Total Project Trips 664 61 14 75 21 60 81
1 Institute of Transportation Engineers, Trip Generation Manual, Eleventh Edition, Washington DC, 2021.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 17
As requested by Garfield County staff, a comparison of this now proposed project was provided
to the original development plan. The Glenwood Business Center Traffic Impact Report prepared
by David W Grounds in 1980 assumed 231,100 square feet of Business Park uses split between
office and non-office space. The projected ADT for the original development used the ITE trip
generation rates that were current at the time of the study and further applied a weighted average
of the office rate and warehouse rate to provide a conservative analysis. Therefore, the original
development generated 2,236 trips per day whereas the remaining Lots 2 and 3 generate 664
trips per day. Lot 1 currently generates 12 afternoon peak hour trips and assuming a K-factor of
10, the daily trips are 120 per day. Therefore, the new development program provided today
generates 1,452 less trips than previously studied with the 1980 development program. This
equates to approximately 65 percent less trips proposed to be on the roadway network with this
new proposal compared to the original development.
4.2 Trip Distribution
Distribution of site traffic on the street system was based on the area street system characteristics,
existing traffic patterns, existing and anticipated surrounding demographic information, and the
proposed access system for the project. The directional distribution of traffic is a means to quantify
the percentage of site-generated traffic that approaches the site from a given direction and
departs the site back to the original source. The project trip distribution for the proposed
development is illustrated in Figure 7.
4.3 Traffic Assignment
Glenwood Business Center traffic assignment was obtained by applying the project trip
distribution to the estimated traffic generation of the development shown in Table 1. Traffic
assignment is shown in Figure 8.
4.4 Total (Background Plus Project) Traffic
Site traffic volumes were added to the background volumes to represent estimated traffic
conditions for the short-term 2025 buildout horizon and long-term 2045 twenty-year planning
horizon. These total traffic volumes for the study area are illustrated for the 2025 and 2045 horizon
years in Figures 9 and 10, respectively.
[5%]
5%
5%
[5
%
]
1
10%
[30%]
[10%]
30
%
2
[50%]
[5%]
5%
50
%
3
45%
5%
[4
5
%
]
[5
%
]
4
40%
5%[4
0
%
]
[5
%
]
5
1(3)
3(1)
3(1)
1(
3
)
1
6(2)
4(18)
1(6)
18
(
6
)
2
7(30)
1(3)
3(
1
)
31
(
1
1
)
3
27(9)
3(1)
6(
2
7
)
1(
3
)
4
24(8)
3(1)6(
2
4
)
1(
3
)
5
49(25)
22(29)
46(25)
28(39)
21
(
1
6
)
18
(
3
2
)
1
42(35)
28(37)
7(9)
42(44)
23(28)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
2
)
51
(
3
9
)
2
16(35)
1(1)
2(8)
73(64)
3(0)
18(18)
8(
1
)
47
(
3
8
)
29
(
2
1
)
45
(
1
8
)
24
(
2
4
)
15
0
(
5
6
)
3
139(159)
289(106)
222(168)
19(10)
14
5
(
1
9
7
)
9(
2
1
)
4
24(8)
56(73)
5(5)
3(1)
61(49)
5(5)
5(
5
)
5(
5
)
6(
2
4
)
1(
3
)
5
56(29)
25(33)
52(29)
32(44)
24
(
1
9
)
21
(
3
7
)
1
48(41)
32(43)
8(10)
47(48)
27(32)
1(1)
6(
5
)
36
(
2
1
)
1(
6
)
23
(
4
0
)
15
(
5
9
)
56
(
4
4
)
2
17(36)
1(1)
2(9)
84(73)
3(0)
21(21)
9(
1
)
54
(
4
3
)
34
(
2
4
)
47
(
1
9
)
28
(
2
8
)
17
3
(
6
4
)
3
160(183)
328(121)
255(194)
22(11)
16
6
(
2
2
3
)
10
(
2
4
)
4
24(8)
65(85)
5(5)
3(1)
70(57)
5(5)
5(
5
)
5(
5
)
6(
2
4
)
1(
3
)
5
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 22
5.0 TRAFFIC OPERATIONS ANALYSIS
Kimley-Horn’s analysis of traffic operations in the site vicinity was conducted to determine
potential capacity deficiencies in the 2025 and 2045 development horizons at the identified key
intersections. The acknowledged source for determining overall capacity is the Highway Capacity
Manual (HCM)2.
5.1 Analysis Methodology
Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term
describing operating conditions a driver will experience while traveling on a particular street or
highway during a specific time interval. It ranges from A (very little delay) to F (long delays and
congestion). For intersections and roadways in this study area, standard traffic engineering
practice recommends overall intersection LOS D and movement/approach LOS E as the minimum
desirable thresholds for acceptable operations. Table 2 shows the definition of level of service for
signalized and unsignalized intersections.
Table 2 – Level of Service Definitions
Level of
Service
Signalized Intersection
Average Total Delay
(sec/veh)
Unsignalized Intersection
Average Total Delay
(sec/veh)
A ≤ 10 ≤ 10
B > 10 and ≤ 20 > 10 and ≤ 15
C > 20 and ≤ 35 > 15 and ≤ 25
D > 35 and ≤ 55 > 25 and ≤ 35
E > 55 and ≤ 80 > 35 and ≤ 50
F > 80 > 50
Definitions provided from the Highway Capacity Manual, Sixth Edition, Transportation Research Board, 2016.
Study area intersections were analyzed based on average total delay analysis for signalized and
unsignalized intersections. Under the unsignalized analysis, the LOS for a two-way stop-
controlled intersection is determined by the computed or measured control delay and is defined
for each minor movement. LOS for a two-way stop-controlled intersection is not defined for the
intersection as a whole. LOS for signalized, roundabout, and all-way stop controlled intersections
are defined for each approach and for the overall intersection.
2 Transportation Research Board, Highway Capacity Manual, Sixth Edition, Washington DC, 2016.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 23
5.2 Key Intersection Operational Analysis
Calculations for the operational level of service at the key intersections for the study area are
provided in Appendix D. The existing year analysis is based on the lane geometry and
intersection control shown in Figure 2. Existing peak hour factors were utilized in the existing
analysis. Synchro traffic analysis software was used to analyze the unsignalized key intersections
for HCM level of service.
Donegan Road and Storm King Road (#1)
The existing T-intersection of Donegan Road and Storm King Road (#1) is unsignalized with stop
control on the northbound approach of Storm King Road. The movements at this intersection all
currently operate acceptably with LOS A during the morning and afternoon peak hours. With
construction of this project, the movements at this intersection are anticipated to continue to
operate acceptably with LOS A during the peak hours throughout the 2045 horizon. Therefore, no
improvements or modifications are anticipated to be needed at this intersection based on the
addition of project traffic and this operational level of service analysis. Table 3 provides the results
of the LOS analysis conducted at this intersection
Table 3 – Donegan Road & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Northbound Approach
Westbound Left
9.4
7.5
A
A
9.4
7.4
A
A
2025 Background
Northbound Approach
Westbound Left
9.4
7.5
A
A
9.4
7.4
A
A
2025 Background Plus Project
Northbound Approach
Westbound Left
9..5
7.5
A
A
9.5
7.4
A
A
2045 Background
Northbound Approach
Westbound Left
9.6
7.5
A
A
9.6
7.5
A
A
2045 Background Plus Project
Northbound Approach
Westbound Left
9.7
7.6
A
A
9.7
7.5
A
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 24
Donegan Road and Mel Ray Road (#2)
The intersection of Donegan Road and Mel Ray Road (#2) is a four-leg, all-way stop controlled
intersection. This intersection currently operates acceptably with LOS A during the morning and
afternoon peak hours. With the existing lane configuration and control, this intersection is
anticipated to continue to operate acceptably with LOS A during the peak hours throughout 2045.
Therefore, no improvements or modifications are anticipated to be needed at this intersection
based on the addition of project traffic and this operational level of service analysis. Table 4
provides the results of the LOS analysis conducted at this intersection.
Table 4 – Donegan Road & Mel Ray Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
7.9
7.5
8.1
8.0
7.9
A
A
A
A
A
7.8
7.4
7.9
7.9
7.5
A
A
A
A
A
2025 Background
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
7.9
7.5
8.1
8.0
7.9
A
A
A
A
A
7.8
7.4
7.9
7.9
7.5
A
A
A
A
A
2025 Background Plus Project
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.1
7.7
8.3
8.3
8.0
A
A
A
A
A
7.9
7.5
8.0
8.1
7.6
A
A
A
A
A
2045 Background
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.1
7.7
8.4
8.2
8.0
A
A
A
A
A
8.0
7.5
8.1
8.2
7.6
A
A
A
A
A
2045 Background Plus Project
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.3
7.9
8.5
8.5
8.1
A
A
A
A
A
8.1
7.7
8.2
8.3
7.7
A
A
A
A
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 25
Center Drive and Storm King Road (#3)
The intersection of Center Drive and Storm King Road (#3) is an unsignalized four-leg intersection
with stop control on the eastbound Center Drive and westbound Glenwood Business Center
approaches. The movements at this intersection currently operate acceptably with LOS C or
better during the morning peak hour and the afternoon peak hour. With construction of this project,
the east leg of this intersection will provide access to the development. With project traffic, all
movements are anticipated to continu e operating at an acceptable level of service D or better
throughout the 2045 horizon. Therefore, no improvements or modifications are anticipated to be
needed at this intersection based on the addition of project traffic and this operational level of
service analysis. Table 5 shows the level of service results at this intersection.
Table 5 – Center Drive & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.1
20.8
7.4
A
B
C
A
7.8
11.7
12.6
0.0
A
B
B
A
2025 Background
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.2
21.2
7.4
A
B
C
A
7.8
11.8
12.8
0.0
A
B
B
A
2025 Background Plus Project
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.7
23.5
7.5
A
B
C
A
7.8
11.9
18.4
7.5
A
B
C
A
2045 Background
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.3
15.3
26.5
7.4
A
C
D
A
7.9
12.9
13.9
0.0
A
B
B
A
2045 Background Plus Project
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.3
16.0
30.5
7.6
A
C
D
A
7.9
13.1
21.8
7.5
A
B
C
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 26
Highway 6 and Storm King Road (#4)
The intersection of Highway 6 and Storm King Road (#4) is an unsignalized three-leg intersection
with stop control on the southbound approach of Storm King Road. The movements at this
intersection all currently operate acceptably with LOS C or better during the morning and
afternoon peak hours. With construction of this project, the movements at this intersection are
anticipated to continue to operate acceptably with LOS C or better during the peak hours
throughout the 2045 horizon. Therefore, no improvements or modifications are anticipated to be
needed at this intersection based on the addition of project traffic and this operational level of
service analysis. Table 6 shows the level of service results at this intersection.
Table 6 – Highway 6 & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Eastbound Left
Southbound Approach
8.9
16.1
A
C
7.9
13.0
A
B
2025 Background
Eastbound Left
Southbound Approach
8.9
16.3
A
C
7.9
13.1
A
B
2025 Background Plus Project
Eastbound Left
Southbound Approach
9.1
16.9
A
C
7.9
13.8
A
B
2045 Background
Eastbound Left
Southbound Approach
9.2
19.7
A
C
8.0
14.5
A
B
2045 Background Plus Project
Eastbound Left
Southbound Approach
9.4
20.6
A
C
8.1
15.5
A
C
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 27
Project Accesses
With completion of the Glenwood Business Center project, an additional access is proposed to
align with Chapparal Circle. It is recommended that a R1 -1 “STOP” sign be installed on the
northbound approach exiting the development. A single northbound approach lane for shared
movements is all that is needed for this access. Table 7 provides the results of the level of service
for this project street access. As shown in the table, the project access intersection of Donegan
Road and Chapparal Circle is anticipated to have all movements operating with acceptable LOS
A during the peak hours in both the buildout year 2025 and the 2045 long term horizons.
Table 7 – Project Access Level of Service Results
Intersection
2025 Total 2045 Total
AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Donegan & Chapparal
Northbound Approach
Eastbound Left
Westbound Left
Southbound Approach
8.8
7.4
7.4
9.3
A
A
A
A
8.8
7.4
7.3
9.3
A
A
A
A
8.9
7.4
7.4
9.4
A
A
A
A
8.8
7.4
7.4
9.4
A
A
A
A
There are no turn lanes at the existing intersections. Therefore, a queue analysis was not
prepared for this development.
5.3 CDOT Access Permit Need Analysis
The threshold for requiring an access permit along Colorado Department of Transportation
(CDOT) roadways occurs when project traffic is anticipated to increase the existing access traffic
volumes by more than 20 percent. Based on traffic projections, the addition of project traffic on
the north leg of Storm King Road at Highway 6 (US-6) is not anticipated to increase existing
access traffic volumes by more than 20 percent, with the maximum expected increase at 18
percent during the afternoon peak hour on the north leg (40/291 ). Therefore, a CDOT access
permit is not anticipated to be required in association with this project.
5.4 Improvement Summary
Based on the results of the intersection operational and vehicle queuing analysis, the key
intersection recommended improvements and control are shown in Figure 11.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 29
6.0 CONCLUSIONS AND RECOMMENDATIONS
Based on the analysis presented in this report, Kimley-Horn believes Glenwood Business Center
will be successfully incorporated into the existing and future roadway network. Analysis of the
existing street network, the proposed project development, and expected traffic volumes resulted
in the following recommendations:
• With completion of the Glenwood Business Center project, an additional access to the
development area is proposed along Donegan Road to align with Chapparal Circle. It is
recommended that a R1-1 “STOP” sign be installed on the northbound approach exiting the
development. A single northbound approach lane for shared movements is all that is needed
for this access.
• The Glenwood Business Center Traffic Impact Report prepared by David W Grounds in 1980
assumed 231,100 square feet of Business Park uses split between office and non-office
space. The original development generated 2,236 trips per day whereas the remaining Lots 2
and 3 generate 664 trips per day. Lot 1 currently generates 12 afternoon peak hour trips and
assuming a K-factor of 10, the daily trips are 120 per day. Therefore, the new development
program provided today generates 1,452 less trips than previously studied with the 1980
development program.
• Any onsite or offsite improvements should be incorporated into the Civil Drawings and conform
to standards of the Garfield County, CDOT, and the Manual on Uniform Traffic Control
Devices (MUTCD) – 2009 Edition.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDICES
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX A
Intersection Count Sheets
Study Intersections Counts
COVID-19 Comparison Counts
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
1
0
3
12
0
0
0
16
153000156
7 3
Peak Hour 1 2 0 0 3 0 0
0 0 0 0 1 5Count Total 6 5 1 0 12 0
0 0 00000008:45 AM 1 1 1 0 3
0 0 0 0 0 0
0
8:30 AM 0 1 0 0 1 0 0 0
0 0 0 0 0 0
5 2
8:15 AM 1 1 0 0 2 0 0
0 0 0 0 0 5
0 1 1
8:00 AM 0 1 0 0 1 0
0 0 0 0 0 1
0 0 0
0
7:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 1
0 4 0
EB WB NB SB Total East
7:45 AM 0 0 0 0 0
0 0 0
-0%-HV%--5%0%-
0 0
7:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 3 1 0
2
13 0 16 0 0 0320371600
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%----2%5%0%-
Peak
Hour
All 0 0 19
0 0 26 0 22 0
0 0 0 0 3 0000000
0 133 0
HV 0 0 1 0 0
Count Total 0 0 32 52 0 47 21 0 0 0 200 0
18 119030000052004
0 0 0 22 132
8:45 AM 0 0 1 3
0 0 5 0 1 0
37 133
8:30 AM 0 0 6 5 0 3 2
0 11 0 0 0 00103004
0 0 0 42 111
8:15 AM 0 0 6 3
0 0 4 0 2 0
31 81
8:00 AM 0 0 7 8 0 16 5
0 3 0 0 0 0086003
0 0 0 23 0
7:45 AM 0 0 1 10
0 0 2 0 0 0
15 0
7:30 AM 0 0 5 11 0 3 2
0 0 0 0 0 0020004
0 0 0 12 0
7:15 AM 0 0 1 8
0 0 0 0 2 07:00 AM 0 0 5 4 0 0 1
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB --
TOTAL 2.3%0.79
TH RT
WB 3.8%0.63
NB 0.0%0.48
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 2.0%0.80
0
0
0
0 0 0
000
0
0
0
6
3
5 1
N
STORM KING RD
DONEGAN RD
DONEGAN RD
ST
O
R
M
K
I
N
G
RD
DONEGAN RD
DR
I
V
E
W
A
Y
133TEV:
0.79PHF:
0 0 0
0 0
0
0
16
37
53
350
16013
2969
0
32
19
0
51
29 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
3 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One Hour
0 0 0 0 0 0020000
RTTHLT RTTHLTRT
0 0 0 12 0
Peak Hour 0 0 1 0
0 0 0 0 1 0Count Total 0 0 4 2 0 4 1
3 7010000010000
0 0 0 1 4
8:45 AM 0 0 0 1
0 0 0 0 0 0
2 3
8:30 AM 0 0 0 0 0 1 0
0 0 0 0 0 0010000
0 0 0 1 2
8:15 AM 0 0 1 0
0 0 0 0 0 0
0 5
8:00 AM 0 0 0 0 0 1 0
0 0 0 0 0 0000000
0 0 0 0 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 4 0
7:15 AM 0 0 0 1
0 0 0 0 0 0
TH RT
7:00 AM 0 0 3 0 0 0 1
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
2
0
3
1
6Peak Hour 2 3 0 0 5 0 0 0 0 0 3 0 0 3
3:45 PM
3:15 PM
3:30 PM 0 2
0 0 0 0 0 0 0 0 0 0 1 0
3:00 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0
0 2 0 0 2 0 1 0 0 1
2 1 0 0 3 0 0 0 0 0 0 0 0 0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 5 0
HV%--7%0%-11%5%--0%-0%----4%0
Peak
Hour
All 0 0 28 18 0 19 20 0 0 22 0 12 0 0 0
0 0 0 0 0 0
0 119 0
HV 0 0 2 0 0 2 1 0 0
0
0
0
24 0
3:45 PM 0 5 3 0 3 6 0 0 5 0 3 0 0 0 0 25 119
3:30 PM 0 8 2 0 1 4 0 0 5 0 4 0 0 0 0
35 0
3:15 PM 0 10 5 0 8 4 0 0 5 0 3 0 0 0 0 35 0
3:00 PM 0 0 5 8 0 7 6 0 0 7 0 2 0 0 0 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB --
TOTAL 4.2%0.85
WB 7.7%0.75
NB 0.0%0.94
Peak Hour: 3:00 PM 4:00 PM
HV %:PHF
EB 4.3%0.77
0
0
0
0 0 0
000
0
0
0
0
3
0 3
N
STORM KING RD
DONEGAN RD
DONEGAN RD
ST
O
R
M
K
I
N
G
RD
DONEGAN RD
DR
I
V
E
W
A
Y
119TEV:
0.85PHF:
0 0 0
0 0
0
0
20
19
39
400
12022
3437
0
18
28
0
46
42 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
32
3
2
1
2
0
3
1
0
0
2
1
0
2
0
0
49
63000300
10 20
Peak Hour 2 3 0 0 5 0 0
0 0 0 0 9 10Count Total 4 7 0 0 11 0
0 0 00000005:45 PM 0 0 0 0 0
0 0 0 0 0 0
2
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 1
5:00 PM 0 0 0 0 0 0
0 0 0 0 0 04:45 PM 0 0 0 0 0
0 0 0 0 1 1
0
4:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 0
4:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:00 PM 1 0 0 0 1 0
0 0 0 0 0 13:45 PM 0 0 0 0 0
0 0 1 0 0 2
0
3:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1
3:15 PM 2 1 0 0 3 0 0
0 0 0 0 1 0
0 0 1
3:00 PM 0 2 0 0 2 0
0 0 0 0 0 0
0 0 0
2
2:30 PM 0 1 0 0 1 0 0 0
0 0 0 1 0 0
0 1 0
EB WB NB SB Total East
2:45 PM 0 1 0 0 1
0 0 2
-0%-HV%--7%0%-
9 10
2:15 PM 0 1 0 0 1 0 0
0 0 0 0 3 10
West North South
2:00 PM 0 1 0
2
22 0 12 0 0 0180192000
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%----4%11%5%-
Peak
Hour
All 0 0 28
0 0 79 0 65 0
0 0 0 0 5 0100000
0 119 0
HV 0 0 2 0 0
Count Total 0 0 64 78 0 71 66 0 1 1 425 0
19 92040000022006
0 0 0 21 102
5:45 PM 0 0 0 5
0 0 8 0 2 0
22 105
5:30 PM 0 0 1 4 0 3 3
0 1 0 0 0 0024009
0 0 0 30 108
5:15 PM 0 0 1 5
0 0 7 0 5 0
29 109
5:00 PM 0 0 2 6 0 5 5
0 5 0 0 0 0062005
0 0 0 24 105
4:45 PM 0 0 6 5
0 0 5 0 3 0
25 105
4:30 PM 0 0 3 4 0 5 4
0 5 0 0 0 0044005
0 0 0 31 115
4:15 PM 0 0 3 4
0 0 2 0 3 0
25 119
4:00 PM 0 0 7 8 0 5 6
0 3 0 0 0 0036005
0 0 0 24 114
3:45 PM 0 0 5 3
0 0 5 0 4 0
35 108
3:30 PM 0 0 8 2 0 1 4
0 3 0 0 0 0084005
0 0 0 35 94
3:15 PM 0 0 10 5
0 0 7 0 2 0
20 105
3:00 PM 0 0 5 8 0 7 6
0 4 0 0 0 0034001
0 0 0 18 0
2:45 PM 0 0 2 6
0 0 1 0 3 0
21 0
2:30 PM 0 0 3 4 0 4 3
0 6 0 0 0 1012003
0 1 0 46 0
2:15 PM 0 0 5 3
0 0 5 0 12 02:00 PM 0 0 3 6 0 12 7
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0
0 0 0
0 0 0
0 0
0 0 0
0 0
0 0 0
0 0 0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 0
0
0
0000
0 0
0 0
Peak Hour
0 0Count Total
0
0000
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000000
0 0 0
0
5:15 PM
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0
0
4:30 PM
0000000
0 0
4:15 PM
0 0 0
0
4:00 PM
0000000
0 0 0
0 0 0
0
0
0 0
3:45 PM
0 0 0 0
0
3:30 PM
0000000
0 0
3:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
3:00 PM
0000
0 0
2:45 PM
0 0 0 0
0
2:30 PM
00000002:15 PM 0
0 0
0 0 0
0 02:00 PM
RT
5 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One Hour
0 0 0 0 0 0021000
RTTHLT RTTHLTRT
0 0 0 11 0
Peak Hour 0 0 2 0
0 0 0 0 0 0Count Total 0 0 2 2 0 5 2
0 0000000000000
0 0 0 0 0
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 1
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
5:15 PM 0 0 0 0
0 0 0 0 0 0
0 2
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 2
4:45 PM 0 0 0 0
0 0 0 0 0 0
0 1
4:30 PM 0 0 0 1 0 0 0
0 0 0 0 0 0000000
0 0 0 1 4
4:15 PM 0 0 0 0
0 0 0 0 0 0
0 5
4:00 PM 0 0 0 1 0 0 0
0 0 0 0 0 0000000
0 0 0 0 6
3:45 PM 0 0 0 0
0 0 0 0 0 0
3 7
3:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0010000
0 0 0 2 5
3:15 PM 0 0 2 0
0 0 0 0 0 0
1 4
3:00 PM 0 0 0 0 0 1 1
0 0 0 0 0 0001000
0 0 0 1 0
2:45 PM 0 0 0 0
0 0 0 0 0 0
1 0
2:30 PM 0 0 0 0 0 1 0
0 0 0 0 0 0010000
0 0 0 1 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 0 0 0 1 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
2
1
0
3
0
2
0
8
53000101
2 5
Peak Hour 2 4 5 1 12 0 0
0 0 0 0 1 0Count Total 5 4 6 1 16 0
0 0 00000008:45 AM 0 2 1 1 4
0 0 1 0 1 0
0
8:30 AM 1 1 1 0 3 0 0 0
0 0 0 0 0 0
0 3
8:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 0 1 3 0 4 0
0 0 0 0 0 0
0 0 1
1
7:30 AM 1 0 0 0 1 0 0 0
0 0 0 0 0 1
0 2 0
EB WB NB SB Total East
7:45 AM 0 0 1 0 1
0 0 0
-16%10%HV%--6%4%-
0 0
7:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
West North South
7:00 AM 2 0 0
4
25 10 15 0 4 24280311750
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%4%-7%13%0%0%
Peak
Hour
All 0 0 17
5 0 39 14 21 0
0 0 1 0 12 0000410
0 176 0
HV 0 0 1 1 0
Count Total 0 0 28 36 0 59 30 4 49 1 286 0
39 176430270064105
0 5 0 32 171
8:45 AM 0 0 3 4
2 0 1 1 1 0
44 175
8:30 AM 0 0 5 5 0 10 2
0 5 0 0 4 0074106
2 8 0 61 145
8:15 AM 0 0 8 9
1 0 13 5 6 0
34 110
8:00 AM 0 0 1 10 0 8 7
1 0 0 0 3 10116008
0 10 0 36 0
7:45 AM 0 0 3 1
0 0 3 3 3 0
14 0
7:30 AM 0 0 4 5 0 4 4
0 1 0 0 4 0072000
0 8 0 26 0
7:15 AM 0 0 0 0
0 0 3 0 2 07:00 AM 0 0 4 2 0 6 1
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 3.6%0.70
TOTAL 6.8%0.72
TH RT
WB 7.5%0.83
NB 10.0%0.52
Peak Hour: 8:00 AM 9:00 AM
HV %:PHF
EB 4.4%0.66
0
0
0
0 0 0
000
0
0
0
1
3
0 1
N
MEL RAY RD
DONEGAN RD
DONEGAN RD
ME
L
R
A
Y
R
D
DONEGAN RD
ME
L
R
A
Y
R
D
176TEV:
0.72PHF:
0 24 4
28 15
0
5
17
31
53
360
151025
5083
0
28
17
0
45
42 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
12 0
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One Hour
1 0 0 0 1 0040004
RTTHLT RTTHLTRT
0 1 0 16 0
Peak Hour 0 0 1 1
0 0 5 1 0 0Count Total 0 0 4 1 0 4 0
4 12000010020001
0 0 0 3 9
8:45 AM 0 0 0 0
0 0 1 0 0 0
1 7
8:30 AM 0 0 1 0 0 1 0
0 0 0 0 0 0000000
0 0 0 4 6
8:15 AM 0 0 0 1
0 0 2 1 0 0
1 4
8:00 AM 0 0 0 0 0 1 0
0 0 0 0 0 0000001
0 0 0 1 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
0 0
7:30 AM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 2 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 2 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
0
2
0
5
7Peak Hour 0 0 1 0 1 0 0 0 0 0 0 0 4 3
5:00 PM
4:30 PM
4:45 PM 0 0
0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3 2
0 0 1 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 1
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 1 0
HV%-0%0%0%-0%0%0%-0%3%0%-0%0%0%0%0
Peak
Hour
All 0 1 17 20 0 27 27 7 0 25 39 26 0 3 14
0 1 0 0 0 0
4 210 0
HV 0 0 0 0 0 0 0 0 0
0
0
0
52 0
5:00 PM 0 3 7 0 9 8 2 0 8 8 7 0 1 1 0 54 210
4:45 PM 1 4 7 0 5 8 2 0 2 10 4 0 0 7 2
50 0
4:30 PM 0 5 4 0 6 7 1 0 8 9 7 0 2 5 0 54 0
4:15 PM 0 0 5 2 0 7 4 2 0 7 12 8 0 0 1 2
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB 0.0%0.58
TOTAL 0.5%0.97
WB 0.0%0.80
NB 1.1%0.83
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 0.0%0.79
0
0
0
0 0 0
000
0
0
0
4
3
0 0
N
MEL RAY RD
DONEGAN RD
DONEGAN RD
ME
L
R
A
Y
R
D
DONEGAN RD
ME
L
R
A
Y
R
D
210TEV:
0.97PHF:
4 14 3
21 47
0
7
27
27
61
460
263925
9061
0
20
17
1
38
56 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
4
1
4
3
2
3
5
1
4
0
2
0
5
4
2
1
41
73000004
12 28
Peak Hour 0 0 1 0 1 0 0
0 0 0 0 1 0Count Total 2 4 8 0 14 0
0 0 10000005:45 PM 0 0 0 0 0
0 0 0 0 0 2
3
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 1
3 2
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
5:00 PM 0 0 0 0 0 0
0 0 0 0 0 04:45 PM 0 0 0 0 0
0 0 0 0 1 1
0
4:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
4 0
4:15 PM 0 0 1 0 1 0 0
0 0 0 0 0 0
0 0 1
4:00 PM 0 0 0 0 0 0
0 0 0 0 0 03:45 PM 0 0 0 0 0
0 0 0 0 0 5
3
3:30 PM 0 0 1 0 1 0 0 0
0 0 0 0 0 0
0 2
3:15 PM 2 2 0 0 4 0 0
0 0 0 0 0 0
0 1 1
3:00 PM 0 1 2 0 3 0
0 0 0 0 0 1
0 1 3
1
2:30 PM 0 1 1 0 2 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
2:45 PM 0 0 2 0 2
0 0 0
-0%3%HV%-0%0%0%-
1 3
2:15 PM 0 0 1 0 1 0 0
0 0 0 0 0 0
West North South
2:00 PM 0 0 0
0
25 39 26 0 3 14200272770
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%0%0%0%0%
Peak
Hour
All 0 1 17
27 0 95 108 81 0
0 0 0 0 1 0000010
4 210 0
HV 0 0 0 0 0
Count Total 0 6 74 83 0 108 89 14 65 6 756 0
43 1851040130046307
2 5 0 53 194
5:45 PM 0 1 2 2
1 0 6 9 10 0
35 195
5:30 PM 0 0 1 2 0 11 6
6 1 0 1 5 1054203
1 1 0 54 210
5:15 PM 0 0 3 4
2 0 8 8 7 0
52 205
5:00 PM 0 0 3 7 0 9 8
10 4 0 0 7 2058202
2 5 0 54 204
4:45 PM 0 1 4 7
1 0 8 9 7 0
50 191
4:30 PM 0 0 5 4 0 6 7
12 8 0 0 1 2074207
0 3 1 49 191
4:15 PM 0 0 5 2
2 0 5 6 4 0
51 197
4:00 PM 0 0 6 5 0 11 6
8 6 0 0 6 0055308
1 3 0 41 192
3:45 PM 0 0 5 5
1 0 3 4 5 0
50 189
3:30 PM 0 0 9 7 0 5 3
1 7 0 2 3 00117004
2 3 0 55 172
3:15 PM 0 2 5 8
2 0 8 10 8 0
46 169
3:00 PM 0 2 7 2 0 6 5
5 2 0 1 7 0067308
0 5 0 38 0
2:45 PM 0 0 3 4
1 0 4 4 3 0
33 0
2:30 PM 0 0 7 4 0 5 5
1 2 0 1 2 0073104
0 6 0 52 0
2:15 PM 0 0 4 8
1 0 10 5 3 02:00 PM 0 0 5 12 0 5 5
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0
0 0 0
0 0 0
0 0
0 0 0
0 0
0 0 0
0 0 0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 0
0
0
0000
0 0
0 0
Peak Hour
0 0Count Total
0
0000
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000000
0 0 0
0
5:15 PM
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0
0
4:30 PM
0000000
0 0
4:15 PM
0 0 0
0
4:00 PM
0000000
0 0 0
0 0 0
0
0
0 0
3:45 PM
0 0 0 0
0
3:30 PM
0000000
0 0
3:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
3:00 PM
0000
0 0
2:45 PM
0 0 0 0
0
2:30 PM
00000002:15 PM 0
0 0
0 0 0
0 02:00 PM
RT
1 0
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One Hour
1 0 0 0 0 0000000
RTTHLT RTTHLTRT
0 0 0 14 0
Peak Hour 0 0 0 0
0 0 7 1 0 0Count Total 0 0 1 1 0 4 0
0 0000000000000
0 0 0 0 0
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 0
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
5:15 PM 0 0 0 0
0 0 0 0 0 0
0 1
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
4:45 PM 0 0 0 0
0 0 0 0 0 0
1 2
4:30 PM 0 0 0 0 0 0 0
1 0 0 0 0 0000000
0 0 0 0 5
4:15 PM 0 0 0 0
0 0 0 0 0 0
0 8
4:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 10
3:45 PM 0 0 0 0
0 0 1 0 0 0
4 11
3:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0020000
0 0 0 3 8
3:15 PM 0 0 1 1
0 0 2 0 0 0
2 5
3:00 PM 0 0 0 0 0 1 0
0 0 0 0 0 0000002
0 0 0 2 0
2:45 PM 0 0 0 0
0 0 1 0 0 0
1 0
2:30 PM 0 0 0 0 0 1 0
0 0 0 0 0 0000001
0 0 0 0 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
1
11
17
1
0
0
30
2900008138
8 0
Peak Hour 1 0 3 3 7 0 0
0 0 0 0 8 14Count Total 1 0 4 6 11 0
0 0 00000008:45 AM 0 0 1 2 3
0 0 0 0 0 0
0
8:30 AM 1 0 2 2 5 0 0 0
0 0 0 1 0 0
4 0
8:15 AM 0 0 1 1 2 0 0
0 0 0 0 3 10
3 4 0
8:00 AM 0 0 0 0 0 0
0 0 0 0 0 4
1 0 0
0
7:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 0 0 0 0 0
0 0 0
-3%0%HV%-0%0%2%-
0 0
7:15 AM 0 0 0 1 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 0 0
0
113 18 11 0 4 355507110
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%6%5%2%0%0%0%
Peak
Hour
All 0 14 2
1 0 122 32 19 0
0 0 2 1 7 0000300
22 283 0
HV 0 0 0 1 0
Count Total 0 15 2 72 0 9 1 6 66 27 372 0
25 249720072010001
2 5 2 36 283
8:45 AM 0 0 0 5
1 0 5 4 3 0
64 277
8:30 AM 0 1 1 6 0 5 1
4 3 0 1 8 40100016
1 11 10 124 236
8:15 AM 0 9 1 17
0 0 68 4 3 0
59 123
8:00 AM 0 4 0 22 0 1 0
6 2 0 0 11 60000024
1 12 2 30 0
7:45 AM 0 0 0 10
0 0 4 2 4 0
23 0
7:30 AM 0 0 0 5 0 0 0
4 1 0 1 7 1010004
0 5 0 11 0
7:15 AM 0 0 0 4
0 0 0 1 1 07:00 AM 0 1 0 3 0 0 0
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 4.9%0.69
TOTAL 2.5%0.57
TH RT
WB 0.0%0.32
NB 2.1%0.47
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 1.4%0.66
0
0
0
0 0 0
000
0
0
0
8
0
13 8
N
STORM KING RD
CENTER DR
DRIVEWAY
ST
O
R
M
K
I
N
G
RD
CENTER DR
ST
O
R
M
K
I
N
G
RD
283TEV:
0.57PHF:
22 35 4
61 33
0
1
1
7
9
170
1118
11
3
14
2
97
0
55
2
14
71
136 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
7 0
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One Hour
0 0 0 0 2 1000003
RTTHLT RTTHLTRT
1 4 1 11 0
Peak Hour 0 0 0 1
0 0 3 1 0 0Count Total 0 0 0 1 0 0 0
3 10100020000000
0 1 1 5 7
8:45 AM 0 0 0 0
0 0 2 0 0 0
2 2
8:30 AM 0 0 0 1 0 0 0
0 0 0 0 1 0000001
0 0 0 0 1
8:15 AM 0 0 0 0
0 0 0 0 0 0
0 1
8:00 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 0 0 0 0 0
0 0 0 1 0 0000000
0 0 0 0 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
53
3
2
0
58Peak Hour 1 0 0 3 4 0 0 0 0 0 21 14 22 1
2:45 PM
2:15 PM
2:30 PM 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 2
0 0
0 0 0 3 3 0 19 11 22 1
1 0 0 0 1 0 0 0 0 0 2 1 0 0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 4 0
HV%-0%-2%-0%0%0%-0%0%0%--11%0%2%0
Peak
Hour
All 0 14 0 48 0 4 1 4 0 42 18 5 0 0 28
0 0 0 0 0 3
16 180 0
HV 0 0 0 1 0 0 0 0 0
0
0
0
20 0
2:45 PM 0 0 2 0 1 1 0 0 7 4 2 0 0 6 3 26 180
2:30 PM 4 0 4 0 1 0 0 0 1 1 1 0 0 6 2
110 0
2:15 PM 1 0 6 0 2 0 0 0 5 7 0 0 0 2 1 24 0
2:00 PM 0 9 0 36 0 0 0 4 0 29 6 2 0 0 14 10
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB 6.8%0.46
TOTAL 2.2%0.41
WB 0.0%0.56
NB 0.0%0.44
Peak Hour: 2:00 PM 3:00 PM
HV %:PHF
EB 1.6%0.34
0
0
0
0 0 0
000
0
0
0
22
1
14 21
N
STORM KING RD
CENTER DR
DRIVEWAY
ST
O
R
M
K
I
N
G
RD
CENTER DR
ST
O
R
M
K
I
N
G
RD
180TEV:
0.41PHF:
16 28 0
44 36
0
4
1
4
9
50
51842
6580
0
48
0
14
62
59 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
53
3
2
0
4
3
4
5
0
0
1
1
2
3
3
0
84
581000211422
27 2
Peak Hour 1 0 0 3 4 0 0
0 0 0 0 30 25Count Total 5 1 2 7 15 0
0 0 00000005:45 PM 1 0 0 0 1
0 0 2 0 1 0
0
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 3 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 1 1
0 0 0
5:00 PM 0 0 1 0 1 0
0 0 0 0 0 14:45 PM 1 0 0 0 1
0 0 1 0 0 0
0
4:30 PM 0 0 0 1 1 0 0 0
0 0 0 0 0 0
0 0
4:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
2 0 1
4:00 PM 0 0 0 1 1 0
0 0 0 0 0 23:45 PM 0 0 0 0 0
0 0 0 3 1 0
0
3:30 PM 0 0 1 0 1 0 0 0
0 0 0 2 1 0
3 0
3:15 PM 1 0 0 1 2 0 0
0 0 0 0 0 1
0 0 0
3:00 PM 1 1 0 1 3 0
0 0 0 0 0 0
2 0 0
0
2:30 PM 0 0 0 0 0 0 0 0
0 0 0 2 1 0
3 3 0
EB WB NB SB Total East
2:45 PM 0 0 0 0 0
0 0 0
-0%0%HV%-0%-2%-
22 1
2:15 PM 1 0 0 0 1 0 0
0 0 0 0 19 11
West North South
2:00 PM 0 0 0
0
42 18 5 0 0 284804140
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%--11%0%2%0%0%0%
Peak
Hour
All 0 14 0
10 0 85 104 15 0
0 0 3 0 4 0000000
16 180 0
HV 0 0 0 1 0
Count Total 0 30 0 109 0 26 3 6 109 35 532 0
24 114700061010002
0 3 3 22 131
5:45 PM 0 3 0 4
0 0 1 10 0 0
23 131
5:30 PM 0 0 0 4 0 1 0
7 1 0 1 5 1040000
0 6 4 45 136
5:15 PM 0 3 0 1
0 0 6 9 0 0
41 127
5:00 PM 0 2 0 12 0 5 1
9 1 0 1 9 10001012
0 8 0 22 106
4:45 PM 0 1 0 6
1 0 1 7 0 0
28 106
4:30 PM 0 0 0 3 0 2 0
7 1 0 0 6 2000202
0 12 1 36 112
4:15 PM 0 1 0 7
1 0 7 2 2 0
20 111
4:00 PM 0 2 0 6 0 3 0
7 1 0 1 5 0000002
0 2 0 22 117
3:45 PM 0 1 0 3
0 0 2 7 1 0
34 115
3:30 PM 0 1 0 6 0 3 0
6 1 0 2 7 4020105
1 12 2 35 105
3:15 PM 0 1 0 5
0 0 3 8 2 0
26 180
3:00 PM 0 1 0 4 0 1 1
4 2 0 0 6 3011007
0 6 2 20 0
2:45 PM 0 0 0 2
0 0 1 1 1 0
24 0
2:30 PM 0 4 0 4 0 1 0
7 0 0 0 2 1020005
0 14 10 110 0
2:15 PM 0 1 0 6
4 0 29 6 2 02:00 PM 0 9 0 36 0 0 0
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
4
0
0
0
1
3
1
0
9
40000004
9 0
Peak Hr 12 13 0 2 27 0 0
0 0 0 0 0 0Count Total 23 24 0 6 53 0
0 0 00000008:45 AM 2 1 0 2 5
0 0 0 0 1 0
0
8:30 AM 2 4 0 2 8 0 0 0
0 0 0 0 0 3
1 0
8:15 AM 1 4 0 2 7 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 3 3 0 0 6 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 4 3 0 0 7 0 0 0
0 0 0 0 0 0
0 7 0
EB WB NB SB Total East
7:45 AM 4 3 0 0 7
0 0 0
---HV%-0%7%--
4 0
7:15 AM 3 3 0 0 6 0 0
0 0 0 0 0 0
West North South
7:00 AM 4 3 0
0
0 0 0 0 105 00001051970
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--1%-17%5%-10%1%
Peak
Hour
All 0 12 167
263 0 0 0 0 0
0 1 0 1 27 01120000
6 592 0
HV 0 0 12 0 0
Count Total 0 17 253 0 0 0 181 158 0 11 883 0
94 540000180300241400
15 0 2 89 574
8:45 AM 0 2 33 0
23 0 0 0 0 0
133 592
8:30 AM 0 2 24 0 0 0 23
0 0 0 32 0 500213000
41 0 1 224 513
8:15 AM 0 3 42 0
85 0 0 0 0 0
128 343
8:00 AM 0 4 70 0 0 0 23
0 0 0 17 0 000275500
15 0 0 107 0
7:45 AM 0 5 24 0
27 0 0 0 0 0
54 0
7:30 AM 0 0 31 0 0 0 34
0 0 0 11 0 000171600
9 0 0 54 0
7:15 AM 0 0 10 0
13 0 0 0 0 07:00 AM 0 1 19 0 0 0 12
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
TotalUTLTTHRT
SB 1.8%0.66
TOTAL 4.6%0.66
TH RTUTLTTHRTUTLT
WB 4.3%0.70
NB --
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 6.7%0.60
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
0
0
0 0
0
0
4
0
0 0
N
STORM KING RD
US 6
US 6
ST
O
R
M
K
I
N
G
RD
US 6
592TEV:
0.66PHF:
6 10
5
11
1
20
9
0
197
105 302
2720
167
12179
111 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0
0000000
0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:30 AM 0 0 0 0 0 0
0 0 0 0 0 08:15 AM 0 0 0 0 0
0 0 0 0 0 0
0
8:00 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
27 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastbound
0 0 0 1 0 10011200
5 0 1 53 0
Peak Hour 0 0 12 0
5 0 0 0 0 0Count Total 0 1 22 0 0 0 19
5 26000200001000
2 0 0 8 28
8:45 AM 0 0 2 0
2 0 0 0 0 0
7 27
8:30 AM 0 1 1 0 0 0 2
0 0 0 1 0 1002200
0 0 0 6 26
8:15 AM 0 0 1 0
0 0 0 0 0 0
7 27
8:00 AM 0 0 3 0 0 0 3
0 0 0 0 0 0003000
0 0 0 7 0
7:45 AM 0 0 4 0
0 0 0 0 0 0
6 0
7:30 AM 0 0 4 0 0 0 3
0 0 0 0 0 0002100
0 0 0 7 0
7:15 AM 0 0 3 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 4 0 0 0 3
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
0
1
1
3
5050000000Peak Hour 5 10 0 4 19
0 0 0 0 3 0
0
5:00 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 1
1 0
4:45 PM 1 2 0 1 4 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 1 3 0 1 5 0
0 0 0 0 0 0
East West North South
4:15 PM 2 2 0 1 5
Total EB WB NB SB Total
4%0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB
---3%-0%--7%3%--
0 0
469 0
HV 0 0 5 0 0 0 8
0 0 0 128 0 14001207300
469
Peak
Hour
All 0 7 127 0
0 0 0 0 0 43
4 0 0 19 0
HV%-0%4%-
5:00 PM 0 1 38 0 0
2 0 0
115
0 32 17
0 0 22 0 4 114034250004:45 PM 0 2 27 0 0
0 4 135
0
RT
4:15 PM 0 2 31 0 0
TH RT UT LT TH RT
0 2 105 0
LT
0 0 0 0 0 29
0
4:30 PM 0 2 31 0 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One Hour
0 27 17 0 0 0
UT LT TH
SB 2.8%0.76
TOTAL 4.1%0.87
Eastbound Westbound Northbound Southbound
UT LT TH RT UT
0 27 14
0 0 34 0 4
0
WB 5.2%0.82
NB --
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 3.7%0.86
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
0
0
0 0
0
0
5
0
0 0
N
STORM KING RD
US 6
US 6
ST
O
R
M
K
I
N
G
RD
US 6
469TEV:
0.87PHF:
14 12
8
14
2 80
0
73
120 193
2550
127
7134
134 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
2
0
0
6
1
1
2
2
0
1
1
3
1
0
1
22
50000005
22 0
Peak Hr 5 10 0 4 19 0 0
0 0 0 0 0 0Count Total 14 26 0 14 54 0
0 1 00000005:45 PM 1 3 0 0 4
0 0 0 0 0 0
0
5:30 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 1
3 0
5:15 PM 1 1 0 0 2 0 0
0 0 0 0 0 0
0 1 0
5:00 PM 1 3 0 1 5 0
0 0 0 0 0 04:45 PM 1 2 0 1 4
0 0 0 0 1 0
0
4:30 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 0
2 0
4:15 PM 2 2 0 1 5 0 0
0 0 0 0 0 0
0 2 0
4:00 PM 2 3 0 1 6 0
0 0 0 0 0 03:45 PM 0 0 0 0 0
0 0 0 0 1 0
0
3:30 PM 0 2 0 2 4 0 0 0
0 0 0 0 0 1
6 0
3:15 PM 2 2 0 0 4 0 0
0 0 0 0 0 0
0 0 0
3:00 PM 1 1 0 1 3 0
0 0 0 0 0 0
0 0 0
0
2:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 2
4 5 0
EB WB NB SB Total East
2:45 PM 0 1 0 0 1
0 0 0
---HV%-0%4%--
1 0
2:15 PM 0 0 0 1 1 0 0
0 0 0 0 0 0
West North South
2:00 PM 1 0 0
0
0 0 0 0 128 0000120730
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--3%-0%4%-7%3%
Peak
Hour
All 0 7 127
280 0 0 0 0 1
0 4 0 0 19 0820000
14 469 0
HV 0 0 5 0 0
Count Total 0 21 476 0 0 0 434 414 0 57 1,683 0
92 428000170100261700
18 0 3 98 450
5:45 PM 0 0 31 0
17 0 0 0 0 0
103 457
5:30 PM 0 1 31 0 0 0 28
0 0 0 24 0 400281300
43 0 4 135 469
5:15 PM 0 0 34 0
17 0 0 0 0 0
114 422
5:00 PM 0 1 38 0 0 0 32
0 0 0 22 0 400342500
29 0 2 105 386
4:45 PM 0 2 27 0
14 0 0 0 0 0
115 389
4:30 PM 0 2 31 0 0 0 27
0 0 0 34 0 400271700
23 0 5 88 373
4:15 PM 0 2 31 0
13 0 0 0 0 0
78 376
4:00 PM 0 1 20 0 0 0 26
0 0 0 20 0 30027900
29 0 4 108 401
3:45 PM 0 2 17 0
21 0 0 0 0 0
99 385
3:30 PM 0 3 34 0 0 0 17
0 0 1 14 0 100371800
16 0 4 91 374
3:15 PM 0 1 27 0
20 0 0 0 0 0
103 457
3:00 PM 0 1 22 0 0 0 28
0 0 0 21 0 400321500
26 0 5 92 0
2:45 PM 0 3 28 0
8 0 0 0 0 0
88 0
2:30 PM 0 1 29 0 0 0 23
0 0 0 18 0 000182500
60 0 9 174 0
2:15 PM 0 0 27 0
31 0 0 0 0 02:00 PM 0 1 49 0 0 0 24
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
TotalUTLTTHRTTHRTUTLTTHRTUTLT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0
0000000
0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
5:30 PM 0 0 0 0 0 0
0 0 0 0 0 05:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
5:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 0 0 0 0 0 0
0 0 0 0 0 04:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
4:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
3:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
3:30 PM 0 0 0 0 0 0
0 0 0 0 0 03:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
3:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
2:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
2:30 PM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
2:15 PM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
2:00 PM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
19 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastbound
0 0 0 4 0 0008200
13 0 1 54 0
Peak Hour 0 0 5 0
4 0 0 0 0 0Count Total 0 0 14 0 0 0 22
4 16000000003000
1 0 0 5 16
5:45 PM 0 0 1 0
0 0 0 0 0 0
2 16
5:30 PM 0 0 1 0 0 0 3
0 0 0 0 0 0001000
1 0 0 5 19
5:15 PM 0 0 1 0
1 0 0 0 0 0
4 20
5:00 PM 0 0 1 0 0 0 2
0 0 0 1 0 0002000
1 0 0 5 16
4:45 PM 0 0 1 0
0 0 0 0 0 0
5 15
4:30 PM 0 0 1 0 0 0 3
0 0 0 1 0 0001100
1 0 0 6 14
4:15 PM 0 0 2 0
0 0 0 0 0 0
0 11
4:00 PM 0 0 2 0 0 0 3
0 0 0 0 0 0000000
2 0 0 4 12
3:45 PM 0 0 0 0
1 0 0 0 0 0
4 8
3:30 PM 0 0 0 0 0 0 1
0 0 0 0 0 0001100
0 0 1 3 5
3:15 PM 0 0 2 0
0 0 0 0 0 0
1 7
3:00 PM 0 0 1 0 0 0 1
0 0 0 0 0 0001000
0 0 0 0 0
2:45 PM 0 0 0 0
0 0 0 0 0 0
1 0
2:30 PM 0 0 0 0 0 0 0
0 0 0 1 0 0000000
4 0 0 5 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 1 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 03/03/2021
Count Period: 7:00 AM to 9:00 AM
HV %:PHF
EB 5.1%0.63
WB 3.5%0.66
NB 5.3%0.93
SB 4.1%0.84
NEB --Peak Hour: 7:45 AM to 8:45 AM
Peak Hour
NWB 7.4%0.87
TOTAL 4.9%0.88
0
US 6
0
ME
L
R
E
Y
R
D
296
372
00
0
11
72
162
51
258
3510
78
47
4
116
13
1
0 ME
L
R
E
Y
R
D
0
US 6
1,339TEV:
0.88PHF:
MEL REY RD
US 6
N
57
0
35
6
0
33 01
23
3
23
073
12
1 68
4
67 0 0191421
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
886
1,087
1,266
1,339
1,326
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
43
45
60
66
68
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
US 6 US 6
Eastbound Westbound
LT BL LT TH
MEL REY RD MEL REY RD I-70 WB RAMP
RT HR UT LT
0
I-70 WB RAMP 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
7:00 AM 0 2 11 0 15 4 1 3 0
One
16 2 0115261033
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
15 2 10 1
33 0 0 116751015356
0 2 0 16131
181
7:15 AM 0 0 12 0 14 1 0 0
0 6 0 4 0 2000000
2 2
02
47 020109143
0 3 0 2 168
7:30 AM 0 2 14 0
0 0 0 0 0 2094200
36 0 248
7:45 AM 0 0 9 0 31 7
0 0 0 5 0 1363000011847123143098
81 8
0 17
289
8:00 AM 0 6 24 0 68 20 0 0
0 5 0 14 2 60000000301464113
0 14 5 4 382
8:15 AM 0 4 24 0
0 0 0 0 0 40206300801542006168213
74 0 0 8 0 181150153074314004216
42 3 67 0204814322
3 9 347
8:30 AM 0 1 15 0 20 10
0 0 0 1 0 13550000
1 23
321
8:45 AM 0 2 23 0 31 8 2 0
0 0 0 6 1 70000000201542028
0 16 5 4 276000001001730002614310052611162
4 144 367 75 363 01101827512218Count Total 0 17 132 0 253 68
47 78 13 1
2,212
Peak
Hour
All 0 11 72 0 162 51 4
0 33 0 83 18 3600000013001253619
HV 0 0 4 0 7
10 0 47 11 26 1,33900000019067211407323333230000116
0 0 0 00010401081057400134
0%-11%4%15%3%---1%6%5%8%0%
3 66
HV%-0%6%-4%8%0%
0 0 2 0 2 000
NB SB
1 0 0 2
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
20%-4%0%12%5%------5%-6%0%
0 0 0 1 0 01100000
South SE SW Total
7:00 AM 3 0 6 0 0
NEB NWB Total East West NorthNWBTotalEBWB
0 1 0 5
7:30 AM 4 4 3 0 0
0 0 0 2 0 2070000
0 0 0 0
7:15 AM 3 2 2 0 0
0 0 0 0 0 01120000
0 0 0 0 0 01120000
0 0 0 0
8:00 AM 2 1 7 1 0
0 0 0 0 0 01140000
0 0 0 0
7:45 AM 5 0 7 1 0
0 0 0 3
8:30 AM 3 4 9 1 0
0 0 0 0 0 34220000
0 1 0 3
8:15 AM 5 4 7 2 0
0 0 0 1 0 11180000
0 1 0 300010131600008:45 AM 3 1 6 3 0
0 0 0 5 0 7121110000Count Total 28 16 47 8 0 1 3 0 16
0 0 0
UT LT TH BR RT HR
I-70 WB RAMP
Peak Hr 15 9 30 5 0 0 1 0 6
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
US 6 MEL REY RD MEL REY RD I-70 WB RAMP
0 0 0 1 0 47660
7:15 AM 0 0 1 0
Hour
7:00 AM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
US 6
0 0011
10
1 0000130
0 0 7
12
0 00000100000000
7:30 AM 0 0 1 0 2 1
0 0 0 0 0 00000000000000020200
7:45 AM 0 0 1 0 2 2 0 0
0 0 0 1 0 00000000000000200
0 0 0 14
8:00 AM 0 0 0 0
0 0 0 0 0 101000041100000000
0 0 0 1100213200000
01
2 0000211
0 0 12
8:15 AM 0 0 3 0 1 1
0 0 0 1 0 000000010
22
8:30 AM 0 0 0 0 2 1 0 0
0 0 0 2 0 20000000101000131
0 0 1 18
8:45 AM 0 0 0 0
0 0 0 0 0 001000020300011200
0 0 0 3000201300010
04
0 1 1600010100000030
Count Total 0 1 6 0 15 6 0 0 0 4 111
Peak Hour 0 0 4 0
0 0 0 0 0 40700001561200135710
Interval Start
US 6 US 6 MEL REY RD MEL REY RD I-70 WB RAMP I-70 WB RAMP
0 0 0 2 0 200000070010441081057
One
UT
0 3 6640013
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
7:15 AM 0 0 0 0 0 0 0
7:00 AM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
7:30 AM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000008:00 AM 0 0 0 0 0
0 0 0 0
0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000
8:30 AM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 1 0 0 1 1 0 0 0 0 0 0023010
Northbound Southbound Northeastbound Northwestbound
014 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 03/03/2021
Count Period: 4:00 PM to 6:00 PM
HV %:PHF
EB 2.4%0.86
WB 2.8%0.96
NB 2.0%0.80
SB 0.8%0.85
NEB --Peak Hour: 5:00 PM to 6:00 PM
Peak Hour
NWB 2.9%0.79
TOTAL 2.2%0.86
0
US 6
0
ME
L
R
E
Y
R
D
375
291
10
0
9
90
126
150
363
3440
105
143
4
94
17
11
0 ME
L
R
E
Y
R
D
0
US 6
1,930TEV:
0.86PHF:
MEL REY RD
US 6
N
90
2
33
2
0
10
6
09
13
0
18
6
47
1
11
9
15
4
11
45 0 0191045
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,733
1,904
1,925
1,922
1,930
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
49
47
41
42
43
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
US 6 US 6
Eastbound Westbound
LT BL LT TH
MEL REY RD MEL REY RD I-70 WB RAMP
RT HR UT LT
0
I-70 WB RAMP 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
4:00 PM 0 2 15 0 34 22 0 9 0
One
8 11 2166331550
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
26 35 22 3
43 0 0 223192581982724
1 6 0 14305
393
4:15 PM 0 2 27 0 37 32 1 0
0 17 0 8 4 10000000
4 9
00
40 0002221347
0 21 3 7 434
4:30 PM 0 5 20 0
0 0 0 0 0 1101211000
41 0 454
4:45 PM 0 3 21 0 37 17
0 0 0 9 0 11510000012931303519002326
47 27
2 162
452
5:00 PM 0 3 20 0 36 50 1 0
0 10 0 11 6 6000000040181030108
0 16 4 14 564
5:15 PM 0 2 24 0
0 0 0 0 0 1508191003436490072035302
53 0 0 5 0 10272010631203333102042
33 25 49 0103134245
4 7 455
5:30 PM 0 2 21 0 22 33
0 0 0 14 0 51240000
2 105
451
5:45 PM 0 2 25 0 35 34 1 0
0 11 0 12 5 100000000501771598
0 13 9 14 460000001801074003225350022332248
11 872 268 202 360 05018824421640Count Total 0 21 173 0 269 240
143 105 17 9
3,663
Peak
Hour
All 0 9 90 0 126 150 4
0 105 0 97 39 770000001400978216
HV 0 0 3 0 3
58 0 46 22 45 1,930000000190454510047113010618600094
0 0 0 0000001006804300262
0%-1%6%0%2%---2%4%2%0%0%
1 43
HV%-0%3%-2%2%0%
0 0 0 0 2 200
NB SB
0 1 0 3
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
0%-4%9%2%2%------0%-0%2%
0 0 0 1 0 12120000
South SE SW Total
4:00 PM 1 3 6 0 0
NEB NWB Total East West NorthNWBTotalEBWB
0 0 0 0
4:30 PM 1 2 2 0 0
0 0 0 0 0 06190000
0 0 0 1
4:15 PM 6 2 5 0 0
0 0 0 0 0 1160000
0 0 0 2 0 10100000
0 3 0 7
5:00 PM 0 7 3 0 0
0 0 0 2 0 20120000
0 1 0 4
4:45 PM 4 2 5 1 0
0 3 0 10
5:30 PM 0 1 3 1 0
0 0 0 3 0 42130000
0 1 1 4
5:15 PM 4 1 6 0 0
0 0 0 1 1 0270000
0 5 0 1600050611300005:45 PM 5 1 6 0 0
0 0 0 14 1 1514920000Count Total 21 19 36 2 0 0 14 1 45
0 0 0
UT LT TH BR RT HR
I-70 WB RAMP
Peak Hr 9 10 18 1 0 0 10 1 34
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
US 6 MEL REY RD MEL REY RD I-70 WB RAMP
0 0 0 11 1 115430
4:15 PM 0 0 1 0
Hour
4:00 PM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
US 6
0 0000
12
0 0000200
1 3 19
6
0 10000100000000
4:30 PM 0 0 0 0 0 1
0 0 0 1 0 10000001000200220410
4:45 PM 0 0 1 0 3 0 0 0
0 0 0 0 0 10000000000000200
0 0 0 12
5:00 PM 0 0 0 0
0 0 0 0 0 001000030100000110
0 0 0 0100210000015
01
2 0001000
0 0 10
5:15 PM 0 0 2 0 1 1
0 0 0 0 0 000000000
13
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 1 1 00000000000000220
0 1 1 7
5:45 PM 0 0 1 0
0 0 0 0 0 000100010100001000
0 0 0 0100140220000
01
0 0 1300000100000010
Count Total 0 0 5 0 11 5 0 0 3 6 92
Peak Hour 0 0 3 0
0 0 0 0 0 2011000150700039610
Interval Start
US 6 US 6 MEL REY RD MEL REY RD I-70 WB RAMP I-70 WB RAMP
0 0 0 0 0 21000004000002006803
One
UT
2 1 4330026
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
4:15 PM 0 0 0 0 0 0 0
4:00 PM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
4:30 PM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000005:00 PM 0 0 0 0 0
0 0 0 0
0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000
5:30 PM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 0 0 1 0 0 0 1 1 1 0032010
Northbound Southbound Northeastbound Northwestbound
014 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 10/20/2022
Count Period: 7:00 AM to 9:00 AM
HV %:PHF
EB 6.1%0.72
WB 6.0%0.78
NB 5.5%0.87
SB 3.6%0.77
NEB --Peak Hour: 7:30 AM to 8:30 AM
Peak Hour
NWB 4.4%0.74
TOTAL 5.4%0.88
0
Hwy 6
0
Me
l
R
a
y
R
d
328
260
00
0
7
98
178
45
300
4700
51
36
5
197
11
1
0 Mi
d
l
a
n
d
A
v
e
0
Hwy 6
1,705TEV:
0.88PHF:
Midland Ave
Hwy 6
N
71
2
60
7
0
76 01
15
5
33
6
14
4
13
9
11
0
6
77 0 026630
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,250
1,539
1,705
1,620
1,383
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
63
74
92
87
90
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
Hwy 6 Hwy 6
Eastbound Westbound
LT BL LT TH
Midland Ave Mel Ray Rd I70 Westbound Ramp
RT HR UT LT
0
I70 Westbound Ramp 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
7:00 AM 0 2 12 0 16 4 0 5 0
One
19 8 101723944
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
19 4 4 0
41 0 0 4206520182012
0 5 0 22121
194
7:15 AM 0 1 16 0 25 4 0 0
0 4 0 0 0 1000000
4 0
02
94 000686166
0 3 2 0 204
7:30 AM 0 1 17 0
0 0 0 0 0 80114200
85 0 386
7:45 AM 0 1 24 0 41 5
0 0 0 61 2 91200000130299257104112
42 33
0 38
466
8:00 AM 0 2 27 0 74 11 2 0
0 30 0 16 3 10000000602964035
1 8 5 2 483
8:15 AM 0 3 30 0
0 0 0 0 0 500157000422489009576122
68 0 0 6 0 1111204142103822203112
30 19 55 010227140
4 2 370
8:30 AM 1 0 24 0 35 12
0 0 0 13 0 15520000
1 27
301
8:45 AM 0 1 16 0 19 9 1 0
0 10 0 10 5 00000000501561029
0 8 6 0 2290000080184200271133004104173
2 235 255 127 509 090268579116Count Total 1 11 166 0 273 74
36 51 11 1
2,633
Peak
Hour
All 0 7 98 0 178 45 5
0 184 3 69 29 600000004401405212
HV 0 0 5 0 8
154 3 48 16 5 1,70500000026077306014415576336000197
0 0 0 000103100119217710755
0%-8%6%3%5%---4%14%10%0%0%
0 92
HV%-0%5%-4%16%20%
0 0 3 1 2 400
NB SB
0 2 0 4
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
2%33%4%25%0%5%------4%-4%3%
0 0 0 0 0 2090000
South SE SW Total
7:00 AM 1 2 5 1 0
NEB NWB Total East West NorthNWBTotalEBWB
0 2 0 3
7:30 AM 5 3 11 1 0
0 0 0 0 0 10120000
0 0 0 0
7:15 AM 4 2 5 1 0
0 0 0 0 0 02220000
0 0 0 0 0 03200000
0 1 0 6
8:00 AM 3 2 10 2 0
0 0 0 1 0 40200000
0 0 0 0
7:45 AM 5 4 9 2 0
0 0 0 2
8:30 AM 7 2 7 1 0
0 0 0 0 0 25300000
0 0 0 1
8:15 AM 7 9 9 0 0
0 0 0 0 0 10170000
0 3 0 500010102300008:45 AM 3 1 17 2 0
0 0 0 2 0 11101530000Count Total 35 25 73 10 0 0 8 0 21
0 0 0
UT LT TH BR RT HR
I70 Westbound Ramp
Peak Hr 20 18 39 5 0 0 1 0 8
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp
0 0 0 1 0 610920
7:15 AM 0 0 2 0
Hour
7:00 AM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
Hwy 6
0 0020
9
5 0002010
0 0 12
22
1 00000000000000
7:30 AM 0 0 1 0 3 1
0 0 0 0 0 00100000000000320020
7:45 AM 0 0 2 0 2 1 0 0
0 0 1 0 1 00000000001000510
0 0 0 20
8:00 AM 0 0 0 0
0 0 0 0 0 001000041200120200
0 0 0 1000201120020
02
3 0101520
1 0 20
8:15 AM 0 0 2 0 2 3
0 0 0 2 0 010000070
30
8:30 AM 0 0 1 0 5 1 0 0
0 1 0 2 2 00000000000000240
0 0 0 17
8:45 AM 0 0 1 0
0 0 0 0 0 001000021300020000
0 0 0 2100852200000
01
0 0 2300000000000020
Count Total 0 0 9 0 16 10 1 0 4 0 153
Peak Hour 0 0 5 0
0 0 0 0 0 306210021523001135600
Interval Start
Hwy 6 Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp I70 Westbound Ramp
0 0 0 3 1 2100000170010350011928
One
UT
4 0 9271075
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
7:15 AM 0 0 0 0 0 0 0
7:00 AM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
7:30 AM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000008:00 AM 0 0 0 0 0
0 0 0 0
0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000
8:30 AM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 0 0 1 0 0 0 2 0 0 0013010
Northbound Southbound Northeastbound Northwestbound
124 2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 10/20/2022
Count Period: 4:00 PM to 6:00 PM
HV %:PHF
EB 3.7%0.84
WB 1.4%0.83
NB 2.9%0.84
SB 2.8%0.89
NEB --Peak Hour: 4:30 PM to 5:30 PM
Peak Hour
NWB 0.0%0.88
TOTAL 2.5%0.91
0
Hwy 6
0
Me
l
R
a
y
R
d
437
460
00
0
8
115
151
163
415
4130
108
139
3
154
11
8
0 Mi
d
l
a
n
d
A
v
e
0
Hwy 6
2,225TEV:
0.91PHF:
Midland Ave
Hwy 6
N
1,
0
1
2
43
7
0
77 00
26
4
26
8
40
3
17
7
13
4
20
59 0 0242074
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,949
2,066
2,225
2,216
2,191
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
63
62
56
43
41
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
Hwy 6 Hwy 6
Eastbound Westbound
LT BL LT TH
Midland Ave Mel Ray Rd I70 Westbound Ramp
RT HR UT LT
0
I70 Westbound Ramp 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
4:00 PM 0 2 20 0 31 31 0 7 0
One
20 11 4082442364
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
32 25 20 3
54 0 0 528202180785627
0 6 0 16313
457
4:15 PM 0 1 14 0 27 24 1 0
0 15 0 16 6 1000000
7 1
00
66 0104821353
1 13 18 3 452
4:30 PM 0 3 26 0
0 0 0 0 0 2001417200
60 0 512
4:45 PM 0 0 26 0 29 37
0 0 0 18 0 18176000008869213834102524
55 13
0 107
528
5:00 PM 0 2 40 0 38 50 0 0
0 15 1 20 14 2000000070161630100
0 14 7 0 574
5:15 PM 0 3 23 0
0 0 0 0 0 18015154005317630064353263
79 0 0 5 0 12162010887264642103841
60 18 54 0002745159
10 0 611
5:30 PM 0 3 24 0 41 43
0 0 0 22 1 162670000
0 92
503
5:45 PM 0 1 17 0 33 38 1 0
0 15 0 10 8 100000012011144098
1 10 12 1 5030000010081820051126900122842396
0 753 475 157 509 05026927120337Count Total 0 15 190 0 283 299
139 108 11 0
4,140
Peak
Hour
All 0 8 115 0 151 163 3
0 133 4 117 82 9000000150011213432
HV 0 1 5 0 8
73 2 68 38 3 2,225000000240597420040326477268000154
0 0 0 00020210012953200123
0%-3%3%6%1%---1%1%3%0%-
0 56
HV%-13%4%-5%1%0%
0 0 0 0 0 000
NB SB
0 1 0 4
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
0%0%0%0%0%3%------8%-3%1%
0 0 0 0 0 31130000
South SE SW Total
4:00 PM 3 2 5 2 0
NEB NWB Total East West NorthNWBTotalEBWB
0 1 0 3
4:30 PM 7 2 8 1 0
0 0 0 0 0 22190000
0 5 0 21
4:15 PM 3 4 9 1 0
0 0 0 5 0 110180000
0 0 0 0 0 40120000
0 4 0 9
5:00 PM 2 1 8 1 0
0 0 0 2 0 30130000
0 2 0 6
4:45 PM 3 2 7 1 0
0 1 0 4
5:30 PM 1 0 3 0 0
0 0 0 1 0 20130000
0 1 0 3
5:15 PM 4 1 6 2 0
0 0 0 1 0 1150000
0 1 0 900040431100005:45 PM 3 2 3 0 0
0 0 0 13 0 3071040000Count Total 26 14 49 8 0 0 16 0 59
0 0 0
UT LT TH BR RT HR
I70 Westbound Ramp
Peak Hr 16 6 29 5 0 0 12 0 40
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp
0 0 0 8 0 200560
4:15 PM 0 0 0 0
Hour
4:00 PM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
Hwy 6
0 0001
13
1 0001100
1 0 19
18
1 00000001001000
4:30 PM 0 1 3 0 3 0
0 0 0 0 0 11000002000120241210
4:45 PM 0 0 0 0 2 1 0 0
0 0 0 0 0 00000000001000313
0 0 0 13
5:00 PM 0 0 1 0
0 0 0 0 0 000000031100100200
0 1 0 0000511100001
02
0 0000010
0 0 12
5:15 PM 0 0 1 0 2 1
0 0 0 0 0 000000010
13
5:30 PM 0 0 1 0 0 0 0 0
0 0 0 0 0 00000000001100240
0 0 0 5
5:45 PM 0 0 0 0
0 0 0 0 0 100000010200000000
0 0 0 0200020300000
00
0 0 1100020100000010
Count Total 0 1 8 0 13 4 0 0 1 0 104
Peak Hour 0 1 5 0
0 0 0 0 0 3023000176900314720
Interval Start
Hwy 6 Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp I70 Westbound Ramp
0 0 0 0 0 010000030020230012958
One
UT
0 0 5620012
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
4:15 PM 0 0 0 0 0 0 0
4:00 PM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
4:30 PM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000005:00 PM 0 0 0 0 0
0 0 0 0
0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000
5:30 PM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 2 0 0 1 0 0 0 1 1 0031010
Northbound Southbound Northeastbound Northwestbound
017 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX B
Future Traffic Projections
CDOT OTIS: Glenwood Business Center
ROUTE REFPT ENDREFPT LENGTH UPDATEYR AADT YR20FACTOR
Growth Rate
%DHV DD LOCATION
006K 0 0.338 0.314 2021 11000 1.15 0.70%9.5 54 ON SH 6 WEST ST W/O SH 82 GLENWOOD SPRINGS
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX C
Trip Generation Worksheets
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No. of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Warehousing (150)
Independent Variable - 1000 Square Feet Gross Floor Feet (X)
Gross Floor Area =67,950
X =68.0
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (100 Series Page 96)
Directional Distribution: 77% ent. 23%exit.
T = 0.17 (X)T =12 Average Vehicle Trip Ends
T = 0.17 *67.95 9 entering 3 exiting
9 + 3 (*) =12
(*) TRIP END WAS CHANGED BY 1 TO SATISFY THE TOTAL
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (100 Series Page 97)
Directional Distribution: 28% ent. 72%exit.
T = 0.18 (X)T =13 Average Vehicle Trip Ends
T = 0.18 *67.95 4 entering 9 exiting
4 + 9 =13
Weekday (100 Series Page 95)
Directional Distribution: 50% entering, 50% exiting
T = 1.71 (X)T =118 Average Vehicle Trip Ends
T = 1.71 *67.95 59 entering 59 exiting
59 + 59 = 118
Trip Generation for Warehousing
Glenwood Business Center
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No. of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Mini-Warehouse (151)
Independent Variable - 1000 Square Feet Gross Floor Feet (X)
Gross Floor Area =97,750
X =97.8
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (Page 111)
Weekday Average Directional Distribution: 59% ent. 41%exit.
T = 0.09 (X)T = 9 Average Vehicle Trip Ends
T = 0.09 *97.75 5 entering 4 exiting
5 + 4 (*) =9
(*) TRIP END WAS CHANGED BY 1 TO SATISFY THE TOTAL
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (Page 112)
Weekday Average Directional Distribution: 47% ent. 53%exit.
T = 0.15 (X)T =15 Average Vehicle Trip Ends
T = 0.15 *97.75 7 entering 8 exiting
7 + 8 =15
Weekday Daily (Page 110)
Weekday Average Directional Distribution: 50% entering, 50% exiting
T = 1.45 (X)T =142 Average Vehicle Trip Ends
T = 1.45 *97.75 71 entering 71 exiting
71 + 71 = 142
Trip Generation for Mini Warehouse
Glenwood Business Center
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Multifamily Housing (Low-Rise) (220)
Independent Variable - Dwelling Units (X)
X = 3
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (200 Series Page 255)
Average Weekday Directional Distribution: 24% ent. 76%exit.
(T) = 0.40 (X)T = 1 Average Vehicle Trip Ends
(T) = 0.40 *(3.0)0 entering 1 exiting
0 + 1 = 1
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (200 Series Page 256)
Average Weekday Directional Distribution: 63% ent. 37%exit.
(T) = 0.51(X)T = 2 Average Vehicle Trip Ends
(T) = 0.51 *(3.0)1 entering 1 exiting
1 + 1 = 2
Weekday (200 Series Page 254)
Average Weekday Directional Distribution: 50% entering, 50% exiting
(T) = 6.74 (X)T =22 Average Vehicle Trip Ends
(T) = 6.74 *(3.0)11 entering 11 exiting
11 + 11 = 22
Glenwood Business Center
Trip Generation for Multifamily Housing (Low-Rise)
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rates
Land Use Code - General Office Building (710)
Independent Variable - 1000 Square Feet (X)
SF =
X =35.175
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (700 Series Page 710)
Directional Distribution:88% ent. 12%exit.
(T) = 1.52 (X)T =53 Average Vehicle Trip Ends
(T) = 1.52 *(35.2)47 entering 6 exiting
47 + 6 =53
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (700 Series Page 711)
Directional Distribution:17% ent. 83%exit.
(T) = 1.44 (X)T =51 Average Vehicle Trip Ends
(T) = 1.44 *(35.2)9 entering 42 exiting
9 +42 =51
Weekday (700 Series Page 709)
Directional Distribution:50% ent. 50%exit.
(T) = 10.84 (X)T =382 Average Vehicle Trip Ends
(T) = 10.84 *(35.2)191 entering 191 exiting
191 +191 =382
35,175
Glenwood Business Center
Trip Generation for General Office Building
MAG February 09, 2023 096671009
1 1
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX D
Intersection Analysis Worksheets
HCM 6th TWSC 2023 Existing AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 25 42 48 21 17 21
Future Vol, veh/h 25 42 48 21 17 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 32 53 61 27 22 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 88 0 216 63
Stage 1 - - -- 62 -
Stage 2 - - -- 154 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1508 - 772 1002
Stage 1 - - -- 961 -
Stage 2 - - -- 874 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1504 - 734 998
Mov Cap-2 Maneuver - - -- 734 -
Stage 1 - - -- 958 -
Stage 2 - - -- 834 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)860 - - 1504 -
HCM Lane V/C Ratio 0.056 - - 0.04 -
HCM Control Delay (s)9.4 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2023 Existing PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 37 24 25 26 29 16
Future Vol, veh/h 37 24 25 26 29 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 44 28 29 31 34 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 75 0 155 62
Stage 1 - - -- 61 -
Stage 2 - - -- 94 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1512 - 832 997
Stage 1 - - -- 957 -
Stage 2 - - -- 925 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1508 - 809 993
Mov Cap-2 Maneuver - - -- 809 -
Stage 1 - - -- 954 -
Stage 2 - - -- 902 -
Approach EB WB NB
HCM Control Delay, s 0 3.6 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)866 - - 1508 -
HCM Lane V/C Ratio 0.061 - - 0.02 -
HCM Control Delay (s)9.4 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Background AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 25 43 49 21 17 21
Future Vol, veh/h 25 43 49 21 17 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 32 54 62 27 22 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 89 0 218 63
Stage 1 - - -- 62 -
Stage 2 - - -- 156 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1506 - 770 1002
Stage 1 - - -- 961 -
Stage 2 - - -- 872 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1502 - 732 998
Mov Cap-2 Maneuver - - -- 732 -
Stage 1 - - -- 958 -
Stage 2 - - -- 831 -
Approach EB WB NB
HCM Control Delay, s 0 5.3 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)858 - - 1502 -
HCM Lane V/C Ratio 0.056 - - 0.041 -
HCM Control Delay (s)9.4 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Background PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 38 24 25 26 29 16
Future Vol, veh/h 38 24 25 26 29 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 45 28 29 31 34 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 76 0 156 63
Stage 1 - - -- 62 -
Stage 2 - - -- 94 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1510 - 831 996
Stage 1 - - -- 956 -
Stage 2 - - -- 925 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1506 - 808 992
Mov Cap-2 Maneuver - - -- 808 -
Stage 1 - - -- 953 -
Stage 2 - - -- 902 -
Approach EB WB NB
HCM Control Delay, s 0 3.6 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)865 - - 1506 -
HCM Lane V/C Ratio 0.061 - - 0.02 -
HCM Control Delay (s)9.4 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Total AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 28 46 49 22 18 21
Future Vol, veh/h 28 46 49 22 18 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 58 62 28 23 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 96 0 224 68
Stage 1 - - -- 67 -
Stage 2 - - -- 157 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1498 - 764 995
Stage 1 - - -- 956 -
Stage 2 - - -- 871 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1494 - 726 991
Mov Cap-2 Maneuver - - -- 726 -
Stage 1 - - -- 953 -
Stage 2 - - -- 830 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)848 - - 1494 -
HCM Lane V/C Ratio 0.058 - - 0.042 -
HCM Control Delay (s)9.5 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Total PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 39 25 25 29 32 16
Future Vol, veh/h 39 25 25 29 32 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 46 29 29 34 38 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 78 0 161 65
Stage 1 - - -- 64 -
Stage 2 - - -- 97 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1508 - 825 993
Stage 1 - - -- 954 -
Stage 2 - - -- 922 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1504 - 802 989
Mov Cap-2 Maneuver - - -- 802 -
Stage 1 - - -- 951 -
Stage 2 - - -- 899 -
Approach EB WB NB
HCM Control Delay, s 0 3.4 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)856 - - 1504 -
HCM Lane V/C Ratio 0.066 - - 0.02 -
HCM Control Delay (s)9.5 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Background AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 29 49 56 24 20 24
Future Vol, veh/h 29 49 56 24 20 24
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 37 62 71 30 25 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 102 0 248 72
Stage 1 - - -- 71 -
Stage 2 - - -- 177 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1490 - 740 990
Stage 1 - - -- 952 -
Stage 2 - - -- 854 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1486 - 698 986
Mov Cap-2 Maneuver - - -- 698 -
Stage 1 - - -- 949 -
Stage 2 - - -- 808 -
Approach EB WB NB
HCM Control Delay, s 0 5.3 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)830 - - 1486 -
HCM Lane V/C Ratio 0.067 - - 0.048 -
HCM Control Delay (s)9.6 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Background PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 43 28 29 30 34 19
Future Vol, veh/h 43 28 29 30 34 19
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 51 33 34 35 40 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 87 0 179 72
Stage 1 - - -- 71 -
Stage 2 - - -- 108 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1496 - 806 985
Stage 1 - - -- 947 -
Stage 2 - - -- 911 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1492 - 781 981
Mov Cap-2 Maneuver - - -- 781 -
Stage 1 - - -- 944 -
Stage 2 - - -- 885 -
Approach EB WB NB
HCM Control Delay, s 0 3.7 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)843 - - 1492 -
HCM Lane V/C Ratio 0.074 - - 0.023 -
HCM Control Delay (s)9.6 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Total AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 32 52 56 25 21 24
Future Vol, veh/h 32 52 56 25 21 24
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 41 66 71 32 27 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 110 0 256 78
Stage 1 - - -- 77 -
Stage 2 - - -- 179 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1480 - 733 983
Stage 1 - - -- 946 -
Stage 2 - - -- 852 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1476 - 691 979
Mov Cap-2 Maneuver - - -- 691 -
Stage 1 - - -- 943 -
Stage 2 - - -- 806 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)820 - - 1476 -
HCM Lane V/C Ratio 0.069 - - 0.048 -
HCM Control Delay (s)9.7 - - 7.6 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.2 -
HCM 6th TWSC 2045 Total PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 44 29 29 33 37 19
Future Vol, veh/h 44 29 29 33 37 19
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 52 34 34 39 44 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 89 0 184 73
Stage 1 - - -- 72 -
Stage 2 - - -- 112 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1494 - 801 983
Stage 1 - - -- 946 -
Stage 2 - - -- 908 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1490 - 776 979
Mov Cap-2 Maneuver - - -- 776 -
Stage 1 - - -- 943 -
Stage 2 - - -- 883 -
Approach EB WB NB
HCM Control Delay, s 0 3.5 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)835 - - 1490 -
HCM Lane V/C Ratio 0.079 - - 0.023 -
HCM Control Delay (s)9.7 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.3 - - 0.1 -
HCM 6th AWSC 2023 Existing AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 37 41 22 7 33 13 20 5 31 1
Future Vol, veh/h 1 22 37 41 22 7 33 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 31 51 57 31 10 46 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8 7.9
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 2% 59% 14%
Vol Thru, %20% 37% 31% 84%
Vol Right, %30% 62% 10% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 66 60 70 37
LT Vol 33 1 41 5
Through Vol 13 22 22 31
RT Vol 20 37 7 1
Lane Flow Rate 92 83 97 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.112 0.095 0.121 0.065
Departure Headway (Hd)4.402 4.092 4.493 4.538
Convergence, Y/N Yes Yes Yes Yes
Cap 817 878 800 792
Service Time 2.414 2.104 2.506 2.551
HCM Lane V/C Ratio 0.113 0.095 0.121 0.064
HCM Control Delay 8 7.5 8.1 7.9
HCM Lane LOS A A A A
HCM 95th-tile Q 0.4 0.3 0.4 0.2
HCM 6th AWSC 2023 Existing PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 26 35 35 9 33 51 34 4 18 5
Future Vol, veh/h 1 22 26 35 35 9 33 51 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 23 27 36 36 9 34 53 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.4 7.9 7.9 7.5
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 44% 15%
Vol Thru, %43% 45% 44% 67%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 118 49 79 27
LT Vol 33 1 35 4
Through Vol 51 22 35 18
RT Vol 34 26 9 5
Lane Flow Rate 122 51 81 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.14 0.058 0.098 0.034
Departure Headway (Hd)4.151 4.129 4.339 4.364
Convergence, Y/N Yes Yes Yes Yes
Cap 852 872 814 825
Service Time 2.235 2.131 2.43 2.366
HCM Lane V/C Ratio 0.143 0.058 0.1 0.034
HCM Control Delay 7.9 7.4 7.9 7.5
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.2 0.3 0.1
HCM 6th AWSC 2025 Background AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 38 42 22 7 33 13 20 5 31 1
Future Vol, veh/h 1 22 38 42 22 7 33 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 31 53 58 31 10 46 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8 7.9
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 2% 59% 14%
Vol Thru, %20% 36% 31% 84%
Vol Right, %30% 62% 10% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 66 61 71 37
LT Vol 33 1 42 5
Through Vol 13 22 22 31
RT Vol 20 38 7 1
Lane Flow Rate 92 85 99 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.112 0.096 0.123 0.065
Departure Headway (Hd)4.408 4.09 4.497 4.544
Convergence, Y/N Yes Yes Yes Yes
Cap 816 879 800 791
Service Time 2.419 2.102 2.509 2.557
HCM Lane V/C Ratio 0.113 0.097 0.124 0.064
HCM Control Delay 8 7.5 8.1 7.9
HCM Lane LOS A A A A
HCM 95th-tile Q 0.4 0.3 0.4 0.2
HCM 6th AWSC 2025 Background PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 26 35 35 9 33 52 34 4 18 5
Future Vol, veh/h 1 22 26 35 35 9 33 52 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 23 27 36 36 9 34 54 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.4 7.9 7.9 7.5
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 44% 15%
Vol Thru, %44% 45% 44% 67%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 119 49 79 27
LT Vol 33 1 35 4
Through Vol 52 22 35 18
RT Vol 34 26 9 5
Lane Flow Rate 123 51 81 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.141 0.058 0.098 0.034
Departure Headway (Hd)4.152 4.131 4.341 4.365
Convergence, Y/N Yes Yes Yes Yes
Cap 851 872 814 825
Service Time 2.236 2.133 2.432 2.367
HCM Lane V/C Ratio 0.145 0.058 0.1 0.034
HCM Control Delay 7.9 7.4 7.9 7.5
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.2 0.3 0.1
HCM 6th AWSC 2025 Total AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 23 42 42 28 7 51 13 20 5 31 1
Future Vol, veh/h 1 23 42 42 28 7 51 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 32 58 58 39 10 71 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.3 8.3 8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %61% 2% 55% 14%
Vol Thru, %15% 35% 36% 84%
Vol Right, %24% 64% 9% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 84 66 77 37
LT Vol 51 1 42 5
Through Vol 13 23 28 31
RT Vol 20 42 7 1
Lane Flow Rate 117 92 107 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.146 0.106 0.136 0.066
Departure Headway (Hd)4.508 4.159 4.567 4.614
Convergence, Y/N Yes Yes Yes Yes
Cap 797 863 787 778
Service Time 2.525 2.175 2.582 2.634
HCM Lane V/C Ratio 0.147 0.107 0.136 0.066
HCM Control Delay 8.3 7.7 8.3 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.4 0.5 0.2
HCM 6th AWSC 2025 Total PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 28 44 35 37 9 39 52 34 4 18 5
Future Vol, veh/h 1 28 44 35 37 9 39 52 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 29 45 36 38 9 40 54 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8 8.1 7.6
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %31% 1% 43% 15%
Vol Thru, %42% 38% 46% 67%
Vol Right, %27% 60% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 125 73 81 27
LT Vol 39 1 35 4
Through Vol 52 28 37 18
RT Vol 34 44 9 5
Lane Flow Rate 129 75 84 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.154 0.086 0.104 0.034
Departure Headway (Hd)4.316 4.109 4.474 4.434
Convergence, Y/N Yes Yes Yes Yes
Cap 836 875 804 810
Service Time 2.316 2.12 2.483 2.446
HCM Lane V/C Ratio 0.154 0.086 0.104 0.035
HCM Control Delay 8.1 7.5 8 7.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.3 0.3 0.1
HCM 6th AWSC 2045 Background AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 26 43 48 26 8 38 15 23 6 36 1
Future Vol, veh/h 1 26 43 48 26 8 38 15 23 6 36 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 36 60 67 36 11 53 21 32 8 50 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.4 8.2 8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 1% 59% 14%
Vol Thru, %20% 37% 32% 84%
Vol Right, %30% 61% 10% 2%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 76 70 82 43
LT Vol 38 1 48 6
Through Vol 15 26 26 36
RT Vol 23 43 8 1
Lane Flow Rate 106 97 114 60
Geometry Grp 1 1 1 1
Degree of Util (X)0.132 0.113 0.144 0.077
Departure Headway (Hd)4.486 4.17 4.567 4.633
Convergence, Y/N Yes Yes Yes Yes
Cap 801 860 787 775
Service Time 2.504 2.189 2.586 2.653
HCM Lane V/C Ratio 0.132 0.113 0.145 0.077
HCM Control Delay 8.2 7.7 8.4 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.4 0.5 0.2
HCM 6th AWSC 2045 Background PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 26 30 41 41 10 38 59 40 5 21 6
Future Vol, veh/h 1 26 30 41 41 10 38 59 40 5 21 6
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 27 31 42 42 10 39 61 41 5 22 6
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8.2 7.6
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 45% 16%
Vol Thru, %43% 46% 45% 66%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 137 57 92 32
LT Vol 38 1 41 5
Through Vol 59 26 41 21
RT Vol 40 30 10 6
Lane Flow Rate 141 59 95 33
Geometry Grp 1 1 1 1
Degree of Util (X)0.169 0.069 0.119 0.041
Departure Headway (Hd)4.3 4.209 4.501 4.442
Convergence, Y/N Yes Yes Yes Yes
Cap 839 853 799 808
Service Time 2.3 2.223 2.515 2.457
HCM Lane V/C Ratio 0.168 0.069 0.119 0.041
HCM Control Delay 8.2 7.5 8.1 7.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.2 0.4 0.1
HCM 6th AWSC 2045 Total AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.3
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 27 47 48 32 8 56 15 23 6 36 1
Future Vol, veh/h 1 27 47 48 32 8 56 15 23 6 36 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 38 65 67 44 11 78 21 32 8 50 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.9 8.5 8.5 8.1
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %60% 1% 55% 14%
Vol Thru, %16% 36% 36% 84%
Vol Right, %24% 63% 9% 2%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 94 75 88 43
LT Vol 56 1 48 6
Through Vol 15 27 32 36
RT Vol 23 47 8 1
Lane Flow Rate 131 104 122 60
Geometry Grp 1 1 1 1
Degree of Util (X)0.166 0.123 0.158 0.078
Departure Headway (Hd)4.581 4.242 4.64 4.706
Convergence, Y/N Yes Yes Yes Yes
Cap 783 846 774 761
Service Time 2.605 2.264 2.661 2.733
HCM Lane V/C Ratio 0.167 0.123 0.158 0.079
HCM Control Delay 8.5 7.9 8.5 8.1
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.4 0.6 0.3
HCM 6th AWSC 2045 Total PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 32 48 41 43 10 44 59 40 5 21 6
Future Vol, veh/h 1 32 48 41 43 10 44 59 40 5 21 6
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 33 49 42 44 10 45 61 41 5 22 6
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.2 8.3 7.7
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %31% 1% 44% 16%
Vol Thru, %41% 40% 46% 66%
Vol Right, %28% 59% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 143 81 94 32
LT Vol 44 1 41 5
Through Vol 59 32 43 21
RT Vol 40 48 10 6
Lane Flow Rate 147 84 97 33
Geometry Grp 1 1 1 1
Degree of Util (X)0.179 0.097 0.122 0.041
Departure Headway (Hd)4.36 4.19 4.545 4.511
Convergence, Y/N Yes Yes Yes Yes
Cap 826 858 791 796
Service Time 2.372 2.205 2.56 2.527
HCM Lane V/C Ratio 0.178 0.098 0.123 0.041
HCM Control Delay 8.3 7.7 8.2 7.7
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.3 0.4 0.1
HCM 6th TWSC 2023 Existing AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 72 9 1 1 148 24 14 5 46 29
Future Vol, veh/h 18 3 72 9 1 1 148 24 14 5 46 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 126 16 2 2 260 42 25 9 81 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 724 734 121 773 747 71 146 0 0 75 0 0
Stage 1 139 139 - 583 583 - - - - - - -
Stage 2 585 595 - 190 164 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 340 346 928 315 340 989 1430 - - 1518 - -
Stage 1 862 780 - 496 497 - - - - - - -
Stage 2 495 491 - 809 761 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 281 272 916 226 267 974 1411 - - 1506 - -
Mov Cap-2 Maneuver 281 272 - 226 267 - - - - - - -
Stage 1 687 765 - 398 399 - - - - - - -
Stage 2 394 394 - 688 747 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.1 20.8 6.5 0.5
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1411 - - 605 247 1506 - -
HCM Lane V/C Ratio 0.184 - - 0.27 0.078 0.006 - -
HCM Control Delay (s)8.1 0 - 13.1 20.8 7.4 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.1 0.3 0 - -
HCM 6th TWSC 2023 Existing PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 63 5 1 5 55 24 7 0 37 21
Future Vol, veh/h 18 0 63 5 1 5 55 24 7 0 37 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 154 12 2 12 134 59 17 0 90 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 481 482 130 537 499 84 155 0 0 84 0 0
Stage 1 130 130 - 344 344 - - - - - - -
Stage 2 351 352 - 193 155 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 495 484 920 455 473 975 1425 - - 1513 - -
Stage 1 874 789 - 671 637 - - - - - - -
Stage 2 666 632 - 809 769 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 440 426 908 346 417 960 1406 - - 1501 - -
Mov Cap-2 Maneuver 440 426 - 346 417 - - - - - - -
Stage 1 776 779 - 599 569 - - - - - - -
Stage 2 585 564 - 672 759 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.7 12.6 5 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1406 - - 734 499 1501 - -
HCM Lane V/C Ratio 0.095 - - 0.269 0.054 - - -
HCM Control Delay (s)7.8 0 - 11.7 12.6 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.3 - - 1.1 0.2 0 - -
HCM 6th TWSC 2025 Background AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 73 9 1 1 150 24 14 5 47 29
Future Vol, veh/h 18 3 73 9 1 1 150 24 14 5 47 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 128 16 2 2 263 42 25 9 82 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 731 741 122 781 754 71 147 0 0 75 0 0
Stage 1 140 140 - 589 589 - - - - - - -
Stage 2 591 601 - 192 165 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 336 343 926 311 337 989 1429 - - 1518 - -
Stage 1 861 779 - 493 494 - - - - - - -
Stage 2 492 488 - 807 760 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 277 269 914 221 264 974 1410 - - 1506 - -
Mov Cap-2 Maneuver 277 269 - 221 264 - - - - - - -
Stage 1 684 764 - 394 395 - - - - - - -
Stage 2 391 390 - 685 746 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.2 21.2 6.5 0.5
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1410 - - 603 242 1506 - -
HCM Lane V/C Ratio 0.187 - - 0.273 0.08 0.006 - -
HCM Control Delay (s)8.1 0 - 13.2 21.2 7.4 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.1 0.3 0 - -
HCM 6th TWSC 2025 Background PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 64 5 1 5 56 24 7 0 38 21
Future Vol, veh/h 18 0 64 5 1 5 56 24 7 0 38 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 156 12 2 12 137 59 17 0 93 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 490 491 133 547 508 84 158 0 0 84 0 0
Stage 1 133 133 - 350 350 - - - - - - -
Stage 2 357 358 - 197 158 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 489 478 916 448 468 975 1422 - - 1513 - -
Stage 1 870 786 - 666 633 - - - - - - -
Stage 2 661 628 - 805 767 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 434 420 904 339 411 960 1403 - - 1501 - -
Mov Cap-2 Maneuver 434 420 - 339 411 - - - - - - -
Stage 1 771 776 - 593 564 - - - - - - -
Stage 2 579 560 - 666 757 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.8 12.8 5 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1403 - - 730 491 1501 - -
HCM Lane V/C Ratio 0.097 - - 0.274 0.055 - - -
HCM Control Delay (s)7.8 0 - 11.8 12.8 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.3 - - 1.1 0.2 0 - -
HCM 6th TWSC 2025 Total AM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 73 16 1 2 150 24 45 8 47 29
Future Vol, veh/h 18 3 73 16 1 2 150 24 45 8 47 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 128 28 2 4 263 42 79 14 82 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 769 805 122 818 791 98 147 0 0 129 0 0
Stage 1 150 150 - 616 616 - - - - - - -
Stage 2 619 655 - 202 175 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 317 315 926 294 321 955 1429 - - 1451 - -
Stage 1 850 771 - 476 480 - - - - - - -
Stage 2 474 461 - 798 752 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 258 243 914 207 248 941 1410 - - 1440 - -
Mov Cap-2 Maneuver 258 243 - 207 248 - - - - - - -
Stage 1 669 752 - 377 380 - - - - - - -
Stage 2 372 365 - 674 734 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.7 23.5 5.6 0.7
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1410 - - 580 228 1440 - -
HCM Lane V/C Ratio 0.187 - - 0.284 0.146 0.01 - -
HCM Control Delay (s)8.1 0 - 13.7 23.5 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.2 0.5 0 - -
HCM 6th TWSC 2025 Total PM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 64 35 1 8 56 24 18 1 38 21
Future Vol, veh/h 18 0 64 35 1 8 56 24 18 1 38 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 156 85 2 20 137 59 44 2 93 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 511 522 133 564 525 97 158 0 0 111 0 0
Stage 1 137 137 - 363 363 - - - - - - -
Stage 2 374 385 - 201 162 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 473 459 916 436 458 959 1422 - - 1479 - -
Stage 1 866 783 - 656 625 - - - - - - -
Stage 2 647 611 - 801 764 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 415 402 904 329 401 944 1403 - - 1468 - -
Mov Cap-2 Maneuver 415 402 - 329 401 - - - - - - -
Stage 1 766 772 - 583 556 - - - - - - -
Stage 2 561 543 - 662 753 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.9 18.4 4.5 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1403 - - 718 375 1468 - -
HCM Lane V/C Ratio 0.097 - - 0.279 0.286 0.002 - -
HCM Control Delay (s)7.8 0 - 11.9 18.4 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.3 - - 1.1 1.2 0 - -
HCM 6th TWSC 2045 Background AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 3 84 10 1 1 173 28 16 6 54 34
Future Vol, veh/h 21 3 84 10 1 1 173 28 16 6 54 34
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 37 5 147 18 2 2 304 49 28 11 95 60
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 842 854 139 902 870 79 169 0 0 85 0 0
Stage 1 161 161 - 679 679 - - - - - - -
Stage 2 681 693 - 223 191 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 283 295 907 258 289 979 1402 - - 1505 - -
Stage 1 839 763 - 440 450 - - - - - - -
Stage 2 439 443 - 777 740 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 225 221 895 172 216 964 1383 - - 1494 - -
Mov Cap-2 Maneuver 225 221 - 172 216 - - - - - - -
Stage 1 638 747 - 336 344 - - - - - - -
Stage 2 333 338 - 639 724 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.3 26.5 6.6 0.5
HCM LOS C D
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1383 - - 538 188 1494 - -
HCM Lane V/C Ratio 0.219 - - 0.352 0.112 0.007 - -
HCM Control Delay (s)8.3 0 - 15.3 26.5 7.4 0 -
HCM Lane LOS A A - C D A A -
HCM 95th %tile Q(veh)0.8 - - 1.6 0.4 0 - -
HCM 6th TWSC 2045 Background PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 0 73 6 1 6 64 28 8 0 43 24
Future Vol, veh/h 21 0 73 6 1 6 64 28 8 0 43 24
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 51 0 178 15 2 15 156 68 20 0 105 59
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 556 557 149 622 576 94 178 0 0 96 0 0
Stage 1 149 149 - 398 398 - - - - - - -
Stage 2 407 408 - 224 178 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 442 439 898 399 428 963 1398 - - 1498 - -
Stage 1 854 774 - 628 603 - - - - - - -
Stage 2 621 597 - 779 752 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 385 379 886 288 369 948 1379 - - 1487 - -
Mov Cap-2 Maneuver 385 379 - 288 369 - - - - - - -
Stage 1 742 764 - 549 527 - - - - - - -
Stage 2 532 522 - 622 742 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.9 13.9 5.1 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1379 - - 686 435 1487 - -
HCM Lane V/C Ratio 0.113 - - 0.334 0.073 - - -
HCM Control Delay (s)7.9 0 - 12.9 13.9 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.4 - - 1.5 0.2 0 - -
HCM 6th TWSC 2045 Total AM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 3 84 17 1 2 173 28 47 9 54 34
Future Vol, veh/h 21 3 84 17 1 2 173 28 47 9 54 34
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 37 5 147 30 2 4 304 49 82 16 95 60
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 880 918 139 939 907 106 169 0 0 139 0 0
Stage 1 171 171 - 706 706 - - - - - - -
Stage 2 709 747 - 233 201 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 267 271 907 243 275 946 1402 - - 1438 - -
Stage 1 829 755 - 425 437 - - - - - - -
Stage 2 423 419 - 768 733 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 209 199 895 160 202 932 1383 - - 1427 - -
Mov Cap-2 Maneuver 209 199 - 160 202 - - - - - - -
Stage 1 622 736 - 320 329 - - - - - - -
Stage 2 316 316 - 629 715 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 16 30.5 5.8 0.7
HCM LOS C D
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1383 - - 516 176 1427 - -
HCM Lane V/C Ratio 0.219 - - 0.367 0.199 0.011 - -
HCM Control Delay (s)8.3 0 - 16 30.5 7.6 0 -
HCM Lane LOS A A - C D A A -
HCM 95th %tile Q(veh)0.8 - - 1.7 0.7 0 - -
HCM 6th TWSC 2045 Total PM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 0 73 36 1 9 64 28 19 1 43 24
Future Vol, veh/h 21 0 73 36 1 9 64 28 19 1 43 24
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 51 0 178 88 2 22 156 68 46 2 105 59
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 576 587 149 639 593 107 178 0 0 122 0 0
Stage 1 153 153 - 411 411 - - - - - - -
Stage 2 423 434 - 228 182 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 428 422 898 389 418 947 1398 - - 1465 - -
Stage 1 849 771 - 618 595 - - - - - - -
Stage 2 609 581 - 775 749 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 369 362 886 279 359 933 1379 - - 1454 - -
Mov Cap-2 Maneuver 369 362 - 279 359 - - - - - - -
Stage 1 736 759 - 539 519 - - - - - - -
Stage 2 516 507 - 618 738 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.1 21.8 4.6 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1379 - - 675 325 1454 - -
HCM Lane V/C Ratio 0.113 - - 0.34 0.345 0.002 - -
HCM Control Delay (s)7.9 0 - 13.1 21.8 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.4 - - 1.5 1.5 0 - -
HCM 6th TWSC 2023 Existing AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 16 219 137 258 137 8
Future Vol, veh/h 16 219 137 258 137 8
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 24 332 208 391 208 12
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 604 0 - 0 593 213
Stage 1 - - -- 213 -
Stage 2 - - -- 380 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 959 - - - 463 820
Stage 1 - - -- 815 -
Stage 2 - - -- 685 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 954 - -- 444 816
Mov Cap-2 Maneuver - - -- 533 -
Stage 1 - - -- 786 -
Stage 2 - - -- 682 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 16.1
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)954 - - - 543
HCM Lane V/C Ratio 0.025 - - - 0.405
HCM Control Delay (s)8.9 0 -- 16.1
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 1.9
HCM 6th TWSC 2023 Existing PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 166 157 96 168 18
Future Vol, veh/h 9 166 157 96 168 18
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 10 191 180 110 193 21
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 295 0 - 0 396 185
Stage 1 - - -- 185 -
Stage 2 - - -- 211 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1255 - - - 605 852
Stage 1 - - -- 842 -
Stage 2 - - -- 819 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1249 - -- 594 848
Mov Cap-2 Maneuver - - -- 646 -
Stage 1 - - -- 830 -
Stage 2 - - -- 815 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1249 - - - 661
HCM Lane V/C Ratio 0.008 - - - 0.323
HCM Control Delay (s)7.9 0 -- 13
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.4
HCM 6th TWSC 2025 Background AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 16 222 139 262 139 8
Future Vol, veh/h 16 222 139 262 139 8
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 24 336 211 397 211 12
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 613 0 - 0 600 216
Stage 1 - - -- 216 -
Stage 2 - - -- 384 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 952 - - - 459 816
Stage 1 - - -- 813 -
Stage 2 - - -- 682 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 947 - -- 440 812
Mov Cap-2 Maneuver - - -- 530 -
Stage 1 - - -- 784 -
Stage 2 - - -- 679 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 16.3
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)947 - - - 540
HCM Lane V/C Ratio 0.026 - - - 0.412
HCM Control Delay (s)8.9 0 -- 16.3
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2
HCM 6th TWSC 2025 Background PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 168 159 97 170 18
Future Vol, veh/h 9 168 159 97 170 18
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 10 193 183 111 195 21
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 299 0 - 0 401 188
Stage 1 - - -- 188 -
Stage 2 - - -- 213 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1251 - - - 601 849
Stage 1 - - -- 839 -
Stage 2 - - -- 818 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1245 - -- 590 845
Mov Cap-2 Maneuver - - -- 644 -
Stage 1 - - -- 827 -
Stage 2 - - -- 814 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1245 - - - 659
HCM Lane V/C Ratio 0.008 - - - 0.328
HCM Control Delay (s)7.9 0 -- 13.1
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.4
HCM 6th TWSC 2025 Total AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 19 222 139 289 145 9
Future Vol, veh/h 19 222 139 289 145 9
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 29 336 211 438 220 14
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 654 0 - 0 610 216
Stage 1 - - -- 216 -
Stage 2 - - -- 394 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 919 - - - 453 816
Stage 1 - - -- 813 -
Stage 2 - - -- 675 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 915 - -- 431 812
Mov Cap-2 Maneuver - - -- 523 -
Stage 1 - - -- 777 -
Stage 2 - - -- 672 -
Approach EB WB SB
HCM Control Delay, s 0.7 0 16.9
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)915 - - - 534
HCM Lane V/C Ratio 0.031 - - - 0.437
HCM Control Delay (s)9.1 0 -- 16.9
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2.2
HCM 6th TWSC 2025 Total PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 10 168 159 106 197 21
Future Vol, veh/h 10 168 159 106 197 21
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 11 193 183 122 226 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 310 0 - 0 403 188
Stage 1 - - -- 188 -
Stage 2 - - -- 215 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1239 - - - 600 849
Stage 1 - - -- 839 -
Stage 2 - - -- 816 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1233 - -- 588 845
Mov Cap-2 Maneuver - - -- 642 -
Stage 1 - - -- 826 -
Stage 2 - - -- 812 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13.8
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1233 - - - 657
HCM Lane V/C Ratio 0.009 - - - 0.381
HCM Control Delay (s)7.9 0 -- 13.8
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.8
HCM 6th TWSC 2045 Background AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 19 255 160 301 160 9
Future Vol, veh/h 19 255 160 301 160 9
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 29 386 242 456 242 14
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 703 0 - 0 691 247
Stage 1 - - -- 247 -
Stage 2 - - -- 444 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 881 - - - 406 784
Stage 1 - - -- 787 -
Stage 2 - - -- 640 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 877 - -- 385 780
Mov Cap-2 Maneuver - - -- 487 -
Stage 1 - - -- 750 -
Stage 2 - - -- 637 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 19.7
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)877 - - - 497
HCM Lane V/C Ratio 0.033 - - - 0.515
HCM Control Delay (s)9.2 0 -- 19.7
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2.9
HCM 6th TWSC 2045 Background PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 10 194 183 112 196 21
Future Vol, veh/h 10 194 183 112 196 21
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 11 223 210 129 225 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 344 0 - 0 460 215
Stage 1 - - -- 215 -
Stage 2 - - -- 245 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1204 - - - 556 820
Stage 1 - - -- 816 -
Stage 2 - - -- 791 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1198 - -- 545 816
Mov Cap-2 Maneuver - - -- 612 -
Stage 1 - - -- 804 -
Stage 2 - - -- 787 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 14.5
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1198 - - - 627
HCM Lane V/C Ratio 0.01 - - - 0.398
HCM Control Delay (s) 8 0 - - 14.5
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.9
HCM 6th TWSC 2045 Total AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 22 255 160 328 166 10
Future Vol, veh/h 22 255 160 328 166 10
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 33 386 242 497 252 15
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 744 0 - 0 699 247
Stage 1 - - -- 247 -
Stage 2 - - -- 452 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 850 - - - 402 784
Stage 1 - - -- 787 -
Stage 2 - - -- 635 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 846 - -- 378 780
Mov Cap-2 Maneuver - - -- 482 -
Stage 1 - - -- 744 -
Stage 2 - - -- 632 -
Approach EB WB SB
HCM Control Delay, s 0.7 0 20.6
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)846 - - - 493
HCM Lane V/C Ratio 0.039 - - - 0.541
HCM Control Delay (s)9.4 0 -- 20.6
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 3.2
HCM 6th TWSC 2045 Total PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 11 194 183 121 223 24
Future Vol, veh/h 11 194 183 121 223 24
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 13 223 210 139 256 28
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 354 0 - 0 464 215
Stage 1 - - -- 215 -
Stage 2 - - -- 249 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1194 - - - 553 820
Stage 1 - - -- 816 -
Stage 2 - - -- 788 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1188 - -- 541 816
Mov Cap-2 Maneuver - - -- 609 -
Stage 1 - - -- 802 -
Stage 2 - - -- 784 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 15.5
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1188 - - - 624
HCM Lane V/C Ratio 0.011 - - - 0.455
HCM Control Delay (s)8.1 0 -- 15.5
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh) 0 - -- 2.4
HCM 6th TWSC 2025 Total AM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 61 3 24 56 5 1 0 6 5 0 5
Future Vol, veh/h 5 61 3 24 56 5 1 0 6 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 66 3 26 61 5 1 0 7 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 66 0 0 69 0 0 196 196 68 197 195 64
Stage 1 - - - - -- 78 78 - 116 116 -
Stage 2 - - - - -- 118 118 - 81 79 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1536 - - 1532 - - 763 699 995 762 700 1000
Stage 1 - - - - -- 931 830 - 889 800 -
Stage 2 - - - - -- 887 798 - 927 829 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1536 -- 1532 - - 747 684 995 745 685 1000
Mov Cap-2 Maneuver - - - - -- 747 684 - 745 685 -
Stage 1 - - - - -- 928 828 - 886 786 -
Stage 2 - - - - -- 866 784 - 918 827 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 2.1 8.8 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)950 1536 - - 1532 - - 854
HCM Lane V/C Ratio 0.008 0.004 - - 0.017 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.4 0 - 9.3
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 -- 0.1 - - 0
HCM 6th TWSC 2025 Total PM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 49 1 8 73 5 3 0 24 5 0 5
Future Vol, veh/h 5 49 1 8 73 5 3 0 24 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 53 1 9 79 5 3 0 26 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 84 0 0 54 0 0 166 166 54 177 164 82
Stage 1 - - - - -- 64 64 - 100 100 -
Stage 2 - - - - -- 102 102 - 77 64 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1513 - - 1551 - - 798 727 1013 785 729 978
Stage 1 - - - - -- 947 842 - 906 812 -
Stage 2 - - - - -- 904 811 - 932 842 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1513 -- 1551 - - 788 720 1013 760 722 978
Mov Cap-2 Maneuver - - - - -- 788 720 - 760 722 -
Stage 1 - - - - -- 944 839 - 903 807 -
Stage 2 - - - - -- 894 806 - 905 839 -
Approach EB WB NB SB
HCM Control Delay, s 0.7 0.7 8.8 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)982 1513 - - 1551 - - 855
HCM Lane V/C Ratio 0.03 0.004 - - 0.006 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.3 0 - 9.3
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh)0.1 0 - - 0 - - 0
HCM 6th TWSC 2045 Total AM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 70 3 24 65 5 1 0 6 5 0 5
Future Vol, veh/h 5 70 3 24 65 5 1 0 6 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 76 3 26 71 5 1 0 7 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 76 0 0 79 0 0 216 216 78 217 215 74
Stage 1 - - - - -- 88 88 - 126 126 -
Stage 2 - - - - -- 128 128 - 91 89 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1523 - - 1519 - - 740 682 983 739 683 988
Stage 1 - - - - -- 920 822 - 878 792 -
Stage 2 - - - - -- 876 790 - 916 821 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1523 -- 1519 - - 724 668 983 722 669 988
Mov Cap-2 Maneuver - - - - -- 724 668 - 722 669 -
Stage 1 - - - - -- 917 820 - 875 778 -
Stage 2 - - - - -- 856 776 - 907 819 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 1.9 8.9 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)935 1523 - - 1519 - - 834
HCM Lane V/C Ratio 0.008 0.004 - - 0.017 - - 0.013
HCM Control Delay (s)8.9 7.4 0 - 7.4 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 -- 0.1 - - 0
HCM 6th TWSC 2045 Total PM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 57 1 8 85 5 3 0 24 5 0 5
Future Vol, veh/h 5 57 1 8 85 5 3 0 24 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 62 1 9 92 5 3 0 26 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 97 0 0 63 0 0 188 188 63 199 186 95
Stage 1 - - - - -- 73 73 - 113 113 -
Stage 2 - - - - -- 115 115 - 86 73 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1496 - - 1540 - - 772 707 1002 760 708 962
Stage 1 - - - - -- 937 834 - 892 802 -
Stage 2 - - - - -- 890 800 - 922 834 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1496 -- 1540 - - 763 701 1002 735 702 962
Mov Cap-2 Maneuver - - - - -- 763 701 - 735 702 -
Stage 1 - - - - -- 934 831 - 889 797 -
Stage 2 - - - - -- 880 795 - 895 831 -
Approach EB WB NB SB
HCM Control Delay, s 0.6 0.6 8.8 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)968 1496 - - 1540 - - 833
HCM Lane V/C Ratio 0.03 0.004 - - 0.006 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.4 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh)0.1 0 - - 0 - - 0
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX E
Conceptual Site Plan
sasvc
5720
5725
5730
5735
5740
5745
5717
5718
5719
5721
5722
5723
5724
5726
5727
5728
572
9
5731
5732
5733
5734
5736
5737
5738
5739
5741
57415741
5742
5743
5744
5746
5730
5730
5735
5740
5745
5731
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
57435744
57465747
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
xxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK
STBK
ST
B
K
ST
B
K
STBK
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK
5
7
2
5
573
0
5735
5740
5745
57235
7
2
3
572
3
5
7
2
4
5726
57
2
7
5728
57
2
9
5731
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
574657475748574857495749
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
s
E
UE
L
U
E
L
U
E
L
E
s
6
'
'
S
A
6''SA
PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD
PSD
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
XU
T
XUT XUT XUT XUT XUT XUT
XUT XUT
XUT
XUT
XUT
XUT
XU
T
XUTXUT
X
U
T
XUT XUT XUT XUT XUT XUT
XUT XUT XUT XUT XUT
XE
L
XE
L
XEL XEL XEL XEL XEL XEL
XE
L
XEL
X
G
A
S
XEL XEL XEL XEL XEL XEL
XEL
XEL
X
E
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL
XG
A
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGA
S
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
XU
T
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XU
T
XU
T
XU
T
XU
T
XE
L
XE
L
XE
L
X
E
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
TXWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XE
L
XE
L
XEL
XE
L
XWL XWL
XWL
XW
L
XW
L
XW
L
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XEL XEL
XEL
XEL XEL XEL
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL
XG
A
S
XEL
XE
L
XE
L
XEL
XEL XEL XEL
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XW
L
XW
L
XEL
XG
A
S
XG
A
S
XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XE
L
XEL XEL XEL XEL XE
L
XG
A
S
XE
L
XE
L
XE
L
XE
L
XE
L
>>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OEL
OEL
OE
L
OE
L
OE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XS
D
XSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA
XSA
XSA
XSA
XSA XSA XSA XSA XSA XSA
XS
A
XSA XSA XSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD
X
S
D
X
S
D
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
100' STORAGE SETBACKFROM RESIDENTIALPROPERTY LINE
DONEGAN ROAD
ST
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
WEST GLENWOOD MALL
LOT 1
AREA=3.192 AC.
10' SIDE SETBACK
CENTER DRIVE
30
CLOSE ENTRANCE
EXTEND ISLAND
CURB & GUTTER + 5' WIDE SIDEWALK.
R25'
LOT 3: FUTURE
DEVELOPMENT.
AREA=4.748 AC.
50' ACCESS & UTILITY EASEMENT
STORM WATER STORAGE
& LANDSCAPING
7.5' REAR SETBACK (COMMERCIAL)
12
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
STORM WATER STORAGE & LANDSCAPING
340'
100'
BUILDING B: FLEX, 1 STORY100x340' = 34,000 SF
LOT 2: STORAGE, FLEX,
EMPLOYEE UNITS.
AREA=7.879 AC.
30'
R30'
R30.00'
R25'
32'
30'
32'
180'
285'
26
3' TALL WALL±
50' ACCESS & UTILITY EASEMENT
R30'
R30'
275'
75'
R25'
R25'
25'
25'
R25'
30'
24
10' SIDEWALK
10' SIDEWALK
BUILDING C: FLEX, 1 STORY
75x275' = 20,625 SF
Assumed 20% office space and 80% warehouse
(Rates conservatice per old approval, not current code)
20,625x.2 = 4125 / 200 = 20.6 = 21
20,625x.8 = 16500 / 1000 = 16.5 = 17REQUIRED = 38PROVIDED = 54
8
8 PARKING SPACES FOR EMPLOYEE HOUSING
28'
28'
28'
28'
25'
25' FOR PARKING & SIDEWALK
28' DRIVE WIDTH 53'
25' FRONT
10' SIDE
40'7.50' REAR (COMMERCIAL)
11 11
STORM WATER STORAGE
Assumed 20% office space and 80% warehouse
(Rates conservatice per old approval, not current code)
34,000x.2 = 6800 / 200 = 34
34,000x.8 = 27200 / 1000 = 27.2 = 28
REQUIRED = 62PROVIDED = 69
28'
LOADING ZONE
21
151'
104 L.F. RETAINING WALL
DATE REVISION
C-1.0-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
1
0
-
S
I
T
E
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
2
:
5
6
p
m
NO
R
T
H
PROPOSED HARDSCAPE
OVERALL SITE PLAN
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
050 50 100
50
20025
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
EXISTING ELECTRIC MANHOLE
EXISTING DRAINAGE DRY-WELL
EXISTING SEWER MANHOLE
EXISTING TELEPHONE MANHOLE
EXISTING GUY WIRE
EXISTING POWER POLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING GAS METER
EXISTING ELECTRIC TRANSFORMER
EXISTING ELECTRIC METER
EXISTING TELEPHONE PEDESTAL
EXISTING CATV PEDESTAL
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING LEGEND
EXISTING STORM INLET
EXISTING STORM SEWERXSDXSD
EXISTING EASEMENT
EXISTING PROPERTY LINE
EXISTING ASPHALT
EXISTING 8" SANITARY SEWER MAIN
EXISTING GAS
EXISTING TELEPHONE
XGAS XGAS XGAS
EXISTING UNDERGROUND ELECTRIC
EXISTING CABLE
EXISTING FIBER OPTIC
XUT XUT XUT
XEL XEL XEL
XTV XTV XTV
XFO XFO XFO
EXISTING OVERHEAD ELECTRICOELOEL
EXISTING IRRIGATION PIPEXIRRXIRR
EXISTING SWALE OR DITCH>>>>
XSA XSA
EXISTING 8" WATER MAINXWLXWL
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
EXISTING WIRE FENCExx
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
>>
>>
XS
D
XSD XSD XSD XSD
XS
D
XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
X
S
D
X
S
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ME: 22.0'±
ME: 20.0'±
ME: 25.0'±
ME: 32.0'±
5720
572
5
5730
5735
5740
5745
5721
572
2
5723
5724
5726
5727
5728
5729
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
5744
5746
5747
572
0
5
7
2
5
573
0
5735
5740
57
4
5
571657
1
7
571
8
5719
5721
5722
572
3
5
7
2
4
5
7
2
6
57
2
7
5728
5
7
2
9
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
5748
5720
5
7
1
6
57
1
7
5718
5719
sasvc
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
X
U
T
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XUT XUT
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
xxxxxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
8'
'
SA
s
E
UE
L
U
E
L
U
E
L
E
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
LOT 1
LOT 3
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
BUILDING B:
LOT 2
BUILDING C:
5748
574
8 57495749
XS
D
XS
D
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00
EX:5747.3'±
LOWER FF=5732.0'
UPPER FF=5743.0'
FF=5732'
FF=5729'
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54
PT: 6+64.41
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP
:
8
+
4
8
.
1
5
PC
:
3
+
8
7
.
1
1
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
PT
:
5
+
7
0
.
1
3
0+001+002+003+003+84
BP: 0+00.00
EP
:
3
+
8
4
.
5
0
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.7
0
PC
:
4
+
4
5
.
0
8
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
STA:4+54.44OFF:0.00'
STA:1+67.00OFF:12.50'L
STA:3+84.00OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:3+07.63OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35
OFF:0.00'
STA:4+31.08OFF:0.00'
0+
0
0
1+
0
0
2+
0
0
3+
0
0
4+
0
0
4+
7
6
BP: 0+00.00
PC: 0+67.66
PT: 0+82.16
EP: 4+76.32
STA:0+11.08OFF:0.00'
STA:1+54.30OFF:0.00'
STA:3+49.32OFF:0.00'
STA:3+90.22OFF:15.50'R
STA:5+18.22OFF:15.50'R
STA:1+08.31OFF:0.00'
STA:3+15.00OFF:14.00'L
STA:4+67.32
OFF:0.02'R
STA:6+85.65OFF:14.00'R
5730
5735
5740
5745
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
573
1
5
7
3
3
5
7
3
4
5
7
3
6
5728
5728
572
8
5725
5728
572
8
5
7
2
8
57
2
5
STA:5+98.52OFF:0.00'
0.9%0.6%0.0%0.1%0.5%0.4%
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
574
1
5742
5
7
4
2
5735
5740
5732
5733
5734
5736
5737
5738
5739
5
7
4
1
5742
57
4
2
STA:1+25.94OFF:0.00'
5.
8
%
1.
8
%
FG:5731.91'
FG:5728.78'
5.5%
9.
2
%
4.
6
%
1.
5
%
6.
2
%
5.
5
%
1.
1
%
5720
57
2
5
5717
57185719
5721
572
2
5723
57
2
4
57
2
6
572
7
572
8
57285728
572
9
5
7
2
9
5730
57285729
573
1
HANDICAP RAMP STEPS UP (TYPICAL)
BOW = BOTTOM OF WALL
EOA = EDGE OF ASPHALT
EX = EXISTING GRADE
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE
FL = FLOW LINE
HP = HIGH POINT
LP = LOW POINT
ME = MATCH EXISTING
RIM = RIM ELEVATION
TBC = TOP BACK OF CURB
TOC = TOP OF CONCRETE
SPOT ELEVATION LEGEND
GRADING LEGEND:
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL
PROPOSED SLOPE
PROPOSED SPOT ELEVATION
PROPOSED STORM SEWER
PROPOSED STORM INLET
7900
7900
PSD PSD
FL: 32.0
2.0%
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
STBK
DATE REVISION
C-2.0-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
GRADING PLAN
OPTION 2
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE EXISTING CONTOUR INTERVAL IS TWO (2) FEET. THE DIVIDE CREEK
SURVEY DATUM IS NAVD 88. SE HAS LOWERED ALL POINTS 4.09 FEET TO
CONVERT ELEVATIONS TO CITY OF GLENWOOD NGVD 29 DATUM.
2. PROPOSED CONTOUR INTERVAL IS ONE (1) FOOT.
3. THE STORM WATER DRAINAGE PLAN CONCEPT IS SHOWN ON SHEET C__.
STORM WATER RUNOFF WILL FLOW IN LANDSCAPE SWALES AND CURB
AND GUTTER TO WATER QUALITY AND DETENTION FACILITIES.
GENERAL GRADING NOTES:
>>
>>
XS
D
XS
D
XS
D
XW
L
XW
L
XW
L
ME: 32.0'±
572
5
5730
5724
5726
5727
5728
5729
5731
5732
573
0
5735
5
7
2
9
573
1
5732
573
3
573
4
5736
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
ST
B
K
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SAPS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
LOT 1
BUILDING B:
BUILDING C:
>
>
>
>
>
>
>
>
>
>
>
>
>
LOWER FF=5732.0'FF=5732'
FF=5729'
0+
0
0
1+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP
:
8
+
4
8
.
1
5
PC
:
3
+
8
7
.
1
1
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
PT
:
5
+
7
0
.
1
3
0
+
0
0
BP: 0+00.00
PC: 0+24.7
0
PT: 0+42.17
STA:4+54.44
OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35OFF:0.00'
3+
0
0
4+
0
0
STA:3+49.32OFF:0.00'
STA:1+08.31
STA:6+85.65OFF:14.00'R
5730
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5728
5728
572
8
5730
5731
5732
5733
5734
5732
5733
FG:5728.78'
4.
6
%
1.
5
%
1.
1
%
572
8
57285728
572
9
5
7
2
9
5730
57285729
573
1
HANDICAP RAMP STEPS UP (TYPICAL)
AL-CENTER DRIVE PROFILE
5726
5728
5730
5732
5726
5728
5730
5732
0+00
57
3
1
.
0
57
3
0
.
8
0+50
57
3
1
.
3
57
3
0
.
7
1+00
57
3
0
.
6
57
3
0
.
6
1+50
57
3
0
.
5
57
3
0
.
3
2+00
57
3
0
.
0
57
2
9
.
7
2+50
57
2
9
.
2
57
2
8
.
9
3+00
57
2
8
.
5
57
2
8
.
2
3+50
57
2
7
.
9
57
2
7
.
6
4+00
57
2
7
.
5
57
2
7
.
5
4+50
57
2
7
.
6
57
2
8
.
3
57
2
7
.
8
5
5+00
57
2
8
.
1
57
2
8
.
1
2
57
2
8
.
5
57
2
8
.
1
1
5+50
57
2
8
.
6
57
2
7
.
8
1
57
2
8
.
5
57
2
7
.
6
2
6+00
57
2
8
.
5
57
2
7
.
8
7
57
2
8
.
2
57
2
8
.
1
2
6+50
57
2
8
.
1
57
2
7
.
9
3
57
2
8
.
1
57
2
7
.
6
8
7+00
57
2
8
.
0
57
2
7
.
7
1
57
2
7
.
6
57
2
7
.
9
6
7+50
57
2
7
.
7
57
2
8
.
0
9
57
2
7
.
4
57
2
7
.
8
4
8+00
57
2
7
.
2
57
2
7
.
5
9
57
2
7
.
0
57
2
7
.
9
1
8+48
57
2
6
.
2
57
2
8
.
3
5
2.00%1.00%-1.00%1.00%-1.00%1.10%-1.18%1.77%
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
4
.
4
4
EL
E
V
=
5
7
2
7
.
6
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
2
8
.
3
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
2
7
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
8
5
.
6
5
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
4
3
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
0
4
.
1
5
EL
E
V
=
5
7
2
7
.
5
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
2
.
2
8
EL
E
V
=
5
7
2
8
.
2
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
7
0
.
1
3
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
3
6
.
1
5
EL
E
V
=
5
7
2
8
.
1
1
STA: 4+99.35
ELEV= 5728.12'
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
AL-CHAPPARAL DR PROFILE
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
0+00
57
4
7
.
9
57
4
5
.
0
57
4
7
.
0
5
0+50
57
4
2
.
2
57
4
5
.
5
5
57
4
0
.
3
57
4
3
.
2
5
1+00
57
3
8
.
3
57
4
0
.
9
4
57
3
6
.
9
57
3
8
.
6
8
1+50
57
3
6
.
0
57
3
7
.
4
1
57
3
4
.
3
57
3
6
.
4
1
2+00
57
3
3
.
1
57
3
5
.
2
5
57
3
1
.
6
57
3
4
.
1
0
2+50
57
3
0
.
5
57
3
2
.
9
4
57
2
9
.
3
57
3
1
.
7
9
3+00
57
2
8
.
2
57
3
0
.
6
3
57
2
7
.
0
57
2
9
.
4
7
3+50
57
2
6
.
2
57
2
8
.
3
4
57
2
6
.
0
57
2
7
.
9
6
4+00
57
2
5
.
0
57
2
7
.
5
9
57
2
4
.
3
57
2
7
.
2
1
4+50
57
2
3
.
5
57
2
6
.
8
4
57
2
3
.
0
57
2
6
.
7
0
4+76
57
2
2
.
9
57
2
6
.
7
2
-2.00%
-9.22%
-4.00%
-4.62%
-1.50%1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
1
.
0
8
EL
E
V
=
5
7
4
7
.
3
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
7
4
.
3
0
EL
E
V
=
5
7
3
6
.
4
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
4
9
.
3
2
EL
E
V
=
5
7
2
8
.
3
5
GRADE BREAK STA = 4+67.32ELEV = 5726.58
GRADE BREAK STA = 4+76.32
ELEV = 5726.72
PVI STA: 1+29.30
PVI ELEV: 5738.24
K: 3.83LVC: 20.00BVCS: 1+19.30
BVCE: 5739.16
EVCS: 1+39.30EVCE: 5737.84
PVI STA: 0+36.08PVI ELEV: 5746.83K: 3.46
LVC: 25.00
BVCS: 0+23.58BVCE: 5747.08EVCS: 0+48.58
EVCE: 5745.68
STA: 1+54.30ELEV= 5737.24'
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
XSD
XS
D
XS
D
XS
D
XS
D
XSD
XSD
XSD
5716
571
7
XU
T
XU
T
XU
T
X
U
T
XU
T
XU
T
XU
T
ST
B
K
ST
B
K
x
x
x
x
x
x
x
x
x
x
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
GA
S
GA
S
GA
S
GAS GAS GAS GAS GAS 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
8'
'
WL
8'
'
WL
8'
'
WL 6'
'
SA
6'
'
SA
8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA s 8''SA 8''SA 8''SA s
PSD
PSD
PSD
PSD
PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PSD
574
8
8+
0
0
9+
0
0
EX:5747.3'±
8+
0
0
8+
4
8
EP: 8+48.15
0+
0
0
1+
0
0
BP: 0+00.00
4+
0
0
4+89
EP: 4+89.35
PC: 4+45.08
PT: 4+84.35
STA:4+31.08OFF:0.00'
0+001+002+003+004+004+76
BP
:
0
+
0
0
.
0
0
PC
:
0
+
6
7
.
6
6
PT
:
0
+
8
2
.
1
6
EP
:
4
+
7
6
.
3
2
STA:0+11.08
OFF:0.00'
STA:1+54.30OFF:0.00'
STA:3+49.32OFF:0.00'
STA:4+67.32OFF:0.02'R
573
0
573
5
57
4
0
57
4
5
5727
5728
572
9
573
1
573
2
573
3
573
4
573
6
573
7
57
3
8
57
3
9
57
4
1
57
4
2
57
4
3
57
4
4
57
4
6
5735
5733
5734
5736
0.
4
%
5.
5
%
9.2%
4.6%
1.5%
ST
E
P
S
U
P
(
T
Y
P
I
C
A
L
)
DATE REVISION
C-2.1-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
ROAD
PLAN/PROFILE 1
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
NORTH
>>
XS
D
XS
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ME: 32.0'±
573
0
5735
5740
57
4
5
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
sasvc
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x
x x x x x x x x x x x
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
8''WL 8''WL
U
E
L
U
E
L
E
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
LOWER FF=5732.0'
UPPER FF=5743.0'
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54
PT: 6+64.41
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
BP
:
0
+
0
0
.
0
0
PC
:
3
+
8
7
.
1
1
P
T
:
4
+
5
7
.
0
1
3+84
EP
:
3
+
8
4
.
5
0
STA:4+54.44
STA:3+84.00OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:3+07.63OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35OFF:0.00'
STA:3+90.22OFF:15.50'R
STA:5+18.22
OFF:15.50'RSTA:5+98.52OFF:0.00'
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
574
1
5742
5
7
4
2
5735
5740
5732
5733
5734
5736
5737
5738
5739
5
7
4
1
5742
57
4
2
6.
2
%
5.
5
%
5730
57285729
573
1
AL-BLDG A LOOP PROFILE
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
0+00
57
2
7
.
5
57
2
8
.
0
57
2
8
.
0
9
0+50
57
2
9
.
0
57
2
9
.
1
8
57
2
9
.
6
57
3
0
.
2
6
1+00
57
3
0
.
5
57
3
1
.
7
4
57
3
1
.
0
57
3
3
.
2
8
1+50
57
3
1
.
8
57
3
4
.
8
2
57
3
2
.
6
57
3
6
.
3
6
2+00
57
3
3
.
8
57
3
7
.
9
1
57
3
5
.
1
57
3
9
.
4
5
2+50
57
3
6
.
4
57
4
0
.
9
3
57
3
7
.
8
57
4
1
.
6
4
3+00
57
3
8
.
0
57
4
2
.
3
5
57
3
7
.
9
57
4
2
.
6
5
3+50
57
3
7
.
9
57
4
2
.
5
4
57
3
7
.
9
57
4
2
.
4
2
4+00
57
3
8
.
4
57
4
2
.
3
9
57
3
8
.
9
57
4
2
.
5
1
4+50
57
3
9
.
4
57
4
2
.
6
4
57
3
9
.
7
57
4
2
.
5
6
5+00
57
3
9
.
9
57
4
2
.
4
3
57
4
0
.
4
57
4
2
.
3
7
5+50
57
4
1
.
0
57
4
2
.
5
0
57
4
1
.
6
57
4
2
.
6
2
6+00
57
4
1
.
3
57
4
2
.
5
4
57
4
0
.
5
57
4
1
.
9
2
6+50
57
4
0
.
2
57
4
1
.
2
9
57
3
8
.
4
57
4
0
.
3
4
7+00
57
3
7
.
0
57
3
8
.
9
6
57
3
6
.
1
57
3
7
.
5
7
7+50
57
3
4
.
8
57
3
6
.
1
8
57
3
3
.
4
57
3
4
.
7
9
8+00
57
3
2
.
4
57
3
3
.
5
9
57
3
1
.
9
57
3
2
.
5
9
8+50
57
3
1
.
6
57
3
1
.
6
6
57
3
1
.
4
57
3
1
.
6
6
9+00
57
3
0
.
6
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
9+50
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
10+00
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
10+50
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
11+00
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
11+50
57
2
9
.
6
57
3
1
.
3
5
57
2
9
.
6
57
3
0
.
6
3
11+82
57
2
9
.
7
57
3
0
.
4
3
3.00%4.34%
6.17%
2.84%-2.50%
-5.55%
-4.00%
0.00%-2.86%
0.50%-0.50%0.50%-0.50%0.50%-0.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
0
.
0
5
EL
E
V
=
5
7
2
7
.
6
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
2
5
.
0
0
EL
E
V
=
5
7
2
8
.
0
9
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
7
8
.
8
3
EL
E
V
=
5
7
3
0
.
4
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
8
.
1
2
EL
E
V
=
5
7
4
0
.
8
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
0
7
.
6
3
EL
E
V
=
5
7
4
2
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
2
6
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
9
0
.
2
2
EL
E
V
=
5
7
4
2
.
3
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
4
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
8
.
2
2
EL
E
V
=
5
7
4
2
.
3
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
8
2
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
9
8
.
5
2
EL
E
V
=
5
7
4
2
.
5
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
6
4
.
4
1
EL
E
V
=
5
7
4
0
.
9
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
8
8
.
4
1
EL
E
V
=
5
7
3
4
.
0
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
3
1
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
3
9
.
0
4
EL
E
V
=
5
7
3
1
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
8
2
.
0
4
EL
E
V
=
5
7
3
0
.
4
3
EXISTING GRADE PROPOSED GRADE
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
AL-BLDG C-LOOP PROFILE
5722
5724
5726
5728
5730
5722
5724
5726
5728
5730
0+00
57
2
8
.
2
57
2
8
.
1
2
57
2
7
.
6
57
2
7
.
9
7
0+50
57
2
6
.
7
57
2
8
.
2
4
57
2
5
.
5
57
2
8
.
5
2
1+00
57
2
4
.
6
57
2
8
.
5
3
57
2
4
.
0
57
2
8
.
1
6
1+50
57
2
3
.
3
57
2
7
.
7
6
57
2
3
.
0
57
2
7
.
7
0
2+00
57
2
3
.
0
57
2
7
.
9
5
57
2
3
.
1
57
2
8
.
2
0
2+50
57
2
3
.
2
57
2
8
.
0
4
57
2
3
.
1
57
2
7
.
7
9
3+00
57
2
3
.
0
57
2
7
.
6
0
57
2
3
.
0
57
2
7
.
8
5
3+50
57
2
2
.
9
57
2
8
.
1
0
57
2
3
.
0
57
2
8
.
1
3
4+00
57
2
2
.
7
57
2
7
.
8
8
57
2
2
.
3
57
2
7
.
6
3
4+50
57
2
2
.
3
57
2
7
.
3
3
57
2
2
.
5
57
2
6
.
9
5
4+89
57
2
2
.
9
57
2
6
.
7
4
-2.00%-1.61%1.00%-1.00%1.00%-1.01%1.09%-1.15%-1.20%-1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
2
8
.
1
2
GRADE BREAK STA = 0+12.50ELEV = 5727.87
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
5
.
5
0
EL
E
V
=
5
7
2
7
.
8
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
1
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
2
9
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
9
6
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
6
4
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
3
1
.
0
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
8
8
.
3
1
EL
E
V
=
5
7
2
8
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
0
8
.
3
1
EL
E
V
=
5
7
2
8
.
4
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
4
5
.
0
8
EL
E
V
=
5
7
2
7
.
4
0
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
>>
XS
D
XS
D
XS
D
XS
D
ME: 25.0'±
STBK
STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
8'
'
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
E
UE
L
6''SA
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
BUILDING C:
>
>
>
>
>
>
>
>
>
>
FF=5729'
0+
0
0
5+00
6+00 7+00 8+00 8+48
EP
:
8
+
4
8
.
1
5
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.7
0
PC
:
4
+
4
5
.
0
8
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
STA:4+54.44OFF:0.00'
STA:0+10.05OFF:0.00'
STA:4+31.08OFF:0.00'
4+
0
0
4+
7
6
EP: 4+76.32
STA:3+49.32OFF:0.00'
STA:1+08.31
OFF:0.00'
STA:4+67.32OFF:0.02'R
STA:6+85.65OFF:14.00'R
5
7
2
7
5
7
2
8
5729
5728
5728
572
8
5725
5728
572
8
5
7
2
8
57
2
5
1.
5
%
1.
1
%
57
2
5
5723
57
2
4
57
2
6
572
7
STBK STBK STBK STBK STBK STBK STBK STBK
x x x x x x x x x x x x
STBK STBK STBK STBK STBK STBK STBK STBK
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
SA
8'
'
SA
8'
'
SA
s
U
E
L
U
E
L
E
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD
BUILDING B:
LOT 2
FF=5732'
2+
0
0
0+001+002+003+003+84
BP: 0+00.00
EP
:
3
+
8
4
.
5
0
STA:1+67.00OFF:12.50'L
STA:3+84.00OFF:0.00'
1+
0
0
2+
0
0
PC: 0+67.66
PT: 0+82.16
STA:1+54.30OFF:0.00'
STA:3+15.00
OFF:14.00'L
5735
5740
5745
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
573
1
5
7
3
3
5
7
3
4
5
7
3
6
5735
5740
5732
5733
5734
5736
5737
5738
5739
574
1
STA:1+25.94OFF:0.00'
5.
8
%
1.
8
%
FG:5731.91'5.5%
9.
2
%
4.
6
%
6.
2
%
AL-BLDG B-BACK PROFILE
5730
5732
5734
5736
5738
5740
5730
5732
5734
5736
5738
5740
0+00
57
3
5
.
7
57
3
7
.
2
4
57
3
6
.
2
57
3
6
.
5
9
0+50
57
3
6
.
5
57
3
5
.
2
6
57
3
6
.
4
57
3
3
.
8
8
1+00
57
3
6
.
4
57
3
2
.
5
1
57
3
6
.
3
57
3
1
.
5
1
1+50
57
3
6
.
3
57
3
1
.
2
0
57
3
6
.
4
57
3
1
.
0
6
2+00
57
3
6
.
4
57
3
1
.
3
1
57
3
7
.
2
57
3
1
.
5
6
2+50
57
3
7
.
7
57
3
1
.
6
3
57
3
7
.
9
57
3
1
.
3
8
3+00
57
3
8
.
0
57
3
1
.
1
3
57
3
8
.
1
57
3
1
.
0
9
3+50
57
3
7
.
9
57
3
1
.
3
6
57
3
7
.
8
57
3
1
.
6
2
3+84
57
3
8
.
0
-2.00%
-5.51%
-1.27%1.00%-1.00%1.07%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
3
7
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
7
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
1
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
1
5
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
8
4
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
PVI STA: 1+15.94
PVI ELEV: 5731.63
K: 4.72LVC: 20.00BVCS: 1+05.94
BVCE: 5732.18
EVCS: 1+25.94EVCE: 5731.50
PVI STA: 0+22.00
PVI ELEV: 5736.80
K: 5.70LVC: 20.00BVCS: 0+12.00
BVCE: 5737.00
EVCS: 0+32.00EVCE: 5736.25
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
STA: 1+11.50
ELEV= 5732.69'
STA: 1+25.94
ELEV= 5731.50'
DATE REVISION
C-2.2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
ROAD
PLAN/PROFILE 2
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
NO
R
T
H
TRACT "F"
TRACT "E"
FOUND PKIN CONC
FLUSH
FOUND #5 REBAR & 1.25"YELLOW PLASTIC CAP
FLUSH
L.S.13501
SOUTH QUARTER CORNER
SEC 34FOUND #5 REBAR
3" UNDER ASPHALT
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSHL.S. 13501
PROJECT BENCHMARK
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
4" ABOVE GROUNDL.S. 13501
GLENWOOD PARTNERSHIP LLLP
REC No. 568864
PARCEL No. 218506100042
GLENWOOD SPRINGS MALL LLLP
REC No. 336102
PARCEL No. 218506106009
WORKING KING LLLP
REC No. ???
PARCEL No. 218506106008
M & N ASSOCIATES LTD
REC No.
PARCEL No. 218506209001
LOT 2B LLLP
REC No.
PARCEL No. 218506209012
LOT 2A LLLP
REC No.
PARCEL No. 218506209011
TWO RIVERS BUILDINGCORPORATION
REC No.
PARCEL No. 218506209009
FOUND #6 REBARWITNESS CORNER
NO CAP FOUND #5 REBARNO CAPBENT
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSH
L.S. 19598
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSHILLEGIBLE
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAP
HCE L.S. ILLEGIBLE
FOUND #5 REBARNO CAP
FOUND #5 REBAR
& ALUMINUM CAP1" UNDER GROUND
SURVEY TECH L.S. 13174
FOUND #5 REBARNO CAP
FOUND #5 REBAR
& 1.25" YELLOW PLASTIC CAPFLUSHILLEGIBLE
FOUND #5 REBAR
& 1.25" RED PLASTIC CAPILLEGIBLE
MEL RAY SUBDIVISION
REC No. 170138
BOOK 245 PAGE 515
WESTERN HILLS SUBDIVISION
REC No. 203826
LOT 14
BLOCK 2
LOT 13
BLOCK 2 LOT 12
BLOCK 2
LOT 11
BLOCK 2
LOT 10
BLOCK 2
LOT 9BLOCK 2 LOT 7
BLOCK 3 LOT 8
BLOCK 3 LOT 13
BLOCK 3
LOT 14
BLOCK 3
LOT 1BLOCK 5 LOT 12
BLOCK 5
LOT 11BLOCK 5 LOT 10BLOCK 5
LOT 9
BLOCK 5
LOT 8
BLOCK 5
P.O.B. TITLE DESCRIPTION
NORTH LINE SEC. 6
SOUTH LINE SEC. 34
N89° 52' 00"E ͛312.68'N89° 49' 18"E ͛860.83'
N2
°
4
4
'
0
0
"
E
͛
6
0
5
.
6
4
'
N87° 18' 00"W ͛476.98'
S47°
4
2
'
0
0
"
W
͛
1
2
5
.
0
6
'
N87° 18' 00"W ͛615.36'
S1
°
5
2
'
0
0
"
W
͛
5
7
5
.
9
6
'
BASIS OF BEARING:
N89° 49' 59"E ͛2623.99'
34 | 35 SECTION CORNER
FOUND 3" USGLO BRASS CAP &
1.5" IRON PIPE4" BELOW SURFACE
S0° 09' 59"E ͛25.35'
SET #5 REBAR & 1.25"ORANGE PLASTIC CAP
FLUSHL.S. 28643
SET #5 REBAR &1.25"
ORANGE PLASTIC CAP
FLUSH
L.S. 28643
SET WITNESS CORNER
#5 REBAR & 1.25"
RED PLASTIC CAP
FLUSH
L.S. 28643
LOT 1
BLOCK 4
LOT 2BLOCK 4
LOT 3
LOT 1BLOCK 1
LOT 2BLOCK 1
LOT 3BLOCK 1
LOT 4BLOCK 1
LOT 5BLOCK 1
LOT 6BLOCK 1
LOT 7BLOCK 1
TIE:
N
3
8
°
4
0
'
5
3
"
E
͛
8
5
3
.
4
5
'
NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON.
SOPRIS ENGINEERING - LLC
CIVIL CONSULTANTS
502 MAIN STREET, SUITE A3
CARBONDALE, COLORADO 81623
(970) 704-0311 SOPRISENG@SOPRISENG.COM 4/25/2023 - 30017- G:\2020\30017\SURVEY\Survey DWGs\PLAT 2020\30017 ISP 2023.dwg
VICINITY MAP
SCALE: 1" = 2000'
IMPROVEMENT SURVEY PLAT OFGLENWOOD PARTNERSHIP LLLP
BEING SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH,
RANGE 89 WEST OF THE 6TH P.M.
CITY OF GLENWOOD SPRINGS, COUNTY OF GARFIELD, STATE OF COLORADO.
SHEET 1 OF 2
NOTES
1) Date of Survey: October 7-28, December 15-18, 2020 & January 5, 8, 14, 2021 Updated: April, 2023.
2) Date of Preparation: October - December 2020 & January 2021. Updated; April, 2023
3) Basis of Bearing: A bearing of N 89 49'59" E along the south east section line of Section 34,established by the found monuments.
4) This survey does not constitute a title search by Sopris Engineering, LLC (SE) to determineownership or easements of record. For all information regarding easements, rights of wayand/or title of record, SE relied upon the Title Report prepared by Title Company of theRockies, Commitment No. 0603918-C2, Effective Date, January 17, 2023 and documents andplats of record as shown in the Source Documents, hereon.
5) Basis of elevation: Project based on Global Position System (GPS) observations from theContinuous Operating Reference Station (CORS) GSC1 utilizing the Continental United States2012 geoid model (GEOID 12A) CONUS and based the 1988 North American Vertical Datum(NAVD88) and a vertical shift of -4.22 feet as calculated by the North American VerticalDatum Conversion (VERTCON) an online service provided by a subsidy of the NationalOceanic Atmospheric Administration (NOAA). Which established all elevations shown heron.Placement benchmarks to be set as requested.
6) The linear unit used in the preparation of this plat is the U.S. survey foot as defined by theUnited States Department of Commerce, National Institute of Standards and Technology.
1 inch = ft.
( IN U.S. SURVEY FEET )
GRAPHIC SCALE
060 60 120
60
24030
SITE
TITLE DESCRIPTION (THIS SURVEY EDITS/ADDITIONS)
A TRACT OF LAND SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH, RANGE 89 WEST OF THE 6TH P.M.
BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT ON THE NORTH LINE OF THE GLENWOOD SPRINGS MALL SUBDIVISION
WHENCE THE WITNESS CORNER TO THE S1/4 CORNER OF SECTION 34, TOWNSHIP 5 SOUTH, RANGE 89
WEST OF THE 6TH P.M. BEARS N 89° 13' 08" E 866.63 FEET (N 38°40'53" E 853.45 FEET FIELD) SAID
POINT OF BEGINNING ALSO BEING THE SOUTHEAST CORNER OF THAT PARCEL DESCRIBED AS PARCEL C
IN BOOK 1205 AT PAGE 589 IN THE OFFICE OF THE GARFIELD COUNTY CLERK AND RECORDER;
THENCE ALONG THE EAST LINE OF SAID PARCEL C N 2° 44' 00" E 605.64 FEET TO THE SOUTH
RIGHT-OF-WAY LINE OF COUNTY ROAD NO. 130;
THENCE ALONG SAID RIGHT-OF-WAY N 89° 52' 00" E 312.68 FEET;
THENCE (CONTINUING ALONG SAID RIGHT-OF-WAY) N 89° 49' 18" E 860.83 FEET TO THE WEST LINE OF
THE MEL-RAY SUBDIVISION;
THENCE ALONG SAID WEST LINE S 1° 52' 00" W 575.96 FEET;
THENCE DEPARTING SAID EAST (WEST) LINE AND ALONG THE NORTH LINE OF SAID GLENWOOD
SPRINGS MALL N 87° 18' 00" W 615.36 FEET;
THENCE (CONTINUING ALONG SAID NORTH LINE) S 47° 42' 00" W 125.06 FEET;
THENCE (CONTINUING ALONG SAID NORTH LINE) N 87° 18' 00" W 476.98 FEET TO THE POINT OF
BEGINNING.
COUNTY OF GARFIELD
STATE OF COLORADO.
IMPROVEMENT SURVEY PLAT
I, MARK S. BECKLER, HEREBY STATE THAT THIS IMPROVEMENT SURVEY PLAT WAS PREPARED BY SOPRIS
ENGINEERING, LLC (SE) FOR
GLENWOOD PARTNERSHIP, LLLP.
TITLE COMPANY OF THE ROCKIES.
THAT THIS IS AN “IMPROVEMENT SURVEY PLAT” AS DEFINED BY C.R.S. § 38-51-102(9), AND THAT IT IS A
MONUMENTED LAND SURVEY SHOWING THE CURRENT LOCATION OF ALL STRUCTURES, WATER
COURSES, WATER FEATURES AND/OR BODIES OF WATER , VISIBLE ROADS, UTILITIES, FENCES, OR WALLS
SITUATED ON THE DESCRIBED PARCEL AND WITHIN FIVE FEET OF ALL BOUNDARIES OF SUCH PARCEL,
ANY CONFLICTING BOUNDARY EVIDENCE OR VISIBLE ENCROACHMENTS, AND ALL EASEMENTS AND
RIGHTS OF WAY OF A PUBLIC OR PRIVATE NATURE THAT ARE VISIBLE, OR APPARENT, OR OF RECORD
AND UNDERGROUND UTILITIES DESCRIBED IN TITLE COMPANY OF THE ROCKIES COMMITMENT NO.
0603918-C2, OR OTHER SOURCES AS SPECIFIED ON THE IMPROVEMENT SURVEY PLAT.
________________________________
MARK S. BECKLER L.S. #28643
xxxxxxxxxxxxx
x
x
xx
x
x
x
x
x
xxx
XU
T
XUT XUT XUT XUT XUT XUT
XUT XUT
XUT
XUT
XUT
XUT
XU
T
XUTXUT
X
U
T
XUT XUT XUT XUT XUT XUT
XUT XUT XUT XUT XUT
XE
L
XE
L
XEL XEL XEL XEL XEL XEL
XE
L
XEL
XFOX
F
O
XF
O
XFO XFO XFO XFO XFO X
F
O
XFO XFO
XFO
XFO
XFO
XG
A
S
XG
A
S
XEL XEL XEL XEL XEL XEL
XEL
XEL
X
E
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL
XG
A
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGA
S
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XU
T
XF
O
XF
O
XF
O
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
X
F
O
X
F
O
XF
O
XSA
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
X
F
O
X
F
O
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XU
T
XU
T
XU
T
XU
T
XE
L
XE
L
XE
L
X
E
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
>
>
>
>
>
>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
TXWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XE
L
XE
L
XEL
XE
L
XWL XWL XWL XWL
XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XEL XEL
XEL
XEL XEL XEL
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL
XG
A
S
XEL
XE
L
XE
L
XEL
XEL XEL XEL
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XW
L
XW
L
XEL
XG
A
S
XG
A
S
XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XE
L
XEL XEL XEL XEL XE
L
XG
A
S
XE
L
XE
L
XE
L
XE
L
XE
L
>>>>>
>>>>>>>>>>>>>
>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OEL
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
OE
L
OE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSA XSA XSA XSA XSA XSA
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSAXSAXSAXSA
XS
A
XSA XSA XSA XSA XSA XSA
XSA
XSA
XSA
XSA XSA XSA XSA XSA XSA
XSDXSDXSD
XS
D
XSD
>
XW
L
XW
L
X
S
D
X
S
D
X
S
D
XS
D
XS
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
x
ST
O
R
M
K
I
N
G
R
D
.
ASPHALT SURFACE
CONCRETE
SURFACE
DONEGAN RD.
CENTER RD.
SINGLE STORY BUILDING
GLENWOOD SPRINGS MALL
SINGLE STORY
BUILDING
SINGLE STORY BUILDING
ME
L
R
A
Y
R
D
.
15' UTILITY EASEMENT
20' UTILITY EASEMENT
60.0' RIGHT OF WAY
145.6
14
5
.
7
79.6
96
.
0
66.0
49
.
8
73.8
20
6
.
1
73.8
20
6
.
1
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (N)= 5740.43'
INV IN ELEV (E)= 5739.64'
INV OUT ELEV (W)= 5739.65'
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (N)= 5738.57'
INV IN ELEV (E)= 5738.53'
INV OUT ELEV (W)= 5738.47'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (E)= 5737.40'
INV OUT ELEV (W)= 5737.36'SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (N)= 5739.61'
INV IN ELEV (E)=5739.05'
INV OUT ELEV (W)=5738.96'
SEWER MANHOLE8IN CLAY PIPE
INV IN ELEV (W)= 5737.84'
INV IN ELEV (E)= 5738.0'
INV OUT ELEV (S)= 5737.72'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (N)= 5723.07'
INV OUT ELEV (S)= 5723.01'
SEWER MANHOLE
8IN CLAY PIPE
INV IN ELEV (W)= 5721.69'
INV IN ELEV (N)= 5721.68'
INV OUT (S)= 5721.54'
15IN CMPINV OUT ELEV = 5745.47'
6IN PVC PIPEINV IN ELEV = 5745.66'
6IN PVC PIPEPOL ELEV = 5745.32'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (N)= 5717.31'
INV IN ELEV (E)= 5717.26'
INV OUT ELEV (W)= 5717.23'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (N)= 5715.79'
INV IN ELEV (E)= 5715.89'
INV OUT ELEV (W)= 5715.69'
SEWER MANHOLE
8IN PVC PIPE
INV IN ELEV (E)= 5710.1'
INV IN ELEV (N)= 5714.43'
INV OUT ELEV (W)= 5710.05'
EXISTING STORM INLETRIM ELEV = 5724.38'
SUMP ELEV = 5719.58'
6" PVC INV IN (N) = 5720.18'
18" CMP INV OUT (W) = 5719.73'
8" PVC PIPE
SEWER CLEANOUT EXISTING STORM INLET
RIM ELEV = 5727.70'
18" CMP INV OUT (S) = 5723.40'
EXISTING STORM INLETRIM ELEV = 5726.41'SUMP ELEV = 5722.12'
6" PVC INV IN (E) = 5722.24'
6" PVC INV IN (W) = 5722.11'
18" CMP INV IN (N) = 5722.16'
18" CMP INV OUT (S) = 5722.10'
EXISTING STORM INLET
RIM ELEV = 5723.33'
SUMP ELEV = 5716.53'
60.0' R.O.W.
6.0'
SIDEWALKWIDTH
5.0'SIDEWALK
WIDTH
5720
572
5
5730
5735
5740
5717
5718
5719
572
1
5722
5723
5724
5726
5727
5728
5729
5731
5732
5733
5734
5736
5737
5738
5739
5741
5720
57
2
5
573
0
5735
5740
57
4
5
5750
5718
5719
5721
5722
5723
5724
5726
5727
57
2
8
5729
5731
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
574
4
5746
5747
5748
574957495749
ASPHALT SURFACE
EXISTING STORM INLET
RIM ELEV = 5715.62'SUMP ELEV = 5709.42'
15IN CMPINV IN ELEV = 5746.18'
15IN CMPINV OUT ELEV = 5744.74'
30' UTILITY EASEMENT
ACCESS EASEMENTRECORDED REC No. 443451
8" WATER LINE STUB
6" WATER LINE STUB
8" WATER LINE STUB
NOTE: PER RECEPTION NO. 443451 THE
SUBJECT PROPERTY HAS THE RIGHT TO TIE
ONTO EXISTING UTILITY STUBS ALONG IT'S
COMMON BOUNDARY WITH THEGLENWOOD SPRINGS MALL PROPERTY
22' DRIVEWAY EASMENT
30' DRIVEWAY EASMENT
5742
5743
5745
5747
57485748
57495750
5751
24.0
30.0
LOT 1
BLOCK 4
LOT 1BLOCK 1
LOT 2BLOCK 1
LOT 3
BLOCK 1
LOT 4BLOCK 1
LOT 5BLOCK 1
LOT 6
BLOCK 1
LOT 7BLOCK 1
FLAGSTONEAREA
NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL
ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS
AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON.
SOPRIS ENGINEERING - LLC
CIVIL CONSULTANTS
502 MAIN STREET, SUITE A3
CARBONDALE, COLORADO 81623
(970) 704-0311 SOPRISENG@SOPRISENG.COM 4/25/2023 - 30017 - G:\2020\30017\SURVEY\Survey DWGs\PLAT 2020\30017 ISP 2023.dwg
GENERAL UTILITY NOTES:
The locations of underground utilities have been plotted based on utility maps,
construction/design plans, other information provided by utility companies and actual
field locations in some instances. These utilities, as shown, may not represent actual
field conditions. It is the responsibility of the contractor to contact all utility
companies for field location of utilities prior to construction.
IMPROVEMENT SURVEY PLAT OFGLENWOOD PARTNERSHIP LLLP
BEING SITUATED IN SECTION 6, TOWNSHIP 6 SOUTH,
RANGE 89 WEST OF THE 6TH P.M.
CITY OF GLENWOOD SPRINGS, COUNTY OF GARFIELD, STATE OF COLORADO.
SHEET 2 OF 2
1 inch = ft.
( IN U.S. SURVEY FEET )
GRAPHIC SCALE
050 50 100
50
20025
ELECTRIC TRANSFORMER
ELECTRIC METER
TELEPHONE PEDESTAL
CATV PEDESTAL
EXISTING CONDITIONS LEGEND
GAS METER
EXISTING WOODEN FENCESIGN
PVC PIPE
DECIDUOUS TREE
CONIFEROUS TREE
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL
EXISTING STORM SEWERXSDXSDXSDXSD
7900
EXISTING GAS
EXISTING TELEPHONE
XGAS XGAS XGAS
EXISTING UNDERGROUND ELECTRIC
EXISTING CABLE
XUT XUT XUT
XEL XEL XEL
XTV XTV XTV
WATER SHUTOFF
EXISTING WIRE FENCExx
EXISTING 8" WATER MAINXWLXWL
EXISTING 8" SANITARY SEWER MAIN
EXISTING FIBER OPTICXFOXFOXFO
EXISTING SWALE OR DITCH>>>>XSA XSA
DRAINAGE DRY-WELL
SEWER MANHOLE
GUY WIRE
POWER POLE
FIRE HYDRANT
WATER VALVE
GAS METER
SEWER CLEANOUT
LIGHT POLE
IRRIGATION VALVE
From:jpetaisto@sopriseng.com
To:roadandbridge@garfield-county.com; John Diemoz
Cc:Chad Lee; Haley Carmer; ynichol
Subject:Glenwood Business Center - CR 130 driveway permit
Date:Wednesday, April 26, 2023 1:56:02 PM
Attachments:1-2023-04-26-CR130-CHAP Driveway-Permit-Appl.pdf
2-2023-04-26-30017-GBC DRIVEWAY PERMIT-APPL.pdf
3-Glenwood Business Center Traffic Study 2023-02-13.pdf
Wyatt,
See attached driveway permit application for County Road 130 at Chapparal Circle.
We are working on Garfield County completeness review for the Cooper Minor
Subdivision which is part of the existing Glenwood Business Center in West
Glenwood Springs. The County completeness review required that Access Permit
information needs to be provided including the proposed access onto County Road
130 (Donegan Rd). The site is proposing one new access to connect to County Road
130 (Donegan Rd) at Chapparal Circle.
The driveway permit application is attached along with the civil plans and the traffic
study. Note the overhead telephone / communication utilities along county 130 are
low at the new road location. We will coordinate raising the utility to provide a
minimum of 16' clearance above the new road during construction.
John Diemoz is the applicant and is copied here. Let us know if payment is needed
now and we will get that done.
Call or email to discuss or with questions.
Thanks,
John Petaisto, PE
Sopris Engineering
970-316-5212
Garfield County Road and Bridge
0298 CR 333A
Rifle, CO 81650
PH: 970-625-8601 Fax: 970-625-8627
Email: roadandbridge@garfield-county.com
Garfield County Driveway Permit Requirements
Information required by Garfield County Road & Bridge for driveway permits or
exemption letters:
State your request (driveway permits vs. exemption).
Legal Description; lot & block # preferred, meets & bounds if necessary.
Plat or sketch, showing driveway location and any easements (must show nearest County
Road and be easily readable).
Owner’s mailing address, phone, and email.
Subcontractor (if applicable) with phone number.
Be prepared to show your property pins/corners.
Quick reference guideline for new or change of use driveways.
Only one access per parcel (unless need demonstrated).
90 degree intersection with County Road for first 30 feet.
3 % maximum grade for first 30 feet.
4” thick hot asphalt or concrete apron if County Road is paved or chip sealed.
300 feet visibility in both directions.
Corrugated steel culvert if a road ditch is crossed.
Driveway runoff must not reach County Road.
Completed and signed permit must be obtained prior to commencing work and permit
must be kept on jobsite for the entire duration of the project.
All work must be completed within 90 days of permit issuance.
The Road and Bridge office will issue the permit. It can be picked up at the above address,
emailed, or faxed upon receipt of payment.
Make checks out to Garfield County Road and Bridge, please include permit number on
your check.
We also accept Visa & MasterCard. Garfield County does not retain credit card
information.
Garfield County Road and Bridge
0298 CR 333A
Rifle, CO 81650
PH: 970-625-8601 Fax: 970-625-8627
Email: roadandbridge@garfield-county.com
Driveway Permit Application
Permit Fee: $75.00
1. Property Owner: Glenwood Partnership LLLP
2. Mailing Address: 214 Center Drive
3. City, State, Zip: Glenwood Springs, CO 81601
4. Phone No: (970)945-6712 (970)379-4182 Email: john@diemoz.net
5. Sub-contractor: TBD Phone: TBD
6. Estimated Start Date: Summer 2023
7. County Road No: 130 (Donegan Rd)
8. Nearest Intersection or Address: Chapparal Circle
9. Distance from Int. or Address: @ Chapparal
10. Direction from Int. or Address: N E S W
11. Side of Road: N E S W
12. Width of apron: 30-foot 40-foot 100-foot Other: 80
13. Culvert Required: Yes No
14. Size of culvert required: 12-inch 15-inch 18-inch Other:_N/A
15. Length of Culvert: 30-foot 40-foot 100-foot Other: N/A
16. Asphalt or concrete pad required: Yes No
17. Size of Pad: 30-foot wide X 10-foot long X 4 inches thick
40-foot wide X 10-foot long X 4 inches thick
100-foot wide X 20-foot long X 4 inches thick
X
X
X
X
X
18. Gravel Recommended: Yes No
**Gravel recommended so as to not track mud onto County Road.
19. Length of gravel portion: 40-foot 50-foot 100-foot
20. Trees of brush removed for visibility: Yes No
21. Distance and direction from driveway to be removed:
22. Driveway must be no more than 3 % slope away from County Road.
23. Driveway must be constructed so that no drainage accesses the County Road.
24. Certified traffic control required: Yes No
25. Work zone signage only required: Yes No
26. Stop sign required at entrance to County Road: Yes No
27. Inspection of driveway will be required upon completion and must be approved by Garfield
County Road and Bridge.
28. Person Requesting Permit: John Diemoz
29. Person approving Permit:
30. Date approved:
Payment Information
Check Visa MasterCard
Name of Cardholder:
Billing Address:
Card Number: / / / / / / / / / / / /
Expiration Date: / V Code (last 3 or 4 numbers on back of card)
Signature Required:
Authorized Card Holder Signature
X
X
X
X
X
>
>
PSD
PSD PSD
PS
D
PS
D
PS
D
ST PSD PSDPSDPSD
CHAPPARAL CIRCLE
ME
L
R
A
Y
R
O
A
D
GLENWOOD SPRINGS MALL
ST
O
R
M
K
I
N
G
R
O
A
D
PONDEROSA CIRCLE
WESTERN HILLS
SUBDIVISION
CENTER DR
JU
N
I
P
E
R
C
T
DONEGAN ROAD
LOT 1
LOT 2
LOT 3
CENTER DR CENTER DR
CH
A
P
P
A
R
A
L
D
R
I
V
E
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
0
0
-
C
O
V
E
R
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
:
0
9
p
m
GLENWOOD BUSINESS CENTER
MINOR SUBDIVISION CIVIL PLANS: 04/26/2023
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
0
VICINITY MAP
SCALE: 1" = 2000'
SITE
COLORADO RIVER
MI
T
C
H
E
L
L
C
R
E
E
K
INTERSTATE 70
MIDLAND
A
V
E
C0.0 - COVER SHEET
C1.0 - SITE PLAN
C2.0 - GRADING & DRAINAGE PLAN
C2.1 - ROAD PLAN/PROFILE 1
C2.2 - ROAD PLAN/PROFILE 2
C2.5 - OFFSITE DRAINAGE PLAN
C2.6 - ONSITE DRAINAGE PLAN
C3.0 - UTILITY PLAN
PLAN INDEX
SOPRIS ENGINEERING LLC
502 MAIN STREET SUITE A3 CARBONDALE CO 81623
(970) 704 0311 soprisengineering.com
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
xxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK
STBK
ST
B
K
ST
B
K
STBK
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
6''WL
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK
STBK
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
>>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
>>
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XS
D
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD
X
S
D
X
S
D
ou
ou
100' STORAGE SETBACK
FROM RESIDENTIALPROPERTY LINE
10' SIDE SETBACK
40' ACCESS EASEMENT
7.5' REAR SETBACK (COMMERCIAL)
340'
100'
30'
32'
30'
32'
180'
285'
40' ACCESS EASEMENTRE: PRELIMINARY PLAT
275'
75'
25'
25'
30'
28'
28'
28'
28'
25'
53'
25' FRONT
10' SIDE
40'
7.50' REAR (COMMERCIAL)
28'
CLOSE ENTRANCE
EXTEND ISLAND
DRAINAGE SWALE + 5' WIDE SIDEWALK.
70 L.F. - 3' HIGH BOULDER WALL
6' SIDEWALK
10' SIDEWALK
8 PARKING SPACES FOR EMPLOYEE HOUSING
28' DRIVE WIDTH
101'
5.0'
8.2'
HANDICAP RAMPSTEPS UP
4' SIDEWALK
UPPER LEVEL
LOWER LEVEL
DONEGAN ROAD
ST
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
WEST GLENWOOD MALL
LOT 1
AREA=3.192 AC.
30
LOT 3: FUTURE
DEVELOPMENT.
AREA=4.748 AC.
12
BUILDING A: 2 STORY STORAGE97,500 SF STORAGE + 3 RESIDENTIAL UNIT
S
BUILDING B: FLEX, 1 STORY100x340' = 34,000 SF
LOT 2: STORAGE, FLEX,
EMPLOYEE UNITS.
AREA=7.879 AC.
26
24
BUILDING C: FLEX, 1 STORY75x275' = 20,625 SF
20% office space and 80% warehouse
(Rates conservative per SUP approval, not current code)
20,625x.2 = 4125 / 200 = 20.6 = 21
20,625x.8 = 16500 / 1000 = 16.5 = 17REQUIRED = 38PROVIDED = 54
8
11 11
20% office space and 80% warehouse
(Rates conservative per SUP approval, not current code)
34,000x.2 = 6800 / 200 = 34
34,000x.8 = 27200 / 1000 = 27.2 = 28
REQUIRED = 62
PROVIDED = 69
LOADING ZONE
21
CH
A
P
P
A
R
A
L
D
R
I
V
E
R25'
R30'
R30.00'
R25'
R30'
R30'
R25'
R25'
R25'
ME
L
R
A
Y
R
O
A
D
25' FOR PARKING & SIDEWALK
BUILDING D: FLEX, 1 STORY
100x270' = 27,000 SFAssumed 50% office space and 50% warehouse
(Rates conservative per SUP approval, not current code)
27,000x.5 = 13,500 / 200 = 67.5
27,000x.5 = 13,500 / 1000 = 13.5
REQUIRED = 81
PROVIDED = 81
BUILDING E: FLEX, 1 STORY
75x280' = 21,000 SFAssumed 50% office space and 50% warehouse
(Rates conservative per SUP approval, not current code)
21,000x.5 = 10,500 / 200 = 52.5
21,000x.5 = 10,500 / 1000 = 10.5
REQUIRED = 63
PROVIDED = 71
26
28
12
30
26
30
270'
100'
280'
75'
R25'
R25'
28'
28'
LOADING ZONE
7.5' REAR SETBACK (COMMERCIAL)
10' SIDE SETBACK
45.30'
32.70'
34.72'
85.47'
113.58'
CENTER DRIVE
DATE REVISION
C-1.0
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
1
0
-
S
I
T
E
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
1
:
5
9
a
m
NO
R
T
H
PROPOSED ASPHALT
SITE PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
050 50 100
50
20025
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING LEGEND
EXISTING STORM INLET
EXISTING STORM SEWERXSDXSD
EXISTING EASEMENT
EXISTING PROPERTY LINE
EXISTING ASPHALT
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
STBK
EXISTING WIRE FENCExx
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE BUILDING LOCATION, USES, AND SITE LAYOUT OF LOT 3 ARE
CONCEPTUAL PENDING FUTURE DEVELOPMENT OF LOT 3. SEE
APPLICATION NARRATIVE FOR ADDITIONAL DETAILS.
2. THE EXISTING BOUNDARY AND TOPOGRAPHIC SURVEY WAS PERFORMED
BY SOPRIS ENGINEERING, LLC. THE EXISTING CONTOUR INTERVAL IS ONE
(1) FOOT (DASHED).
3. THE PROPOSED CONTOUR INTERVAL IS ONE (1) FOOT.
4. REFER TO THE ARCHITECT'S PLANS FOR BUILDING INFORMATION.
5. REFER TO THE LANDSCAPE ARCHITECT'S PLANS REGARDING THE SITE
LANDSCAPE IMPROVEMENTS.
6. ALL GEOTECHNICAL ENGINEERING RECOMMENDATIONS SHALL BE
ADHERED TO.
SITE NOTES:
PROPOSED SNOW STORAGE
PROPOSED CHAPPARAL DRIVE STREET SECTION
LOOKING NORTHN.T.S.
2%
STANDARD CATCH CURB
AND GUTTER PER DETAIL
2%
14.0' LANE 14.0' LANE 8.5'± DRAINAGE SWALE 5.0' SIDEWALK
40.0' EASEMENT (MIN.)
1.0'
SHOULDER
1.0'
SHOULDER
2'H:1'V MAX SLOPE TO
MATCH EXISTING GRADE9" CLASS 6 BASE COURSE COMPACTED TO
95% OF MAX. STD. PROCTOR DENSITY
4" ASPHALTSITE GRADING PER PLAN
NOTES:
1. STRIP ALL TOPSOIL SCARIFY AND RECOMPACT SUBGRADE A MINIMUM OF 8" DEPTH TO 95% STANDARD PROCTOR.
2. CONFIRM FILL SOILS (WHERE APPLICABLE) AND ROAD SECTION WITH SOILS ENGINEER PRIOR TO CONSTRUCTION
PROPOSED CENTER DRIVE STREET SECTION
LOOKING EASTN.T.S.
2%
STANDARD CATCH CURB
AND GUTTER PER DETAIL
14.0' LANE 14.0' LANE
40.0' EASEMENT (MIN.)
1.0'
SHOULDER
1.0'
SHOULDER
2'H:1'V MAX SLOPE TO
MATCH EXISTING GRADE9" CLASS 6 BASE COURSE COMPACTED TO
95% OF MAX. STD. PROCTOR DENSITY
4" ASPHALTSITE GRADING
PER PLAN
NOTES:
1. REFER TO PLAN FOR PARKING LOCATIONS.
2. STRIP ALL TOPSOIL SCARIFY AND RECOMPACT SUBGRADE A MINIMUM OF 8" DEPTH TO 95% STANDARD PROCTOR.
3. CONFIRM FILL SOILS (WHERE APPLICABLE) AND ROAD SECTION WITH SOILS ENGINEER PRIOR TO CONSTRUCTION
2%
STANDARD SPILL CURB
AND GUTTER PER DETAIL
PROPOSED DONEGAN SIDEWALK & DRAINAGE SECTION
LOOKING EASTN.T.S.
60'± ROW
EX.EX.
PSD
RE: STANDARD DETAIL
SLOPE PER PLAN (TYP.)
STORM SEWER PER PLAN
>>
>>
XS
D
XS
D
XS
D
XW
L
XW
L
XW
L
ME: 32.0'±
572
5
5730
5724
5726
5727
5728
5729
5731
5732
573
0
5735
5
7
2
9
573
1
5732
573
3
573
4
5736
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
ST
B
K
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
G
A
S
G
A
S
GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
FO
FO
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD
PSD
ST
IR
R
IR
R
IR
R
IR
R
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD PSD PSD
PSD PSD PSD
PSD PSD PSD
PS
D
PS
D
P
S
D
P
S
D
ST
PS
D
PSD PSD PSD PSD PSD PSD PSD PSD
P
S
D
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
PS
D
PSD
PS
D
PS
D
F
O
F
O
F
O
F
O
FO FO
FO
FO
FO FO FO FO FO FO FO FO FO FO
FO
>
>
>
>
>>>>>>>>>>>>>>>>>>>>>>
PS
D
8''WL 8''WL 8''WL 8''WL 8''
6''SA
PSD PSD PSD
LOT 1
BUILDING B:
BUILDING C:
LOWER FF=5731.5'
572
8
5730
5727
57285729
573
1
57285728
572
9
5
7
2
9
CURB OPENING
CURB OPENING
STORM MANHOLE
DRAIANGE SWALE DETENTION
WATER QUALITY SEPARATOR
FF=5732.0'
FF=5729.0'
CURB INLET
VALLEY PAN INLET
DETENTION
STORM MANHOLE
ROOF DRAIN STORM (TYP.)
5730
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5728
5728
572
8
572
8
5730
5731
5732
5733
5731
5732
5733 4.
6
%
1.
5
%
1.
0
%
6
.
3
%
2.0%
3.
2
%
2.
0
%
3.
7
%
2.
0
%
3.
7
%
3.
0
%
0.5%
0.9%0.9%
1.0%1.0%1.0%
1.0%2.3%
3.
0
%
1.0%1.0%1.0%1.0%2.1%
2.
0
%
2.
0
%
2.
0
%
5.
7
%
2.
1
%
5.
3
%
5.
3
%
2.
1
%
5.
4
%
1.0%
2.0%
0.7%
1.3%
2
.
0
%
1.0%
3.
0
%
3.
4
%
2.6%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
7.0%FL: 30.50
FL: 30.50
FL: 28.30
TC: 32.00
TC: 32.00 TC: 32.00
TC: 28.91
TC: 29.11 TC: 29.42TC: 28.92TC: 29.43TC: 28.86
TC: 29.00
TC: 28.99
TC: 29.00
FL: 27.20 FL: 27.78 FL: 27.20
FL: 27.78
FL: 27.20
EA: 28.23 EA: 28.23 EA: 28.23
EA: 28.23 EA: 28.23
EA: 28.25EA: 28.78EA: 28.26EA: 28.78
EA: 28.20EA: 28.45
FG: 31.50
FG: 31.50
FG: 28.30FG: 27.30
FG: 29.00
FL: 27.36FL: 27.48
FL: 28.05
FL: 29.26FL: 30.37
FL: 30.74
FL: 31.19
EA: 30.87
FL: 29.68
FL: 29.67
FL: 29.67
EA: 30.38 EA: 30.89 EA: 30.38 EA: 30.89
TC: 31.50
TC: 31.50
TC: 31.50
EA: 30.50
EA: 28.71
EA: 27.84
EA: 28.78
FL: 29.23
FL: 29.90
FL: 30.53
3.
4
%
57
3
0
1.5%
1.1%
0.5%
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP: 8+48.15
PC: 3+87.11
PC: 5+00.23
PT: 4+57.01
PT: 5+70.13
3+
0
0
4+
0
0
0
+
0
0
BP: 0+00.00
PC: 0+24.70
PT: 0+42.17
0+
0
0
1+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PT: 8+59.09
BUILDING E:
LI
M
I
T
O
F
L
O
T
2
G
R
A
D
I
N
G
AL-CENTER DRIVE PROFILE
5726
5728
5730
5732
5726
5728
5730
5732
0+00
57
3
1
.
0
57
3
0
.
8
0+50
57
3
1
.
3
57
3
0
.
7
1+00
57
3
0
.
6
57
3
0
.
6
1+50
57
3
0
.
5
57
3
0
.
3
2+00
57
3
0
.
0
57
2
9
.
7
2+50
57
2
9
.
2
57
2
8
.
9
3+00
57
2
8
.
5
57
2
8
.
2
3+50
57
2
7
.
9
57
2
7
.
6
4+00
57
2
7
.
5
57
2
7
.
5
4+50
57
2
7
.
6
57
2
7
.
7
8
57
2
8
.
3
57
2
8
.
0
1
5+00
57
2
8
.
1
57
2
8
.
1
8
57
2
8
.
5
57
2
8
.
1
1
5+50
57
2
8
.
6
57
2
7
.
8
1
57
2
8
.
5
57
2
7
.
6
2
6+00
57
2
8
.
5
57
2
7
.
8
7
57
2
8
.
2
57
2
8
.
1
2
6+50
57
2
8
.
1
57
2
7
.
9
3
57
2
8
.
1
57
2
7
.
6
8
7+00
57
2
8
.
0
57
2
7
.
7
1
57
2
7
.
6
57
2
7
.
9
6
7+50
57
2
7
.
7
57
2
8
.
0
9
57
2
7
.
4
57
2
7
.
8
4
8+00
57
2
7
.
2
57
2
7
.
5
9
57
2
7
.
0
57
2
7
.
9
1
8+48
57
2
6
.
2
57
2
8
.
3
5
2.00%1.00%-1.00%1.00%-1.00%-1.18%1.77%1.57%0.67%
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
3
3
.
0
1
EL
E
V
=
5
7
2
7
.
5
1
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
7
.
0
9
EL
E
V
=
5
7
2
7
.
8
9
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
2
.
2
8
EL
E
V
=
5
7
2
8
.
2
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
7
0
.
1
3
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
2
7
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
8
5
.
6
5
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
4
3
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
0
4
.
1
5
EL
E
V
=
5
7
2
7
.
5
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
3
6
.
1
5
EL
E
V
=
5
7
2
8
.
1
1
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
2
8
.
3
5
STA: 4+99.35
ELEV= 5728.12'
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
AL-CHAPPARAL DR PROFILE
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
0+00
57
4
7
.
9
57
4
5
.
0
57
4
6
.
9
2
0+50
57
4
2
.
2
57
4
5
.
7
5
57
4
0
.
3
57
4
3
.
4
0
1+00
57
3
8
.
3
57
4
1
.
0
2
57
3
6
.
9
57
3
8
.
6
9
1+50
57
3
6
.
0
57
3
7
.
4
1
57
3
4
.
3
57
3
6
.
4
1
2+00
57
3
3
.
1
57
3
5
.
2
5
57
3
1
.
6
57
3
4
.
1
0
2+50
57
3
0
.
5
57
3
2
.
9
4
57
2
9
.
3
57
3
1
.
7
9
3+00
57
2
8
.
2
57
3
0
.
6
3
57
2
7
.
0
57
2
9
.
4
7
3+50
57
2
6
.
2
57
2
8
.
3
4
57
2
6
.
0
57
2
7
.
9
6
4+00
57
2
5
.
0
57
2
7
.
5
9
57
2
4
.
3
57
2
7
.
2
1
4+50
57
2
3
.
5
57
2
6
.
8
4
57
2
3
.
0
57
2
6
.
7
0
4+76
57
2
2
.
9
57
2
6
.
7
2
-3.00%
-9.50%
-4.00%
-4.62%
-1.50%1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
1
.
0
8
EL
E
V
=
5
7
4
7
.
3
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
7
4
.
3
0
EL
E
V
=
5
7
3
6
.
4
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
4
9
.
3
2
EL
E
V
=
5
7
2
8
.
3
5
GRADE BREAK STA = 4+67.32ELEV = 5726.58
GRADE BREAK STA = 4+76.32
ELEV = 5726.72
PVI STA: 1+29.30PVI ELEV: 5738.24
K: 3.64
LVC: 20.00BVCS: 1+19.30BVCE: 5739.19
EVCS: 1+39.30
EVCE: 5737.84
PVI STA: 0+43.97
PVI ELEV: 5746.35K: 3.08LVC: 20.00
BVCS: 0+33.97
BVCE: 5746.65EVCS: 0+53.97EVCE: 5745.40
STA: 1+54.30ELEV= 5737.24'
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
XSD
XS
D
XS
D
XS
D
XS
D
XSD
XSD
XSD
5716
571
7
ST
B
K
ST
B
K
x
x
x
x
x
x
x
x
x
x IR
R
IR
R
IR
R
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
GA
S
GA
S
GA
S
GAS GAS GAS GAS GASFOFOFOFOFOFO FO
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
8'
'
WL
8'
'
WL
8'
'
WL
6'
'
SA
6'
'
SA
8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA s 8''SA 8''SA 8''SA s
EUEL PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PS
D
PSD PSD
PSD
ST
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD
PSD
>
>
>
>
>>>>>>>>>>
>
>
>
>
>
PSD PSD PSD
FO
FO
FO
FO
8'
'
WL
8'
'
WL
8'
'
WL
R2
6
.
5
6'
'
SA 6'
'
SA
6'
'
WL
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
574
8
ST
O
R
M
M
A
N
H
O
L
E
WA
T
E
R
Q
U
A
L
I
T
Y
S
E
P
A
R
A
T
O
R
FO
U
N
D
A
T
I
O
N
W
A
L
L
2
'
A
B
O
V
E
F
F
10
5
L
.
F
.
R
E
T
A
I
N
I
N
G
W
A
L
L
CU
R
B
I
N
L
E
T
573
0
573
5
57
4
0
57
4
5
5727
5728
572
9
573
1
573
2
573
3
573
4
573
6
573
7
57
3
8
57
3
9
57
4
1
57
4
2
57
4
3
57
4
4
57
4
6
5735
5732
5733
5734
5736
57
2
5
57
2
2
0.
4
%
5.
5
%
9.5%
4.6%
1.5%
3.0%
0.
8
%
1.
0
%
2.
1
%
5.4%4.8%2.0%
4.
1
%
1.
0
%
2.0%
2.0%
-3.0:1
-3.0:1
-3.0
:
1
FL: 47.00
FL
:
3
0
.
5
0
FL
:
2
8
.
3
0
FL
:
3
2
.
5
0
TC: 32.00
TC: 32.00
TC
:
2
8
.
9
1
TC
:
2
9
.
4
2
TC
:
2
9
.
0
0
TC: 29.00
FL
:
2
7
.
2
3
FL
:
2
7
.
8
7
FL
:
2
7
.
7
8
FL: 27.20
EA
:
2
8
.
2
3
EA
:
2
8
.
2
3
EA
:
2
8
.
2
5
EA
:
2
8
.
7
8
EA
:
3
6
.
1
3
EA
:
3
2
.
6
8
EA
:
3
5
.
6
2
FL: 31.08
EA: 31.80
FG: 33.50
FG: 31.50
5723
5730 5735
5740
5
7
4
4
CU
R
B
O
P
E
N
I
N
G
8+
0
0
8+
4
8
EP: 8+48.15
0+001+002+003+004+004+76
BP
:
0
+
0
0
.
0
0
PC
:
0
+
6
7
.
6
6
PT
:
0
+
8
2
.
1
6
EP
:
4
+
7
6
.
3
2
4+
0
0
4+89
EP: 4+89.35
PC: 4+45.08
PT: 4+84.35
0+
0
0
1+
0
0
EA: 47.47
EA: 47.36
EA: 47.63
BU
I
L
D
I
N
G
E
:
(F
U
T
U
R
E
G
R
A
D
I
N
G
)
LIMIT OF LOT 2 GRADING
DATE REVISION
C-2.1
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
.
D
W
G
-
A
p
r
2
6
,
2
0
2
3
-
1
2
:
0
5
p
m
NO
R
T
H
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:04-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GA
R
F
I
E
L
D
C
O
U
N
T
Y
,
C
O
L
O
R
A
D
O
MI
N
O
R
S
U
B
D
I
V
I
S
I
O
N
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
ROAD
PLAN/PROFILE 1
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
NORTH
Traffic Impact Study
Glenwood Business Center
Garfield County, Colorado
Prepared for:
Sopris Engineering, LLC
T R A F F I C I M P A C T S T U D Y
Glenwood Business Center
Garfield County, Colorado
Prepared for
Sopris Engineering, LLC
502 Main Street
Suite A-3
Carbondale, Colorado 81623
Prepared by
Kimley-Horn and Associates, Inc.
4582 South Ulster Street
Suite 1500
Denver, Colorado 80237
(303) 228-2300
February 2023
This document, together with the concepts and designs presented herein, as an instrument of
service, is intended only for the specific purpose and client for which it was prepared. Reuse of
and improper reliance on this document without written authorization and adaptation by
Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
02/13/2023
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page i
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................... i
LIST OF TABLES .............................................................................................................ii
LIST OF FIGURES ...........................................................................................................ii
1.0 EXECUTIVE SUMMARY ........................................................................................... 1
2.0 INTRODUCTION ....................................................................................................... 3
3.0 EXISTING AND FUTURE CONDITIONS .................................................................. 5
3.1 Existing Study Area ...........................................................................................................5
3.2 Existing Roadway Network ................................................................................................5
3.3 Existing Traffic Volumes ..................................................................................................11
3.4 Unspecified Development Traffic Growth .........................................................................11
4.0 PROJECT TRAFFIC CHARACTERISTICS ............................................................. 16
4.1 Trip Generation................................................................................................................16
4.2 Trip Distribution ...............................................................................................................17
4.3 Traffic Assignment ...........................................................................................................17
4.4 Total (Background Plus Project) Traffic............................................................................17
5.0 TRAFFIC OPERATIONS ANALYSIS ...................................................................... 22
5.1 Analysis Methodology ......................................................................................................22
5.2 Key Intersection Operational Analysis .............................................................................23
5.3 CDOT Access Permit Need Analysis ...............................................................................27
5.4 Improvement Summary ...................................................................................................27
6.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................... 29
APPENDICES
Appendix A – Intersection Count Sheets
Appendix B – Future Traffic Projections
Appendix C – Trip Generation Worksheets
Appendix D – Intersection Analysis Worksheets
Appendix E – Conceptual Site Plan
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page ii
LIST OF TABLES
Table 1 – Glenwood Business Center Traffic Generation ..........................................................16
Table 2 – Level of Service Definitions .......................................................................................22
Table 3 – Donegan Road & Storm King Road LOS Results ......................................................23
Table 4 – Donegan Road & Mel Ray Road LOS Results ...........................................................24
Table 5 – Center Drive & Storm King Road LOS Results ..........................................................25
Table 6 – Highway 6 & Storm King Road LOS Results .............................................................26
Table 7 – Project Access Level of Service Results ....................................................................27
LIST OF FIGURES
Figure 1 – Vicinity Map ................................................................................................................4
Figure 2 – Existing Geometry and Control .................................................................................10
Figure 3 – Existing Traffic Volumes ...........................................................................................12
Figure 4 – 2023 Existing Traffic Volumes ..................................................................................13
Figure 5 – 2025 Background Traffic Volumes............................................................................14
Figure 6 – 2045 Background Traffic Volumes............................................................................15
Figure 7 – Project Trip Distribution ............................................................................................18
Figure 8 – Project Traffic Assignment .......................................................................................19
Figure 9 – 2025 Total Traffic Volumes ......................................................................................20
Figure 10 – 2045 Total Traffic Volumes.....................................................................................21
Figure 11 – Recommended Geometry and Control ...................................................................28
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 1
1.0 EXECUTIVE SUMMARY
Glenwood Business Center is proposed to be located on the southeast corner of the Donegan
Road and Storm King Road intersection in Garfield County, Colorado. Lot 1 is currently developed
with existing commercial/office uses within the southwest portion of Glenwood Business Center
whereas the remining Lots 2 and 3 are proposed to include an approximate 97,750 square foot
self-storage facility, three (3) residential units, 35,175 square feet of office space, and
approximately 67,950 square feet of warehouse uses, as evaluated in this traffic study. It is
expected that Glenwood Business Center will be completed in the next several years. Therefore,
analysis was conducted for the 2025 short -term buildout horizon as well as the 2045 long-term
twenty-year planning horizon.
The purpose of this traffic study is to identify project traffic generation characteristics to determine
potential project traffic related impacts on the local street system and to develop the necessary
mitigation measures required for the identified traffic impacts. The following intersections were
incorporated into this traffic study in accordance with the City of Glenwood Springs standards and
requirements:
• Donegan Road and Storm King Road (Intersection #1)
• Donegan Road and Mel Ray Road (#2)
• Center Drive and Storm King Road (#3)
• Highway 6 and Storm King Road (#4)
In addition, the full movement access proposed to align with Chapparal Circle along Donegan
Road was evaluated.
Regional access to the project will be provided by Interstate 70 (I-70), State Highway 82 (SH-82),
and Highway 6 (US-6). Primary access will be provided by Donegan Road, Storm King Road and
Mel Ray Road. Direct access to the site will be provided by one full movement project access
along the east side of Storm King Road as well as one full movement access along the south side
of Donegan Road. The access along Storm King Road aligns with Center Drive while the access
along Donegan Road is proposed to align with Chapparal Circle.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 2
Glenwood Business Center is expected to generate approximately 664 weekday daily trips, with
75 of these trips occurring during the morning peak hour and 81 of these trips occurring during
the afternoon peak hour.
Based on the analysis presented in this report, Kimley -Horn believes Glenwood Business Center
will be successfully incorporated into the existing and future roadway network. Analysis of the
existing street network, the proposed project developmen t, and expected traffic volumes resulted
in the following recommendations:
• With completion of the Glenwood Business Center project, an additional access to the
development area is proposed along Donegan Road to align with Chapparal Circle. It is
recommended that a R1-1 “STOP” sign be installed on the northbound approach exiting the
development. A single northbound approach lane for shared movements is all that is needed
for this access.
• Any onsite or offsite improvements should be incorporated into the Civil Drawings and conform
to standards of the Garfield County and the Manual on Uniform Traffic Control Devices
(MUTCD) – 2009 Edition.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 3
2.0 INTRODUCTION
Kimley-Horn and Associates, Inc. has prepared this report to document the results of a Traffic
Impact Study for Glenwood Business Center proposed to be located on the southeast corner of
the Donegan Road and Storm King Road intersection in Garfield County, Colorado. A vicinity map
illustrating the Glenwood Business Center location is shown in Figure 1. Lot 1 is currently
developed with existing commercial/office uses within the southwest portion of Glenwood
Business Center whereas the remining Lot s 2 and 3 are proposed to include a n approximate
97,750 square foot self-storage facility, three (3) residential units, 35,175 square feet of office
space, and approximately 67,950 square feet of warehouse uses, as evaluated in this traffic study.
A conceptual site plan is attached in Appendix E. It is expected that Glenwood Business Center
will be completed in the next couple of years; therefore, analysis was conducted for the 2025
short-term buildout horizon as well as the 2045 long -term twenty-year planning horizon.
The purpose of this traffic study is to identify project traffic generation characteristics to determine
potential project traffic related impacts on the local street system and to develop the necessary
mitigation measures required for the identified traff ic impacts. The following intersections were
incorporated into this traffic study in accordance with the City of Glenwood Springs standards and
requirements:
• Donegan Road and Storm King Road (Intersection #1)
• Donegan Road and Mel Ray Road (#2)
• Center Drive and Storm King Road (#3)
• Highway 6 and Storm King Road (#4)
In addition, the full movement access proposed to align with Chapparal Circle along Donegan
Road was evaluated.
Regional access to the project will be provided by Interstate 70 (I-70), State Highway 82 (SH-82),
and Highway 6 (US-6). Primary access will be provided by Donegan Road, Storm King Road and
Mel Ray Road. Direct access to the site will be provided by one full movement project access
along the east side of Storm King Road as well as one full movement access along the south side
of Donegan Road. The access along Storm King Road aligns with Center Drive while the access
along Donegan Road is proposed to align with Chapparal Circle.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 5
3.0 EXISTING AND FUTURE CONDITIONS
3.1 Existing Study Area
The existing site is currently vacant land. To the east of the site are existing residences, a church,
and Glenwood Springs Middle School. To the west of the site are existing residences, auto
dealerships, and Two Rivers Community School. The area to the north of the project is primarily
residential. To the south of the project is the Glenwood Springs Mall.
3.2 Existing Roadway Network
Donegan Road is a two-lane roadway with one through lane in each direction, eastbound and
westbound within the project study area. The roadway has a posted speed limit of 25 miles per
hour in the vicinity of the site.
Storm King Road and Mel Ray Road are both two-lane roadways with one through lane in each
direction, northbound and southbound, within the project study area. These roadways have a
posted speed limit of 25 miles per hour in the vicinity of the site and in the study area.
Highway 6 is a two-lane roadway with one through lane in each direction, eastbound and
westbound, within the project limits. The roadway has a posted speed limit of 40 miles per hour
in the project study area.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 6
The existing T-intersection of Donegan Road and Storm King Road (#1) is unsignalized with stop
control on the northbound approach of Storm King Road. The three approaches of this
intersection all provide a single lane for shared movements. An aerial photo of the existing
intersection configuration is below (north is up - typical).
Donegan Road and Storm King Road (#1)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 7
The intersection of Donegan Road and Mel Ray Road (#2) is a four-leg, all-way stop controlled
intersection. This intersection currently has one lane for all movements on the
northbound/southbound approaches of Mel Ray Road and the eastbound /westbound approaches
of Donegan Road. An aerial photo of the existing intersection configuration is below.
Donegan Road and Mel Ray Road (#2)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 8
The intersection of Center Drive and Storm King Road (#3) is an unsignalized four-leg intersection
with stop control on the eastbound Center Drive and westbound project access approaches. This
intersection currently has a single lane for shared movements at all approaches. Of note, a bus
only lane is designated along southbound Storm King Road adjacent to Two Rivers Community
School. With construction of this project, the east leg will also provide shared access to buildout
of this development area. An aerial photo of the existing intersection configuration i s below.
Center Drive and Storm King Road (#3)
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 9
The intersection of Highway 6 and Storm King Road (#4) is an unsignalized three-leg intersection
with stop control on the southbound approach of Storm King Road. The westbound approach of
Highway 6 consists of a through lane and a right turn lane. The eastbound Highway 6 and
southbound Storm King Road approaches consist of a single lane for shared movements. An
aerial photo of the existing intersection configuration is below.
Highway 6 and Storm King Road (#4)
The intersection lane configuration and control for the study area intersections are shown in
Figure 2.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 11
3.3 Existing Traffic Volumes
Existing turning movement counts were conducted at th e study intersections on Wednesday,
March 3, 2021 during the weekday morning and afternoon peak hours. The counts were
conducted during the morning and afternoon peak hours of adjacent street traffic in 15 -minute
intervals from 7:00 AM to 9:00 AM and 2:00 PM to 6:00 PM on this count date. The afternoon
peak period includes the Two Rivers Community School and Glenwood Springs Middle School
dismissal times The existing intersection traffic volumes are shown in Figure 3.
These counts were collected during the COVID-19 pandemic. Counts at Highway 6 and Mel Ray
Avenue roundabout intersection were recently collected on Thursday, October 20, 2022 and
depict the new normal traffic conditions. These 2022 counts were compared to the previously
used 2021 counts for an appropriate COVID-19 adjustment. From the comparison, the 2021
volumes for the west leg of Highway 6 during the morning peak hour were actually higher than
the 2022 volumes while the 2021 afternoon peak hour volumes were 30 percent lower than the
2022 volumes. The 2021 volumes for the north leg of Mel Ray Road were 30 percent less in the
morning peak hour and were 10 percent less in the afternoon peak hour compared to the 2022
volumes. Therefore, to provide a conservative analysis, a 1.3 factor to increase traffic volumes by
30 percent was applied to all the study intersections to represent the new normal traffic conditions
without the impact of the COVID 19 pandemic. The volumes were grown by the CDOT 20 -year
growth rate of 0.7 percent per year to estimate 2023 traffic volumes. These adjusted turning
movement counts are shown in Figure 4 with COVID-19 adjustments. The count sheets for the
study intersections and the COVID-19 comparison intersection are provided in Appendix A.
3.4 Unspecified Development Traffic Growth
According to information provided on the website for the Colorado Department of Transportation
(CDOT), the 20-year growth factor along Highway 6 in the vicinity of the site is 1.15. The 20-year
growth factor equates to annual growth rate of 0.7 percent. Traffic information from the CDOT
Online Transportation Information System (OTIS) website is included in Appendix B. This annual
growth rate was used to estimate near term 2025 and long term 2045 traffic volume projections
at the key intersections. Background traffic volumes for 2025 and 2045 are shown in Figures 4
and 5, respectively.
37(19)
16(20)
32(18)
19(28)
16
(
1
2
)
13
(
2
2
)
1
31(27)
17(27)
5(7)
28(20)
17(17)
1(1)
4(
3
)
24
(
1
4
)
1(
4
)
15
(
2
6
)
10
(
3
9
)
25
(
2
5
)
2
7(4)
1(1)
1(4)
55(48)
2(0)
14(14)
4(
0
)
35
(
2
8
)
22
(
1
6
)
11
(
5
)
18
(
1
8
)
11
3
(
4
2
)
3
105(120)
197(73)
167(127)
12(7)
10
5
(
1
2
8
)
6(
1
4
)
4
48(25)
21(26)
42(24)
25(37)
21
(
1
6
)
17
(
2
9
)
1
41(35)
22(35)
7(9)
37(26)
22(22)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
1
)
33
(
3
3
)
2
9(5)
1(1)
1(5)
72(63)
3(0)
18(18)
5(
0
)
46
(
3
7
)
29
(
2
1
)
14
(
7
)
24
(
2
4
)
14
8
(
5
5
)
3
137(157)
258(96)
219(166)
16(9)
13
7
(
1
6
8
)
8(
1
8
)
4
49(25)
21(26)
43(24)
25(38)
21
(
1
6
)
17
(
2
9
)
1
42(35)
22(35)
7(9)
38(26)
22(22)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
2
)
33
(
3
3
)
2
9(5)
1(1)
1(5)
73(64)
3(0)
18(18)
5(
0
)
47
(
3
8
)
29
(
2
1
)
14
(
7
)
24
(
2
4
)
15
0
(
5
6
)
3
139(159)
262(97)
222(168)
16(9)
13
9
(
1
7
0
)
8(
1
8
)
4
56(29)
24(30)
49(28)
29(43)
24
(
1
9
)
20
(
3
4
)
1
48(41)
26(41)
8(10)
43(30)
26(26)
1(1)
6(
5
)
36
(
2
1
)
1(
6
)
23
(
4
0
)
15
(
5
9
)
38
(
3
8
)
2
10(6)
1(1)
1(6)
84(73)
3(0)
21(21)
6(
0
)
54
(
4
3
)
34
(
2
4
)
16
(
8
)
28
(
2
8
)
17
3
(
6
4
)
3
160(183)
301(112)
255(194)
19(10)
16
0
(
1
9
6
)
9(
2
1
)
4
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 16
4.0 PROJECT TRAFFIC CHARACTERISTICS
4.1 Trip Generation
Site-generated traffic estimates are determined through a process known as trip generation.
Rates and equations are applied to the proposed land use to estimate t raffic generated by the
development during a specific time interval. The acknowledged source for trip generation rates is
the Trip Generation Manual1 published by the Institute of Transportation Engineers (ITE). ITE has
established trip rates in nationwide studies of similar land uses. For this study, Kimley-Horn used
the ITE Trip Generation Report average rates that apply to Warehousing (ITE Land Use Code
150), Mini-Warehouse (ITE 151), Multifamily Low-Rise Housing (ITE 220), and General Office
Building (ITE 710) for traffic associated with the development.
Glenwood Business Center is expected to generate approximately 664 weekday daily trips, with
75 of these trips occurring during the morning peak hour and 81 of these trips occurring during
the afternoon peak hour. Calculations were based on the procedure and information provided in
the ITE Trip Generation Manual, 11th Edition – Volume 1: User’s Guide and Handbook, 2021.
Table 1 summarizes the estimated trip generation for the Glenwood Business Center. The trip
generation worksheets are included in Appendix C.
Table 1 – Glenwood Business Center Traffic Generation
Land Use and Size
Weekday Vehicle Trips
Daily AM Peak Hour PM Peak Hour
In Out Total In Out Total
Warehousing (ITE 150) –
67,950 Square Feet 118 9 3 12 4 9 13
Mini Warehouse (ITE 151) –
97,750 Square Feet 142 5 4 9 7 8 15
Multifamily Low-Rise Housing (ITE 220) –
3 Dwelling Units 22 0 1 1 1 1 2
General Office Building (ITE 710) –
35,175 Square Feet 382 47 6 53 9 42 51
Total Project Trips 664 61 14 75 21 60 81
1 Institute of Transportation Engineers, Trip Generation Manual, Eleventh Edition, Washington DC, 2021.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 17
As requested by Garfield County staff, a comparison of this now proposed project was provided
to the original development plan. The Glenwood Business Center Traffic Impact Report prepared
by David W Grounds in 1980 assumed 231,100 square feet of Business Park uses split between
office and non-office space. The projected ADT was 2,236 trips per day whereas the remaining
Lots 2 and 3 generate 664 trips pe r day. Lot 1 currently generates 12 afternoon peak hour trips
and assuming a K-factor of 10, the daily trips are 120 per day. Therefore, the new development
program provided today generates 1,452 less trips than previously studied with the 1980
development program.
4.2 Trip Distribution
Distribution of site traffic on the street system was based on the area street system characteristics,
existing traffic patterns, existing and anticipated surrounding demographic information, and the
proposed access system for the project. Th e directional distribution of traffic is a means to quantify
the percentage of site -generated traffic that approaches the site from a given direction and
departs the site back to the original source. The project trip distribution for the proposed
development is illustrated in Figure 7.
4.3 Traffic Assignment
Glenwood Business Center traffic assignment was obtained by applying the project trip
distribution to the estimated traffic generation of the development shown in Table 1. Traffic
assignment is shown in Figure 8.
4.4 Total (Background Plus Project) Traffic
Site traffic volumes were added to the background volumes to represent estimated traffic
conditions for the short-term 2025 buildout horizon and long-term 2045 twenty-year planning
horizon. These total traffic volumes for the study area are illustrated for the 2025 and 2045 horizon
years in Figures 9 and 10, respectively.
[5%]
5%
5%
[5
%
]
1
10%
[30%]
[10%]
30
%
2
[50%]
[5%]
5%
50
%
3
45%
5%
[4
5
%
]
[5
%
]
4
40%
5%[4
0
%
]
[5
%
]
5
1(3)
3(1)
3(1)
1(
3
)
1
6(2)
4(18)
1(6)
18
(
6
)
2
7(30)
1(3)
3(
1
)
31
(
1
1
)
3
27(9)
3(1)
6(
2
7
)
1(
3
)
4
24(8)
3(1)6(
2
4
)
1(
3
)
5
49(25)
22(29)
46(25)
28(39)
21
(
1
6
)
18
(
3
2
)
1
42(35)
28(37)
7(9)
42(44)
23(28)
1(1)
5(
4
)
31
(
1
8
)
1(
5
)
20
(
3
4
)
13
(
5
2
)
51
(
3
9
)
2
16(35)
1(1)
2(8)
73(64)
3(0)
18(18)
8(
1
)
47
(
3
8
)
29
(
2
1
)
45
(
1
8
)
24
(
2
4
)
15
0
(
5
6
)
3
139(159)
289(106)
222(168)
19(10)
14
5
(
1
9
7
)
9(
2
1
)
4
24(8)
56(73)
5(5)
3(1)
61(49)
5(5)
5(
5
)
5(
5
)
6(
2
4
)
1(
3
)
5
56(29)
25(33)
52(29)
32(44)
24
(
1
9
)
21
(
3
7
)
1
48(41)
32(43)
8(10)
47(48)
27(32)
1(1)
6(
5
)
36
(
2
1
)
1(
6
)
23
(
4
0
)
15
(
5
9
)
56
(
4
4
)
2
17(36)
1(1)
2(9)
84(73)
3(0)
21(21)
9(
1
)
54
(
4
3
)
34
(
2
4
)
47
(
1
9
)
28
(
2
8
)
17
3
(
6
4
)
3
160(183)
328(121)
255(194)
22(11)
16
6
(
2
2
3
)
10
(
2
4
)
4
24(8)
65(85)
5(5)
3(1)
70(57)
5(5)
5(
5
)
5(
5
)
6(
2
4
)
1(
3
)
5
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 22
5.0 TRAFFIC OPERATIONS ANALYSIS
Kimley-Horn’s analysis of traffic operations in the site vicinity was conducted to determine
potential capacity deficiencies in the 2025 and 2045 development horizons at the identified key
intersections. The acknowledged source for determining overall capacity is the Highway Capacity
Manual (HCM)2.
5.1 Analysis Methodology
Capacity analysis results are listed in terms of Level of Service (LOS). LOS is a qualitative term
describing operating conditions a driver will experience while traveling on a particular street or
highway during a specific time interval. It ranges from A (very little delay) to F (long delays and
congestion). For intersections and roadways in this study area, standard traffic engineering
practice recommends overall intersection LOS D and movement/approach LOS E as the minimum
desirable thresholds for acceptable operations. Table 2 shows the definition of level of service for
signalized and unsignalized intersections .
Table 2 – Level of Service Definitions
Level of
Service
Signalized Intersection
Average Total Delay
(sec/veh)
Unsignalized Intersection
Average Total Delay
(sec/veh)
A ≤ 10 ≤ 10
B > 10 and ≤ 20 > 10 and ≤ 15
C > 20 and ≤ 35 > 15 and ≤ 25
D > 35 and ≤ 55 > 25 and ≤ 35
E > 55 and ≤ 80 > 35 and ≤ 50
F > 80 > 50
Definitions provided from the Highway Capacity Manual, Sixth Edition, Transportation Research Board, 2016.
Study area intersections were analyzed based on average total delay analysis for signalized and
unsignalized intersections. Under the unsignalized analysis, the LOS for a two -way stop-
controlled intersection is determined by the computed or measured control delay and is defined
for each minor movement. LOS for a two -way stop-controlled intersection is not defined for the
intersection as a whole. LOS for signalized , roundabout, and all-way stop controlled intersections
are defined for each approach and for the overall intersection.
2 Transportation Research Board, Highway Capacity Manual, Sixth Edition, Washington DC, 2016.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 23
5.2 Key Intersection Operational Analysis
Calculations for the operational level of service at the key intersection s for the study area are
provided in Appendix D. The existing year analysis is based on the lane geometry and
intersection control shown in Figure 2. Existing peak hour factors were utilized in the existing
analysis. Synchro traffic analysis software was used to analyze the unsignalized key intersections
for HCM level of service.
Donegan Road and Storm King Road (#1)
The existing T-intersection of Donegan Road and Storm King Road (#1) is unsignalized with stop
control on the northbound approach of Storm King Road. The movements at this intersection all
currently operate acceptably wit h LOS A during the morning and afternoon peak hours. With
construction of this project, the movements at this intersection are anticipated to continue to
operate acceptably with LOS A during the peak hours throughout the 2045 horizon. Therefore, no
improvements or modifications are anticipated to be needed at this intersection based on the
addition of project traffic and this operational level of service analysis. Table 3 provides the results
of the LOS analysis conducted at this intersection
Table 3 – Donegan Road & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Northbound Approach
Westbound Left
9.4
7.5
A
A
9.4
7.4
A
A
2025 Background
Northbound Approach
Westbound Left
9.4
7.5
A
A
9.4
7.4
A
A
2025 Background Plus Project
Northbound Approach
Westbound Left
9..5
7.5
A
A
9.5
7.4
A
A
2045 Background
Northbound Approach
Westbound Left
9.6
7.5
A
A
9.6
7.5
A
A
2045 Background Plus Project
Northbound Approach
Westbound Left
9.7
7.6
A
A
9.7
7.5
A
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 24
Donegan Road and Mel Ray Road (#2)
The intersection of Donegan Road and Mel Ray Road (#2) is a four -leg, all-way stop controlled
intersection. This intersection currently operates acceptably with LOS A during the morning and
afternoon peak hours. With the existing lane configuration and con trol, this intersection is
anticipated to continue to operate acceptably with LOS A during the peak hours throughout 2045.
Therefore, no improvements or modifications are anticipated to be needed at this intersection
based on the addition of project traffic and this operational level of service analysis. Table 4
provides the results of the LOS analysis conducted at this intersection.
Table 4 – Donegan Road & Mel Ray Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
7.9
7.5
8.1
8.0
7.9
A
A
A
A
A
7.8
7.4
7.9
7.9
7.5
A
A
A
A
A
2025 Background
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
7.9
7.5
8.1
8.0
7.9
A
A
A
A
A
7.8
7.4
7.9
7.9
7.5
A
A
A
A
A
2025 Background Plus Project
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.1
7.7
8.3
8.3
8.0
A
A
A
A
A
7.9
7.5
8.0
8.1
7.6
A
A
A
A
A
2045 Background
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.1
7.7
8.4
8.2
8.0
A
A
A
A
A
8.0
7.5
8.1
8.2
7.6
A
A
A
A
A
2045 Background Plus Project
Eastbound approach
Westbound Approach
Northbound Approach
Southbound Approach
8.3
7.9
8.5
8.5
8.1
A
A
A
A
A
8.1
7.7
8.2
8.3
7.7
A
A
A
A
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 25
Center Drive and Storm King Road (#3)
The intersection of Center Drive and Storm King Road (#3) is an unsignalized four -leg intersection
with stop control on the eastbound Center Drive and westbound Glenwood Business Center
approaches. The movements at this intersection currently operate acceptably with LOS C or
better during the morning peak hour and the afternoon peak hour. With construction of this project,
the east leg of this intersection will provide access to the development. With project traffic, all
movements are anticipated to continue operat ing at an acceptable level of service D or better
throughout the 2045 horizon. Therefore, no improvements or modifications are anticipated to be
needed at this intersection based on the addition of project traffic and this operational level of
service analysis. Table 5 shows the level of service results at this intersection.
Table 5 – Center Drive & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.1
20.8
7.4
A
B
C
A
7.8
11.7
12.6
0.0
A
B
B
A
2025 Background
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.2
21.2
7.4
A
B
C
A
7.8
11.8
12.8
0.0
A
B
B
A
2025 Background Plus Project
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.1
13.7
23.5
7.5
A
B
C
A
7.8
11.9
18.4
7.5
A
B
C
A
2045 Background
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.3
15.3
26.5
7.4
A
C
D
A
7.9
12.9
13.9
0.0
A
B
B
A
2045 Background Plus Project
Northbound Left
Eastbound Approach
Westbound Approach
Southbound Left
8.3
16.0
30.5
7.6
A
C
D
A
7.9
13.1
21.8
7.5
A
B
C
A
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 26
Highway 6 and Storm King Road (#4)
The intersection of Highway 6 and Storm King Road (#4) is an unsignalized three -leg intersection
with stop control on the southbound approach of Storm King Road. The movements at this
intersection all currently operate a cceptably with LOS C or better during the morning and
afternoon peak hours. With construction of this project, the movements at this intersection are
anticipated to continue to operate acceptably with LOS C or better during the peak hours
throughout the 2045 horizon. Therefore, no improvements or modifications are anticipated to be
needed at this intersection based on the addition of project traffic and this operational level of
service analysis. Table 6 shows the level of service results at this intersection.
Table 6 – Highway 6 & Storm King Road LOS Results
Scenario
AM Peak Hour PM Peak Hour
Delay
(sec/veh) LOS Delay
(sec/veh) LOS
2023 Existing
Eastbound Left
Southbound Approach
8.9
16.1
A
C
7.9
13.0
A
B
2025 Background
Eastbound Left
Southbound Approach
8.9
16.3
A
C
7.9
13.1
A
B
2025 Background Plus Project
Eastbound Left
Southbound Approach
9.1
16.9
A
C
7.9
13.8
A
B
2045 Background
Eastbound Left
Southbound Approach
9.2
19.7
A
C
8.0
14.5
A
B
2045 Background Plus Project
Eastbound Left
Southbound Approach
9.4
20.6
A
C
8.1
15.5
A
C
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 27
Project Accesses
With completion of the Glenwood Business Center project, an additional access is proposed to
align with Chapparal Circle. It is recommended that a R1-1 “STOP” sign be installed on the
northbound approach exiting the development. A single northbound approach lane for shared
movements is all that is needed for this access. Table 7 provides the results of the level of service
for this project street access. As shown in the table, the project access intersection of Donegan
Road and Chapparal Circle is anticipated to have all movements operating with acceptable LOS
A during the peak hours in both the buildout year 2025 and the 2045 long term horizons.
Table 7 – Project Access Level of Service Results
Intersection
2025 Total 2045 Total
AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Delay
(sec/
veh)
LOS
Donegan & Chapparal
Northbound Approach
Eastbound Left
Westbound Left
Southbound Approach
8.8
7.4
7.4
9.3
A
A
A
A
8.8
7.4
7.3
9.3
A
A
A
A
8.9
7.4
7.4
9.4
A
A
A
A
8.8
7.4
7.4
9.4
A
A
A
A
There are no turn lanes at the existing intersections. Therefore, a queue analysis was not
prepared for this development.
5.3 CDOT Access Permit Need Analysis
The threshold for requiring an access permit along Colorado Department of Transportation
(CDOT) roadways occurs when project traffic is anticipated to increase the existing access traffic
volumes by more than 20 percent. Based on traffic projections, the addition of project traffic on
the north leg of Storm King Road at Highway 6 (US-6) is not anticipated to increase existing
access traffic volumes by more than 20 percent, with the maximum expected increase at 18
percent during the afternoon peak hour on the north leg (40/291). Therefore, a CDOT access
permit is not anticipated to be required in association with this project.
5.4 Improvement Summary
Based on the results of the intersection operational and vehicle queuing analysis, the key
intersection recommended improvements and control are shown in Figure 11.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center Page 29
6.0 CONCLUSIONS AND RECOMMENDATIONS
Based on the analysis presented in this report, Kimley -Horn believes Glenwood Business Center
will be successfully incorporated into the existing and future roadway network. Analysis of the
existing street network, the proposed project developmen t, and expected traffic volumes resulted
in the following recommendations:
• With completion of the Glenwood Business Center project, an additional access to the
development area is proposed along Donegan Road to align with Chapparal Circle. It is
recommended that a R1-1 “STOP” sign be installed on the northbound approach exiting the
development. A single northbound approach lane for shared movements is all that is needed
for this access.
• Any onsite or offsite improvements should be incorporated into the Civil Drawings and conform
to standards of the Garfield County and the Manual on Uniform Traffic Control Devices
(MUTCD) – 2009 Edition.
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDICES
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX A
Intersection Count Sheets
Study Intersections Counts
COVID-19 Comparison Counts
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
1
0
3
12
0
0
0
16
153000156
7 3
Peak Hour 1 2 0 0 3 0 0
0 0 0 0 1 5Count Total 6 5 1 0 12 0
0 0 00000008:45 AM 1 1 1 0 3
0 0 0 0 0 0
0
8:30 AM 0 1 0 0 1 0 0 0
0 0 0 0 0 0
5 2
8:15 AM 1 1 0 0 2 0 0
0 0 0 0 0 5
0 1 1
8:00 AM 0 1 0 0 1 0
0 0 0 0 0 1
0 0 0
0
7:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 1
0 4 0
EB WB NB SB Total East
7:45 AM 0 0 0 0 0
0 0 0
-0%-HV%--5%0%-
0 0
7:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 3 1 0
2
13 0 16 0 0 0320371600
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%----2%5%0%-
Peak
Hour
All 0 0 19
0 0 26 0 22 0
0 0 0 0 3 0000000
0 133 0
HV 0 0 1 0 0
Count Total 0 0 32 52 0 47 21 0 0 0 200 0
18 119030000052004
0 0 0 22 132
8:45 AM 0 0 1 3
0 0 5 0 1 0
37 133
8:30 AM 0 0 6 5 0 3 2
0 11 0 0 0 00103004
0 0 0 42 111
8:15 AM 0 0 6 3
0 0 4 0 2 0
31 81
8:00 AM 0 0 7 8 0 16 5
0 3 0 0 0 0086003
0 0 0 23 0
7:45 AM 0 0 1 10
0 0 2 0 0 0
15 0
7:30 AM 0 0 5 11 0 3 2
0 0 0 0 0 0020004
0 0 0 12 0
7:15 AM 0 0 1 8
0 0 0 0 2 07:00 AM 0 0 5 4 0 0 1
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB --
TOTAL 2.3%0.79
TH RT
WB 3.8%0.63
NB 0.0%0.48
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 2.0%0.80
0
0
0
0 0 0
000
0
0
0
6
3
5 1
N
STORM KING RD
DONEGAN RD
DONEGAN RD
ST
O
R
M
K
I
N
G
RD
DONEGAN RD
DR
I
V
E
W
A
Y
133TEV:
0.79PHF:
0 0 0
0 0
0
0
16
37
53
350
16013
2969
0
32
19
0
51
29 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
3 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One Hour
0 0 0 0 0 0020000
RTTHLT RTTHLTRT
0 0 0 12 0
Peak Hour 0 0 1 0
0 0 0 0 1 0Count Total 0 0 4 2 0 4 1
3 7010000010000
0 0 0 1 4
8:45 AM 0 0 0 1
0 0 0 0 0 0
2 3
8:30 AM 0 0 0 0 0 1 0
0 0 0 0 0 0010000
0 0 0 1 2
8:15 AM 0 0 1 0
0 0 0 0 0 0
0 5
8:00 AM 0 0 0 0 0 1 0
0 0 0 0 0 0000000
0 0 0 0 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 4 0
7:15 AM 0 0 0 1
0 0 0 0 0 0
TH RT
7:00 AM 0 0 3 0 0 0 1
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
2
0
3
1
6Peak Hour 2 3 0 0 5 0 0 0 0 0 3 0 0 3
3:45 PM
3:15 PM
3:30 PM 0 2
0 0 0 0 0 0 0 0 0 0 1 0
3:00 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 1 0
0 0
0 2 0 0 2 0 1 0 0 1
2 1 0 0 3 0 0 0 0 0 0 0 0 0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 5 0
HV%--7%0%-11%5%--0%-0%----4%0
Peak
Hour
All 0 0 28 18 0 19 20 0 0 22 0 12 0 0 0
0 0 0 0 0 0
0 119 0
HV 0 0 2 0 0 2 1 0 0
0
0
0
24 0
3:45 PM 0 5 3 0 3 6 0 0 5 0 3 0 0 0 0 25 119
3:30 PM 0 8 2 0 1 4 0 0 5 0 4 0 0 0 0
35 0
3:15 PM 0 10 5 0 8 4 0 0 5 0 3 0 0 0 0 35 0
3:00 PM 0 0 5 8 0 7 6 0 0 7 0 2 0 0 0 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB --
TOTAL 4.2%0.85
WB 7.7%0.75
NB 0.0%0.94
Peak Hour: 3:00 PM 4:00 PM
HV %:PHF
EB 4.3%0.77
0
0
0
0 0 0
000
0
0
0
0
3
0 3
N
STORM KING RD
DONEGAN RD
DONEGAN RD
ST
O
R
M
K
I
N
G
RD
DONEGAN RD
DR
I
V
E
W
A
Y
119TEV:
0.85PHF:
0 0 0
0 0
0
0
20
19
39
400
12022
3437
0
18
28
0
46
42 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
32
3
2
1
2
0
3
1
0
0
2
1
0
2
0
0
49
63000300
10 20
Peak Hour 2 3 0 0 5 0 0
0 0 0 0 9 10Count Total 4 7 0 0 11 0
0 0 00000005:45 PM 0 0 0 0 0
0 0 0 0 0 0
2
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 1
5:00 PM 0 0 0 0 0 0
0 0 0 0 0 04:45 PM 0 0 0 0 0
0 0 0 0 1 1
0
4:30 PM 1 0 0 0 1 0 0 0
0 0 0 0 0 0
0 0
4:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:00 PM 1 0 0 0 1 0
0 0 0 0 0 13:45 PM 0 0 0 0 0
0 0 1 0 0 2
0
3:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1
3:15 PM 2 1 0 0 3 0 0
0 0 0 0 1 0
0 0 1
3:00 PM 0 2 0 0 2 0
0 0 0 0 0 0
0 0 0
2
2:30 PM 0 1 0 0 1 0 0 0
0 0 0 1 0 0
0 1 0
EB WB NB SB Total East
2:45 PM 0 1 0 0 1
0 0 2
-0%-HV%--7%0%-
9 10
2:15 PM 0 1 0 0 1 0 0
0 0 0 0 3 10
West North South
2:00 PM 0 1 0
2
22 0 12 0 0 0180192000
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%----4%11%5%-
Peak
Hour
All 0 0 28
0 0 79 0 65 0
0 0 0 0 5 0100000
0 119 0
HV 0 0 2 0 0
Count Total 0 0 64 78 0 71 66 0 1 1 425 0
19 92040000022006
0 0 0 21 102
5:45 PM 0 0 0 5
0 0 8 0 2 0
22 105
5:30 PM 0 0 1 4 0 3 3
0 1 0 0 0 0024009
0 0 0 30 108
5:15 PM 0 0 1 5
0 0 7 0 5 0
29 109
5:00 PM 0 0 2 6 0 5 5
0 5 0 0 0 0062005
0 0 0 24 105
4:45 PM 0 0 6 5
0 0 5 0 3 0
25 105
4:30 PM 0 0 3 4 0 5 4
0 5 0 0 0 0044005
0 0 0 31 115
4:15 PM 0 0 3 4
0 0 2 0 3 0
25 119
4:00 PM 0 0 7 8 0 5 6
0 3 0 0 0 0036005
0 0 0 24 114
3:45 PM 0 0 5 3
0 0 5 0 4 0
35 108
3:30 PM 0 0 8 2 0 1 4
0 3 0 0 0 0084005
0 0 0 35 94
3:15 PM 0 0 10 5
0 0 7 0 2 0
20 105
3:00 PM 0 0 5 8 0 7 6
0 4 0 0 0 0034001
0 0 0 18 0
2:45 PM 0 0 2 6
0 0 1 0 3 0
21 0
2:30 PM 0 0 3 4 0 4 3
0 6 0 0 0 1012003
0 1 0 46 0
2:15 PM 0 0 5 3
0 0 5 0 12 02:00 PM 0 0 3 6 0 12 7
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0
0 0 0
0 0 0
0 0
0 0 0
0 0
0 0 0
0 0 0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 0
0
0
0000
0 0
0 0
Peak Hour
0 0Count Total
0
0000
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000000
0 0 0
0
5:15 PM
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0
0
4:30 PM
0000000
0 0
4:15 PM
0 0 0
0
4:00 PM
0000000
0 0 0
0 0 0
0
0
0 0
3:45 PM
0 0 0 0
0
3:30 PM
0000000
0 0
3:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
3:00 PM
0000
0 0
2:45 PM
0 0 0 0
0
2:30 PM
00000002:15 PM 0
0 0
0 0 0
0 02:00 PM
RT
5 0
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One Hour
0 0 0 0 0 0021000
RTTHLT RTTHLTRT
0 0 0 11 0
Peak Hour 0 0 2 0
0 0 0 0 0 0Count Total 0 0 2 2 0 5 2
0 0000000000000
0 0 0 0 0
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 1
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
5:15 PM 0 0 0 0
0 0 0 0 0 0
0 2
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 2
4:45 PM 0 0 0 0
0 0 0 0 0 0
0 1
4:30 PM 0 0 0 1 0 0 0
0 0 0 0 0 0000000
0 0 0 1 4
4:15 PM 0 0 0 0
0 0 0 0 0 0
0 5
4:00 PM 0 0 0 1 0 0 0
0 0 0 0 0 0000000
0 0 0 0 6
3:45 PM 0 0 0 0
0 0 0 0 0 0
3 7
3:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0010000
0 0 0 2 5
3:15 PM 0 0 2 0
0 0 0 0 0 0
1 4
3:00 PM 0 0 0 0 0 1 1
0 0 0 0 0 0001000
0 0 0 1 0
2:45 PM 0 0 0 0
0 0 0 0 0 0
1 0
2:30 PM 0 0 0 0 0 1 0
0 0 0 0 0 0010000
0 0 0 1 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 0 0 0 1 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD STORM KING RD DRIVEWAY 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
2
1
0
3
0
2
0
8
53000101
2 5
Peak Hour 2 4 5 1 12 0 0
0 0 0 0 1 0Count Total 5 4 6 1 16 0
0 0 00000008:45 AM 0 2 1 1 4
0 0 1 0 1 0
0
8:30 AM 1 1 1 0 3 0 0 0
0 0 0 0 0 0
0 3
8:15 AM 1 0 0 0 1 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 0 1 3 0 4 0
0 0 0 0 0 0
0 0 1
1
7:30 AM 1 0 0 0 1 0 0 0
0 0 0 0 0 1
0 2 0
EB WB NB SB Total East
7:45 AM 0 0 1 0 1
0 0 0
-16%10%HV%--6%4%-
0 0
7:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
West North South
7:00 AM 2 0 0
4
25 10 15 0 4 24280311750
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%4%-7%13%0%0%
Peak
Hour
All 0 0 17
5 0 39 14 21 0
0 0 1 0 12 0000410
0 176 0
HV 0 0 1 1 0
Count Total 0 0 28 36 0 59 30 4 49 1 286 0
39 176430270064105
0 5 0 32 171
8:45 AM 0 0 3 4
2 0 1 1 1 0
44 175
8:30 AM 0 0 5 5 0 10 2
0 5 0 0 4 0074106
2 8 0 61 145
8:15 AM 0 0 8 9
1 0 13 5 6 0
34 110
8:00 AM 0 0 1 10 0 8 7
1 0 0 0 3 10116008
0 10 0 36 0
7:45 AM 0 0 3 1
0 0 3 3 3 0
14 0
7:30 AM 0 0 4 5 0 4 4
0 1 0 0 4 0072000
0 8 0 26 0
7:15 AM 0 0 0 0
0 0 3 0 2 07:00 AM 0 0 4 2 0 6 1
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 3.6%0.70
TOTAL 6.8%0.72
TH RT
WB 7.5%0.83
NB 10.0%0.52
Peak Hour: 8:00 AM 9:00 AM
HV %:PHF
EB 4.4%0.66
0
0
0
0 0 0
000
0
0
0
1
3
0 1
N
MEL RAY RD
DONEGAN RD
DONEGAN RD
ME
L
R
A
Y
R
D
DONEGAN RD
ME
L
R
A
Y
R
D
176TEV:
0.72PHF:
0 24 4
28 15
0
5
17
31
53
360
151025
5083
0
28
17
0
45
42 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
12 0
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One Hour
1 0 0 0 1 0040004
RTTHLT RTTHLTRT
0 1 0 16 0
Peak Hour 0 0 1 1
0 0 5 1 0 0Count Total 0 0 4 1 0 4 0
4 12000010020001
0 0 0 3 9
8:45 AM 0 0 0 0
0 0 1 0 0 0
1 7
8:30 AM 0 0 1 0 0 1 0
0 0 0 0 0 0000000
0 0 0 4 6
8:15 AM 0 0 0 1
0 0 2 1 0 0
1 4
8:00 AM 0 0 0 0 0 1 0
0 0 0 0 0 0000001
0 0 0 1 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
0 0
7:30 AM 0 0 1 0 0 0 0
0 0 0 0 0 0000000
0 0 0 2 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 2 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
0
2
0
5
7Peak Hour 0 0 1 0 1 0 0 0 0 0 0 0 4 3
5:00 PM
4:30 PM
4:45 PM 0 0
0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
3 2
0 0 1 0 1 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 1
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 1 0
HV%-0%0%0%-0%0%0%-0%3%0%-0%0%0%0%0
Peak
Hour
All 0 1 17 20 0 27 27 7 0 25 39 26 0 3 14
0 1 0 0 0 0
4 210 0
HV 0 0 0 0 0 0 0 0 0
0
0
0
52 0
5:00 PM 0 3 7 0 9 8 2 0 8 8 7 0 1 1 0 54 210
4:45 PM 1 4 7 0 5 8 2 0 2 10 4 0 0 7 2
50 0
4:30 PM 0 5 4 0 6 7 1 0 8 9 7 0 2 5 0 54 0
4:15 PM 0 0 5 2 0 7 4 2 0 7 12 8 0 0 1 2
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB 0.0%0.58
TOTAL 0.5%0.97
WB 0.0%0.80
NB 1.1%0.83
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 0.0%0.79
0
0
0
0 0 0
000
0
0
0
4
3
0 0
N
MEL RAY RD
DONEGAN RD
DONEGAN RD
ME
L
R
A
Y
R
D
DONEGAN RD
ME
L
R
A
Y
R
D
210TEV:
0.97PHF:
4 14 3
21 47
0
7
27
27
61
460
263925
9061
0
20
17
1
38
56 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
4
1
4
3
2
3
5
1
4
0
2
0
5
4
2
1
41
73000004
12 28
Peak Hour 0 0 1 0 1 0 0
0 0 0 0 1 0Count Total 2 4 8 0 14 0
0 0 10000005:45 PM 0 0 0 0 0
0 0 0 0 0 2
3
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 1
3 2
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
5:00 PM 0 0 0 0 0 0
0 0 0 0 0 04:45 PM 0 0 0 0 0
0 0 0 0 1 1
0
4:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
4 0
4:15 PM 0 0 1 0 1 0 0
0 0 0 0 0 0
0 0 1
4:00 PM 0 0 0 0 0 0
0 0 0 0 0 03:45 PM 0 0 0 0 0
0 0 0 0 0 5
3
3:30 PM 0 0 1 0 1 0 0 0
0 0 0 0 0 0
0 2
3:15 PM 2 2 0 0 4 0 0
0 0 0 0 0 0
0 1 1
3:00 PM 0 1 2 0 3 0
0 0 0 0 0 1
0 1 3
1
2:30 PM 0 1 1 0 2 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
2:45 PM 0 0 2 0 2
0 0 0
-0%3%HV%-0%0%0%-
1 3
2:15 PM 0 0 1 0 1 0 0
0 0 0 0 0 0
West North South
2:00 PM 0 0 0
0
25 39 26 0 3 14200272770
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%0%0%0%0%0%0%
Peak
Hour
All 0 1 17
27 0 95 108 81 0
0 0 0 0 1 0000010
4 210 0
HV 0 0 0 0 0
Count Total 0 6 74 83 0 108 89 14 65 6 756 0
43 1851040130046307
2 5 0 53 194
5:45 PM 0 1 2 2
1 0 6 9 10 0
35 195
5:30 PM 0 0 1 2 0 11 6
6 1 0 1 5 1054203
1 1 0 54 210
5:15 PM 0 0 3 4
2 0 8 8 7 0
52 205
5:00 PM 0 0 3 7 0 9 8
10 4 0 0 7 2058202
2 5 0 54 204
4:45 PM 0 1 4 7
1 0 8 9 7 0
50 191
4:30 PM 0 0 5 4 0 6 7
12 8 0 0 1 2074207
0 3 1 49 191
4:15 PM 0 0 5 2
2 0 5 6 4 0
51 197
4:00 PM 0 0 6 5 0 11 6
8 6 0 0 6 0055308
1 3 0 41 192
3:45 PM 0 0 5 5
1 0 3 4 5 0
50 189
3:30 PM 0 0 9 7 0 5 3
1 7 0 2 3 00117004
2 3 0 55 172
3:15 PM 0 2 5 8
2 0 8 10 8 0
46 169
3:00 PM 0 2 7 2 0 6 5
5 2 0 1 7 0067308
0 5 0 38 0
2:45 PM 0 0 3 4
1 0 4 4 3 0
33 0
2:30 PM 0 0 7 4 0 5 5
1 2 0 1 2 0073104
0 6 0 52 0
2:15 PM 0 0 4 8
1 0 10 5 3 02:00 PM 0 0 5 12 0 5 5
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0
0 0 0
0 0 0
0 0
0 0 0
0 0
0 0 0
0 0 0
0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 0
0
0
0000
0 0
0 0
Peak Hour
0 0Count Total
0
0000
0 0
5:45 PM
0 0 0 0
0
5:30 PM
0000000000
0 0 0
0
5:15 PM
0 0 0
0
5:00 PM
0000
0 0
4:45 PM
0 0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0
0
4:30 PM
0000000
0 0
4:15 PM
0 0 0
0
4:00 PM
0000000
0 0 0
0 0 0
0
0
0 0
3:45 PM
0 0 0 0
0
3:30 PM
0000000
0 0
3:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0
3:00 PM
0000
0 0
2:45 PM
0 0 0 0
0
2:30 PM
00000002:15 PM 0
0 0
0 0 0
0 02:00 PM
RT
1 0
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One Hour
1 0 0 0 0 0000000
RTTHLT RTTHLTRT
0 0 0 14 0
Peak Hour 0 0 0 0
0 0 7 1 0 0Count Total 0 0 1 1 0 4 0
0 0000000000000
0 0 0 0 0
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 0
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
5:15 PM 0 0 0 0
0 0 0 0 0 0
0 1
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 1
4:45 PM 0 0 0 0
0 0 0 0 0 0
1 2
4:30 PM 0 0 0 0 0 0 0
1 0 0 0 0 0000000
0 0 0 0 5
4:15 PM 0 0 0 0
0 0 0 0 0 0
0 8
4:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 1 10
3:45 PM 0 0 0 0
0 0 1 0 0 0
4 11
3:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0020000
0 0 0 3 8
3:15 PM 0 0 1 1
0 0 2 0 0 0
2 5
3:00 PM 0 0 0 0 0 1 0
0 0 0 0 0 0000002
0 0 0 2 0
2:45 PM 0 0 0 0
0 0 1 0 0 0
1 0
2:30 PM 0 0 0 0 0 1 0
0 0 0 0 0 0000001
0 0 0 0 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
DONEGAN RD DONEGAN RD MEL RAY RD MEL RAY RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
0
0
1
11
17
1
0
0
30
2900008138
8 0
Peak Hour 1 0 3 3 7 0 0
0 0 0 0 8 14Count Total 1 0 4 6 11 0
0 0 00000008:45 AM 0 0 1 2 3
0 0 0 0 0 0
0
8:30 AM 1 0 2 2 5 0 0 0
0 0 0 1 0 0
4 0
8:15 AM 0 0 1 1 2 0 0
0 0 0 0 3 10
3 4 0
8:00 AM 0 0 0 0 0 0
0 0 0 0 0 4
1 0 0
0
7:30 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
EB WB NB SB Total East
7:45 AM 0 0 0 0 0
0 0 0
-3%0%HV%-0%0%2%-
0 0
7:15 AM 0 0 0 1 1 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 0 0
0
113 18 11 0 4 355507110
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%-0%6%5%2%0%0%0%
Peak
Hour
All 0 14 2
1 0 122 32 19 0
0 0 2 1 7 0000300
22 283 0
HV 0 0 0 1 0
Count Total 0 15 2 72 0 9 1 6 66 27 372 0
25 249720072010001
2 5 2 36 283
8:45 AM 0 0 0 5
1 0 5 4 3 0
64 277
8:30 AM 0 1 1 6 0 5 1
4 3 0 1 8 40100016
1 11 10 124 236
8:15 AM 0 9 1 17
0 0 68 4 3 0
59 123
8:00 AM 0 4 0 22 0 1 0
6 2 0 0 11 60000024
1 12 2 30 0
7:45 AM 0 0 0 10
0 0 4 2 4 0
23 0
7:30 AM 0 0 0 5 0 0 0
4 1 0 1 7 1010004
0 5 0 11 0
7:15 AM 0 0 0 4
0 0 0 1 1 07:00 AM 0 1 0 3 0 0 0
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
TotalUTLTTHRT
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 4.9%0.69
TOTAL 2.5%0.57
TH RT
WB 0.0%0.32
NB 2.1%0.47
Peak Hour: 7:45 AM 8:45 AM
HV %:PHF
EB 1.4%0.66
0
0
0
0 0 0
000
0
0
0
8
0
13 8
N
STORM KING RD
CENTER DR
DRIVEWAY
ST
O
R
M
K
I
N
G
RD
CENTER DR
ST
O
R
M
K
I
N
G
RD
283TEV:
0.57PHF:
22 35 4
61 33
0
1
1
7
9
170
1118
11
3
14
2
97
0
55
2
14
71
136 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0
0 0 0
0 0 0
0 0 0
0 0 0
000 0 0 0
000 0 0 0
0000
0
0
0
00
0
THLT
00000000
0
00
0
0
0 0 0
0 0 0
0
THLT
0000000
0 00000
0 0
0 0
Peak Hour
0 0Count Total
0
000000000
0 0
8:45 AM
0 0 0 0
0
8:30 AM
0000000
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0
8:00 AM
0000
0 0
7:45 AM
0 0 0 0
0
7:30 AM
00000007:15 AM 0
0 0
0 0 0
0 07:00 AM
RT
7 0
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One Hour
0 0 0 0 2 1000003
RTTHLT RTTHLTRT
1 4 1 11 0
Peak Hour 0 0 0 1
0 0 3 1 0 0Count Total 0 0 0 1 0 0 0
3 10100020000000
0 1 1 5 7
8:45 AM 0 0 0 0
0 0 2 0 0 0
2 2
8:30 AM 0 0 0 1 0 0 0
0 0 0 0 1 0000001
0 0 0 0 1
8:15 AM 0 0 0 0
0 0 0 0 0 0
0 1
8:00 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000000
0 0 0 0 0
7:45 AM 0 0 0 0
0 0 0 0 0 0
1 0
7:30 AM 0 0 0 0 0 0 0
0 0 0 1 0 0000000
0 0 0 0 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
SouthboundNorthboundWestboundEastbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
53
3
2
0
58Peak Hour 1 0 0 3 4 0 0 0 0 0 21 14 22 1
2:45 PM
2:15 PM
2:30 PM 0 0
0 0 0 0 0 0 0 0 0 0 0 0
2:00 PM 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 2
0 0
0 0 0 3 3 0 19 11 22 1
1 0 0 0 1 0 0 0 0 0 2 1 0 0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total EB WB NB SB Total East West North South
0 4 0
HV%-0%-2%-0%0%0%-0%0%0%--11%0%2%0
Peak
Hour
All 0 14 0 48 0 4 1 4 0 42 18 5 0 0 28
0 0 0 0 0 3
16 180 0
HV 0 0 0 1 0 0 0 0 0
0
0
0
20 0
2:45 PM 0 0 2 0 1 1 0 0 7 4 2 0 0 6 3 26 180
2:30 PM 4 0 4 0 1 0 0 0 1 1 1 0 0 6 2
110 0
2:15 PM 1 0 6 0 2 0 0 0 5 7 0 0 0 2 1 24 0
2:00 PM 0 9 0 36 0 0 0 4 0 29 6 2 0 0 14 10
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
Total
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT UT LT TH RT UT LT TH RT UT LT TH RT
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
SB 6.8%0.46
TOTAL 2.2%0.41
WB 0.0%0.56
NB 0.0%0.44
Peak Hour: 2:00 PM 3:00 PM
HV %:PHF
EB 1.6%0.34
0
0
0
0 0 0
000
0
0
0
22
1
14 21
N
STORM KING RD
CENTER DR
DRIVEWAY
ST
O
R
M
K
I
N
G
RD
CENTER DR
ST
O
R
M
K
I
N
G
RD
180TEV:
0.41PHF:
16 28 0
44 36
0
4
1
4
9
50
51842
6580
0
48
0
14
62
59 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
53
3
2
0
4
3
4
5
0
0
1
1
2
3
3
0
84
581000211422
27 2
Peak Hour 1 0 0 3 4 0 0
0 0 0 0 30 25Count Total 5 1 2 7 15 0
0 0 00000005:45 PM 1 0 0 0 1
0 0 2 0 1 0
0
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 3 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 1 1
0 0 0
5:00 PM 0 0 1 0 1 0
0 0 0 0 0 14:45 PM 1 0 0 0 1
0 0 1 0 0 0
0
4:30 PM 0 0 0 1 1 0 0 0
0 0 0 0 0 0
0 0
4:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
2 0 1
4:00 PM 0 0 0 1 1 0
0 0 0 0 0 23:45 PM 0 0 0 0 0
0 0 0 3 1 0
0
3:30 PM 0 0 1 0 1 0 0 0
0 0 0 2 1 0
3 0
3:15 PM 1 0 0 1 2 0 0
0 0 0 0 0 1
0 0 0
3:00 PM 1 1 0 1 3 0
0 0 0 0 0 0
2 0 0
0
2:30 PM 0 0 0 0 0 0 0 0
0 0 0 2 1 0
3 3 0
EB WB NB SB Total East
2:45 PM 0 0 0 0 0
0 0 0
-0%0%HV%-0%-2%-
22 1
2:15 PM 1 0 0 0 1 0 0
0 0 0 0 19 11
West North South
2:00 PM 0 0 0
0
42 18 5 0 0 284804140
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
0%--11%0%2%0%0%0%
Peak
Hour
All 0 14 0
10 0 85 104 15 0
0 0 3 0 4 0000000
16 180 0
HV 0 0 0 1 0
Count Total 0 30 0 109 0 26 3 6 109 35 532 0
24 114700061010002
0 3 3 22 131
5:45 PM 0 3 0 4
0 0 1 10 0 0
23 131
5:30 PM 0 0 0 4 0 1 0
7 1 0 1 5 1040000
0 6 4 45 136
5:15 PM 0 3 0 1
0 0 6 9 0 0
41 127
5:00 PM 0 2 0 12 0 5 1
9 1 0 1 9 10001012
0 8 0 22 106
4:45 PM 0 1 0 6
1 0 1 7 0 0
28 106
4:30 PM 0 0 0 3 0 2 0
7 1 0 0 6 2000202
0 12 1 36 112
4:15 PM 0 1 0 7
1 0 7 2 2 0
20 111
4:00 PM 0 2 0 6 0 3 0
7 1 0 1 5 0000002
0 2 0 22 117
3:45 PM 0 1 0 3
0 0 2 7 1 0
34 115
3:30 PM 0 1 0 6 0 3 0
6 1 0 2 7 4020105
1 12 2 35 105
3:15 PM 0 1 0 5
0 0 3 8 2 0
26 180
3:00 PM 0 1 0 4 0 1 1
4 2 0 0 6 3011007
0 6 2 20 0
2:45 PM 0 0 0 2
0 0 1 1 1 0
24 0
2:30 PM 0 4 0 4 0 1 0
7 0 0 0 2 1020005
0 14 10 110 0
2:15 PM 0 1 0 6
4 0 29 6 2 02:00 PM 0 9 0 36 0 0 0
UT LT TH RT UT LT
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
CENTER DR DRIVEWAY STORM KING RD STORM KING RD 15-min
TotalUTLTTHRTTHRT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
4
0
0
0
1
3
1
0
9
40000004
9 0
Peak Hr 12 13 0 2 27 0 0
0 0 0 0 0 0Count Total 23 24 0 6 53 0
0 0 00000008:45 AM 2 1 0 2 5
0 0 0 0 1 0
0
8:30 AM 2 4 0 2 8 0 0 0
0 0 0 0 0 3
1 0
8:15 AM 1 4 0 2 7 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 3 3 0 0 6 0
0 0 0 0 0 0
0 0 0
0
7:30 AM 4 3 0 0 7 0 0 0
0 0 0 0 0 0
0 7 0
EB WB NB SB Total East
7:45 AM 4 3 0 0 7
0 0 0
---HV%-0%7%--
4 0
7:15 AM 3 3 0 0 6 0 0
0 0 0 0 0 0
West North South
7:00 AM 4 3 0
0
0 0 0 0 105 00001051970
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--1%-17%5%-10%1%
Peak
Hour
All 0 12 167
263 0 0 0 0 0
0 1 0 1 27 01120000
6 592 0
HV 0 0 12 0 0
Count Total 0 17 253 0 0 0 181 158 0 11 883 0
94 540000180300241400
15 0 2 89 574
8:45 AM 0 2 33 0
23 0 0 0 0 0
133 592
8:30 AM 0 2 24 0 0 0 23
0 0 0 32 0 500213000
41 0 1 224 513
8:15 AM 0 3 42 0
85 0 0 0 0 0
128 343
8:00 AM 0 4 70 0 0 0 23
0 0 0 17 0 000275500
15 0 0 107 0
7:45 AM 0 5 24 0
27 0 0 0 0 0
54 0
7:30 AM 0 0 31 0 0 0 34
0 0 0 11 0 000171600
9 0 0 54 0
7:15 AM 0 0 10 0
13 0 0 0 0 07:00 AM 0 1 19 0 0 0 12
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
TotalUTLTTHRT
SB 1.8%0.66
TOTAL 4.6%0.66
TH RTUTLTTHRTUTLT
WB 4.3%0.70
NB --
Peak Hour: 7:30 AM 8:30 AM
HV %:PHF
EB 6.7%0.60
Date: 03/03/2021
Peak Hour Count Period: 7:00 AM 9:00 AM
0
0
0 0
0
0
4
0
0 0
N
STORM KING RD
US 6
US 6
ST
O
R
M
K
I
N
G
RD
US 6
592TEV:
0.66PHF:
6 10
5
11
1
20
9
0
197
105 302
2720
167
12179
111 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0
0000000
0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
8:30 AM 0 0 0 0 0 0
0 0 0 0 0 08:15 AM 0 0 0 0 0
0 0 0 0 0 0
0
8:00 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
27 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastbound
0 0 0 1 0 10011200
5 0 1 53 0
Peak Hour 0 0 12 0
5 0 0 0 0 0Count Total 0 1 22 0 0 0 19
5 26000200001000
2 0 0 8 28
8:45 AM 0 0 2 0
2 0 0 0 0 0
7 27
8:30 AM 0 1 1 0 0 0 2
0 0 0 1 0 1002200
0 0 0 6 26
8:15 AM 0 0 1 0
0 0 0 0 0 0
7 27
8:00 AM 0 0 3 0 0 0 3
0 0 0 0 0 0003000
0 0 0 7 0
7:45 AM 0 0 4 0
0 0 0 0 0 0
6 0
7:30 AM 0 0 4 0 0 0 3
0 0 0 0 0 0002100
0 0 0 7 0
7:15 AM 0 0 3 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 4 0 0 0 3
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
to
to
Four-Hour Count Summaries
Note: For all three-hour count summary, see next page.
Total
0
1
1
3
5050000000Peak Hour 5 10 0 4 19
0 0 0 0 3 0
0
5:00 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 1
1 0
4:45 PM 1 2 0 1 4 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 1 3 0 1 5 0
0 0 0 0 0 0
East West North South
4:15 PM 2 2 0 1 5
Total EB WB NB SB Total
4%0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB
---3%-0%--7%3%--
0 0
469 0
HV 0 0 5 0 0 0 8
0 0 0 128 0 14001207300
469
Peak
Hour
All 0 7 127 0
0 0 0 0 0 43
4 0 0 19 0
HV%-0%4%-
5:00 PM 0 1 38 0 0
2 0 0
115
0 32 17
0 0 22 0 4 114034250004:45 PM 0 2 27 0 0
0 4 135
0
RT
4:15 PM 0 2 31 0 0
TH RT UT LT TH RT
0 2 105 0
LT
0 0 0 0 0 29
0
4:30 PM 0 2 31 0 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One Hour
0 27 17 0 0 0
UT LT TH
SB 2.8%0.76
TOTAL 4.1%0.87
Eastbound Westbound Northbound Southbound
UT LT TH RT UT
0 27 14
0 0 34 0 4
0
WB 5.2%0.82
NB --
Peak Hour: 4:15 PM 5:15 PM
HV %:PHF
EB 3.7%0.86
Date: 03/03/2021
Peak Hour Count Period: 2:00 PM 6:00 PM
0
0
0 0
0
0
5
0
0 0
N
STORM KING RD
US 6
US 6
ST
O
R
M
K
I
N
G
RD
US 6
469TEV:
0.87PHF:
14 12
8
14
2 80
0
73
120 193
2550
127
7134
134 0
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries
Note: Four-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Total
1
2
0
0
6
1
1
2
2
0
1
1
3
1
0
1
22
50000005
22 0
Peak Hr 5 10 0 4 19 0 0
0 0 0 0 0 0Count Total 14 26 0 14 54 0
0 1 00000005:45 PM 1 3 0 0 4
0 0 0 0 0 0
0
5:30 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 1
3 0
5:15 PM 1 1 0 0 2 0 0
0 0 0 0 0 0
0 1 0
5:00 PM 1 3 0 1 5 0
0 0 0 0 0 04:45 PM 1 2 0 1 4
0 0 0 0 1 0
0
4:30 PM 1 3 0 1 5 0 0 0
0 0 0 0 0 0
2 0
4:15 PM 2 2 0 1 5 0 0
0 0 0 0 0 0
0 2 0
4:00 PM 2 3 0 1 6 0
0 0 0 0 0 03:45 PM 0 0 0 0 0
0 0 0 0 1 0
0
3:30 PM 0 2 0 2 4 0 0 0
0 0 0 0 0 1
6 0
3:15 PM 2 2 0 0 4 0 0
0 0 0 0 0 0
0 0 0
3:00 PM 1 1 0 1 3 0
0 0 0 0 0 0
0 0 0
0
2:30 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 2
4 5 0
EB WB NB SB Total East
2:45 PM 0 1 0 0 1
0 0 0
---HV%-0%4%--
1 0
2:15 PM 0 0 0 1 1 0 0
0 0 0 0 0 0
West North South
2:00 PM 1 0 0
0
0 0 0 0 128 0000120730
0
Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
EB WB NB SB Total
--3%-0%4%-7%3%
Peak
Hour
All 0 7 127
280 0 0 0 0 1
0 4 0 0 19 0820000
14 469 0
HV 0 0 5 0 0
Count Total 0 21 476 0 0 0 434 414 0 57 1,683 0
92 428000170100261700
18 0 3 98 450
5:45 PM 0 0 31 0
17 0 0 0 0 0
103 457
5:30 PM 0 1 31 0 0 0 28
0 0 0 24 0 400281300
43 0 4 135 469
5:15 PM 0 0 34 0
17 0 0 0 0 0
114 422
5:00 PM 0 1 38 0 0 0 32
0 0 0 22 0 400342500
29 0 2 105 386
4:45 PM 0 2 27 0
14 0 0 0 0 0
115 389
4:30 PM 0 2 31 0 0 0 27
0 0 0 34 0 400271700
23 0 5 88 373
4:15 PM 0 2 31 0
13 0 0 0 0 0
78 376
4:00 PM 0 1 20 0 0 0 26
0 0 0 20 0 30027900
29 0 4 108 401
3:45 PM 0 2 17 0
21 0 0 0 0 0
99 385
3:30 PM 0 3 34 0 0 0 17
0 0 1 14 0 100371800
16 0 4 91 374
3:15 PM 0 1 27 0
20 0 0 0 0 0
103 457
3:00 PM 0 1 22 0 0 0 28
0 0 0 21 0 400321500
26 0 5 92 0
2:45 PM 0 3 28 0
8 0 0 0 0 0
88 0
2:30 PM 0 1 29 0 0 0 23
0 0 0 18 0 000182500
60 0 9 174 0
2:15 PM 0 0 27 0
31 0 0 0 0 02:00 PM 0 1 49 0 0 0 24
Rolling
One HourEastboundWestboundNorthboundSouthbound
UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
TotalUTLTTHRTTHRTUTLTTHRTUTLT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Four-Hour Count Summaries - Heavy Vehicles
Four-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.
0 0 0000000Peak Hour 0 0 0 0 0
0 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0
0000000
0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
5:30 PM 0 0 0 0 0 0
0 0 0 0 0 05:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
5:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 0 0 0 0 0 0
0 0 0 0 0 04:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
4:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
3:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
3:30 PM 0 0 0 0 0 0
0 0 0 0 0 03:15 PM 0 0 0 0 0
0 0 0 0 0 0
0
3:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
2:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
2:30 PM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
2:15 PM 0 0 0 0 0
0 0 0 0 0 0
TH RT LT TH RT
2:00 PM 0 0 0 0
Westbound Northbound Southbound
LT TH RT LT TH RT LT
19 0
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastbound
0 0 0 4 0 0008200
13 0 1 54 0
Peak Hour 0 0 5 0
4 0 0 0 0 0Count Total 0 0 14 0 0 0 22
4 16000000003000
1 0 0 5 16
5:45 PM 0 0 1 0
0 0 0 0 0 0
2 16
5:30 PM 0 0 1 0 0 0 3
0 0 0 0 0 0001000
1 0 0 5 19
5:15 PM 0 0 1 0
1 0 0 0 0 0
4 20
5:00 PM 0 0 1 0 0 0 2
0 0 0 1 0 0002000
1 0 0 5 16
4:45 PM 0 0 1 0
0 0 0 0 0 0
5 15
4:30 PM 0 0 1 0 0 0 3
0 0 0 1 0 0001100
1 0 0 6 14
4:15 PM 0 0 2 0
0 0 0 0 0 0
0 11
4:00 PM 0 0 2 0 0 0 3
0 0 0 0 0 0000000
2 0 0 4 12
3:45 PM 0 0 0 0
1 0 0 0 0 0
4 8
3:30 PM 0 0 0 0 0 0 1
0 0 0 0 0 0001100
0 0 1 3 5
3:15 PM 0 0 2 0
0 0 0 0 0 0
1 7
3:00 PM 0 0 1 0 0 0 1
0 0 0 0 0 0001000
0 0 0 0 0
2:45 PM 0 0 0 0
0 0 0 0 0 0
1 0
2:30 PM 0 0 0 0 0 0 0
0 0 0 1 0 0000000
4 0 0 5 0
2:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
2:00 PM 0 0 1 0 0 0 0
UT LT TH RT UT LT
Northbound Southbound
UT LT TH RT UT LT TH RT
Interval
Start
US 6 US 6 0 STORM KING RD 15-min
Total
Rolling
One HourEastboundWestbound
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 03/03/2021
Count Period: 7:00 AM to 9:00 AM
HV %:PHF
EB 5.1%0.63
WB 3.5%0.66
NB 5.3%0.93
SB 4.1%0.84
NEB --Peak Hour: 7:45 AM to 8:45 AM
Peak Hour
NWB 7.4%0.87
TOTAL 4.9%0.88
0
US 6
0
ME
L
R
E
Y
R
D
296
372
00
0
11
72
162
51
258
3510
78
47
4
116
13
1
0 ME
L
R
E
Y
R
D
0
US 6
1,339TEV:
0.88PHF:
MEL REY RD
US 6
N
57
0
35
6
0
33 01
23
3
23
073
12
1 68
4
67 0 0191421
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
886
1,087
1,266
1,339
1,326
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
43
45
60
66
68
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
US 6 US 6
Eastbound Westbound
LT BL LT TH
MEL REY RD MEL REY RD I-70 WB RAMP
RT HR UT LT
0
I-70 WB RAMP 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
7:00 AM 0 2 11 0 15 4 1 3 0
One
16 2 0115261033
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
15 2 10 1
33 0 0 116751015356
0 2 0 16131
181
7:15 AM 0 0 12 0 14 1 0 0
0 6 0 4 0 2000000
2 2
02
47 020109143
0 3 0 2 168
7:30 AM 0 2 14 0
0 0 0 0 0 2094200
36 0 248
7:45 AM 0 0 9 0 31 7
0 0 0 5 0 1363000011847123143098
81 8
0 17
289
8:00 AM 0 6 24 0 68 20 0 0
0 5 0 14 2 60000000301464113
0 14 5 4 382
8:15 AM 0 4 24 0
0 0 0 0 0 40206300801542006168213
74 0 0 8 0 181150153074314004216
42 3 67 0204814322
3 9 347
8:30 AM 0 1 15 0 20 10
0 0 0 1 0 13550000
1 23
321
8:45 AM 0 2 23 0 31 8 2 0
0 0 0 6 1 70000000201542028
0 16 5 4 276000001001730002614310052611162
4 144 367 75 363 01101827512218Count Total 0 17 132 0 253 68
47 78 13 1
2,212
Peak
Hour
All 0 11 72 0 162 51 4
0 33 0 83 18 3600000013001253619
HV 0 0 4 0 7
10 0 47 11 26 1,33900000019067211407323333230000116
0 0 0 00010401081057400134
0%-11%4%15%3%---1%6%5%8%0%
3 66
HV%-0%6%-4%8%0%
0 0 2 0 2 000
NB SB
1 0 0 2
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
20%-4%0%12%5%------5%-6%0%
0 0 0 1 0 01100000
South SE SW Total
7:00 AM 3 0 6 0 0
NEB NWB Total East West NorthNWBTotalEBWB
0 1 0 5
7:30 AM 4 4 3 0 0
0 0 0 2 0 2070000
0 0 0 0
7:15 AM 3 2 2 0 0
0 0 0 0 0 01120000
0 0 0 0 0 01120000
0 0 0 0
8:00 AM 2 1 7 1 0
0 0 0 0 0 01140000
0 0 0 0
7:45 AM 5 0 7 1 0
0 0 0 3
8:30 AM 3 4 9 1 0
0 0 0 0 0 34220000
0 1 0 3
8:15 AM 5 4 7 2 0
0 0 0 1 0 11180000
0 1 0 300010131600008:45 AM 3 1 6 3 0
0 0 0 5 0 7121110000Count Total 28 16 47 8 0 1 3 0 16
0 0 0
UT LT TH BR RT HR
I-70 WB RAMP
Peak Hr 15 9 30 5 0 0 1 0 6
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
US 6 MEL REY RD MEL REY RD I-70 WB RAMP
0 0 0 1 0 47660
7:15 AM 0 0 1 0
Hour
7:00 AM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
US 6
0 0011
10
1 0000130
0 0 7
12
0 00000100000000
7:30 AM 0 0 1 0 2 1
0 0 0 0 0 00000000000000020200
7:45 AM 0 0 1 0 2 2 0 0
0 0 0 1 0 00000000000000200
0 0 0 14
8:00 AM 0 0 0 0
0 0 0 0 0 101000041100000000
0 0 0 1100213200000
01
2 0000211
0 0 12
8:15 AM 0 0 3 0 1 1
0 0 0 1 0 000000010
22
8:30 AM 0 0 0 0 2 1 0 0
0 0 0 2 0 20000000101000131
0 0 1 18
8:45 AM 0 0 0 0
0 0 0 0 0 001000020300011200
0 0 0 3000201300010
04
0 1 1600010100000030
Count Total 0 1 6 0 15 6 0 0 0 4 111
Peak Hour 0 0 4 0
0 0 0 0 0 40700001561200135710
Interval Start
US 6 US 6 MEL REY RD MEL REY RD I-70 WB RAMP I-70 WB RAMP
0 0 0 2 0 200000070010441081057
One
UT
0 3 6640013
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
7:15 AM 0 0 0 0 0 0 0
7:00 AM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
7:30 AM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000008:00 AM 0 0 0 0 0
0 0 0 0
0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000
8:30 AM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 1 0 0 1 1 0 0 0 0 0 0023010
Northbound Southbound Northeastbound Northwestbound
014 4
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 03/03/2021
Count Period: 4:00 PM to 6:00 PM
HV %:PHF
EB 2.4%0.86
WB 2.8%0.96
NB 2.0%0.80
SB 0.8%0.85
NEB --Peak Hour: 5:00 PM to 6:00 PM
Peak Hour
NWB 2.9%0.79
TOTAL 2.2%0.86
0
US 6
0
ME
L
R
E
Y
R
D
375
291
10
0
9
90
126
150
363
3440
105
143
4
94
17
11
0 ME
L
R
E
Y
R
D
0
US 6
1,930TEV:
0.86PHF:
MEL REY RD
US 6
N
90
2
33
2
0
10
6
09
13
0
18
6
47
1
11
9
15
4
11
45 0 0191045
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,733
1,904
1,925
1,922
1,930
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
49
47
41
42
43
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
US 6 US 6
Eastbound Westbound
LT BL LT TH
MEL REY RD MEL REY RD I-70 WB RAMP
RT HR UT LT
0
I-70 WB RAMP 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
4:00 PM 0 2 15 0 34 22 0 9 0
One
8 11 2166331550
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
26 35 22 3
43 0 0 223192581982724
1 6 0 14305
393
4:15 PM 0 2 27 0 37 32 1 0
0 17 0 8 4 10000000
4 9
00
40 0002221347
0 21 3 7 434
4:30 PM 0 5 20 0
0 0 0 0 0 1101211000
41 0 454
4:45 PM 0 3 21 0 37 17
0 0 0 9 0 11510000012931303519002326
47 27
2 162
452
5:00 PM 0 3 20 0 36 50 1 0
0 10 0 11 6 6000000040181030108
0 16 4 14 564
5:15 PM 0 2 24 0
0 0 0 0 0 1508191003436490072035302
53 0 0 5 0 10272010631203333102042
33 25 49 0103134245
4 7 455
5:30 PM 0 2 21 0 22 33
0 0 0 14 0 51240000
2 105
451
5:45 PM 0 2 25 0 35 34 1 0
0 11 0 12 5 100000000501771598
0 13 9 14 460000001801074003225350022332248
11 872 268 202 360 05018824421640Count Total 0 21 173 0 269 240
143 105 17 9
3,663
Peak
Hour
All 0 9 90 0 126 150 4
0 105 0 97 39 770000001400978216
HV 0 0 3 0 3
58 0 46 22 45 1,930000000190454510047113010618600094
0 0 0 0000001006804300262
0%-1%6%0%2%---2%4%2%0%0%
1 43
HV%-0%3%-2%2%0%
0 0 0 0 2 200
NB SB
0 1 0 3
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
0%-4%9%2%2%------0%-0%2%
0 0 0 1 0 12120000
South SE SW Total
4:00 PM 1 3 6 0 0
NEB NWB Total East West NorthNWBTotalEBWB
0 0 0 0
4:30 PM 1 2 2 0 0
0 0 0 0 0 06190000
0 0 0 1
4:15 PM 6 2 5 0 0
0 0 0 0 0 1160000
0 0 0 2 0 10100000
0 3 0 7
5:00 PM 0 7 3 0 0
0 0 0 2 0 20120000
0 1 0 4
4:45 PM 4 2 5 1 0
0 3 0 10
5:30 PM 0 1 3 1 0
0 0 0 3 0 42130000
0 1 1 4
5:15 PM 4 1 6 0 0
0 0 0 1 1 0270000
0 5 0 1600050611300005:45 PM 5 1 6 0 0
0 0 0 14 1 1514920000Count Total 21 19 36 2 0 0 14 1 45
0 0 0
UT LT TH BR RT HR
I-70 WB RAMP
Peak Hr 9 10 18 1 0 0 10 1 34
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
US 6 MEL REY RD MEL REY RD I-70 WB RAMP
0 0 0 11 1 115430
4:15 PM 0 0 1 0
Hour
4:00 PM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
US 6
0 0000
12
0 0000200
1 3 19
6
0 10000100000000
4:30 PM 0 0 0 0 0 1
0 0 0 1 0 10000001000200220410
4:45 PM 0 0 1 0 3 0 0 0
0 0 0 0 0 10000000000000200
0 0 0 12
5:00 PM 0 0 0 0
0 0 0 0 0 001000030100000110
0 0 0 0100210000015
01
2 0001000
0 0 10
5:15 PM 0 0 2 0 1 1
0 0 0 0 0 000000000
13
5:30 PM 0 0 0 0 0 0 0 0
0 0 0 1 1 00000000000000220
0 1 1 7
5:45 PM 0 0 1 0
0 0 0 0 0 000100010100001000
0 0 0 0100140220000
01
0 0 1300000100000010
Count Total 0 0 5 0 11 5 0 0 3 6 92
Peak Hour 0 0 3 0
0 0 0 0 0 2011000150700039610
Interval Start
US 6 US 6 MEL REY RD MEL REY RD I-70 WB RAMP I-70 WB RAMP
0 0 0 0 0 21000004000002006803
One
UT
2 1 4330026
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
4:15 PM 0 0 0 0 0 0 0
4:00 PM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
4:30 PM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000005:00 PM 0 0 0 0 0
0 0 0 0
0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000
5:30 PM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 0 0 1 0 0 0 1 1 1 0032010
Northbound Southbound Northeastbound Northwestbound
014 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 10/20/2022
Count Period: 7:00 AM to 9:00 AM
HV %:PHF
EB 6.1%0.72
WB 6.0%0.78
NB 5.5%0.87
SB 3.6%0.77
NEB --Peak Hour: 7:30 AM to 8:30 AM
Peak Hour
NWB 4.4%0.74
TOTAL 5.4%0.88
0
Hwy 6
0
Me
l
R
a
y
R
d
328
260
00
0
7
98
178
45
300
4700
51
36
5
197
11
1
0 Mi
d
l
a
n
d
A
v
e
0
Hwy 6
1,705TEV:
0.88PHF:
Midland Ave
Hwy 6
N
71
2
60
7
0
76 01
15
5
33
6
14
4
13
9
11
0
6
77 0 026630
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,250
1,539
1,705
1,620
1,383
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
63
74
92
87
90
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
Hwy 6 Hwy 6
Eastbound Westbound
LT BL LT TH
Midland Ave Mel Ray Rd I70 Westbound Ramp
RT HR UT LT
0
I70 Westbound Ramp 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
7:00 AM 0 2 12 0 16 4 0 5 0
One
19 8 101723944
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
19 4 4 0
41 0 0 4206520182012
0 5 0 22121
194
7:15 AM 0 1 16 0 25 4 0 0
0 4 0 0 0 1000000
4 0
02
94 000686166
0 3 2 0 204
7:30 AM 0 1 17 0
0 0 0 0 0 80114200
85 0 386
7:45 AM 0 1 24 0 41 5
0 0 0 61 2 91200000130299257104112
42 33
0 38
466
8:00 AM 0 2 27 0 74 11 2 0
0 30 0 16 3 10000000602964035
1 8 5 2 483
8:15 AM 0 3 30 0
0 0 0 0 0 500157000422489009576122
68 0 0 6 0 1111204142103822203112
30 19 55 010227140
4 2 370
8:30 AM 1 0 24 0 35 12
0 0 0 13 0 15520000
1 27
301
8:45 AM 0 1 16 0 19 9 1 0
0 10 0 10 5 00000000501561029
0 8 6 0 2290000080184200271133004104173
2 235 255 127 509 090268579116Count Total 1 11 166 0 273 74
36 51 11 1
2,633
Peak
Hour
All 0 7 98 0 178 45 5
0 184 3 69 29 600000004401405212
HV 0 0 5 0 8
154 3 48 16 5 1,70500000026077306014415576336000197
0 0 0 000103100119217710755
0%-8%6%3%5%---4%14%10%0%0%
0 92
HV%-0%5%-4%16%20%
0 0 3 1 2 400
NB SB
0 2 0 4
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
2%33%4%25%0%5%------4%-4%3%
0 0 0 0 0 2090000
South SE SW Total
7:00 AM 1 2 5 1 0
NEB NWB Total East West NorthNWBTotalEBWB
0 2 0 3
7:30 AM 5 3 11 1 0
0 0 0 0 0 10120000
0 0 0 0
7:15 AM 4 2 5 1 0
0 0 0 0 0 02220000
0 0 0 0 0 03200000
0 1 0 6
8:00 AM 3 2 10 2 0
0 0 0 1 0 40200000
0 0 0 0
7:45 AM 5 4 9 2 0
0 0 0 2
8:30 AM 7 2 7 1 0
0 0 0 0 0 25300000
0 0 0 1
8:15 AM 7 9 9 0 0
0 0 0 0 0 10170000
0 3 0 500010102300008:45 AM 3 1 17 2 0
0 0 0 2 0 11101530000Count Total 35 25 73 10 0 0 8 0 21
0 0 0
UT LT TH BR RT HR
I70 Westbound Ramp
Peak Hr 20 18 39 5 0 0 1 0 8
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp
0 0 0 1 0 610920
7:15 AM 0 0 2 0
Hour
7:00 AM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
Hwy 6
0 0020
9
5 0002010
0 0 12
22
1 00000000000000
7:30 AM 0 0 1 0 3 1
0 0 0 0 0 00100000000000320020
7:45 AM 0 0 2 0 2 1 0 0
0 0 1 0 1 00000000001000510
0 0 0 20
8:00 AM 0 0 0 0
0 0 0 0 0 001000041200120200
0 0 0 1000201120020
02
3 0101520
1 0 20
8:15 AM 0 0 2 0 2 3
0 0 0 2 0 010000070
30
8:30 AM 0 0 1 0 5 1 0 0
0 1 0 2 2 00000000000000240
0 0 0 17
8:45 AM 0 0 1 0
0 0 0 0 0 001000021300020000
0 0 0 2100852200000
01
0 0 2300000000000020
Count Total 0 0 9 0 16 10 1 0 4 0 153
Peak Hour 0 0 5 0
0 0 0 0 0 306210021523001135600
Interval Start
Hwy 6 Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp I70 Westbound Ramp
0 0 0 3 1 2100000170010350011928
One
UT
4 0 9271075
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
7:15 AM 0 0 0 0 0 0 0
7:00 AM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
7:30 AM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000008:00 AM 0 0 0 0 0
0 0 0 0
0
8:15 AM 0 0 0 0 0 0 0
0 0 0 0 0 0000
8:30 AM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 0 0 1 0 0 0 2 0 0 0013010
Northbound Southbound Northeastbound Northwestbound
124 2
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Date: 10/20/2022
Count Period: 4:00 PM to 6:00 PM
HV %:PHF
EB 3.7%0.84
WB 1.4%0.83
NB 2.9%0.84
SB 2.8%0.89
NEB --Peak Hour: 4:30 PM to 5:30 PM
Peak Hour
NWB 0.0%0.88
TOTAL 2.5%0.91
0
Hwy 6
0
Me
l
R
a
y
R
d
437
460
00
0
8
115
151
163
415
4130
108
139
3
154
11
8
0 Mi
d
l
a
n
d
A
v
e
0
Hwy 6
2,225TEV:
0.91PHF:
Midland Ave
Hwy 6
N
1,
0
1
2
43
7
0
77 00
26
4
26
8
40
3
17
7
13
4
20
59 0 0242074
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
www.idaxdata.com
Two-Hour Count Summaries
0
0
0
1,949
2,066
2,225
2,216
2,191
0
0
0
0
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.
Two-Hour Count Summaries - Heavy Vehicles
0
0
0
63
62
56
43
41
0
0
Two-Hour Count Summaries - Bikes
0
0
0
0
0
0
0
0
0
0
TH RT UT HL
Interval Start
Hwy 6 Hwy 6
Eastbound Westbound
LT BL LT TH
Midland Ave Mel Ray Rd I70 Westbound Ramp
RT HR UT LT
0
I70 Westbound Ramp 15-min
Total
Rolling
Northbound Southbound Northeastbound Northwestbound
BR HR Hour
4:00 PM 0 2 20 0 31 31 0 7 0
One
20 11 4082442364
UT LT TH BR RT HR UT HL RT HR UT HL LT BLBRRTUTHLBLBRBLTH
32 25 20 3
54 0 0 528202180785627
0 6 0 16313
457
4:15 PM 0 1 14 0 27 24 1 0
0 15 0 16 6 1000000
7 1
00
66 0104821353
1 13 18 3 452
4:30 PM 0 3 26 0
0 0 0 0 0 2001417200
60 0 512
4:45 PM 0 0 26 0 29 37
0 0 0 18 0 18176000008869213834102524
55 13
0 107
528
5:00 PM 0 2 40 0 38 50 0 0
0 15 1 20 14 2000000070161630100
0 14 7 0 574
5:15 PM 0 3 23 0
0 0 0 0 0 18015154005317630064353263
79 0 0 5 0 12162010887264642103841
60 18 54 0002745159
10 0 611
5:30 PM 0 3 24 0 41 43
0 0 0 22 1 162670000
0 92
503
5:45 PM 0 1 17 0 33 38 1 0
0 15 0 10 8 100000012011144098
1 10 12 1 5030000010081820051126900122842396
0 753 475 157 509 05026927120337Count Total 0 15 190 0 283 299
139 108 11 0
4,140
Peak
Hour
All 0 8 115 0 151 163 3
0 133 4 117 82 9000000150011213432
HV 0 1 5 0 8
73 2 68 38 3 2,225000000240597420040326477268000154
0 0 0 00020210012953200123
0%-3%3%6%1%---1%1%3%0%-
0 56
HV%-13%4%-5%1%0%
0 0 0 0 0 000
NB SB
0 1 0 4
Interval Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg)
Start EB WB NB SB NEB
0%0%0%0%0%3%------8%-3%1%
0 0 0 0 0 31130000
South SE SW Total
4:00 PM 3 2 5 2 0
NEB NWB Total East West NorthNWBTotalEBWB
0 1 0 3
4:30 PM 7 2 8 1 0
0 0 0 0 0 22190000
0 5 0 21
4:15 PM 3 4 9 1 0
0 0 0 5 0 110180000
0 0 0 0 0 40120000
0 4 0 9
5:00 PM 2 1 8 1 0
0 0 0 2 0 30130000
0 2 0 6
4:45 PM 3 2 7 1 0
0 1 0 4
5:30 PM 1 0 3 0 0
0 0 0 1 0 20130000
0 1 0 3
5:15 PM 4 1 6 2 0
0 0 0 1 0 1150000
0 1 0 900040431100005:45 PM 3 2 3 0 0
0 0 0 13 0 3071040000Count Total 26 14 49 8 0 0 16 0 59
0 0 0
UT LT TH BR RT HR
I70 Westbound Ramp
Peak Hr 16 6 29 5 0 0 12 0 40
UT LT BL TH BR RTUTHLLTTHRTHRUTHLLTBLTHRT
Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp
0 0 0 8 0 200560
4:15 PM 0 0 0 0
Hour
4:00 PM
UT HL LT BL BR HRUTHLBLBRRTHR
15-min
Total
Rolling
Eastbound Westbound Northbound Southbound Northeastbound Northwestbound OneInterval Start
Hwy 6
0 0001
13
1 0001100
1 0 19
18
1 00000001001000
4:30 PM 0 1 3 0 3 0
0 0 0 0 0 11000002000120241210
4:45 PM 0 0 0 0 2 1 0 0
0 0 0 0 0 00000000001000313
0 0 0 13
5:00 PM 0 0 1 0
0 0 0 0 0 000000031100100200
0 1 0 0000511100001
02
0 0000010
0 0 12
5:15 PM 0 0 1 0 2 1
0 0 0 0 0 000000010
13
5:30 PM 0 0 1 0 0 0 0 0
0 0 0 0 0 00000000001100240
0 0 0 5
5:45 PM 0 0 0 0
0 0 0 0 0 100000010200000000
0 0 0 0200020300000
00
0 0 1100020100000010
Count Total 0 1 8 0 13 4 0 0 1 0 104
Peak Hour 0 1 5 0
0 0 0 0 0 3023000176900314720
Interval Start
Hwy 6 Hwy 6 Midland Ave Mel Ray Rd I70 Westbound Ramp I70 Westbound Ramp
0 0 0 0 0 010000030020230012958
One
UT
0 0 5620012
HL LT BL BR HR HourHLBLBRRT
15-min
Total
Rolling
LT TH BR RT HR UT
Eastbound Westbound
UT
0
4:15 PM 0 0 0 0 0 0 0
4:00 PM
0 0 0 0 0 0000000
0 0 0 0
0 0
0 0 0 0 0 000
HR UTLTBLTHBRRTUT
0 0 0 0
0
HL LT BL TH RT
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0000 0 0 0 0 0000000
0 0 0 0 0 000
4:30 PM 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0
0 0000000000000
0 0
0 0 0 0 0 0 00000000000000005:00 PM 0 0 0 0 0
0 0 0 0
0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 0 0000
5:30 PM 0 0 0 0 0
0 0 0 0 0 000000000000000000000
0 0000000000000000000 0 0
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 00000
0 0 0000000000000000000000000000
0 0000000000000Count Total 0 0 0 0 0
0 0 0 0 0 0
0 0
Peak Hour 0 0 0 0 0 0 0
0 0 0 0 0 00000000000
000000000000000000000000
0 0 2 0 0 1 0 0 0 1 1 0031010
Northbound Southbound Northeastbound Northwestbound
017 3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000
0 0 0
0 0 0 0 00000000
HL LT TH RT HR UT
Project Manager: (415) 310-6469 project.manager.ca@idaxdata.com
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX B
Future Traffic Projections
CDOT OTIS: Glenwood Business Center
ROUTE REFPT ENDREFPT LENGTH UPDATEYR AADT YR20FACTOR
Growth Rate
%DHV DD LOCATION
006K 0 0.338 0.314 2021 11000 1.15 0.70%9.5 54 ON SH 6 WEST ST W/O SH 82 GLENWOOD SPRINGS
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX C
Trip Generation Worksheets
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No. of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Warehousing (150)
Independent Variable - 1000 Square Feet Gross Floor Feet (X)
Gross Floor Area =67,950
X =68.0
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (100 Series Page 96)
Directional Distribution: 77% ent. 23%exit.
T = 0.17 (X)T =12 Average Vehicle Trip Ends
T = 0.17 *67.95 9 entering 3 exiting
9 + 3 (*) =12
(*) TRIP END WAS CHANGED BY 1 TO SATISFY THE TOTAL
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (100 Series Page 97)
Directional Distribution: 28% ent. 72%exit.
T = 0.18 (X)T =13 Average Vehicle Trip Ends
T = 0.18 *67.95 4 entering 9 exiting
4 + 9 =13
Weekday (100 Series Page 95)
Directional Distribution: 50% entering, 50% exiting
T = 1.71 (X)T =118 Average Vehicle Trip Ends
T = 1.71 *67.95 59 entering 59 exiting
59 + 59 = 118
Trip Generation for Warehousing
Glenwood Business Center
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No. of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Mini-Warehouse (151)
Independent Variable - 1000 Square Feet Gross Floor Feet (X)
Gross Floor Area =97,750
X =97.8
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (Page 111)
Weekday Average Directional Distribution: 59% ent. 41%exit.
T = 0.09 (X)T = 9 Average Vehicle Trip Ends
T = 0.09 *97.75 5 entering 4 exiting
5 + 4 (*) =9
(*) TRIP END WAS CHANGED BY 1 TO SATISFY THE TOTAL
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (Page 112)
Weekday Average Directional Distribution: 47% ent. 53%exit.
T = 0.15 (X)T =15 Average Vehicle Trip Ends
T = 0.15 *97.75 7 entering 8 exiting
7 + 8 =15
Weekday Daily (Page 110)
Weekday Average Directional Distribution: 50% entering, 50% exiting
T = 1.45 (X)T =142 Average Vehicle Trip Ends
T = 1.45 *97.75 71 entering 71 exiting
71 + 71 = 142
Trip Generation for Mini Warehouse
Glenwood Business Center
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rate Equations
Land Use Code - Multifamily Housing (Low-Rise) (220)
Independent Variable - Dwelling Units (X)
X = 3
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (200 Series Page 255)
Average Weekday Directional Distribution: 24% ent. 76%exit.
(T) = 0.40 (X)T = 1 Average Vehicle Trip Ends
(T) = 0.40 *(3.0)0 entering 1 exiting
0 + 1 = 1
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (200 Series Page 256)
Average Weekday Directional Distribution: 63% ent. 37%exit.
(T) = 0.51(X)T = 2 Average Vehicle Trip Ends
(T) = 0.51 *(3.0)1 entering 1 exiting
1 + 1 = 2
Weekday (200 Series Page 254)
Average Weekday Directional Distribution: 50% entering, 50% exiting
(T) = 6.74 (X)T =22 Average Vehicle Trip Ends
(T) = 6.74 *(3.0)11 entering 11 exiting
11 + 11 = 22
Glenwood Business Center
Trip Generation for Multifamily Housing (Low-Rise)
MAG February 09, 2023 096671009
Project
Subject
Designed by Date Job No.
Checked by Date Sheet No.of
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 11th Edition, Average Rates
Land Use Code - General Office Building (710)
Independent Variable - 1000 Square Feet (X)
SF =
X =35.175
T =Average Vehicle Trip Ends
Peak Hour of Adjacent Street Traffic, One Hour Between 7 and 9 a.m. (700 Series Page 710)
Directional Distribution:88% ent. 12%exit.
(T) = 1.52 (X)T =53 Average Vehicle Trip Ends
(T) = 1.52 *(35.2)47 entering 6 exiting
47 + 6 =53
Peak Hour of Adjacent Street Traffic, One Hour Between 4 and 6 p.m. (700 Series Page 711)
Directional Distribution:17% ent. 83%exit.
(T) = 1.44 (X)T =51 Average Vehicle Trip Ends
(T) = 1.44 *(35.2)9 entering 42 exiting
9 +42 =51
Weekday (700 Series Page 709)
Directional Distribution:50% ent. 50%exit.
(T) = 10.84 (X)T =382 Average Vehicle Trip Ends
(T) = 10.84 *(35.2)191 entering 191 exiting
191 +191 =382
35,175
Glenwood Business Center
Trip Generation for General Office Building
MAG February 09, 2023 096671009
1 1
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX D
Intersection Analysis Worksheets
HCM 6th TWSC 2023 Existing AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 25 42 48 21 17 21
Future Vol, veh/h 25 42 48 21 17 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 32 53 61 27 22 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 88 0 216 63
Stage 1 - - -- 62 -
Stage 2 - - -- 154 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1508 - 772 1002
Stage 1 - - -- 961 -
Stage 2 - - -- 874 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1504 - 734 998
Mov Cap-2 Maneuver - - -- 734 -
Stage 1 - - -- 958 -
Stage 2 - - -- 834 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)860 - - 1504 -
HCM Lane V/C Ratio 0.056 - - 0.04 -
HCM Control Delay (s)9.4 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2023 Existing PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 37 24 25 26 29 16
Future Vol, veh/h 37 24 25 26 29 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 44 28 29 31 34 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 75 0 155 62
Stage 1 - - -- 61 -
Stage 2 - - -- 94 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1512 - 832 997
Stage 1 - - -- 957 -
Stage 2 - - -- 925 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1508 - 809 993
Mov Cap-2 Maneuver - - -- 809 -
Stage 1 - - -- 954 -
Stage 2 - - -- 902 -
Approach EB WB NB
HCM Control Delay, s 0 3.6 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)866 - - 1508 -
HCM Lane V/C Ratio 0.061 - - 0.02 -
HCM Control Delay (s)9.4 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Background AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 25 43 49 21 17 21
Future Vol, veh/h 25 43 49 21 17 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 32 54 62 27 22 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 89 0 218 63
Stage 1 - - -- 62 -
Stage 2 - - -- 156 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1506 - 770 1002
Stage 1 - - -- 961 -
Stage 2 - - -- 872 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1502 - 732 998
Mov Cap-2 Maneuver - - -- 732 -
Stage 1 - - -- 958 -
Stage 2 - - -- 831 -
Approach EB WB NB
HCM Control Delay, s 0 5.3 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)858 - - 1502 -
HCM Lane V/C Ratio 0.056 - - 0.041 -
HCM Control Delay (s)9.4 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Background PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 38 24 25 26 29 16
Future Vol, veh/h 38 24 25 26 29 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 45 28 29 31 34 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 76 0 156 63
Stage 1 - - -- 62 -
Stage 2 - - -- 94 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1510 - 831 996
Stage 1 - - -- 956 -
Stage 2 - - -- 925 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1506 - 808 992
Mov Cap-2 Maneuver - - -- 808 -
Stage 1 - - -- 953 -
Stage 2 - - -- 902 -
Approach EB WB NB
HCM Control Delay, s 0 3.6 9.4
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)865 - - 1506 -
HCM Lane V/C Ratio 0.061 - - 0.02 -
HCM Control Delay (s)9.4 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Total AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 28 46 49 22 18 21
Future Vol, veh/h 28 46 49 22 18 21
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 58 62 28 23 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 96 0 224 68
Stage 1 - - -- 67 -
Stage 2 - - -- 157 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1498 - 764 995
Stage 1 - - -- 956 -
Stage 2 - - -- 871 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1494 - 726 991
Mov Cap-2 Maneuver - - -- 726 -
Stage 1 - - -- 953 -
Stage 2 - - -- 830 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)848 - - 1494 -
HCM Lane V/C Ratio 0.058 - - 0.042 -
HCM Control Delay (s)9.5 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2025 Total PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 39 25 25 29 32 16
Future Vol, veh/h 39 25 25 29 32 16
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 46 29 29 34 38 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 78 0 161 65
Stage 1 - - -- 64 -
Stage 2 - - -- 97 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1508 - 825 993
Stage 1 - - -- 954 -
Stage 2 - - -- 922 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1504 - 802 989
Mov Cap-2 Maneuver - - -- 802 -
Stage 1 - - -- 951 -
Stage 2 - - -- 899 -
Approach EB WB NB
HCM Control Delay, s 0 3.4 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)856 - - 1504 -
HCM Lane V/C Ratio 0.066 - - 0.02 -
HCM Control Delay (s)9.5 - - 7.4 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Background AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 29 49 56 24 20 24
Future Vol, veh/h 29 49 56 24 20 24
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 37 62 71 30 25 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 102 0 248 72
Stage 1 - - -- 71 -
Stage 2 - - -- 177 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1490 - 740 990
Stage 1 - - -- 952 -
Stage 2 - - -- 854 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1486 - 698 986
Mov Cap-2 Maneuver - - -- 698 -
Stage 1 - - -- 949 -
Stage 2 - - -- 808 -
Approach EB WB NB
HCM Control Delay, s 0 5.3 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)830 - - 1486 -
HCM Lane V/C Ratio 0.067 - - 0.048 -
HCM Control Delay (s)9.6 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Background PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 43 28 29 30 34 19
Future Vol, veh/h 43 28 29 30 34 19
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 51 33 34 35 40 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 87 0 179 72
Stage 1 - - -- 71 -
Stage 2 - - -- 108 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1496 - 806 985
Stage 1 - - -- 947 -
Stage 2 - - -- 911 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1492 - 781 981
Mov Cap-2 Maneuver - - -- 781 -
Stage 1 - - -- 944 -
Stage 2 - - -- 885 -
Approach EB WB NB
HCM Control Delay, s 0 3.7 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)843 - - 1492 -
HCM Lane V/C Ratio 0.074 - - 0.023 -
HCM Control Delay (s)9.6 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.1 -
HCM 6th TWSC 2045 Total AM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 32 52 56 25 21 24
Future Vol, veh/h 32 52 56 25 21 24
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 41 66 71 32 27 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 110 0 256 78
Stage 1 - - -- 77 -
Stage 2 - - -- 179 -
Critical Hdwy -- 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - -- 5.42 -
Critical Hdwy Stg 2 - - -- 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1480 - 733 983
Stage 1 - - -- 946 -
Stage 2 - - -- 852 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1476 - 691 979
Mov Cap-2 Maneuver - - -- 691 -
Stage 1 - - -- 943 -
Stage 2 - - -- 806 -
Approach EB WB NB
HCM Control Delay, s 0 5.2 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)820 - - 1476 -
HCM Lane V/C Ratio 0.069 - - 0.048 -
HCM Control Delay (s)9.7 - - 7.6 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.2 - - 0.2 -
HCM 6th TWSC 2045 Total PM
1: Storm King Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 44 29 29 33 37 19
Future Vol, veh/h 44 29 29 33 37 19
Conflicting Peds, #/hr 0 3 3 0 5 1
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, %0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 52 34 34 39 44 22
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 89 0 184 73
Stage 1 - - -- 72 -
Stage 2 - - -- 112 -
Critical Hdwy -- 4.14 - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy - - 2.236 - 3.536 3.336
Pot Cap-1 Maneuver - - 1494 - 801 983
Stage 1 - - -- 946 -
Stage 2 - - -- 908 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver -- 1490 - 776 979
Mov Cap-2 Maneuver - - -- 776 -
Stage 1 - - -- 943 -
Stage 2 - - -- 883 -
Approach EB WB NB
HCM Control Delay, s 0 3.5 9.7
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h)835 - - 1490 -
HCM Lane V/C Ratio 0.079 - - 0.023 -
HCM Control Delay (s)9.7 - - 7.5 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh)0.3 - - 0.1 -
HCM 6th AWSC 2023 Existing AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 37 41 22 7 33 13 20 5 31 1
Future Vol, veh/h 1 22 37 41 22 7 33 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 31 51 57 31 10 46 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8 7.9
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 2% 59% 14%
Vol Thru, %20% 37% 31% 84%
Vol Right, %30% 62% 10% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 66 60 70 37
LT Vol 33 1 41 5
Through Vol 13 22 22 31
RT Vol 20 37 7 1
Lane Flow Rate 92 83 97 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.112 0.095 0.121 0.065
Departure Headway (Hd)4.402 4.092 4.493 4.538
Convergence, Y/N Yes Yes Yes Yes
Cap 817 878 800 792
Service Time 2.414 2.104 2.506 2.551
HCM Lane V/C Ratio 0.113 0.095 0.121 0.064
HCM Control Delay 8 7.5 8.1 7.9
HCM Lane LOS A A A A
HCM 95th-tile Q 0.4 0.3 0.4 0.2
HCM 6th AWSC 2023 Existing PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 26 35 35 9 33 51 34 4 18 5
Future Vol, veh/h 1 22 26 35 35 9 33 51 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 23 27 36 36 9 34 53 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.4 7.9 7.9 7.5
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 44% 15%
Vol Thru, %43% 45% 44% 67%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 118 49 79 27
LT Vol 33 1 35 4
Through Vol 51 22 35 18
RT Vol 34 26 9 5
Lane Flow Rate 122 51 81 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.14 0.058 0.098 0.034
Departure Headway (Hd)4.151 4.129 4.339 4.364
Convergence, Y/N Yes Yes Yes Yes
Cap 852 872 814 825
Service Time 2.235 2.131 2.43 2.366
HCM Lane V/C Ratio 0.143 0.058 0.1 0.034
HCM Control Delay 7.9 7.4 7.9 7.5
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.2 0.3 0.1
HCM 6th AWSC 2025 Background AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 38 42 22 7 33 13 20 5 31 1
Future Vol, veh/h 1 22 38 42 22 7 33 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 31 53 58 31 10 46 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8 7.9
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 2% 59% 14%
Vol Thru, %20% 36% 31% 84%
Vol Right, %30% 62% 10% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 66 61 71 37
LT Vol 33 1 42 5
Through Vol 13 22 22 31
RT Vol 20 38 7 1
Lane Flow Rate 92 85 99 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.112 0.096 0.123 0.065
Departure Headway (Hd)4.408 4.09 4.497 4.544
Convergence, Y/N Yes Yes Yes Yes
Cap 816 879 800 791
Service Time 2.419 2.102 2.509 2.557
HCM Lane V/C Ratio 0.113 0.097 0.124 0.064
HCM Control Delay 8 7.5 8.1 7.9
HCM Lane LOS A A A A
HCM 95th-tile Q 0.4 0.3 0.4 0.2
HCM 6th AWSC 2025 Background PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 22 26 35 35 9 33 52 34 4 18 5
Future Vol, veh/h 1 22 26 35 35 9 33 52 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 23 27 36 36 9 34 54 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.4 7.9 7.9 7.5
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 44% 15%
Vol Thru, %44% 45% 44% 67%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 119 49 79 27
LT Vol 33 1 35 4
Through Vol 52 22 35 18
RT Vol 34 26 9 5
Lane Flow Rate 123 51 81 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.141 0.058 0.098 0.034
Departure Headway (Hd)4.152 4.131 4.341 4.365
Convergence, Y/N Yes Yes Yes Yes
Cap 851 872 814 825
Service Time 2.236 2.133 2.432 2.367
HCM Lane V/C Ratio 0.145 0.058 0.1 0.034
HCM Control Delay 7.9 7.4 7.9 7.5
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.2 0.3 0.1
HCM 6th AWSC 2025 Total AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 23 42 42 28 7 51 13 20 5 31 1
Future Vol, veh/h 1 23 42 42 28 7 51 13 20 5 31 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 32 58 58 39 10 71 18 28 7 43 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.3 8.3 8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %61% 2% 55% 14%
Vol Thru, %15% 35% 36% 84%
Vol Right, %24% 64% 9% 3%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 84 66 77 37
LT Vol 51 1 42 5
Through Vol 13 23 28 31
RT Vol 20 42 7 1
Lane Flow Rate 117 92 107 51
Geometry Grp 1 1 1 1
Degree of Util (X)0.146 0.106 0.136 0.066
Departure Headway (Hd)4.508 4.159 4.567 4.614
Convergence, Y/N Yes Yes Yes Yes
Cap 797 863 787 778
Service Time 2.525 2.175 2.582 2.634
HCM Lane V/C Ratio 0.147 0.107 0.136 0.066
HCM Control Delay 8.3 7.7 8.3 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.4 0.5 0.2
HCM 6th AWSC 2025 Total PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 7.9
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 28 44 35 37 9 39 52 34 4 18 5
Future Vol, veh/h 1 28 44 35 37 9 39 52 34 4 18 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 29 45 36 38 9 40 54 35 4 19 5
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8 8.1 7.6
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %31% 1% 43% 15%
Vol Thru, %42% 38% 46% 67%
Vol Right, %27% 60% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 125 73 81 27
LT Vol 39 1 35 4
Through Vol 52 28 37 18
RT Vol 34 44 9 5
Lane Flow Rate 129 75 84 28
Geometry Grp 1 1 1 1
Degree of Util (X)0.154 0.086 0.104 0.034
Departure Headway (Hd)4.316 4.109 4.474 4.434
Convergence, Y/N Yes Yes Yes Yes
Cap 836 875 804 810
Service Time 2.316 2.12 2.483 2.446
HCM Lane V/C Ratio 0.154 0.086 0.104 0.035
HCM Control Delay 8.1 7.5 8 7.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.3 0.3 0.1
HCM 6th AWSC 2045 Background AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 26 43 48 26 8 38 15 23 6 36 1
Future Vol, veh/h 1 26 43 48 26 8 38 15 23 6 36 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 36 60 67 36 11 53 21 32 8 50 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.4 8.2 8
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %50% 1% 59% 14%
Vol Thru, %20% 37% 32% 84%
Vol Right, %30% 61% 10% 2%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 76 70 82 43
LT Vol 38 1 48 6
Through Vol 15 26 26 36
RT Vol 23 43 8 1
Lane Flow Rate 106 97 114 60
Geometry Grp 1 1 1 1
Degree of Util (X)0.132 0.113 0.144 0.077
Departure Headway (Hd)4.486 4.17 4.567 4.633
Convergence, Y/N Yes Yes Yes Yes
Cap 801 860 787 775
Service Time 2.504 2.189 2.586 2.653
HCM Lane V/C Ratio 0.132 0.113 0.145 0.077
HCM Control Delay 8.2 7.7 8.4 8
HCM Lane LOS A A A A
HCM 95th-tile Q 0.5 0.4 0.5 0.2
HCM 6th AWSC 2045 Background PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 26 30 41 41 10 38 59 40 5 21 6
Future Vol, veh/h 1 26 30 41 41 10 38 59 40 5 21 6
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 27 31 42 42 10 39 61 41 5 22 6
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.5 8.1 8.2 7.6
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %28% 2% 45% 16%
Vol Thru, %43% 46% 45% 66%
Vol Right, %29% 53% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 137 57 92 32
LT Vol 38 1 41 5
Through Vol 59 26 41 21
RT Vol 40 30 10 6
Lane Flow Rate 141 59 95 33
Geometry Grp 1 1 1 1
Degree of Util (X)0.169 0.069 0.119 0.041
Departure Headway (Hd)4.3 4.209 4.501 4.442
Convergence, Y/N Yes Yes Yes Yes
Cap 839 853 799 808
Service Time 2.3 2.223 2.515 2.457
HCM Lane V/C Ratio 0.168 0.069 0.119 0.041
HCM Control Delay 8.2 7.5 8.1 7.6
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.2 0.4 0.1
HCM 6th AWSC 2045 Total AM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.3
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 27 47 48 32 8 56 15 23 6 36 1
Future Vol, veh/h 1 27 47 48 32 8 56 15 23 6 36 1
Peak Hour Factor 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 38 65 67 44 11 78 21 32 8 50 1
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.9 8.5 8.5 8.1
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %60% 1% 55% 14%
Vol Thru, %16% 36% 36% 84%
Vol Right, %24% 63% 9% 2%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 94 75 88 43
LT Vol 56 1 48 6
Through Vol 15 27 32 36
RT Vol 23 47 8 1
Lane Flow Rate 131 104 122 60
Geometry Grp 1 1 1 1
Degree of Util (X)0.166 0.123 0.158 0.078
Departure Headway (Hd)4.581 4.242 4.64 4.706
Convergence, Y/N Yes Yes Yes Yes
Cap 783 846 774 761
Service Time 2.605 2.264 2.661 2.733
HCM Lane V/C Ratio 0.167 0.123 0.158 0.079
HCM Control Delay 8.5 7.9 8.5 8.1
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.4 0.6 0.3
HCM 6th AWSC 2045 Total PM
2: Mel Rey Rd & Donegan Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Intersection Delay, s/veh 8.1
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 32 48 41 43 10 44 59 40 5 21 6
Future Vol, veh/h 1 32 48 41 43 10 44 59 40 5 21 6
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Heavy Vehicles, %7 7 7 7 7 7 7 7 7 7 7 7
Mvmt Flow 1 33 49 42 44 10 45 61 41 5 22 6
Number of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1 1 1 1
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1 1 1 1
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1 1 1 1
HCM Control Delay 7.7 8.2 8.3 7.7
HCM LOS A A A A
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, %31% 1% 44% 16%
Vol Thru, %41% 40% 46% 66%
Vol Right, %28% 59% 11% 19%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 143 81 94 32
LT Vol 44 1 41 5
Through Vol 59 32 43 21
RT Vol 40 48 10 6
Lane Flow Rate 147 84 97 33
Geometry Grp 1 1 1 1
Degree of Util (X)0.179 0.097 0.122 0.041
Departure Headway (Hd)4.36 4.19 4.545 4.511
Convergence, Y/N Yes Yes Yes Yes
Cap 826 858 791 796
Service Time 2.372 2.205 2.56 2.527
HCM Lane V/C Ratio 0.178 0.098 0.123 0.041
HCM Control Delay 8.3 7.7 8.2 7.7
HCM Lane LOS A A A A
HCM 95th-tile Q 0.6 0.3 0.4 0.1
HCM 6th TWSC 2023 Existing AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 72 9 1 1 148 24 14 5 46 29
Future Vol, veh/h 18 3 72 9 1 1 148 24 14 5 46 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 126 16 2 2 260 42 25 9 81 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 724 734 121 773 747 71 146 0 0 75 0 0
Stage 1 139 139 - 583 583 - - - - - - -
Stage 2 585 595 - 190 164 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 340 346 928 315 340 989 1430 - - 1518 - -
Stage 1 862 780 - 496 497 - - - - - - -
Stage 2 495 491 - 809 761 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 281 272 916 226 267 974 1411 - - 1506 - -
Mov Cap-2 Maneuver 281 272 - 226 267 - - - - - - -
Stage 1 687 765 - 398 399 - - - - - - -
Stage 2 394 394 - 688 747 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.1 20.8 6.5 0.5
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1411 - - 605 247 1506 - -
HCM Lane V/C Ratio 0.184 - - 0.27 0.078 0.006 - -
HCM Control Delay (s)8.1 0 - 13.1 20.8 7.4 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.1 0.3 0 - -
HCM 6th TWSC 2023 Existing PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 63 5 1 5 55 24 7 0 37 21
Future Vol, veh/h 18 0 63 5 1 5 55 24 7 0 37 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 154 12 2 12 134 59 17 0 90 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 481 482 130 537 499 84 155 0 0 84 0 0
Stage 1 130 130 - 344 344 - - - - - - -
Stage 2 351 352 - 193 155 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 495 484 920 455 473 975 1425 - - 1513 - -
Stage 1 874 789 - 671 637 - - - - - - -
Stage 2 666 632 - 809 769 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 440 426 908 346 417 960 1406 - - 1501 - -
Mov Cap-2 Maneuver 440 426 - 346 417 - - - - - - -
Stage 1 776 779 - 599 569 - - - - - - -
Stage 2 585 564 - 672 759 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.7 12.6 5 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1406 - - 734 499 1501 - -
HCM Lane V/C Ratio 0.095 - - 0.269 0.054 - - -
HCM Control Delay (s)7.8 0 - 11.7 12.6 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.3 - - 1.1 0.2 0 - -
HCM 6th TWSC 2025 Background AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 73 9 1 1 150 24 14 5 47 29
Future Vol, veh/h 18 3 73 9 1 1 150 24 14 5 47 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 128 16 2 2 263 42 25 9 82 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 731 741 122 781 754 71 147 0 0 75 0 0
Stage 1 140 140 - 589 589 - - - - - - -
Stage 2 591 601 - 192 165 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 336 343 926 311 337 989 1429 - - 1518 - -
Stage 1 861 779 - 493 494 - - - - - - -
Stage 2 492 488 - 807 760 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 277 269 914 221 264 974 1410 - - 1506 - -
Mov Cap-2 Maneuver 277 269 - 221 264 - - - - - - -
Stage 1 684 764 - 394 395 - - - - - - -
Stage 2 391 390 - 685 746 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.2 21.2 6.5 0.5
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1410 - - 603 242 1506 - -
HCM Lane V/C Ratio 0.187 - - 0.273 0.08 0.006 - -
HCM Control Delay (s)8.1 0 - 13.2 21.2 7.4 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.1 0.3 0 - -
HCM 6th TWSC 2025 Background PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 64 5 1 5 56 24 7 0 38 21
Future Vol, veh/h 18 0 64 5 1 5 56 24 7 0 38 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 156 12 2 12 137 59 17 0 93 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 490 491 133 547 508 84 158 0 0 84 0 0
Stage 1 133 133 - 350 350 - - - - - - -
Stage 2 357 358 - 197 158 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 489 478 916 448 468 975 1422 - - 1513 - -
Stage 1 870 786 - 666 633 - - - - - - -
Stage 2 661 628 - 805 767 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 434 420 904 339 411 960 1403 - - 1501 - -
Mov Cap-2 Maneuver 434 420 - 339 411 - - - - - - -
Stage 1 771 776 - 593 564 - - - - - - -
Stage 2 579 560 - 666 757 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.8 12.8 5 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1403 - - 730 491 1501 - -
HCM Lane V/C Ratio 0.097 - - 0.274 0.055 - - -
HCM Control Delay (s)7.8 0 - 11.8 12.8 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.3 - - 1.1 0.2 0 - -
HCM 6th TWSC 2025 Total AM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 3 73 16 1 2 150 24 45 8 47 29
Future Vol, veh/h 18 3 73 16 1 2 150 24 45 8 47 29
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 32 5 128 28 2 4 263 42 79 14 82 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 769 805 122 818 791 98 147 0 0 129 0 0
Stage 1 150 150 - 616 616 - - - - - - -
Stage 2 619 655 - 202 175 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 317 315 926 294 321 955 1429 - - 1451 - -
Stage 1 850 771 - 476 480 - - - - - - -
Stage 2 474 461 - 798 752 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 258 243 914 207 248 941 1410 - - 1440 - -
Mov Cap-2 Maneuver 258 243 - 207 248 - - - - - - -
Stage 1 669 752 - 377 380 - - - - - - -
Stage 2 372 365 - 674 734 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.7 23.5 5.6 0.7
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1410 - - 580 228 1440 - -
HCM Lane V/C Ratio 0.187 - - 0.284 0.146 0.01 - -
HCM Control Delay (s)8.1 0 - 13.7 23.5 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.7 - - 1.2 0.5 0 - -
HCM 6th TWSC 2025 Total PM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 7.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 0 64 35 1 8 56 24 18 1 38 21
Future Vol, veh/h 18 0 64 35 1 8 56 24 18 1 38 21
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 44 0 156 85 2 20 137 59 44 2 93 51
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 511 522 133 564 525 97 158 0 0 111 0 0
Stage 1 137 137 - 363 363 - - - - - - -
Stage 2 374 385 - 201 162 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 473 459 916 436 458 959 1422 - - 1479 - -
Stage 1 866 783 - 656 625 - - - - - - -
Stage 2 647 611 - 801 764 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 415 402 904 329 401 944 1403 - - 1468 - -
Mov Cap-2 Maneuver 415 402 - 329 401 - - - - - - -
Stage 1 766 772 - 583 556 - - - - - - -
Stage 2 561 543 - 662 753 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.9 18.4 4.5 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1403 - - 718 375 1468 - -
HCM Lane V/C Ratio 0.097 - - 0.279 0.286 0.002 - -
HCM Control Delay (s)7.8 0 - 11.9 18.4 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.3 - - 1.1 1.2 0 - -
HCM 6th TWSC 2045 Background AM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 3 84 10 1 1 173 28 16 6 54 34
Future Vol, veh/h 21 3 84 10 1 1 173 28 16 6 54 34
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 37 5 147 18 2 2 304 49 28 11 95 60
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 842 854 139 902 870 79 169 0 0 85 0 0
Stage 1 161 161 - 679 679 - - - - - - -
Stage 2 681 693 - 223 191 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 283 295 907 258 289 979 1402 - - 1505 - -
Stage 1 839 763 - 440 450 - - - - - - -
Stage 2 439 443 - 777 740 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 225 221 895 172 216 964 1383 - - 1494 - -
Mov Cap-2 Maneuver 225 221 - 172 216 - - - - - - -
Stage 1 638 747 - 336 344 - - - - - - -
Stage 2 333 338 - 639 724 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15.3 26.5 6.6 0.5
HCM LOS C D
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1383 - - 538 188 1494 - -
HCM Lane V/C Ratio 0.219 - - 0.352 0.112 0.007 - -
HCM Control Delay (s)8.3 0 - 15.3 26.5 7.4 0 -
HCM Lane LOS A A - C D A A -
HCM 95th %tile Q(veh)0.8 - - 1.6 0.4 0 - -
HCM 6th TWSC 2045 Background PM
3: Storm King Rd & Center Dr/Center Drive 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 6.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 0 73 6 1 6 64 28 8 0 43 24
Future Vol, veh/h 21 0 73 6 1 6 64 28 8 0 43 24
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 51 0 178 15 2 15 156 68 20 0 105 59
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 556 557 149 622 576 94 178 0 0 96 0 0
Stage 1 149 149 - 398 398 - - - - - - -
Stage 2 407 408 - 224 178 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 442 439 898 399 428 963 1398 - - 1498 - -
Stage 1 854 774 - 628 603 - - - - - - -
Stage 2 621 597 - 779 752 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 385 379 886 288 369 948 1379 - - 1487 - -
Mov Cap-2 Maneuver 385 379 - 288 369 - - - - - - -
Stage 1 742 764 - 549 527 - - - - - - -
Stage 2 532 522 - 622 742 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.9 13.9 5.1 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1379 - - 686 435 1487 - -
HCM Lane V/C Ratio 0.113 - - 0.334 0.073 - - -
HCM Control Delay (s)7.9 0 - 12.9 13.9 0 - -
HCM Lane LOS A A - B B A - -
HCM 95th %tile Q(veh)0.4 - - 1.5 0.2 0 - -
HCM 6th TWSC 2045 Total AM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 3 84 17 1 2 173 28 47 9 54 34
Future Vol, veh/h 21 3 84 17 1 2 173 28 47 9 54 34
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 57 57 57 57 57 57 57 57 57 57 57 57
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 37 5 147 30 2 4 304 49 82 16 95 60
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 880 918 139 939 907 106 169 0 0 139 0 0
Stage 1 171 171 - 706 706 - - - - - - -
Stage 2 709 747 - 233 201 - - - - - - -
Critical Hdwy 7.13 6.53 6.23 7.13 6.53 6.23 4.13 - - 4.13 - -
Critical Hdwy Stg 1 6.13 5.53 - 6.13 5.53 - - - - - - -
Critical Hdwy Stg 2 6.13 5.53 - 6.13 5.53 - - - - - - -
Follow-up Hdwy 3.527 4.027 3.327 3.527 4.027 3.327 2.227 - - 2.227 - -
Pot Cap-1 Maneuver 267 271 907 243 275 946 1402 - - 1438 - -
Stage 1 829 755 - 425 437 - - - - - - -
Stage 2 423 419 - 768 733 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 209 199 895 160 202 932 1383 - - 1427 - -
Mov Cap-2 Maneuver 209 199 - 160 202 - - - - - - -
Stage 1 622 736 - 320 329 - - - - - - -
Stage 2 316 316 - 629 715 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 16 30.5 5.8 0.7
HCM LOS C D
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1383 - - 516 176 1427 - -
HCM Lane V/C Ratio 0.219 - - 0.367 0.199 0.011 - -
HCM Control Delay (s)8.3 0 - 16 30.5 7.6 0 -
HCM Lane LOS A A - C D A A -
HCM 95th %tile Q(veh)0.8 - - 1.7 0.7 0 - -
HCM 6th TWSC 2045 Total PM
3: Storm King Rd & Center Dr/Center Drive 02/13/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 8.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 0 73 36 1 9 64 28 19 1 43 24
Future Vol, veh/h 21 0 73 36 1 9 64 28 19 1 43 24
Conflicting Peds, #/hr 8 0 0 0 0 8 14 0 8 8 0 14
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 41 41 41 41 41 41 41 41 41 41 41 41
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 51 0 178 88 2 22 156 68 46 2 105 59
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 576 587 149 639 593 107 178 0 0 122 0 0
Stage 1 153 153 - 411 411 - - - - - - -
Stage 2 423 434 - 228 182 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 428 422 898 389 418 947 1398 - - 1465 - -
Stage 1 849 771 - 618 595 - - - - - - -
Stage 2 609 581 - 775 749 - - - - - - -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 369 362 886 279 359 933 1379 - - 1454 - -
Mov Cap-2 Maneuver 369 362 - 279 359 - - - - - - -
Stage 1 736 759 - 539 519 - - - - - - -
Stage 2 516 507 - 618 738 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.1 21.8 4.6 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR
Capacity (veh/h)1379 - - 675 325 1454 - -
HCM Lane V/C Ratio 0.113 - - 0.34 0.345 0.002 - -
HCM Control Delay (s)7.9 0 - 13.1 21.8 7.5 0 -
HCM Lane LOS A A - B C A A -
HCM 95th %tile Q(veh)0.4 - - 1.5 1.5 0 - -
HCM 6th TWSC 2023 Existing AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 16 219 137 258 137 8
Future Vol, veh/h 16 219 137 258 137 8
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 24 332 208 391 208 12
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 604 0 - 0 593 213
Stage 1 - - -- 213 -
Stage 2 - - -- 380 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 959 - - - 463 820
Stage 1 - - -- 815 -
Stage 2 - - -- 685 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 954 - -- 444 816
Mov Cap-2 Maneuver - - -- 533 -
Stage 1 - - -- 786 -
Stage 2 - - -- 682 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 16.1
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)954 - - - 543
HCM Lane V/C Ratio 0.025 - - - 0.405
HCM Control Delay (s)8.9 0 -- 16.1
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 1.9
HCM 6th TWSC 2023 Existing PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 166 157 96 168 18
Future Vol, veh/h 9 166 157 96 168 18
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 10 191 180 110 193 21
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 295 0 - 0 396 185
Stage 1 - - -- 185 -
Stage 2 - - -- 211 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1255 - - - 605 852
Stage 1 - - -- 842 -
Stage 2 - - -- 819 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1249 - -- 594 848
Mov Cap-2 Maneuver - - -- 646 -
Stage 1 - - -- 830 -
Stage 2 - - -- 815 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1249 - - - 661
HCM Lane V/C Ratio 0.008 - - - 0.323
HCM Control Delay (s)7.9 0 -- 13
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.4
HCM 6th TWSC 2025 Background AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 16 222 139 262 139 8
Future Vol, veh/h 16 222 139 262 139 8
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 24 336 211 397 211 12
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 613 0 - 0 600 216
Stage 1 - - -- 216 -
Stage 2 - - -- 384 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 952 - - - 459 816
Stage 1 - - -- 813 -
Stage 2 - - -- 682 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 947 - -- 440 812
Mov Cap-2 Maneuver - - -- 530 -
Stage 1 - - -- 784 -
Stage 2 - - -- 679 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 16.3
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)947 - - - 540
HCM Lane V/C Ratio 0.026 - - - 0.412
HCM Control Delay (s)8.9 0 -- 16.3
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2
HCM 6th TWSC 2025 Background PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 9 168 159 97 170 18
Future Vol, veh/h 9 168 159 97 170 18
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 10 193 183 111 195 21
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 299 0 - 0 401 188
Stage 1 - - -- 188 -
Stage 2 - - -- 213 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1251 - - - 601 849
Stage 1 - - -- 839 -
Stage 2 - - -- 818 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1245 - -- 590 845
Mov Cap-2 Maneuver - - -- 644 -
Stage 1 - - -- 827 -
Stage 2 - - -- 814 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13.1
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1245 - - - 659
HCM Lane V/C Ratio 0.008 - - - 0.328
HCM Control Delay (s)7.9 0 -- 13.1
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.4
HCM 6th TWSC 2025 Total AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 19 222 139 289 145 9
Future Vol, veh/h 19 222 139 289 145 9
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 29 336 211 438 220 14
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 654 0 - 0 610 216
Stage 1 - - -- 216 -
Stage 2 - - -- 394 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 919 - - - 453 816
Stage 1 - - -- 813 -
Stage 2 - - -- 675 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 915 - -- 431 812
Mov Cap-2 Maneuver - - -- 523 -
Stage 1 - - -- 777 -
Stage 2 - - -- 672 -
Approach EB WB SB
HCM Control Delay, s 0.7 0 16.9
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)915 - - - 534
HCM Lane V/C Ratio 0.031 - - - 0.437
HCM Control Delay (s)9.1 0 -- 16.9
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2.2
HCM 6th TWSC 2025 Total PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 10 168 159 106 197 21
Future Vol, veh/h 10 168 159 106 197 21
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 11 193 183 122 226 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 310 0 - 0 403 188
Stage 1 - - -- 188 -
Stage 2 - - -- 215 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1239 - - - 600 849
Stage 1 - - -- 839 -
Stage 2 - - -- 816 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1233 - -- 588 845
Mov Cap-2 Maneuver - - -- 642 -
Stage 1 - - -- 826 -
Stage 2 - - -- 812 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 13.8
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1233 - - - 657
HCM Lane V/C Ratio 0.009 - - - 0.381
HCM Control Delay (s)7.9 0 -- 13.8
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.8
HCM 6th TWSC 2045 Background AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 19 255 160 301 160 9
Future Vol, veh/h 19 255 160 301 160 9
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 29 386 242 456 242 14
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 703 0 - 0 691 247
Stage 1 - - -- 247 -
Stage 2 - - -- 444 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 881 - - - 406 784
Stage 1 - - -- 787 -
Stage 2 - - -- 640 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 877 - -- 385 780
Mov Cap-2 Maneuver - - -- 487 -
Stage 1 - - -- 750 -
Stage 2 - - -- 637 -
Approach EB WB SB
HCM Control Delay, s 0.6 0 19.7
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)877 - - - 497
HCM Lane V/C Ratio 0.033 - - - 0.515
HCM Control Delay (s)9.2 0 -- 19.7
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 2.9
HCM 6th TWSC 2045 Background PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 10 194 183 112 196 21
Future Vol, veh/h 10 194 183 112 196 21
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 11 223 210 129 225 24
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 344 0 - 0 460 215
Stage 1 - - -- 215 -
Stage 2 - - -- 245 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1204 - - - 556 820
Stage 1 - - -- 816 -
Stage 2 - - -- 791 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1198 - -- 545 816
Mov Cap-2 Maneuver - - -- 612 -
Stage 1 - - -- 804 -
Stage 2 - - -- 787 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 14.5
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1198 - - - 627
HCM Lane V/C Ratio 0.01 - - - 0.398
HCM Control Delay (s) 8 0 - - 14.5
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0 - -- 1.9
HCM 6th TWSC 2045 Total AM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 22 255 160 328 166 10
Future Vol, veh/h 22 255 160 328 166 10
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 5 5 5 5 5 5
Mvmt Flow 33 386 242 497 252 15
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 744 0 - 0 699 247
Stage 1 - - -- 247 -
Stage 2 - - -- 452 -
Critical Hdwy 4.15 - - - 6.45 6.25
Critical Hdwy Stg 1 - - -- 5.45 -
Critical Hdwy Stg 2 - - -- 5.45 -
Follow-up Hdwy 2.245 - - - 3.545 3.345
Pot Cap-1 Maneuver 850 - - - 402 784
Stage 1 - - -- 787 -
Stage 2 - - -- 635 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 846 - -- 378 780
Mov Cap-2 Maneuver - - -- 482 -
Stage 1 - - -- 744 -
Stage 2 - - -- 632 -
Approach EB WB SB
HCM Control Delay, s 0.7 0 20.6
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)846 - - - 493
HCM Lane V/C Ratio 0.039 - - - 0.541
HCM Control Delay (s)9.4 0 -- 20.6
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh)0.1 - - - 3.2
HCM 6th TWSC 2045 Total PM
4: Highway 6 & Storm King Rd 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 11 194 183 121 223 24
Future Vol, veh/h 11 194 183 121 223 24
Conflicting Peds, #/hr 5 0 0 5 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 0 0 -
Veh in Median Storage, # - 0 0 - 1 -
Grade, %- 0 0 - 0 -
Peak Hour Factor 87 87 87 87 87 87
Heavy Vehicles, % 4 4 4 4 4 4
Mvmt Flow 13 223 210 139 256 28
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 354 0 - 0 464 215
Stage 1 - - -- 215 -
Stage 2 - - -- 249 -
Critical Hdwy 4.14 - - - 6.44 6.24
Critical Hdwy Stg 1 - - -- 5.44 -
Critical Hdwy Stg 2 - - -- 5.44 -
Follow-up Hdwy 2.236 - - - 3.536 3.336
Pot Cap-1 Maneuver 1194 - - - 553 820
Stage 1 - - -- 816 -
Stage 2 - - -- 788 -
Platoon blocked, %- - -
Mov Cap-1 Maneuver 1188 - -- 541 816
Mov Cap-2 Maneuver - - -- 609 -
Stage 1 - - -- 802 -
Stage 2 - - -- 784 -
Approach EB WB SB
HCM Control Delay, s 0.4 0 15.5
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h)1188 - - - 624
HCM Lane V/C Ratio 0.011 - - - 0.455
HCM Control Delay (s)8.1 0 -- 15.5
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh) 0 - -- 2.4
HCM 6th TWSC 2025 Total AM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 61 3 24 56 5 1 0 6 5 0 5
Future Vol, veh/h 5 61 3 24 56 5 1 0 6 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 66 3 26 61 5 1 0 7 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 66 0 0 69 0 0 196 196 68 197 195 64
Stage 1 - - - - -- 78 78 - 116 116 -
Stage 2 - - - - -- 118 118 - 81 79 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1536 - - 1532 - - 763 699 995 762 700 1000
Stage 1 - - - - -- 931 830 - 889 800 -
Stage 2 - - - - -- 887 798 - 927 829 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1536 -- 1532 - - 747 684 995 745 685 1000
Mov Cap-2 Maneuver - - - - -- 747 684 - 745 685 -
Stage 1 - - - - -- 928 828 - 886 786 -
Stage 2 - - - - -- 866 784 - 918 827 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 2.1 8.8 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)950 1536 - - 1532 - - 854
HCM Lane V/C Ratio 0.008 0.004 - - 0.017 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.4 0 - 9.3
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 -- 0.1 - - 0
HCM 6th TWSC 2025 Total PM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 49 1 8 73 5 3 0 24 5 0 5
Future Vol, veh/h 5 49 1 8 73 5 3 0 24 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 53 1 9 79 5 3 0 26 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 84 0 0 54 0 0 166 166 54 177 164 82
Stage 1 - - - - -- 64 64 - 100 100 -
Stage 2 - - - - -- 102 102 - 77 64 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1513 - - 1551 - - 798 727 1013 785 729 978
Stage 1 - - - - -- 947 842 - 906 812 -
Stage 2 - - - - -- 904 811 - 932 842 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1513 -- 1551 - - 788 720 1013 760 722 978
Mov Cap-2 Maneuver - - - - -- 788 720 - 760 722 -
Stage 1 - - - - -- 944 839 - 903 807 -
Stage 2 - - - - -- 894 806 - 905 839 -
Approach EB WB NB SB
HCM Control Delay, s 0.7 0.7 8.8 9.3
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)982 1513 - - 1551 - - 855
HCM Lane V/C Ratio 0.03 0.004 - - 0.006 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.3 0 - 9.3
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh)0.1 0 - - 0 - - 0
HCM 6th TWSC 2045 Total AM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 70 3 24 65 5 1 0 6 5 0 5
Future Vol, veh/h 5 70 3 24 65 5 1 0 6 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 76 3 26 71 5 1 0 7 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 76 0 0 79 0 0 216 216 78 217 215 74
Stage 1 - - - - -- 88 88 - 126 126 -
Stage 2 - - - - -- 128 128 - 91 89 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1523 - - 1519 - - 740 682 983 739 683 988
Stage 1 - - - - -- 920 822 - 878 792 -
Stage 2 - - - - -- 876 790 - 916 821 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1523 -- 1519 - - 724 668 983 722 669 988
Mov Cap-2 Maneuver - - - - -- 724 668 - 722 669 -
Stage 1 - - - - -- 917 820 - 875 778 -
Stage 2 - - - - -- 856 776 - 907 819 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 1.9 8.9 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)935 1523 - - 1519 - - 834
HCM Lane V/C Ratio 0.008 0.004 - - 0.017 - - 0.013
HCM Control Delay (s)8.9 7.4 0 - 7.4 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 -- 0.1 - - 0
HCM 6th TWSC 2045 Total PM
5: Donegan Rd & Chapparal Cir 02/10/2023
Synchro 11 Report
Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 57 1 8 85 5 3 0 24 5 0 5
Future Vol, veh/h 5 57 1 8 85 5 3 0 24 5 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, %- 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 62 1 9 92 5 3 0 26 5 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 97 0 0 63 0 0 188 188 63 199 186 95
Stage 1 - - - - -- 73 73 - 113 113 -
Stage 2 - - - - -- 115 115 - 86 73 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - -- 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - -- 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1496 - - 1540 - - 772 707 1002 760 708 962
Stage 1 - - - - -- 937 834 - 892 802 -
Stage 2 - - - - -- 890 800 - 922 834 -
Platoon blocked, %- - - -
Mov Cap-1 Maneuver 1496 -- 1540 - - 763 701 1002 735 702 962
Mov Cap-2 Maneuver - - - - -- 763 701 - 735 702 -
Stage 1 - - - - -- 934 831 - 889 797 -
Stage 2 - - - - -- 880 795 - 895 831 -
Approach EB WB NB SB
HCM Control Delay, s 0.6 0.6 8.8 9.4
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)968 1496 - - 1540 - - 833
HCM Lane V/C Ratio 0.03 0.004 - - 0.006 - - 0.013
HCM Control Delay (s)8.8 7.4 0 - 7.4 0 - 9.4
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh)0.1 0 - - 0 - - 0
Kimley-Horn and Associates, Inc.
096671009 – Glenwood Business Center
APPENDIX E
Conceptual Site Plan
sasvc
5720
5725
5730
5735
5740
5745
5717
5718
5719
5721
5722
5723
5724
5726
5727
5728
572
9
5731
5732
5733
5734
5736
5737
5738
5739
5741
57415741
5742
5743
5744
5746
5730
5730
5735
5740
5745
5731
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
57435744
57465747
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
xxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK
STBK
ST
B
K
ST
B
K
STBK
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK
5
7
2
5
573
0
5735
5740
5745
57235
7
2
3
572
3
5
7
2
4
5726
57
2
7
5728
57
2
9
5731
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
574657475748574857495749
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
s
E
UE
L
U
E
L
U
E
L
E
s
6
'
'
S
A
6''SA
PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD
PSD
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
XU
T
XUT XUT XUT XUT XUT XUT
XUT XUT
XUT
XUT
XUT
XUT
XU
T
XUTXUT
X
U
T
XUT XUT XUT XUT XUT XUT
XUT XUT XUT XUT XUT
XE
L
XE
L
XEL XEL XEL XEL XEL XEL
XE
L
XEL
X
G
A
S
XEL XEL XEL XEL XEL XEL
XEL
XEL
X
E
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XE
L
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL
XG
A
S
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XGAS
XGA
S
XGAS
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
X
G
A
S
XG
A
S
XG
A
S
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL
XE
L
XEL
XEL
XEL
XEL
XEL XEL XEL XEL XEL XEL XEL
XF
O
XF
O
XF
O
XFO
XFO
XFO XFO XFO XFO XFO
XF
O
XU
T
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XU
T
XU
T
XU
T
XU
T
XE
L
XE
L
XE
L
X
E
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
>
XF
O
XF
O
XF
O
XF
O
XF
O
XF
O
XFO XFO
XFO XFO XFO XFO XFO XFO
XFO
XFO
XFO
XFO XFO XFO XFO XFO XFO XFO XFO XFO XFO
XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS
X
U
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
T
XU
TXWL
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XG
A
S
XE
L
XE
L
XEL
XE
L
XWL XWL
XWL
XW
L
XW
L
XW
L
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XEL XEL
XEL
XEL XEL XEL
XE
L
XEL XEL XEL XEL XEL XEL XEL XEL
XG
A
S
XEL
XE
L
XE
L
XEL
XEL XEL XEL
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XE
L
XEL
XEL
XW
L
XW
L
XEL
XG
A
S
XG
A
S
XGAS XGAS XGAS
XG
A
S
XG
A
S
XG
A
S
XG
A
S
X
G
A
S
XG
A
S
XG
A
S
XE
L
XEL XEL XEL XEL XE
L
XG
A
S
XE
L
XE
L
XE
L
XE
L
XE
L
>>
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OEL
OEL
OE
L
OE
L
OE
L
OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL OEL
OE
L
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XWL
XWL
XWL
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XS
D
XSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSAXSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA
XSA
XSA
XSA
XSA XSA XSA XSA XSA XSA
XS
A
XSA XSA XSA
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XS
A
XSD XSD
XS
D
XSD XSD XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD
X
S
D
X
S
D
XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
100' STORAGE SETBACKFROM RESIDENTIALPROPERTY LINE
DONEGAN ROAD
ST
O
R
M
K
I
N
G
R
O
A
D
RO
W
/
B
O
U
N
D
A
R
Y
ROW/BOUNDARY
WEST GLENWOOD MALL
LOT 1
AREA=3.192 AC.
10' SIDE SETBACK
CENTER DRIVE
30
CLOSE ENTRANCE
EXTEND ISLAND
CURB & GUTTER + 5' WIDE SIDEWALK.
R25'
LOT 3: FUTURE
DEVELOPMENT.
AREA=4.748 AC.
50' ACCESS & UTILITY EASEMENT
STORM WATER STORAGE
& LANDSCAPING
7.5' REAR SETBACK (COMMERCIAL)
12
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
STORM WATER STORAGE & LANDSCAPING
340'
100'
BUILDING B: FLEX, 1 STORY100x340' = 34,000 SF
LOT 2: STORAGE, FLEX,
EMPLOYEE UNITS.
AREA=7.879 AC.
30'
R30'
R30.00'
R25'
32'
30'
32'
180'
285'
26
3' TALL WALL±
50' ACCESS & UTILITY EASEMENT
R30'
R30'
275'
75'
R25'
R25'
25'
25'
R25'
30'
24
10' SIDEWALK
10' SIDEWALK
BUILDING C: FLEX, 1 STORY
75x275' = 20,625 SF
Assumed 20% office space and 80% warehouse
(Rates conservatice per old approval, not current code)
20,625x.2 = 4125 / 200 = 20.6 = 21
20,625x.8 = 16500 / 1000 = 16.5 = 17REQUIRED = 38PROVIDED = 54
8
8 PARKING SPACES FOR EMPLOYEE HOUSING
28'
28'
28'
28'
25'
25' FOR PARKING & SIDEWALK
28' DRIVE WIDTH 53'
25' FRONT
10' SIDE
40'7.50' REAR (COMMERCIAL)
11 11
STORM WATER STORAGE
Assumed 20% office space and 80% warehouse
(Rates conservatice per old approval, not current code)
34,000x.2 = 6800 / 200 = 34
34,000x.8 = 27200 / 1000 = 27.2 = 28
REQUIRED = 62PROVIDED = 69
28'
LOADING ZONE
21
151'
104 L.F. RETAINING WALL
DATE REVISION
C-1.0-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
3
0
0
1
7
-
C
1
0
-
S
I
T
E
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
2
:
5
6
p
m
NO
R
T
H
PROPOSED HARDSCAPE
OVERALL SITE PLAN
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
050 50 100
50
20025
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
EXISTING ELECTRIC MANHOLE
EXISTING DRAINAGE DRY-WELL
EXISTING SEWER MANHOLE
EXISTING TELEPHONE MANHOLE
EXISTING GUY WIRE
EXISTING POWER POLE
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING GAS METER
EXISTING ELECTRIC TRANSFORMER
EXISTING ELECTRIC METER
EXISTING TELEPHONE PEDESTAL
EXISTING CATV PEDESTAL
EXISTING LIGHT POLE
EXISTING SIGN
EXISTING LEGEND
EXISTING STORM INLET
EXISTING STORM SEWERXSDXSD
EXISTING EASEMENT
EXISTING PROPERTY LINE
EXISTING ASPHALT
EXISTING 8" SANITARY SEWER MAIN
EXISTING GAS
EXISTING TELEPHONE
XGAS XGAS XGAS
EXISTING UNDERGROUND ELECTRIC
EXISTING CABLE
EXISTING FIBER OPTIC
XUT XUT XUT
XEL XEL XEL
XTV XTV XTV
XFO XFO XFO
EXISTING OVERHEAD ELECTRICOELOEL
EXISTING IRRIGATION PIPEXIRRXIRR
EXISTING SWALE OR DITCH>>>>
XSA XSA
EXISTING 8" WATER MAINXWLXWL
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
EXISTING WIRE FENCExx
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
>>
>>
XS
D
XSD XSD XSD XSD
XS
D
XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD XSD
XSD
XSD
XSD
XSD
XSD
XSD
XSD XSD XSD XSD XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XSD XSD XSD XSD XSD
X
S
D
X
S
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ME: 22.0'±
ME: 20.0'±
ME: 25.0'±
ME: 32.0'±
5720
572
5
5730
5735
5740
5745
5721
572
2
5723
5724
5726
5727
5728
5729
5731
5732
5733
5734
5736
5737
5738
5739
5741
5742
5743
5744
5746
5747
572
0
5
7
2
5
573
0
5735
5740
57
4
5
571657
1
7
571
8
5719
5721
5722
572
3
5
7
2
4
5
7
2
6
57
2
7
5728
5
7
2
9
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
5748
5720
5
7
1
6
57
1
7
5718
5719
sasvc
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
X
U
T
XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT
XUT XUT
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
xxxxxxxxxxxxxxxx
x
x
SINGLE STORY
BUILDINGSINGLE STORYBUILDING
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
8'
'
SA
8'
'
SA
s
E
UE
L
U
E
L
U
E
L
E
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
LOT 1
LOT 3
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
BUILDING B:
LOT 2
BUILDING C:
5748
574
8 57495749
XS
D
XS
D
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00
EX:5747.3'±
LOWER FF=5732.0'
UPPER FF=5743.0'
FF=5732'
FF=5729'
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54
PT: 6+64.41
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP
:
8
+
4
8
.
1
5
PC
:
3
+
8
7
.
1
1
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
PT
:
5
+
7
0
.
1
3
0+001+002+003+003+84
BP: 0+00.00
EP
:
3
+
8
4
.
5
0
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.7
0
PC
:
4
+
4
5
.
0
8
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
STA:4+54.44OFF:0.00'
STA:1+67.00OFF:12.50'L
STA:3+84.00OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:3+07.63OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35
OFF:0.00'
STA:4+31.08OFF:0.00'
0+
0
0
1+
0
0
2+
0
0
3+
0
0
4+
0
0
4+
7
6
BP: 0+00.00
PC: 0+67.66
PT: 0+82.16
EP: 4+76.32
STA:0+11.08OFF:0.00'
STA:1+54.30OFF:0.00'
STA:3+49.32OFF:0.00'
STA:3+90.22OFF:15.50'R
STA:5+18.22OFF:15.50'R
STA:1+08.31OFF:0.00'
STA:3+15.00OFF:14.00'L
STA:4+67.32
OFF:0.02'R
STA:6+85.65OFF:14.00'R
5730
5735
5740
5745
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
573
1
5
7
3
3
5
7
3
4
5
7
3
6
5728
5728
572
8
5725
5728
572
8
5
7
2
8
57
2
5
STA:5+98.52OFF:0.00'
0.9%0.6%0.0%0.1%0.5%0.4%
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
574
1
5742
5
7
4
2
5735
5740
5732
5733
5734
5736
5737
5738
5739
5
7
4
1
5742
57
4
2
STA:1+25.94OFF:0.00'
5.
8
%
1.
8
%
FG:5731.91'
FG:5728.78'
5.5%
9.
2
%
4.
6
%
1.
5
%
6.
2
%
5.
5
%
1.
1
%
5720
57
2
5
5717
57185719
5721
572
2
5723
57
2
4
57
2
6
572
7
572
8
57285728
572
9
5
7
2
9
5730
57285729
573
1
HANDICAP RAMP STEPS UP (TYPICAL)
BOW = BOTTOM OF WALL
EOA = EDGE OF ASPHALT
EX = EXISTING GRADE
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE
FL = FLOW LINE
HP = HIGH POINT
LP = LOW POINT
ME = MATCH EXISTING
RIM = RIM ELEVATION
TBC = TOP BACK OF CURB
TOC = TOP OF CONCRETE
SPOT ELEVATION LEGEND
GRADING LEGEND:
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
EXISTING CONTOUR
EXISTING CONTOUR INTERVAL
PROPOSED SLOPE
PROPOSED SPOT ELEVATION
PROPOSED STORM SEWER
PROPOSED STORM INLET
7900
7900
PSD PSD
FL: 32.0
2.0%
PROPOSED LEGEND
PROPERTY LINE
EXISTING EASEMENT
PROPOSED EASEMENT
PROPOSED SETBACK
PROPOSED LOT LINE
PROPOSED CENTERLINE
STBK
DATE REVISION
C-2.0-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
GRADING PLAN
OPTION 2
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
1. THE EXISTING CONTOUR INTERVAL IS TWO (2) FEET. THE DIVIDE CREEK
SURVEY DATUM IS NAVD 88. SE HAS LOWERED ALL POINTS 4.09 FEET TO
CONVERT ELEVATIONS TO CITY OF GLENWOOD NGVD 29 DATUM.
2. PROPOSED CONTOUR INTERVAL IS ONE (1) FOOT.
3. THE STORM WATER DRAINAGE PLAN CONCEPT IS SHOWN ON SHEET C__.
STORM WATER RUNOFF WILL FLOW IN LANDSCAPE SWALES AND CURB
AND GUTTER TO WATER QUALITY AND DETENTION FACILITIES.
GENERAL GRADING NOTES:
>>
>>
XS
D
XS
D
XS
D
XW
L
XW
L
XW
L
ME: 32.0'±
572
5
5730
5724
5726
5727
5728
5729
5731
5732
573
0
5735
5
7
2
9
573
1
5732
573
3
573
4
5736
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK STBK
ST
B
K
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
8'
'
WL
8'
'
WL
8'
'
WL
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
SA
8'
'
SA
8'
'
SA
8'
'
SA
s
8'
'
SA
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SAPS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
LOT 1
BUILDING B:
BUILDING C:
>
>
>
>
>
>
>
>
>
>
>
>
>
LOWER FF=5732.0'FF=5732'
FF=5729'
0+
0
0
1+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
5+00
6+00 7+00 8+00 8+48
BP
:
0
+
0
0
.
0
0
EP
:
8
+
4
8
.
1
5
PC
:
3
+
8
7
.
1
1
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
PT
:
5
+
7
0
.
1
3
0
+
0
0
BP: 0+00.00
PC: 0+24.7
0
PT: 0+42.17
STA:4+54.44
OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35OFF:0.00'
3+
0
0
4+
0
0
STA:3+49.32OFF:0.00'
STA:1+08.31
STA:6+85.65OFF:14.00'R
5730
5
7
2
7
5
7
2
8
5729
5731
5732
5733
5728
5728
572
8
5730
5731
5732
5733
5734
5732
5733
FG:5728.78'
4.
6
%
1.
5
%
1.
1
%
572
8
57285728
572
9
5
7
2
9
5730
57285729
573
1
HANDICAP RAMP STEPS UP (TYPICAL)
AL-CENTER DRIVE PROFILE
5726
5728
5730
5732
5726
5728
5730
5732
0+00
57
3
1
.
0
57
3
0
.
8
0+50
57
3
1
.
3
57
3
0
.
7
1+00
57
3
0
.
6
57
3
0
.
6
1+50
57
3
0
.
5
57
3
0
.
3
2+00
57
3
0
.
0
57
2
9
.
7
2+50
57
2
9
.
2
57
2
8
.
9
3+00
57
2
8
.
5
57
2
8
.
2
3+50
57
2
7
.
9
57
2
7
.
6
4+00
57
2
7
.
5
57
2
7
.
5
4+50
57
2
7
.
6
57
2
8
.
3
57
2
7
.
8
5
5+00
57
2
8
.
1
57
2
8
.
1
2
57
2
8
.
5
57
2
8
.
1
1
5+50
57
2
8
.
6
57
2
7
.
8
1
57
2
8
.
5
57
2
7
.
6
2
6+00
57
2
8
.
5
57
2
7
.
8
7
57
2
8
.
2
57
2
8
.
1
2
6+50
57
2
8
.
1
57
2
7
.
9
3
57
2
8
.
1
57
2
7
.
6
8
7+00
57
2
8
.
0
57
2
7
.
7
1
57
2
7
.
6
57
2
7
.
9
6
7+50
57
2
7
.
7
57
2
8
.
0
9
57
2
7
.
4
57
2
7
.
8
4
8+00
57
2
7
.
2
57
2
7
.
5
9
57
2
7
.
0
57
2
7
.
9
1
8+48
57
2
6
.
2
57
2
8
.
3
5
2.00%1.00%-1.00%1.00%-1.00%1.10%-1.18%1.77%
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
4
.
4
4
EL
E
V
=
5
7
2
7
.
6
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
2
8
.
3
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
2
7
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
8
5
.
6
5
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
4
3
.
6
5
EL
E
V
=
5
7
2
8
.
1
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
0
4
.
1
5
EL
E
V
=
5
7
2
7
.
5
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
2
.
2
8
EL
E
V
=
5
7
2
8
.
2
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
7
0
.
1
3
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
3
6
.
1
5
EL
E
V
=
5
7
2
8
.
1
1
STA: 4+99.35
ELEV= 5728.12'
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
EXISTING GRADE
PROPOSED GRADE
AL-CHAPPARAL DR PROFILE
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
5722
5724
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5746
5748
0+00
57
4
7
.
9
57
4
5
.
0
57
4
7
.
0
5
0+50
57
4
2
.
2
57
4
5
.
5
5
57
4
0
.
3
57
4
3
.
2
5
1+00
57
3
8
.
3
57
4
0
.
9
4
57
3
6
.
9
57
3
8
.
6
8
1+50
57
3
6
.
0
57
3
7
.
4
1
57
3
4
.
3
57
3
6
.
4
1
2+00
57
3
3
.
1
57
3
5
.
2
5
57
3
1
.
6
57
3
4
.
1
0
2+50
57
3
0
.
5
57
3
2
.
9
4
57
2
9
.
3
57
3
1
.
7
9
3+00
57
2
8
.
2
57
3
0
.
6
3
57
2
7
.
0
57
2
9
.
4
7
3+50
57
2
6
.
2
57
2
8
.
3
4
57
2
6
.
0
57
2
7
.
9
6
4+00
57
2
5
.
0
57
2
7
.
5
9
57
2
4
.
3
57
2
7
.
2
1
4+50
57
2
3
.
5
57
2
6
.
8
4
57
2
3
.
0
57
2
6
.
7
0
4+76
57
2
2
.
9
57
2
6
.
7
2
-2.00%
-9.22%
-4.00%
-4.62%
-1.50%1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
1
.
0
8
EL
E
V
=
5
7
4
7
.
3
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
7
4
.
3
0
EL
E
V
=
5
7
3
6
.
4
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
4
9
.
3
2
EL
E
V
=
5
7
2
8
.
3
5
GRADE BREAK STA = 4+67.32ELEV = 5726.58
GRADE BREAK STA = 4+76.32
ELEV = 5726.72
PVI STA: 1+29.30
PVI ELEV: 5738.24
K: 3.83LVC: 20.00BVCS: 1+19.30
BVCE: 5739.16
EVCS: 1+39.30EVCE: 5737.84
PVI STA: 0+36.08PVI ELEV: 5746.83K: 3.46
LVC: 25.00
BVCS: 0+23.58BVCE: 5747.08EVCS: 0+48.58
EVCE: 5745.68
STA: 1+54.30ELEV= 5737.24'
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
XSD
XS
D
XS
D
XS
D
XS
D
XSD
XSD
XSD
5716
571
7
XU
T
XU
T
XU
T
X
U
T
XU
T
XU
T
XU
T
ST
B
K
ST
B
K
x
x
x
x
x
x
x
x
x
x
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
ST
B
K
GA
S
GA
S
GA
S
GAS GAS GAS GAS GAS 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
8'
'
WL
8'
'
WL
8'
'
WL 6'
'
SA
6'
'
SA
8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA s 8''SA 8''SA 8''SA s
PSD
PSD
PSD
PSD
PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PSD
574
8
8+
0
0
9+
0
0
EX:5747.3'±
8+
0
0
8+
4
8
EP: 8+48.15
0+
0
0
1+
0
0
BP: 0+00.00
4+
0
0
4+89
EP: 4+89.35
PC: 4+45.08
PT: 4+84.35
STA:4+31.08OFF:0.00'
0+001+002+003+004+004+76
BP
:
0
+
0
0
.
0
0
PC
:
0
+
6
7
.
6
6
PT
:
0
+
8
2
.
1
6
EP
:
4
+
7
6
.
3
2
STA:0+11.08
OFF:0.00'
STA:1+54.30OFF:0.00'
STA:3+49.32OFF:0.00'
STA:4+67.32OFF:0.02'R
573
0
573
5
57
4
0
57
4
5
5727
5728
572
9
573
1
573
2
573
3
573
4
573
6
573
7
57
3
8
57
3
9
57
4
1
57
4
2
57
4
3
57
4
4
57
4
6
5735
5733
5734
5736
0.
4
%
5.
5
%
9.2%
4.6%
1.5%
ST
E
P
S
U
P
(
T
Y
P
I
C
A
L
)
DATE REVISION
C-2.1-O2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
ROAD
PLAN/PROFILE 1
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
NORTH
>>
XS
D
XS
D
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
XW
L
ME: 32.0'±
573
0
5735
5740
57
4
5
573
1
5732
573
3
573
4
5736
5737
573
8
573
9
5741
574
2
574
3
57
4
4
5746
5747
sasvc
ST
B
K
ST
B
K
ST
B
K
ST
B
K
STBK STBK STBK STBK STBK STBK STBK STBK
x
x
x
x
x
x x x x x x x x x x x
STBK STBK STBK STBK STBK STBK STBK STBK
STBK STBK STBK
STBK STBK STBK STBK STBK STBK STBK
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GAS
8''WL 8''WL
U
E
L
U
E
L
E
s
6
'
'
S
A
6
'
'
S
A
6''SA
6''SA
PSD PSD PSD PSD PSD PSD PSD PSD
PS
D
PS
D
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD
PSD
PSD PSD PSD PSD
PS
D
PS
D
PS
D
PS
D
PSD
BUILDING A: 2 STORY STORAGE285'X180'=51,300 X 2 = 102,600 SF
>>>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
LOWER FF=5732.0'
UPPER FF=5743.0'
0+
0
0
1+
0
0
2+
0
0
3+00
4+00
5+00
6+00
7+
0
0
8
+
0
0
9+00
10+00
11+00 11+82
BP: 0+00.00
EP: 11+82.04
PC: 2+48.58
PC: 5+93.72
PC: 7+88.41
PT: 3+18.54
PT: 6+64.41
PT: 8+59.09
0+00 1+00 2+00 3+00 4+00
BP
:
0
+
0
0
.
0
0
PC
:
3
+
8
7
.
1
1
P
T
:
4
+
5
7
.
0
1
3+84
EP
:
3
+
8
4
.
5
0
STA:4+54.44
STA:3+84.00OFF:0.00'
STA:0+10.05OFF:0.00'
STA:11+41.09OFF:0.00'
STA:3+07.63OFF:0.00'
STA:0+78.83OFF:0.00'
STA:8+53.09
OFF:0.32'L
STA:4+99.35OFF:0.00'
STA:3+90.22OFF:15.50'R
STA:5+18.22
OFF:15.50'RSTA:5+98.52OFF:0.00'
5730
5735
5740
5731
5732
5733
5734
5736
5737
5738
5739
574
1
5742
5
7
4
2
5735
5740
5732
5733
5734
5736
5737
5738
5739
5
7
4
1
5742
57
4
2
6.
2
%
5.
5
%
5730
57285729
573
1
AL-BLDG A LOOP PROFILE
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
5726
5728
5730
5732
5734
5736
5738
5740
5742
5744
0+00
57
2
7
.
5
57
2
8
.
0
57
2
8
.
0
9
0+50
57
2
9
.
0
57
2
9
.
1
8
57
2
9
.
6
57
3
0
.
2
6
1+00
57
3
0
.
5
57
3
1
.
7
4
57
3
1
.
0
57
3
3
.
2
8
1+50
57
3
1
.
8
57
3
4
.
8
2
57
3
2
.
6
57
3
6
.
3
6
2+00
57
3
3
.
8
57
3
7
.
9
1
57
3
5
.
1
57
3
9
.
4
5
2+50
57
3
6
.
4
57
4
0
.
9
3
57
3
7
.
8
57
4
1
.
6
4
3+00
57
3
8
.
0
57
4
2
.
3
5
57
3
7
.
9
57
4
2
.
6
5
3+50
57
3
7
.
9
57
4
2
.
5
4
57
3
7
.
9
57
4
2
.
4
2
4+00
57
3
8
.
4
57
4
2
.
3
9
57
3
8
.
9
57
4
2
.
5
1
4+50
57
3
9
.
4
57
4
2
.
6
4
57
3
9
.
7
57
4
2
.
5
6
5+00
57
3
9
.
9
57
4
2
.
4
3
57
4
0
.
4
57
4
2
.
3
7
5+50
57
4
1
.
0
57
4
2
.
5
0
57
4
1
.
6
57
4
2
.
6
2
6+00
57
4
1
.
3
57
4
2
.
5
4
57
4
0
.
5
57
4
1
.
9
2
6+50
57
4
0
.
2
57
4
1
.
2
9
57
3
8
.
4
57
4
0
.
3
4
7+00
57
3
7
.
0
57
3
8
.
9
6
57
3
6
.
1
57
3
7
.
5
7
7+50
57
3
4
.
8
57
3
6
.
1
8
57
3
3
.
4
57
3
4
.
7
9
8+00
57
3
2
.
4
57
3
3
.
5
9
57
3
1
.
9
57
3
2
.
5
9
8+50
57
3
1
.
6
57
3
1
.
6
6
57
3
1
.
4
57
3
1
.
6
6
9+00
57
3
0
.
6
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
9+50
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
10+00
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
10+50
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
11+00
57
3
0
.
0
57
3
1
.
6
6
57
3
0
.
0
57
3
1
.
6
6
11+50
57
2
9
.
6
57
3
1
.
3
5
57
2
9
.
6
57
3
0
.
6
3
11+82
57
2
9
.
7
57
3
0
.
4
3
3.00%4.34%
6.17%
2.84%-2.50%
-5.55%
-4.00%
0.00%-2.86%
0.50%-0.50%0.50%-0.50%0.50%-0.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
0
.
0
5
EL
E
V
=
5
7
2
7
.
6
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
2
5
.
0
0
EL
E
V
=
5
7
2
8
.
0
9
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
7
8
.
8
3
EL
E
V
=
5
7
3
0
.
4
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
8
.
1
2
EL
E
V
=
5
7
4
0
.
8
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
0
7
.
6
3
EL
E
V
=
5
7
4
2
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
2
6
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
9
0
.
2
2
EL
E
V
=
5
7
4
2
.
3
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
5
4
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
1
8
.
2
2
EL
E
V
=
5
7
4
2
.
3
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
8
2
.
2
2
EL
E
V
=
5
7
4
2
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
5
+
9
8
.
5
2
EL
E
V
=
5
7
4
2
.
5
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
6
+
6
4
.
4
1
EL
E
V
=
5
7
4
0
.
9
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
7
+
8
8
.
4
1
EL
E
V
=
5
7
3
4
.
0
5
GR
A
D
E
B
R
E
A
K
S
T
A
=
8
+
4
8
.
1
5
EL
E
V
=
5
7
3
1
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
3
9
.
0
4
EL
E
V
=
5
7
3
1
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
1
+
8
2
.
0
4
EL
E
V
=
5
7
3
0
.
4
3
EXISTING GRADE PROPOSED GRADE
HORIZONTAL SCALE: 1"=40'
VERTICAL SCALE: 1"=10'
AL-BLDG C-LOOP PROFILE
5722
5724
5726
5728
5730
5722
5724
5726
5728
5730
0+00
57
2
8
.
2
57
2
8
.
1
2
57
2
7
.
6
57
2
7
.
9
7
0+50
57
2
6
.
7
57
2
8
.
2
4
57
2
5
.
5
57
2
8
.
5
2
1+00
57
2
4
.
6
57
2
8
.
5
3
57
2
4
.
0
57
2
8
.
1
6
1+50
57
2
3
.
3
57
2
7
.
7
6
57
2
3
.
0
57
2
7
.
7
0
2+00
57
2
3
.
0
57
2
7
.
9
5
57
2
3
.
1
57
2
8
.
2
0
2+50
57
2
3
.
2
57
2
8
.
0
4
57
2
3
.
1
57
2
7
.
7
9
3+00
57
2
3
.
0
57
2
7
.
6
0
57
2
3
.
0
57
2
7
.
8
5
3+50
57
2
2
.
9
57
2
8
.
1
0
57
2
3
.
0
57
2
8
.
1
3
4+00
57
2
2
.
7
57
2
7
.
8
8
57
2
2
.
3
57
2
7
.
6
3
4+50
57
2
2
.
3
57
2
7
.
3
3
57
2
2
.
5
57
2
6
.
9
5
4+89
57
2
2
.
9
57
2
6
.
7
4
-2.00%-1.61%1.00%-1.00%1.00%-1.01%1.09%-1.15%-1.20%-1.50%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
2
8
.
1
2
GRADE BREAK STA = 0+12.50ELEV = 5727.87
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
1
5
.
5
0
EL
E
V
=
5
7
2
7
.
8
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
1
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
2
9
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
9
6
.
5
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
6
4
.
0
8
EL
E
V
=
5
7
2
8
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
3
1
.
0
8
EL
E
V
=
5
7
2
7
.
5
7
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
8
8
.
3
1
EL
E
V
=
5
7
2
8
.
6
6
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
0
8
.
3
1
EL
E
V
=
5
7
2
8
.
4
3
GR
A
D
E
B
R
E
A
K
S
T
A
=
4
+
4
5
.
0
8
EL
E
V
=
5
7
2
7
.
4
0
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
>>
XS
D
XS
D
XS
D
XS
D
ME: 25.0'±
STBK
STBK
STBK STBK
ST
B
K
ST
B
K
STBK STBK
ST
B
K
ST
B
K
ST
B
K
GA
S
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GA
S
GA
S
GA
S
GA
S
8'
'
8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL 8''WL
6''SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
8'
'
SA
E
UE
L
6''SA
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD PSD PSD
PSD PSD PSD PSD PSD PSD PSD PSD
PSD
PSD
PSD
PSD
BUILDING C:
>
>
>
>
>
>
>
>
>
>
FF=5729'
0+
0
0
5+00
6+00 7+00 8+00 8+48
EP
:
8
+
4
8
.
1
5
PC: 5+00.23
P
T
:
4
+
5
7
.
0
1
0
+
0
0
1+
0
0
2+00 3+00 4+00
4+
8
9
BP: 0+00.00
EP: 4+89.35
PC: 1+22.31
PC: 0+24.7
0
PC
:
4
+
4
5
.
0
8
PT: 1+61.58
PT: 0+42.17
PT: 4+84.35
STA:4+54.44OFF:0.00'
STA:0+10.05OFF:0.00'
STA:4+31.08OFF:0.00'
4+
0
0
4+
7
6
EP: 4+76.32
STA:3+49.32OFF:0.00'
STA:1+08.31
OFF:0.00'
STA:4+67.32OFF:0.02'R
STA:6+85.65OFF:14.00'R
5
7
2
7
5
7
2
8
5729
5728
5728
572
8
5725
5728
572
8
5
7
2
8
57
2
5
1.
5
%
1.
1
%
57
2
5
5723
57
2
4
57
2
6
572
7
STBK STBK STBK STBK STBK STBK STBK STBK
x x x x x x x x x x x x
STBK STBK STBK STBK STBK STBK STBK STBK
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
WL
8'
'
SA
8'
'
SA
8'
'
SA
s
U
E
L
U
E
L
E
PSD
PSD
PSD
PSD
PSD
PSD
PSD
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PS
D
PSD PSD PSD PSD
PSD PSD
BUILDING B:
LOT 2
FF=5732'
2+
0
0
0+001+002+003+003+84
BP: 0+00.00
EP
:
3
+
8
4
.
5
0
STA:1+67.00OFF:12.50'L
STA:3+84.00OFF:0.00'
1+
0
0
2+
0
0
PC: 0+67.66
PT: 0+82.16
STA:1+54.30OFF:0.00'
STA:3+15.00
OFF:14.00'L
5735
5740
5745
5733
5734
5736
573
7
5738
5739
5741
5742
5743
5744
5746
5
7
3
5
573
1
5
7
3
3
5
7
3
4
5
7
3
6
5735
5740
5732
5733
5734
5736
5737
5738
5739
574
1
STA:1+25.94OFF:0.00'
5.
8
%
1.
8
%
FG:5731.91'5.5%
9.
2
%
4.
6
%
6.
2
%
AL-BLDG B-BACK PROFILE
5730
5732
5734
5736
5738
5740
5730
5732
5734
5736
5738
5740
0+00
57
3
5
.
7
57
3
7
.
2
4
57
3
6
.
2
57
3
6
.
5
9
0+50
57
3
6
.
5
57
3
5
.
2
6
57
3
6
.
4
57
3
3
.
8
8
1+00
57
3
6
.
4
57
3
2
.
5
1
57
3
6
.
3
57
3
1
.
5
1
1+50
57
3
6
.
3
57
3
1
.
2
0
57
3
6
.
4
57
3
1
.
0
6
2+00
57
3
6
.
4
57
3
1
.
3
1
57
3
7
.
2
57
3
1
.
5
6
2+50
57
3
7
.
7
57
3
1
.
6
3
57
3
7
.
9
57
3
1
.
3
8
3+00
57
3
8
.
0
57
3
1
.
1
3
57
3
8
.
1
57
3
1
.
0
9
3+50
57
3
7
.
9
57
3
1
.
3
6
57
3
7
.
8
57
3
1
.
6
2
3+84
57
3
8
.
0
-2.00%
-5.51%
-1.27%1.00%-1.00%1.07%
GR
A
D
E
B
R
E
A
K
S
T
A
=
0
+
0
0
.
0
0
EL
E
V
=
5
7
3
7
.
2
4
GR
A
D
E
B
R
E
A
K
S
T
A
=
1
+
6
7
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
2
+
4
1
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
1
5
.
0
0
EL
E
V
=
5
7
3
0
.
9
8
GR
A
D
E
B
R
E
A
K
S
T
A
=
3
+
8
4
.
0
0
EL
E
V
=
5
7
3
1
.
7
2
PVI STA: 1+15.94
PVI ELEV: 5731.63
K: 4.72LVC: 20.00BVCS: 1+05.94
BVCE: 5732.18
EVCS: 1+25.94EVCE: 5731.50
PVI STA: 0+22.00
PVI ELEV: 5736.80
K: 5.70LVC: 20.00BVCS: 0+12.00
BVCE: 5737.00
EVCS: 0+32.00EVCE: 5736.25
HORIZONTAL SCALE: 1"=40'VERTICAL SCALE: 1"=10'
EXISTING GRADE PROPOSED GRADE
STA: 1+11.50
ELEV= 5732.69'
STA: 1+25.94
ELEV= 5731.50'
DATE REVISION
C-2.2
DRAWING NO.
TITLE
G:
\
2
0
2
0
\
3
0
0
1
7
\
C
I
V
I
L
\
C
I
V
I
L
D
W
G
S
\
P
L
O
T
\
C
O
U
N
T
Y
M
I
N
O
R
S
U
B
\
O
L
D
\
3
0
0
1
7
-
C
2
0
-
G
R
A
D
I
N
G
-
O
P
T
2
.
D
W
G
-
J
a
n
2
6
,
2
0
2
3
-
3
:
0
6
p
m
NO
R
T
H
ROAD
PLAN/PROFILE 2
OPTION 2
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
040 40 80
40
16020
MEMBER UTILITIESFOR THE MARKING OF UNDERGROUNDBEFORE YOU DIG, GRADE, OR EXCAVATECALL 2-BUSINESS DAYS IN ADVANCE
Know what's below.before you dig.Call
R
30017JOB NO.
DATE:01-26-2023
DESIGNED BY
DRAWN BY
CHECKED BY
JPP
JPP
YTN
GL
E
N
W
O
O
D
B
U
S
I
N
E
S
S
C
E
N
T
E
R
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
L
O
R
A
D
O
CO
N
C
E
P
T
SO
P
R
I
S
E
N
G
I
N
E
E
R
I
N
G
L
L
C
50
2
M
A
I
N
S
T
R
E
E
T
S
U
I
T
E
A
3
C
A
R
B
O
N
D
A
L
E
C
O
8
1
6
2
3
(9
7
0
)
7
0
4
0
3
1
1
s
o
p
r
i
s
e
n
g
i
n
e
e
r
i
n
g
.
c
o
m
NO
R
T
H
0
6
0O0U4.0O
F
ci
CountyofGarfield
UT
0
0
0
0ud G
J
C u
tt
CommissionerChairman
N0)
0H
r CO Not
n u
U)4>
o NOQ
c rn
v
Jcc
s1 v
0
0
C U
AS1
T 0
4 0CO
0 • 0 0 0
0 0 .0
fl . u 0
C CC a
U U U
HCa
h
0
H24
vNN NvoNNN
0 v N C C H N N 1) P
H •r4 H 'U N N N > •H •ri H A A U O
G N C alro N A 'O I P ,C 0 E
H
HN: •
ri ro MCGU) •
NCrNi
3 N Ho
ant;
I,:•
1). Tb0H
NN •
rU
r1O )
0O N COO WG N H HO O N A H
N A 4) ANHH
NN
N)
WN
17 W
U N N N CA 0
W
ial ^ rN
ri W N VO G
H 'U b •r
N C'7 •r4GafO
Ao
O N •
iGN •rN •-i
wO N > 0 > N N o N o ro H '
U N ccN •r ^
HN
o CO N N N o
H N N Q) A A 3 W NOOHAHv
H H N
N N N H O 00 N •H N >. W N C ,!4 A N C
NN
w ,)•OH •
Nrl
HH
NHU
CO '
7U••
N O
NN
N • A C A '. N W
NOV) 0 0 LH U r-.
0 O •ri N r N P. NN H
HU
M N
A
NH •
rNN
UH •rii'
UNG
N O A NC
roH
4-I.' O N
HH
N -
HU -
S-
4r4 '
W(I) A NNC
Ci '11+
NVC UGONn74aa •H P. N •rN r-1 0) N
H N H ro 0 ' CP, coC H N A U 0 N U • H
C AoC3 ^ v7 P. w o Cu • E rN 0 N N N P A E 0"
1-1 N O H a, b In W cUN N M A CO N V N 0 W C N to C N N v N N b a
EU
WN
NU HN
44 N
a A w CO N.. 0.'i O N N H U) N N '
0HN
0-. N •rl 'U N ..--1 Ill •rl a C N N r -i N N 11 'U N
W w P a.o H G o M N H N O A C A G C H H A H U •• N P •r1 H 0 P, U a +l G
6 >, N O Ul 0 N •r, N vrr• ,
N •H 00 H A- N HI --1' .0 O P O N a C 01 N -H CO C N N N H N ro N •H U a
3
3 I. H G E N C O N H '$ N t•) W 0 'q W o N H P N • W b0 N
O ' G N EB N0WoN'U
GM •
r1 a N
o N + N
C H A N to W ,-t = G cC
U
H
N N 0.N UCau
N N •-H C
U a H W O I- A N N O
O N O F 'i H
U HI
OCA U) O U rH •H 0 •ri N O N
Pr HN ir). Nu
H
W 4-1 • 0 H CO N . 0 0 0- 0 CO N N •ri G N N N N N P. H •r-1 O G .0 UG N N
NN
W 1,0 ria,1;11 NCOHHUONNUO0C-1..0
P. b N A
W HWH
N b N N
O N O N -•-1- O^ V) W M b N t Cl)
HO „
I
40
z O E 'U H N A U N •r
U o CO
H U) A N 0 N N W N O O HH N H O N N H H >.
A
UO
N OUAUWMAPU N H
O CO •i G H
EC
N N
Cl) A O N Cr) N
ro A 'U •rl N N H H W A a N a NH H N•C N N Gi '7 41 N
N O N H •••
C
NH
O
H N T. •rl •H N Cw)
O N .0 N 0 N N A CO CO CrP
H H •H V) NI-I c.P.
ro H VC C G O •,/ o a u - 0 V A N •rl A N Uv Uu • G. N H H H 7 A C
ri u _zroN A H U N C N Gro 3 N • +- N A C N o •n C N a.
3
O NN1-7 O N •H Z W N
VI V-
21cn-000 pia/
WOWri-L ti CI
Mw7o
0
WvGN
a
03
A
O '
t 4-1 N O N N C N N H U A Ce() r-
u
HN NN
7/
1: C)
m
NN ,t07:
3: -
UiN •
NN
GN
a A A HI oOC
U a U) "0 O F N N•H41 u^Pau U) UI 4-1 1--4 P N C
NQNN•
Nr1pN
N •i H Aw .1 w N :7wF 0
a
6
7HP
W FN
NN
HI
UC.
N 1.1 o •rH. C '
U
0 N o z w 4-
iN
I
a N O H PN P 00 H •H 41 G U) G W N •H
O
0E
N •H 'I
H H
U N 0 •r1 U CO N O
O W P, G N N W •ri Nr
A O 0 G co F aPO
60
0 0N W N N H • H U G U 4-1 44 '17 N •r1 N .P CO N N P A :) 3 N
0V
O u O N N N w 0 •r1 F U G a N G O H H 0 H N N. FG
N H 0 E a A N 'U XH N 0 w ..) •rOi
W C•H O) ro a N a
Z O V) A N F 0 U CO O N •rl .l0 A C Hr0 V'U a N co N UA N E N w r•r1 H N U N P N •H •rl C N N N H H N
NUN
N M 0 C N CO N N C H• 1 >) N N
O O 6 C N
HO W O
U N U G N F- C 0 P 6 C N b U d F H •C ,,CCri G y O H O ,GN "-.1 A N aC) N H O N c N GI 'U
0 H
Ca ‘0 •r : _
0 N N C'
H 0 N U W H C H H Z. • .P u i-. A 0 N N CNa) N C V) ^ N C N
I W 0
NP
N H
WrC P a to O N T >. •H A •H C
to W N r1 F CO O co N G N ro N O 0 A
U JNN0
N N W >) U) r1 0 aW )O N C W ^ N O N 14 N N N W N N N •r1 A H H U
C ••rl H ••r•
N M CP 0 N U --.1' cl • i Cl P.
J U A W
0 < N a OPW NAWW a N N $ N N N N x H •H
N1
N A 0 O N A H ro •O N A
U U A 0 U) a N Ur 4 C H
W H xP.: H N
aU
NNN
NH
NN 'UC >.'UO N• C 0 Uu H N a s E N •n 1 A N
0 0 0 CO C N N N O H CO 0 = 'U U C
6 HEH 01O Val •
rC ,
C N •H O G O 4 4 a 0 0 0 ,C N N P H 0 7 P ) C N •HF 'U O N A N N7 H N 'U N CO H a d' N " a J 7 CO W
when
NNcu 0
A 41
ro OJ N N a G 1
N G H A 41 C H N N
H 7 •r1 N +-1 N O N CO H U) F
I N N w U A •N 41 N CdG ^ .0 R. N
LI + ^ H N N O G G 44 4-1 0 •i r1 O N N N N
41 0 ro 0 00 41 00 0 N H <d •ri ca • W 0 • 1 3 41 0
u E JJ rl •rll N C O •.C1 W 'd N 7 Q' N N N .HH 4-1 U • 0 r • O) N P 41 G r •rri P N4-1 0 rn
CHi
OO N~
N 41 41 TI E 41 ro 41 G o' N A A G w G ODA N ro CO W 0 O rn •rl 41 w u N H .0
n P N <d HI 4J ro N r1 G CO N N TO u N 7 G • G O CO N 0 ' 0 41 H •r< HI 41 0) 4-1
A ro .S' H •rl P G O .J-1 N H H CO ri p. N 0 r4 • 'U H O A 'o E 0 7 N N W ICI N C
7 a U N o 0 CD C G E 00 N W H Y1 A O a CO N N 3 a N 4-1 '0 0 a 4-1 •.-1 •r< W N A i.
N N 7 b A a •r4 row 41 C A H ri O •ri N .0 a G 417 C 7 H G H " HI C./ 41 00 +1 41
0H •HN N 7 H Y-1 4-1 N HI 3 N O •ri U pa N A N ro N WO -,400) 0 HI •ri G
N 41 N Il q W CO N N 4.1 4-1 .41 'U N 0 .. 0 A CO G ri 0 CO a ON bC G a N N ^ 3 7
A 41 N G '0 N A a ,C N 3 G A 4J 41 C0 H H ro U GI 4r1 N N P N al N N • rd •ri N 0
3 N 0 4-1 ro 41 O N g re CO G A 4J •r1 O aJ 0 UHr4 •,-1 0U O G C) .H i1 q •ri ri E G N T H N 0 N N O N •r1 w 11 , O N H G 0
r1 P w •r N N ON H N N ON 0 41 41 A N E G 3 A N A 00 U m ro O 41 til N N N N G '0
O 41 G N '0 0 A A N N u H aro 0 'o ii++ 0 0 41 U 0 N P w G 0 •n H E E • <0 ri
CO) >, O u H A 4J - ON ri Hi N P 7A >, C 0 0 N •r1 rl •r+ A U 'o G O 7 N O A Ln '0 0
N •HA •HG HI 41 N w 41 •r< >, N 0 N •H P •rl 41 ri > H '0 41 N 0 O •n P <+1 O N H H •41
P 41 CO 7 O re 4i •rl 41 W N 41 O A H CO A N N O ro H M r< •H z>+ •ri >, O O a O 44 0 41
U 7 .til N 41 0 •H H G 0 N 0 41 N G A NW 3 •r1 3 41 H H w rl N u P
N N N O N A u H 7 7 H N H G N •H N N 41 0) 7 0 O <d 0 a N 0 P A A U cJ
OO H ro 41 N N P N u H O) .3 44 HI O N 6 P O A U >, GI W•• 41 C 'C 4 P O ro ro O .
G •r1 N O •ri A r1 0 A A N N r1 41 O 041 U N 40 1 41 7 00 O N N 70 C) v1 E w 41 , H '0
H 4. H P 41 HI H 41 fn N N N ro N A N N ro P 41 G N G -0 w 7 '0 A 41 7 N N H G A H
b ro a N CO H •rl CO 3 A N N 0 G .c C N N L1 roA 17 7 ^ O N 41 G E N N OD •ri •rl 41 <d
r{ HI A >, A a 3 >, W A H 4-1 41 41 Y1 •r< ro> CO ro a JJ ••rl r 00 N ,C 4J N . r9 U G 3 • H O
HI CI H N 41 A N 41 0 a 0 N ro,4 ro A A P G W0 r1 O 0 A UP >4 C N •r1 N 3 C1
7 H <d P 'O N • G 4-4 41 00 U HI '0 N 0 G N 0 P O >, a G •r1 4J >, 7 0 N <d < d W ro N A
A 7 U •H O ^ N N U 41 o G >. CO G •rl ro N E 41 'H r0 co U •H U A E •rl a Hi H 4-4A 0 G U H 44 '0 N
G4 •rl 4-4 4-4 N N4 41 G G 0 0 G N> 044 3 4J N ., G 7 0 O ro H H 41 41 N •rr •14 •r1 ri 0 •rI
O u 'O N CO CI N O HI <d N •r1 H •r1 N O N ro CO H 41 0' 3 u H O. O W N ro 464J 0401-1.-4.0
H N H ri P 0 7 C •rl E 41 ro H CU 41 '0 N '0 N A H O N w N rl N w 41 G N H C P A N •H 41
A A H CO 0 0 00 HI 41 N CO P A a P •r1 a 'H 00 41 •r1 C P O •r1 P N '0 CO 0 7 0 0 •r+ N N A W
41 41 U .r4 M C) w a P A r1 0 a 'o. W N X co 41 7 0 3 > O A G >, N U N 4-4 41 it co T A N >,
3 >, G •
CU.)
P• .o N N O P, w 41 ro H U N N rV A P4 n 4J •r -ll 44 4u I-4 W N H N 3 N •rN1 \ '0 E r< H 41 00 A
A •H U a .G ro u CU 1 u ro <d 41 . ri ro,C 0.14-11-1A00 G ro 41 CO CO N A N N '0 co G G •r1 •r1 '0
N CO re ro H q 4J N N .0 Cd 41 < d 41 A •H 41 41 H N 41 N U O C 41 ^ N A N ri 1 G G 7 0 E 41 a1
Tl ^ 4-1 N ro N N N H •rl G 7 41 A u 41 N U a. u-) 0 E v1 41 N G 00 N U 41 A •rl ro O
N 0)M N •ri N U 41 A O N 3 .r4 N 41 N N P 4-4 r< C N •0O N N w E N C U N w E N 5 (0 0 0 0
P '0 E N> H Wal W H N N •n G O 0 Hi N H N N P •n > H0 H0
r1 0 H U 0 •rl G G 41 r1 W H N -H > 4i 0 •4- 1 w •rl A •r1 rl A a O O 44 O P N ,4 G O E ri H >, N U G r -I H
7 O N U P 7 00 W G • H 3N W N A POP WG 3 3 17 '0 41 P • P P N ro >' H •r4 E 41. a •r+ G P.•.1
0 a 44 a O' 4-1•r7 N N ro 444-1 0040(0.0A0 G N a 0 a N •n a 0 CO N '0 ^ 3 7 N •ri ro '<7 •r1 ¢.'0
N H N CO N E N A HI 'd C AOP A •ri ON ^ N N P H 3 E U A N H a 41 N O 0,044 ^ G H A N
P N 00 H W H N N 41 N N> C O O a 0 3 41 41 O •r1 A 0 N P O •4-1 G P P. C N C T HI 7 N 0 HI 44 H
a G 0 A '0 ro H 7 4)C)04) ri O A r -I O U H el w '0 N COO) E ^ N O H U G H U 41 7 •r1 '0 O
N •r1 w 41
H N b . 41 N N a r. GO
CO N H ^
I-1 H
dH
41 HO 41 ri MN i N G '0 N N W •r1 isNO .. NA3 ba '0 40 >, •rl G 41 41 W W H 41 VI E •r1 N N '0
N <d H >, HI A A CO N M CO 0 41 H 0 A N w A '0 41 O 'O N H A ^i •r4 •H P A •4-1 N C> H '0 a 3 E 0 w 0 G N
A •r1 H M 41 q H 41 G ro •rl WH •O N ro N H ro N O ro G A MO 144.070104c077 A U O A N N
3 ^ 7 17 3 H 0 a1 A P A N 00 a 0 0 4.1 N M G G 14-4H H H H 00 .Y 41 N •r1 4J E "-IGACONrl3NP4441ENaNroN ,4 1x O 114 a N 6•r{ O w W H N '0 aro W' 0 N P G •H w P <d P
O N 4J 00 Id N H 0 co U 4J 41 r< '0 H U N 0 N W 6 W A HI A >•• E ro O A N N H W N H 0
0 •r4 ro N U G A •ri 4r1 N 1- 4 H N •r1 •rl E W CO T A T H •H O G '0 o 3 41 • A Hl O >, a E A O A N N A
0 41 U N ..-1 N> W t 3 •n <d N H E ro N N 3 41 N 41 44 P. W O N G '0 41 W. 41 W H N ro '0 A 41
r1 CO w CO •r-, "0 N •eO A a G N P> 41 G N G A C N C A N '0N N '0 N H 0 0 ri N 00 41 ^ 2 0 41 7
4 '0 0 G O r40 H '0 H G 7 N 41 N CO N '0 7 H 4-4N 00 ro 41 4, G 41 4J F E H N >, 7 • I A CO <n CO G 7 CO
U G P •rI O G CO N CO P 0 41 a T H •r1 o 0 0 ro N N N N <d N G N •ri A 41 0 0 3 4-1 G N 4J G
N II) N •ri a 7 •rl O CO N CO N N N N O U G •r< H 44 rI N N W 41 0 U 41 rest G E 41 •r+ >,
41 E U •ri A 41 41 GI H 'Id OO u E OO a 41 • P 41 •r1 ri G 4J N a E ^ a 0 7 <d OD G F H N 7 G rl
0 E 0 '0 N U 41 A o G G U G ro u N 41 3 N N 00 u <0 ro N N N 44 E N 41 .• 0 0 0 t H •rl. E E N '0 ,-I
H 0 ro N .0 0 7 41 G- w <d •r1 N >, •r1 41 .r1 3 0 W N 7 C N P aJ 41 > 7 •r+ O> C N N >, O 41 •r1 Hl 4-1 441A •H E 0 <d
P. O 7 P 41 ..-1 H O N n0 • 41 '0 H OZCOO •n ro O N N E <O 0 O N N N G w a N 1 N Y. CL04C 0
O CO 41 N E N U1 N 0 0 •,i H P A N w A O H O W0 I H E 7 G ro 3 s .H ro N N Hi <d O •r1 • r1
N H CO G. 00 N N •n 44 ro ca4J 441H H •r1 N 7 A N a ro P N •r1 N P G N a 41 •r1 N N 44 U N W H .--1E r1 N w
P •r1 P C N G A P 04-1H a 7 7 41 0.41 )0 A N a +J >, If.) N O A E H rl rd re z H N N A N 11 •r1
ii II -r1 N O 7 ro -PEPI U .00 4J 41 H A x •r4 41 N 41 •rl ro O G 75N '0 O 'O N N > O
W G N F >p a u CO a O 6 WO • 3404-16 N N H H N N N G r-4 4l) a •r1 H ro N G O G N a G 4 .0 N 0 00. ro H N • N ,,cC N oD O O G H a <d ,,CC C) G G N rri1 N N N O N ro <d P <d N
r. .1-4-4 H. N r. HI 'Cl q GO rs a 41 H G 2 41 E r. •rl •H .••, H G O •rl H O 7 q N 7 N In
A 3 U N ro G G • 0) C C •rl G O HI ro w H A N O Uri E H
N 0 •r1 al b3 D bO N 0 P. N P r< >, N -0N 00 rn N ,Y' CO a H N • • G N
H 41 . N U G • E CO • •r1 W ro • 41 N > • • H • 3 >, • N • 4J G H >, N N N 'd' O N
A N 41 •r1 N •••14J VI. N O O n H A N <-- N 0p • N 41 H N O) O • •r1 N ^ al N N r1 N A N O 1.1 rI •H . 41
N H a •rl G A "Z1P U N •H N N N 4J '0 ro Z •rl N G N N F A co 3 rl 3 H ri H 41 N HI 41 3 F
H O r1 N E C 41 HI N M ro W 4) D a CO r1 a •rl •n N G 41 0) N A o H > 0 P CO
r1 .-I F+4 <d •r4 a > F w F P O H N •• N HI O N 0 <d <d Fro 40 w H o P 4J C) w
O P M P N rl G 7 N '0 CO 7 N N H 0 A 4-4 N .0 41 N 7 H Ari W •r1 •r1 •ri N 0 A N G A F
u a $ 0 n, a •H A q 40H N 0 <n a w 4J 0 HI H P 0 G4 P. P. P4 0 r1 0 MA 44•1 3 CO
44)
w0 ¢
F F
a a) u
6 c
O O r .oUU
f1 •q
O. Ca i G
oW
M' 41, rH1 rt.
ro < , .5
c0
0.1
5 9
0'
44
v
44 N
0
C
8HEi
ILA I/ rntCi.
andaffixedthesealofsaidCounty, atGlenwoodSprings, STATEOFCOLORADO CountyofGarfield
5
0
6
J
SPECIAL USE PERMIT
ISSUED TO THE GLENWOOD PARTNERSHIP
M
In accordance with and pursuant to the provisions of the Garfield CountyZoningResolutionof1979, as amended, and Resolution No. 81 _121 of the Board "
of County Commissioners of Garfield County, Colorado, State of Colorado, hereby _
authorizes, by Special Use Permit, the following activity: g'
0
a commercial park in which the uses shall be limited to those listed below . u
under conditions.
8
nn the following described tract of land in Garield County, Colorado:
yr
a
co
A tract of land situate in Section 6, Township 6 South, Range 89 West of ` ^`
the 6th Principal Meridian, County of Garfield, State of Colorado, more°
particularly described as follows: jtv,gg
j wa° Commencing at the South Quarter Corner of Section 34, Township 5 South,
Range 89 West of the 6th Principal Meridian; thence S 87°11'46"E 670.12 'to -
feet to the point of intersection of the west line of the Mel Ray Subdivisio ti«re
and the south right-of-way line of County Road No. 130, the true point of MM.; beginning; thence S 01° 52'00"W 575.96 feet along said west line of the Mel
Ray Subdivision; thence N 87°18'00"W 615.36 feet; thence 5 47°42'00"W 125.06
feet; thence N 87°18'00"W 521.98 feet; thence N 02° 44'00"E 603.39 feet to a
point on said south right-of-way line of County Road No. 130; thence along said
south right-of-way line of County Road No. 130 N 89°50'00"E 1218.57 feet to
the true point of beginning, containing 16.446 acres more or less.
The within Special Use Permit is issued subject to the conditions set forth
in the above-mentioned resolution, and shall be valid only during compliance with
such conditions and other applicable provisions of the Garfield County Zoning
Resolution, Subdivision Regulations, Building Code, and other regulations of the
Board of County Commissioners of Garfield County.
1. That the use of the tract of land comply with all present and future
regulations of Garfield relating to special use permits for commercial parks in the
zone district in which the property is now or may later be located;
2. That, prior to the issuance of the authorized special use permit, the above
described tract of land shall be severed from any other tract of land upon which
there may exist a principal use, unless such other such principal use has bee terminated
at the time of the issuance of the special use permit.
3. Maintenance rof the waterlines within the property boundaries will be the
responsibility of the project owner. Control valves will be installed at the
property boundaries where water lines inside the project connect to public water lines.
All public water used on the project will be metered with secondary metering installed
to meter water used for irrigation of landscaping, unless otherwise agreed to by theWestGlenWaterDistrict.
4. a) The location(s) of fire hydrant(s) necessary to service each phase of the
project shall be subject to review by the Glenwood Springs Fire Department for
compliance with codes, prior to the issuance of any building permits. Fire hydrants
and necessary waterlines to serve the hydrants shall be in place and functioning for
each phase at the time the foundation walls reach ground level and at the time of
final foundation inspection by the County Building Department.
4. b) Fire protection, where required, within buildings, shall be subject
to review and recommendation, as per code, by the Rural Fire District department,
prior to the issuance of a building permit.
4. c) Turn radii necessary for access in critical areas, by firetrucks that
will be serving the project will be provided.
4. d) Uses in buildings that require special fire protection consideration
or special construction shall be designated prior to the issuance of a building
permit and subject to review, as designated by code, by the Building Department,
Planning Department and Fire Department. These uses shall be those designated
in the U.S.C. as "hazard" or (H) uses.
4. e) Areas for snow storage shall be designated prior to the issuance of
building permits and subject to review for compliance with code by the Building
Department, Planning Department, and Fire Department.
5. The project owner shall confer with the County Sheriff's Department for
advice on security matters prior to the installation of security lighting and
landscaping.
6. No building permits shall be issued for any phase until: 1. there are
sufficient water taps available to serve that phase for all of its water require-
ments from a public system. 2. or proof that a private water system will adequately
serve all of the water needs of the project.
7. a) A 5 foot sidewalk shall be installed along the Westerly end of the
property in the New County Road ROW before a certificate of occupancy will be issued
for the first phase. The construction of the sidewalk shall be at the expense of
the developer. -_
7. b) The owner of the property will be expected to contribute to the financing
of a sidewalk along County Road 130, when it is deemed necessary by the County.
8. The project as proposed, is directly tied to the Ainbinder Shopping Center
ie: a. On site drainage is to be handled through Ainbinders storm drains. b.
The New County Road is necessary for the project and has to be constructed. c.
Utility lines installed on Ainbinders project will serve the Glenwood Business
Center. In the event the Ainbinder project is not constructed, the Glenwood
Business Center must stand on its own. -
9. All on-site and off-site improvements required to service each phase of the
project must be completed before a certificate of occupancy will be issued for that
phase. The improvements will be subject to review by the Building Department,
Planning Department, and the Fire Department for compliance with code and conditions
of the special use permit. The improvements shall include: Necessary roads, water
lines, sewer lines, fire hydrants, parking, landscaping, storm drainage, utilities,
sidewalks, and any other improvements necessary for the function of any particular phase.
10. The New County Road proposed on the Westerly boundary of the site from
Highway 6 and 24 to County Road #130, must be constructed to County specifications,
before any certificate of occupancywill be issued for the project.
11. landscaping will be a minimum of 12% for the entire project.
12. The uses in the park will be limited to a maximum of 3 residential uses,
for the purpose of management, security, and maintenance for Commercial establishments,
wholesale and retail establishments, personal services establishments, general
services establishments, offices, and community buildings.
13. The maximum number of buildings on the site will be 15.
14. Development under the within permit shall be in accordance with the repre-
sentations contained in the amended application filed with Garfield County, unless
otherwise specifically authorized or directed by this Board.
1111k:1M:11 f!MIFIIFIRIV11KA,ki 114.11III
Reception8: 859599
10/09/2014 09:23:00 Pfl Jean Albarlco
2 of 2 Reo Fee:$0.00 Doo Fee:0.00 GRRFIELO COUNTY CO
BOARD OF COUNTY COMMISSIONERS
GARFIELD COUNTY, COLORADO
iJ• 1 r
BY; ° \CL,... _ N.
Chairman \ tritle`
Recorded at ' o'clock
Reception 'No.
STATE OF COLORADO
County of Garfield
At a regular meeting of the Board of County Commissioners for Garfield County, Colorado,
held at the Court House in Glenwood Springs on NPIl 17.Y , the 27 0) day of
actaar A. D. 19 8.Q.... , there were present:
Richard CJolley , Commissioner Chairman
Larry Velascjuez , Commissioner
Flaven Cerise , Commissioner
Arthur A. Abplanalp, Jr. , County Attorney
Nancy Sprick Pager Deputy , Clerk of the Board
when the following proceedings, among others were had and done, to -wit:
RESOLUTION NO. 80-254
3O8s17 M
ss.
m: OCT 2 81980
LDRED ALSDORF, RECORDER
BOOK 558 PAGE 737
RESOLUTION CONCERNED WITH GRANTING AN EXEMPTION FROM THE
GARFIELD COUNTY SUBDIVISION REGULATIONS FOR GLENWOOD PARTNERSHIP
WHEREAS, GLENWOOD PARTNERSHIP has petitioned the Board of County Commissioners
of Garfield County, Colorado, for an exemptiom from the definition of the terms
subdivision" and "subdivided land" under C.R.S. 1973, 30-28-101 (10) (a) -(d),
as amended and the Subdivision Regulations of Garfield County, Colorado,
adopted January 2, 1979 Sections 2.02.21(d) and 3.02.01 for the division of
a 30 acre tract described as follows:
In Book 557 at Page 352 in the office of the Clerk and Recorder of
Garfield County, Colorado, into 3 tracts of approximately 16, 62 and
72 acres each, two of which proposed divided tracts are more particularly
described as follows:
Tract A: A parcel of land situate in Section 6, Township 6 South, Range 89
West of the 6th Principal Meridian, County of Garfield, State
of Colorado, being more particularly described as follows:
Commencing at the S1 corner of Section 34, Township 5 South,
Range 89 West of the 6th Principal Meridian; thence S. 87° 11' 46"
E. 670.12 feet to the point of intersection of the West line of
the Mel -Rey Subdivision, County of Garfield, State of Colorado
and the south right-of-way line of County Road No. 130; thence
along the West line of said Mel -Ray Subdivision S. 01°52'00" W.
575.96 feet to the TRUE POINT OF BEGINNING: thence continuing
along said line S. 01°52'00" W. 183.95 feet to a point of
intersection where the north line of the Glen Theatre, Inc.
property intersects the West line of said Mel -Ray Subdivision;
thence along the north line of the Glen Theatre, Inc. property
N. 87°18'00" W. 536.20 feet to the Northwest corner of said
property; thence along the west line of said property S. 01°53'00"
W. 623.25 feet to the North right-of-way line of U.S. Highway No.
6 & 24; thence along said North right-of-way line the following
course, N. 87° 16' 00" W. 246.80 feet; thence N. 02°44'00" E.
718.54 feet; thence S. 87°18'00" E. 67.23 feet; thence N.
47°42'00" E. 125.06 feet; thence S. 87°18' 00" E. 615.36 feet
to the TRUE POINT OF BEGINNING, containing 6.499 acres, more
or less.
Tract B: A parcel of land situate in Section 6, Township 6 South, Range
89 West of the 6th Principal Meridian, County of Garfield, State
of Colorado, being more particularly described as follows:
Beginning at a point whence the S1 corner of Section 34,
Township 5 South, Range 89 West of the 6th Principal Meridian
bears N. 42°07'49" E. 861.66 feet; thence S. 87° 18'00" E.
454.75 feet; thence S. 02°44'00" W. 718.54 feet to a point on
the north right-of-way line of U.S. Highway 6 & 24; thence along
said north right-of-way line the following course N. 87°16'00" W.
454.75 feet; thence N. 02° 44' 00" E.718.28 feet to the point of
beginning, containing 7.500 acres, more or less.
BOOK 558 PAGE738
WHEREAS, the Petitioner has demonstrated to the satisfaction of the
Board of County Commissioners of Garfield County, Colorado, that the proposed
division does not fall within the purposes of Part 1, Article 28, Title 30,
Colorado Revised Statutes 1973, as amended, for the reason that the property
being subdivided has been under the same ownership for at least five (5) years,
and the division together with any earlier permitted under circumstances
not defined above, will create no more than three (3) new tracts under
35.0 acres in size; and
WHEREAS, the Petitioner has demonstrated to the satisfaction of the
Board of County Commissioners of Garfield County, Colorado, that there is a
reasonable probability of locating domestic water on each of said tracts, that
there is adequate ingress and egress to said tracts, that the location of
septic tanks will be permitted by the Colorado Department of Health, that the
requested division is not part of an existing or larger development and does
not fall within the general purposes and intent of the subdivision regulations
of the State of Colorado and the County of Garfield and should, therefore, be
exempted from the definition of the terms "subdivision" and "subdivided land"
as set forth in C.R.S. 1973, 30-28-101 (10) (a) -(d), as amended.
NOW, THEREFORE, BE IT RESOLVED that the division of the above described
tracts "A" and "B", from the above described 30 acre tract is hereby exempted
from such definitions and said tract may be divided into tracts "A" and "B",
all as is more fully described above, and said divided tract may be conveyed
in the form of such smaller tracts without further compliance with the
aforesaid subdivision statutes and regulations; provided, however, that this
exemption is granted on the condition and with the express understanding
and agreement of the Petitioner that no further exemptions will be allowed on
said tracts "A" and "B", or the remaining tract, and that a copy of the
instrument or instruments of conveyance when recorded shall be filed with this
Resolution.
THE BOARD OF COUNTY COMMISSIONERS
OF GARFIELD COUNTY, COLORADO
ATTEST:
Deputy er of the Boa
County mmissioners
Garfield County, Colorado
Upon motion duly made and seconded the foregoing Resolution was adopted by the following vote:
Richard C. Jolley
Larry Velasquez
Flaven Cerise
STATE OF COLORADO
County of Garfield
Aye
Aye
Aye
Commissioners
I, , County Clerk and ex -officio Clerk of the Board of County Commissioners
in and for the County and State aforesaid do hereby certify that the annexed and foregoing Order is truly copied from the Records of
the Proceedings of the Board of County Commissioners for said Garfield County, now in my office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said County, at Glenwood Springs,
this day of , A. D. 19
County Clerk and ex -officio Clerk of the Board of County Commissioners.
1
COOPER MINOR SUBDIVISION
IMPROVEMENTS AGREEMENT
THIS COOPER MINOR SUBDIVISION IMPROVEMENTS AGREEMENT (“SIA”) is
made and entered into this ___ day of _________________, 2023, by and between GLENWOOD
PARTNERSHIP, LLLP 1 (“Owner”) and the BOARD OF COUNTY COMMISSIONERS OF
GARFIELD COUNTY, COLORADO, acting for the County of Garfield, State of Colorado, as a
body politic and corporate, directly or through its authorized representatives and agents (“BOCC”).
Recitals
1. Owner is the owner and developer of the Cooper Minor Subdivision (the
“Subdivision”), which property is depicted on the Final Plat of Cooper Minor Subdivision (“Final
Plat” or “Final Plat of the Subdivision”). The real property subject to this SIA is described in that
Final Plat, recorded at Reception Number of the real estate records of Garfield
County, Colorado and incorporated by this reference.
2. On _________________, 2023, the [Planning Director]/[BOCC], by [Decision
No.]/[Resolution No. _________], recorded at Reception Number ____________of the real estate
records of Garfield County, Colorado and incorporated by this reference, approved the Final Plat
which, among other things, would create three commercial lots.
3. As a condition precedent to the approval of the Final Plat submitted to the BOCC as
required by the laws of the State of Colorado and by the Garfield County Land Use and
Development Code (“LUDC”, Owner wishes to enter into this SIA with the BOCC.
4. Owner has agreed to execute and deliver a letter of credit or other security in a form
satisfactory to the BOCC to secure and guarantee Owner’s performance under this Agreement and
has agreed to certain restrictions and conditions regarding the sale of properties and issuance of
1 Note to drafter: to be updated at time of recordation
2
building permits and certificates of occupancy, all as more fully set forth below.
NOW, THEREFORE, in consideration of the foregoing recitals and the mutual covenants
and promises contained herein, the BOCC and Owner (“Parties”) agree as follows:
Agreement
1. FINAL PLAT APPROVAL. The BOCC hereby accepts and approves the Final Plat
of the Subdivision, on the date set forth above, subject to the terms and conditions of this SIA,
[Director’s Decision No. ____]/[Resolution No. ___], the requirements of the LUDC, and any other
governmental or quasi-governmental regulations applicable to the Subdivision (“Final Plat
Approval”). Recording of the Final Plat in the records of the Garfield County Clerk and Recorder
shall be in accordance with this SIA and at the time prescribed herein.
2. OWNER’S PERFORMANCE AS TO SUBDIVISION IMPROVEMENTS.
a. Completion Date/Substantial Compliance. Owner shall cause to be
constructed and installed the subdivision improvements, including off-site improvements,
identified in the Exhibits defined in subparagraph 2.a.i, below (“Subdivision Improvements”)
at Owner’s expense, including payment of fees required by Garfield County and/or other
governmental and quasi-governmental entities with regulatory jurisdiction over the
Subdivision. The Subdivision Improvements shall be completed on or before the end of the
eighteenth calendar month following execution of this SIA (“Completion Date”), in
substantial compliance with the following:
i. Plans marked “Approved for Construction” for all Subdivision
Improvements prepared by Sopris Engineering and submitted to the BOCC on
_______________, 2023, such plans being summarized in the list of drawings
attached to and made a part of this SIA by reference as Exhibit A; the estimate of
cost of completion, certified by and bearing the stamp of Sopris Engineering,
3
Owner’s professional engineer licensed in the State of Colorado (“Owner’s
Engineer”), attached to and made a part of this SIA by reference as Exhibit B, which
estimate shall include an additional ten (10) percent of the total for contingencies;
and all other documentation required to be submitted along with the Final Plat under
pertinent sections of the Land Use and Development Code (“Final Plat Documents”).
ii. All requirements of the Final Plat Approval.
iii. All laws, regulations, orders, resolutions and requirements of Garfield
County and all special districts and any other governmental entity or quasi-
governmental authority (ies) with jurisdiction.
iv. The provisions of this SIA.
b. Satisfaction of Subdivision Improvements Provisions. The BOCC agrees that
if all Subdivision Improvements are constructed and installed in accordance with this
paragraph 2; the record drawings have been submitted upon completion of the Subdivision
Improvements, as detailed in paragraph 3(c), below; and all other requirements of this SIA
have been met, then the Owner shall be deemed to have satisfied all terms and conditions of
the Final Plat Approval, the Final Plat Documents, and the LUDC with respect to the
installation of the Subdivision Improvements.
3. SECURITY FOR SUBDIVISION IMPROVEMENTS (EXCEPT RE-
VEGETATION).
a. Subdivision Improvements Letter of Credit and Substitute Collateral. As
security for Owner’s obligation to complete the Subdivision Improvements, Owner shall
deliver to the BOCC, on or before the date of recording of the Final Plat of the Subdivision, a
Letter of Credit in the form agreed to be acceptable to the BOCC, attached to and
incorporated in this SIA by reference as Exhibit “C” (“LOC”), or in a form consistent with
4
the Uniform Commercial Code, C.R.S. § 4-1-101, et seq. and approved by the BOCC. The
LOC shall be in the amount of $( full estimate ), representing the full estimated cost of
completing the Subdivision Improvements, with a sufficient contingency to cover cost
changes, unforeseen costs and other variables (not less than 10% of the estimated cost and as
approved by the BOCC), as set forth and certified by Owner’s Engineer on Exhibit B to
guarantee completion of the Subdivision Improvements. The LOC shall be valid for a
minimum of six (6) months beyond the Completion Date for the Subdivision Improvements
set forth in Paragraph 2.a., above. The BOCC, at its sole option, may permit the Owner to
substitute collateral other than a Letter of Credit, in a form acceptable to the BOCC, for the
purpose of securing the completion of the Subdivision Improvements subject of this
Paragraph 3.a.
b. LOC Requirements and Plat Recording. The LOC required by this SIA shall
be issued by a state or national banking institution acceptable to the BOCC. If the institution
issuing the LOC is not licensed in the State of Colorado and transacting business within the
State of Colorado, the LOC shall be “confirmed” within the meaning of the Uniform
Commercial Code, Letters of Credit, § 4-5-101, et seq., C.R.S., as amended, by a bank that is
licensed to do business in the State of Colorado, doing business in Colorado, and acceptable
to the BOCC. The LOC shall state that presentation of drafts drawn under the LOC shall be
at an office of the issuer or confirmer located in the State of Colorado. The Final Plat of the
Subdivision shall not be recorded until the security, described in this paragraph 3 has been
received and approved by the BOCC.
c. Extension of LOC Expiration Date. If the Completion Date, identified in
paragraph 2.a., above, is extended by a written amendment to this SIA, the time period for
the validity of the LOC shall be similarly extended by the Owner. For each six (6) month
5
extension, at the sole option of the BOCC, the face amount of the LOC shall be subject to re-
certification by Owner’s Engineer of the cost of completion and review by the BOCC.
d. Unenforceable LOC. Should the LOC expire or become void or
unenforceable for any reason, including bankruptcy of the Owner or the financial institution
issuing or confirming the LOC, prior to the BOCC’s approval of Owner’s Engineer’s
certification of completion of the Subdivision Improvements, this SIA shall become void and
of no force and effect and the Final Plat shall be vacated pursuant to the terms of this SIA.
e. Partial Releases of Security. Owner may request partial releases of the LOC
and shall do so by means of submission to the Building and Planning Department of a
“Written Request for Partial Release of LOC”, in the form attached to and incorporated by
this reference as Exhibit D, accompanied by the Owner’s Engineer’s stamped certificate of
partial completion of improvements. The Owner’s Engineer’s seal shall certify that the
Subdivision Improvements have been constructed in accordance with the requirements of
this SIA, including all Final Plat Documents and Final Plat Approval. Owner may also
request release for a portion of the security upon proof that 1) Owner has a valid contract
with a public utility company regulated by the Colorado Public Utilities Commission
obligating such company to install certain utility lines; and 2) Owner has paid to the utility
company the cost of installation as required by the contract. The BOCC shall authorize
successive releases of portions of the face amount of the LOC as portions of the Subdivision
Improvements, dealt with in this Paragraph 3, are certified as complete to the BOCC by the
Owner’s Engineer and said certification is approved by the BOCC.
f. BOCC’s Investigation. Notwithstanding the foregoing, upon submission of
the Owner’s Written Request for Partial Release of LOC, along with Owner’s Engineer’s
certificate of partial completion of improvements, the BOCC may review the certification
6
and may inspect and review the Subdivision Improvements certified as complete to
determine whether or not they have been constructed in compliance with relevant
specifications, as follows:
i. If no letter of potential deficiency is furnished to Owner by the BOCC
within fifteen (15) business days of submission of Owner’s Written Request for
Partial Release of LOC, accompanied by Owner’s Engineer’s certificate of partial
completion of improvements, all Subdivision Improvements certified as complete
shall be deemed approved by the BOCC, and the BOCC shall authorize release of the
appropriate amount of security.
ii. If the BOCC chooses to inspect and determines that all or a portion of
the Subdivision Improvements certified as complete are not in compliance with the
relevant specifications, the BOCC shall furnish a letter of potential deficiency to the
Owner, within fifteen (15) business days of submission of Owner’s Written Request
for Partial Release of LOC, accompanied by Owner’s Engineer’s certificate of partial
completion of improvements.
iii. If a letter of potential deficiency is issued identifying a portion of the
certified Subdivision Improvements as potentially deficient, then all Subdivision
Improvements not identified as potentially deficient shall be deemed approved by the
BOCC, and the BOCC shall authorize release of the amount of security related to the
Subdivision Improvements certified as complete and not identified as potentially
deficient.
iv. With respect to Subdivision Improvements identified as potentially
deficient in a letter of potential deficiency, the BOCC shall have thirty (30) days
from the date of the letter to complete the initial investigation, begun under
7
subparagraph 3.f.ii., above, and provide written confirmation of the deficiency(ies) to
the Owner.
v. If the BOCC finds that the Subdivision Improvements are complete,
in compliance with the relevant specifications, then the appropriate amount of
security shall be authorized for release within ten (10) business days after completion
of such investigation.
g. BOCC Completion of Improvements and Other Remedies. If the BOCC
finds, within the thirty (30) day period of time defined in subparagraph 3.f.iv. above, that the
Subdivision Improvements are not complete, or if the BOCC determines that the Owner will
not or cannot construct any or all of the Subdivision Improvements, whether or not Owner
has submitted a written request for release of LOC, the BOCC may withdraw and employ
from the LOC such funds as may be necessary to construct the Subdivision Improvements in
accordance with the specifications, up to the face amount or remaining face amount of the
LOC. In such event, the BOCC shall make a written finding regarding Owner’s failure to
comply with this SIA prior to requesting payment from the LOC in accordance with the
LUDC. In lieu of or in addition to drawing on the LOC, the BOCC may bring an action for
injunctive relief or damages for the Owner’s failure to adhere to the provisions of this SIA
regarding Subdivision Improvements. The BOCC shall provide the Owner a reasonable time
which shall to cure any identified deficiency(ies) prior to requesting payment from the LOC
or filing a civil action.
h. Final Release of Security. Upon completion of all Subdivision
Improvements, and including off-site improvements, Owner shall submit to the BOCC,
through the Building and Planning Department: 1) record drawings bearing the stamp of
Owner’s Engineer certifying that all Subdivision Improvements, including off-site
8
improvements, have been constructed in accordance with the requirements of this SIA,
including all Final Plat Documents and the Final Plat Approval, in hard copy and digital
format acceptable to the BOCC; 2) copies of instruments conveying real property and other
interests which Owner is obligated to convey to any statutory special district or other entity
at the time of Final Plat Approval [, unless escrowed in accordance with paragraph __
below]; and 3) a Written Request for Final Release of LOC, in the form attached to and
incorporated herein as Exhibit E, along with Owner ’s Engineer’s stamp and certificate of
final completion of improvements.
i. The BOCC shall authorize a final release of the LOC after the
Subdivision Improvements are certified as final to the BOCC by the Owner’s
Engineer and said final certification is approved by the BOCC. If the BOCC finds
that the Subdivision Improvements are complete, in accordance with the relevant
specifications, the BOCC shall authorize release of the final amount of security,
within ten (10) business days following submission of the Owner’s Written Request
for Final Release of LOC accompanied by the other documents required by this
paragraph 3.h.
ii. Notwithstanding the foregoing, upon Owner’s Written Request for
Final Release of LOC, accompanied by Owner’s Engineer’s certificate of final
completion of improvements, the BOCC may inspect and review the Subdivision
Improvements certified as complete. If the BOCC does so review and inspect, the
process contained in paragraph 3.f., above, shall be followed.
iii. If the BOCC finds that the Subdivision Improvements are complete,
in accordance with the relevant specifications, the BOCC shall authorize final release
of security within ten (10) days after completion of such investigation.
9
iv. If the BOCC finds that the Subdivision Improvements are not
complete, in accordance with the relevant specifications, the BOCC may complete
remaining Subdivision Improvements, or institute court action in accordance with the
process outlined in paragraph 3.g., above.
IF REVEGETATION IS REQUIRED...
4. SECURITY FOR REVEGETATION.
a. Revegetation LOC and Substitute Collateral. $____________ of the face
amount of the LOC, specified in Paragraph 3a above, shall be allocated to revegetation of
disturbed areas within the Subdivision (“Revegetation LOC”), the cost for which is detailed
as a subdivision improvement in Exhibit B. The Revegetation LOC shall be valid for a
minimum of two (2) years following recording of the Final Plat. The BOCC, at its sole
option may permit the Owner to substitute collateral other than a Letter of Credit, in a form
acceptable to the BOCC, for the purpose of securing the completion of revegetation.
b. Revegetation LOC General Provisions. The provisions of paragraphs 3.b.,
3.c. and 3.d., above, dealing with Letter of Credit requirements, extension of expiration
dates, increase in face amounts, plat recording, and plat vacating shall apply to the
Revegetation LOC.
c. Revegetation Review and Notice of Deficiency. Upon establishment of
revegetation, the Owner shall request review of the revegetation work by the Garfield
County Vegetation Management Department, by telephone or in writing. Such review shall
be for the purpose of verification of success of revegetation and reclamation in accordance
with the Garfield County Weed Management Plan 2000, adopted by Resolution No. 2002-94
and recorded in the Office of the Garfield County Clerk and Recorder as Reception No.
580572, as amended, and the revegetation/reclamation plan titled _____________ and dated
10
_________________ for the Subdivision submitted as part of the Final Plat Documents. If
the Vegetation Management Department refuses approval and provides written notice of
deficiency(ies), the Owner shall cure such deficiency(ies) by further revegetation efforts,
approved by the Vegetation Management Department, as such efforts may be instituted
within the two (2) years following recording of the Final Plat.
d. Single Request for Release of Revegetation LOC. Following receipt of
written approval of the Vegetation Management Department, the Owner may request release
of the Revegetation LOC and shall do so by means of submission to the BOCC, through the
Building and Planning Department, of a Written Request for Release of Revegetation LOC,
in the form attached to and incorporated herein by reference as Exhibit E, along with
certification of completion by the Owner, or Owner’s agent with knowledge, and a copy of
the written approval of the Vegetation Management Department. It is specifically understood
by the parties that the Revegetation LOC is not subject to successive partial releases, as
authorized in paragraph 3.e., above. Further, the Revegetation LOC and the BOCC’s
associated rights to withdraw funds and bring a court action may survive final release of the
LOC securing other Subdivision Improvements, defined in paragraph 3.a., above.
e. BOCC’s Completion of Revegetation and Other Remedies. If Owner’s
revegetation efforts are deemed by the BOCC to be unsuccessful, in the sole opinion of the
BOCC upon the recommendation of the Vegetation Management Department, or if the
BOCC determines that the Owner will not or cannot complete revegetation, the BOCC, in its
discretion, may withdraw and employ from the Revegetation LOC such funds as may be
necessary to carry out the revegetation work, up to the face amount of the Revegetation
LOC. In lieu of or in addition to drawing on the Revegetation LOC, the BOCC may bring an
action for injunctive relief or damages for the Owner’s failure to adhere to the provisions of
11
this SIA related to revegetation. The BOCC shall provide the Owner a reasonable time to
cure any identified deficiency prior to requesting payment from the Revegetation LOC or
filing a civil action.
5. WATER SUPPLY AND WASTEWATER COLLECTION. As stated in
paragraph 13, below, prior to issuance by the BOCC of any certificates of occupancy for any
residences or other habitable structures constructed within the Subdivision, Owner shall install,
connect and make operable a water supply and distribution system for potable water, fire protection,
non-potable irrigation water, and a wastewater/sewer collection system in accordance with approved
plans and specifications. All easements and rights-of-way necessary for installation, operation,
service and maintenance of such water supply and distribution system(s) and wastewater collection
system shall be as shown on the Final Plat. Owner shall deposit with the Garfield County Clerk and
Recorder executed originals of the instruments of conveyance for easements appurtenant to the water
and wastewater system(s), for recordation following recording of the Final Plat and this SIA, unless
such easements are established on the Final Plat. All facilities and equipment contained within the
water supply and wastewater collection system(s) shall be transferred by Owner to the applicable
special district or municipality by bill of sale. If a third-party water or sewer service entity requires
warranty of the system(s), Owner shall provide proof to the BOCC that such warranty is in effect
and, if necessary, has been assigned.
6. ROADS. Pursuant to the Final Plat Approvals, all roads within the Subdivision shall
be private and privately owned and maintained. Owner shall be solely responsible for the
maintenance, repair, and upkeep of said rights-of-way, including the traveled surface of the
roadways and portions of the rights-of-way outside of the traveled surface. The BOCC shall not be
obligated to maintain any road rights-of-way within the Subdivision.
7. PUBLIC UTILITY RIGHTS-OF-WAY. Whether or not utility easements exist
12
elsewhere in the Subdivision, all road rights-of-way within the Subdivision shall contain rights-of-
way for installation and maintenance of utilities. Public utility easements shall be dedicated by the
Owner to the public utilities on the face of the Final Plat, subject to the Garfield County Road and
Right-of-Way Use Regulations, recorded as Reception No. 643477, in the records of the Garfield
County Clerk and Recorder, as amended. Owner shall be solely responsible for the maintenance,
repair and upkeep of said public utility easements, unless otherwise agreed to with the public utility
company(ies). The BOCC shall not be obligated for the maintenance, repair and upkeep of any
utility easement within the Subdivision. In the event a utility company, whether publicly or privately
owned, requires conveyance of the easements dedicated on the face of the Final Plat by separate
document, Owner shall execute and record the required conveyance documents.
8. INTENTIONALLY DELETED.
9. INDEMNITY. The Owner shall indemnify and hold the BOCC harmless and defend
the BOCC from all claims which may arise as a result of the Owner’s installation of the Subdivision
Improvements, including off-site improvements and revegetation, and any other agreement or
obligation of Owner, related to development of the Subdivision, required pursuant to this SIA. The
Owner, however, does not indemnify the BOCC for claims made asserting that the standards
imposed by the BOCC are improper or the cause of the injury asserted, or from claims which may
arise from the negligent acts or omissions of the BOCC or its employees. The BOCC shall notify
the Owner of receipt by the BOCC of a notice of claim or a notice of intent to sue, and the BOCC
shall afford the Owner the option of defending any such claim or action. Failure to notify and
provide such written option to the Owner shall extinguish the BOCC’s rights under this paragraph.
Nothing in this paragraph shall be construed to constitute a waiver of governmental immunity
granted to the BOCC by Colorado statutes and case law.
10. ROAD IMPACT FEE. Pursuant to the Garfield County subdivision regulations, the
13
following Road Impact Fees apply withing the Subdivision: $1,988 has per residential unit; $1,630
per 1,000 square feet of office and other services floor area; and $3,766 per 1,000 square feet of
commercial floor area. Owner shall pay fifty percent (50%), i.e., ___________________
($__________) of the Road Impact Fee to the Garfield County Treasurer at or prior to the time of
recording of the Final Plat. The remaining 50%, i.e., __________________ ($__________), will be
collected at the time a building permit issues for a structure within the Subdivision.
11. FEES IN LIEU OF DEDICATION OF SCHOOL LAND. Owner shall make a
cash deposit in lieu of dedicating land to the RE-1 School District, calculated in accordance with the
LUDC and the requirements of state law. The Owner and the BOCC acknowledge and agree that the
cash in lieu payment for the Subdivision is calculated as follows:
Unimproved per acre market value of land, based upon an appraisal submitted to the
BOCC by Owner, i.e. $_________________; and
Land dedication standard: multi-family dwelling units x _____ acres equals
________ acres.
The Owner, therefore, shall pay to the Garfield County Treasurer, at or prior to the time of
recording of the Final Plat, _______________ ($___________) as a payment in lieu of dedication of
land to the RE-1 School District. Said fee shall be transferred by the BOCC to the school district in
accordance with the provisions of § 30-28-133, C.R.S., as amended, and the LUDC.
The Owner agrees that it is obligated to pay the above-stated fee, accepts such obligations,
and waives any claim that Owner is not required to pay the cash in lieu of land dedication fee. The
Owner agrees that Owner will not claim, nor is Owner entitled to claim, subsequent to recording of
the Final Plat of the Subdivision, a reimbursement of the fee in lieu of land dedication to the RE-1
School District.
12. SALE OF LOTS. No lots, tracts, or parcels within the Subdivision may be
14
separately conveyed prior to recording of the Final Plat in the records of the Garfield County Clerk
and Recorder.
13. BUILDING PERMITS AND CERTIFICATES OF OCCUPANCY. As one
remedy for breach of this SIA, the BOCC may withhold issuance of building permits for any
residence or other habitable structure to be constructed within the Subdivision. Further, no building
permit shall be issued unless the Owner demonstrates to the satisfaction of the Glenwood Springs
Fire Department (“District”), if the District has so required, that there is adequate water available to
the construction site for the District’s purposes [and all applicable District fees have been paid to the
District]. No certificates of occupancy shall issue for any habitable building or structure, including
residences, within the Subdivision until all Subdivision Improvements [, except revegetation] and
including off-site improvements, have been completed and are operational as required by this SIA.
14. CONSENT TO VACATE PLAT. In the event the Owner fails to comply with the
terms of this SIA, the BOCC shall have the ability to vacate the Final Plat as it pertains to any lots
for which building permits have not been issued. As to lots for which building permits have been
issued, the Plat shall not be vacated and shall remain valid. In such event, the Owner shall provide
the BOCC a plat, suitable for recording, showing the location by surveyed legal description of any
portion of the Final Plat so vacated by action of the BOCC. If such a Plat is not signed by the BOCC
and recorded, or if such Plat is not provided by the Owner, the BOCC may vacate the Final Plat, or
portions thereof, by resolution.
15. ENFORCEMENT. In addition to any rights provided by Colorado statute, the
withholding of building permits and certificates of occupancy, provided for in paragraph 13, above,
the provisions for release of security, detailed in paragraph 3, above, and the provisions for plat
vacation, detailed in paragraph 14, above, it is mutually agreed by the BOCC and the Owner, that the
BOCC, without making an election of remedies, and any purchaser of any lot within the Subdivision
15
shall have the authority to bring an action in the Garfield County District Court to compel
enforcement of this SIA. Nothing in this SIA, however, shall be interpreted to require the BOCC to
bring an action for enforcement or to withhold permits or certificates or to withdraw unused security
or to vacate the Final Plat or a portion thereof, nor shall this paragraph or any other provision of this
SIA be interpreted to permit the purchaser of a lot to file an action against the BOCC.
16. NOTICE BY RECORDATION. This SIA shall be recorded in the Office of the
Garfield County Clerk and Recorder and shall be a covenant running with title to all lots, tracts and
parcels within the Subdivision. Such recording shall constitute notice to prospective purchasers and
other interested persons as to the terms and provisions of this SIA.
17. SUCCESSORS AND ASSIGNS. The obligations and rights contained herein shall
be binding upon and inure to the benefit of the successors and assigns of the Owner and the BOCC.
16
18. CONTRACT ADMINISTRATION AND NOTICE PROVISIONS. The
representatives of the Owner and the BOCC, identified below, are authorized as contract
administrators and notice recipients. Notices required or permitted by this SIA shall be in writing
and shall be effective upon the date of delivery, or attempted delivery if delivery is refused.
Delivery shall be made in person, by certified return receipt requested U.S. Mail, receipted delivery
service, or facsimile transmission, addressed to the authorized representatives of the BOCC and the
Owner at the address or facsimile number set forth below:
Owner:
BOCC:
______________________________
______________________________
______________________________
______________________________
w/copy to,
______________________________
______________________________
______________________________
______________________________
Board of County Commissioners
of Garfield County, Colorado
c/o Building & Planning Dir.
108 8th Street, Suite 401
Glenwood Springs, CO 81601
Phone: (970) 945-8212
Fax: (970) 384-3470
17
19. AMENDMENT AND SUBSTITUTION OF SECURITY. This SIA may be
modified, but only in writing signed by the parties hereto, as their interests then appear. Any such
amendment, including, by way of example, extension of the Completion Date, substitution of the
form of security, or approval of a change in the identity of the security provider/issuer, shall be
considered by the BOCC at a scheduled public meeting. If such an amendment includes a change in
the identity of the provider/issuer of security, due to a conveyance of the Subdivision by the Owner
to a successor in interest, Owner shall provide a copy of the recorded assignment document(s) to the
BOCC, along with the original security instrument. Notwithstanding the foregoing, the parties may
change the identification of notice recipients and contract administrators and the contact information
provided in paragraph 18, above, in accordance with the provisions of that paragraph and without
formal amendment of this SIA and without consideration at a BOCC meeting.
20. COUNTERPARTS. This SIA may be executed in counterparts, each of which shall
be deemed an original, and all of which, when taken together, shall be deemed one and the same
instrument.
21. VENUE AND JURISDICTION. Venue and jurisdiction for any cause arising out of
or related to this SIA shall lie with the District Court of Garfield County, Colorado, and this SIA
shall be construed according to the laws of the State of Colorado.
18
IN WITNESS WHEREOF, the parties have signed this SIA to be effective upon the
date of Final Plat Approval for the Subdivision.
BOARD OF COUNTY COMMISSIONERS
ATTEST: OF GARFIELD COUNTY, COLORADO
_________________________ By: ___________________________
Clerk to the Board Chairman
Date: __________________________
OWNER
By: ____________________________
________________________________
(Name and Title)
Date: __________________________
STATE OF COLORADO )
)ss.
COUNTY OF GARFIELD )
Subscribed and sworn to before me by ________________________, an authorized
representative of __________________, Owner of the Subdivision, this ___ day of
__________________, 200__.
WITNESS my hand and official seal.
My commission expires: ____________________________
_______________________________
Notary Public
19
EXHIBIT A
List of Drawings of Subdivision Improvements
20
EXHIBIT B
Cost Estimate
21
EXHIBIT C
Copy of Letter of Credit
22
EXHIBIT D
Form Written Request for Partial Release of LOC
Board of County Commissioners
Garfield County, Colorado
c/o Director of Community Development
108 8th Street, Suite 401
Glenwood Springs, CO 81601
RE: _______________Subdivision
This request is written to formally notify the BOCC of work completed for _____________________
Subdivision. As Owner [On behalf of the Owner], we request that the BOCC review the attached Engineer’s
Certificate of Partial Completion and approve a reduction in the face amount of the Letter of Credit in the
amount of $____________________, to a reduced face amount of $_____________________.
Attached is the certified original cost estimate and work completed schedule, showing:
Engineers Cost Estimate _____________
Work Completed, less 10% _____________
Reduced Face Amount of LOC _____________
Based on periodic observation and testing, the construction has been completed, to date, in accordance
with the intent of the plans and specifications that were reviewed and approved by the BOCC’s
representatives and referenced in Paragraph 2 of the Subdivision Improvements Agreement between the
BOCC and the Owner.
If further information is needed, please contact _________________________, at ___________.
_____________________________
Owner
or
_____________________________
Owner’s Representative/Engineer
23
EXHIBIT E
Written Request for Final Release of LOC/Revegetation LOC
REQUEST FOR FINAL RELEASE OF LETTER OF CREDIT
Board of County Commissioners
Garfield County, Colorado
c/o Director of Buildi ng and Planning
108 8th Street, Suite 401
Glenwood Springs, CO 81601
RE: _______________Subdivision
This request is written to formally notify the BOCC of work completed for _____________________
Subdivision. As Owner [On behalf of the Owner], we request that the BOCC review the attached Engineer’s
Certificate of Completion and approve a full release of the Letter of Credit in the amount of
$____________________.
Attached is the certified original cost estimate and work completed schedule, showing that all
[improvements] [revegetation] required by the Improvements Agreement and secured by the Letter of
Credit have been completed.
Also enclosed are the following, required by the Improvements Agreement dated _______ between Owner
and the BOCC, recorded at Reception No. ____________ at the Real Estate Records of the Garfield County
Clerk and Recorder (the “SIA”):
1. record drawings bearing the stamp of Owner’s Engineer certifying that all [improvements]
[revegetation] have been constructed /installed in acco rdance with the requirements of the SIA,
both in hand copy and digital format acceptable to the BOCC; and
2. copies of instruments conveying real property and other interests which Owner was obligated to
convey to the homeowner’s association or other entity at the time of final Plat Approval.
If further information is needed, please contact _________________________, at ___________.
_____________________________
Owner
or
_____________________________
Owner’s Representative/Engineer
Glenwood Business Center Public Improvements
Engineer's Opinion of Probable Construction Costs
SE Job # 30017.04
02/22/2023
1
ITEM NATURE OF WORK QUANTITY UNIT UNIT COST COST
G1 MOBILIZATION JOB L.S.25,000.00 25,000.00$
G2 LAYOUT, OBSERVATION, TESTING & AS-BUILTS JOB L.S.40,000.00 40,000.00$
G3 TRAFFIC CONTROL JOB L.S.5,000.00 5,000.00$
G4 ENGINEERING DRAWINGS JOB L.S.8,000.00 8,000.00$
78,000.00$
D1 4" DEPTH ASPHALTIC PAVEMENT 125 S.Y.40.00 5,000.00$
D2 SUBGRADE PREP, FINE GRADING JOB L.S.5,000.00 5,000.00$
D3 STRUCTURAL FILL MATERIAL 850 C.Y.50.00 42,500.00$
D4 TOPSOIL PLACEMENT 300 C.Y.15.00 4,500.00$
D5 CLASS 6 AGGREGATE 138 C.Y.80.00 11,040.00$
D6 CONCRETE SIDEWALK 3,832 S.F.8.00 30,656.00$
D7 HANDICAP RAMPS 120 S.F.12.00 1,440.00$
D8 CONCRETE CURB & GUTTER @ CHAPPARAL 80 L.F.50.00 4,000.00$
D9 INSTALL TREES 15 E.A.1,000.00 15,000.00$
D10 IRRIGATION AND SEEDING JOB L.S.2,500.00 2,500.00$
121,636.00$
ST1 STORM INLET STRUCTURES 4 E.A.3,500.00 14,000.00$
ST2 12" STORM PIPE 275 L.F.65.00 17,875.00$
ST3 18" STORM PIPE 330 L.F.80.00 26,400.00$
58,275.00$
SS1 8" SDR 35 SEWER LINE 452 L.F.80.00 36,160.00$
SS3 4' DIA. PRECAST SEWER MANHOLE 3 E.A.6,500.00 19,500.00$
SS4 6" SDR 35 SEWER SERVICE 300 L.F.60.00 18,000.00$
73,660.00$
W1 8" C900 PVC WATER MAIN 770 L.F.100.00 77,000.00$
W2 8" WATER VALVES 1 E.A.4,000.00 4,000.00$
W3 WATER SERVICE & VALVE 3 E.A.2,500.00 7,500.00$
W4 HOT TAP AND VALVE AT MAIN 1 L.S.8,000.00 8,000.00$
W5 FIRE HYDRANT ASSEMBLY 2 E.A.8,000.00 16,000.00$
112,500.00$
I1 6" PVC IRRIGATION MAIN 350 L.F.60.00 21,000.00$
I2 6" WATER VALVES 2 E.A.2,500.00 5,000.00$
I3 4" PVC IRRIGATION TO LOT 3 410 L.F.55.00 22,550.00$
I4 4" WATER VALVES 2 E.A.2,000.00 4,000.00$
I5 8" GRAVITY IRR TO LOT 3 410 L.F.60.00 24,600.00$
77,150.00$
E1 ELECTRIC TRENCHING, BEDDING, BACKFILL, CONDUIT 160 L.F.50.00 8,000.00$
E2 ELECTRIC TRANSFORMERS 2 E.A.6,000.00 12,000.00$
20,000.00$
541,221.00$
54,122.10
595,343.10$
SANITARY SEWER
SUBTOTAL SEWER =
WATER MAIN & HYDRANTS
SUBTOTAL WATER =
ELECTRIC & SHALLOW UTILITIES
GENERAL
SUBTOTAL SITE =
OFFSITE STORM + THROUGH SITE
SUBTOTAL OFFSITE STORM =
DONEGAN SIDEWALK
SUBTOTAL PAVING =
SUBTOTAL ELECTRIC =
IRRIGATION MAIN
SUBTOTAL WATER =
TOTAL ALL ITEMS W/ DEMO =
TOTAL OF ITEMS ABOVE =
10% CONTINGENCY =
NOTE: This opinion of probable construction cost was prepared for budgeting purposes only. Sopris Engineering, LLC
cannot be held responsible for variances from this estimate as actual costs may vary due to bid and market fluctuations.
2378153_1
__________________________________________________________________________
RECIPROCAL EASEMENT AND OPERATION AGREEMENT
THIS RECIPROCAL EASEMENT AND OPERATION AGREEMENT (this “Agreement”) is
made and entered into as of ________________, 2023, by and between 214 CENTER DRIVE
LLC, a Colorado limited liability company (“214 Center”) and GLENWOOD PARTNERSHIP,
LLLP, a Colorado limited liability limited partnership (“GP ”). 214 Center and GP may be referred
to individually herein as a “Party” or collectively as the “Parties.”
W I T N E S S E T H:
WHEREAS, on ________________, GP caused to be recorded in the office of the Garfield
County Clerk & Recorder at Reception No. ____________ that certain Final Plat of Cooper
Subdivision, a copy of which is attached as Exhibit A hereto (the “Plat”), which Plat created Lot
1, Lot 2, and Lot 3 as described and depicted thereon and dedicated certain public and private
easements within the subdivision.
WHEREAS, GP is the owner of Lot 1 and Lot 3 as shown on the Plat.
WHEREAS, 214 Center is the owner of Lot 2 as shown on the Plat.
WHEREAS, Lot 1, Lot 2, and Lot 3 may be referred to individually herein as a “Lot” or
collectively as the “Lots” or the “Property.”
WHEREAS, the Property is intended for development and operation as a commercial park
consistent with the Special Use Permit approved by the Garfield County Board of County
Commissioners pursuant to Resolution No. 81-121 and the Special Use Permit recorded at
Reception No. 854599, as amended by _______________ (the “Special Use Permit”).
WHEREAS, Lot 1 is currently improved with two commercial buildings, and 214 Center
intends to develop a self-storage facility and two office/warehouse flex buildings on Lot 2, all as
shown on the site plan attached as Exhibit A approved as part of the Special Use Permit (the “Site
Plan”).
WHEREAS, Lot 3 is currently vacant and may be improved in the future with buildings in
the general location shown on the Site Plan; and
WHEREAS, GP and 214 Center desire to enter into this Agreement to provide for the
integrated use of the Lots as a commercial park consistent with the Site Plan and Special Use
Permit.
NOW, THEREFORE, in consideration of the mutual covenants and agreements contained in
this Agreement and other good and valuable consideration, the Parties agree as follows:
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 2
2378153_3
ARTICLE I
DEFINITIONS
Each reference in this Agreement to any of the following terms shall mean:
1.1 BUILDING AREA. The area(s) of the Lots (i) designated on the Site Plan for buildings or
(ii) upon which buildings are actually built. Subject to the restrictions expressly set forth herein,
the Site Plan may be changed to add, delete, or alter Building Area within a Lot by an amendment
hereto by the Lot owners.
1.2 IRRIGATION EASEMENT. The Irrigation Easements on Lot 2 created by and depicted on the
Plat.
1.3 OCCUPANT. Any Person or Persons from time to time entitled to use or occupy any portion
of the improvements constructed on any Lot by virtue of ownership or pursuant to any written
lease, or other instrument or written arrangement with the Owner of the Lot which is the subject
of the occupancy agreement, under which the Person acquires the right of use and occupancy. The
term shall include the members, managers, partners, officers, directors, employees, agents, and
independent contractors of such Persons who are not individuals.
1.4 OWNER. GP and 214 Center, as fee owners of the Lots, and their successors and assigns in
such capacity.
1.5 PRIVATE ACCESS EASEMENT. The Private Access and Emergency Vehicle Access
Easement created by and depicted on the Plat.
1.6 PRO RATA SHARE: The amount of each of Lot 1, Lot 2, and Lot 3’s respective
responsibility for the shared expenses provided for in this Agreement, expressed as a percentage,
based on the size of the Lot in relation to the aggregate size of all of Lots 1, 2, and 3. If any such
Lot is subdivided, or if the size of any Lot changes, upon prior written notice to the Owners of the
other Lots, the Pro Rata Share of such Lot shall be automatically reallocated among the subdivided
lots or parcels within the Lot, or automatically reallocated based on the changed lot sizes on the
same basis, provided that the Pro Rata Share of all Lots, as subsequently subdivided or adjusted,
must total one hundred percent (100%). As of the date hereof, each Lot’s Pro Rata Share is:
LOT 1 – 20.18%
LOT 2 – 49.80%
LOT 3 – 30.02%
1.7 PRO RATA SHARE FOR SHARED IRRIGATION AND STORMWATER EXPENSES: Each Lot’s
Pro Rata Share for the Shared Irrigation and Ditch Expenses, as defined in Section 3.2 hereof.
1.8 PRO RATA SHARE FOR SHARED ROADWAY EXPENSES. Each Lot’s Pro Rata Share for the
Shared Roadway Expenses, as defined in Section 3.4 hereof.
1.9 PRO RATA SHARE FOR SHARED WATERLINE EXPENSES. Each Lot’s Pro Rata Share for
the Shared Waterline Expenses, as defined in Section 3.3 hereof.
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 3
2378153_3
1.10 PERSON OR PERSONS. Individuals, partnerships, companies, firms, associations,
corporations, trusts, joint ventures, or any other form of business or legal entity.
1.11 SHARED EXPENSES. Collectively, the Shared Irrigation and Ditch Expenses, the Shared
Roadway Expenses, the Shared Waterline Expenses, and any other expenses shared among the Lot
Owners provided for in this Agreement.
1.12 USERS. All Persons granted license or permission by Occupants to utilize or enter upon
the Property, including, without implied limitation, lessees, sublessees, and concessionaires of
Occupants, and all of their employees and service people, licensees, invitees, owners, contractors,
guests, and agents.
1.13 UTILITY EASEMENTS. The public and private utility easements created by and depicted on
the Plat.
ARTICLE II
GRANT OF RECIPROCAL EASEMENTS
2.1 GRANT OF RECIPROCAL EASEMENTS. In addition to the Private Access Easement,
Irrigation Easements, and other easements dedicated on the Plat, each Owner grants to the Owner
of the other Lots the following easements over such Owner’s respective Lot(s):
(a) a non-exclusive easement over those portions of a Lot outside the Building Area to permit
unobstructed pedestrian and vehicular passage by the Owner, Occupants, and Users of the Lots;
(b) a non-exclusive easement over the those portions of a Lot outside the Building Area to
permit the construction, maintenance, and use of all apparatus necessary to provide utility services
to a Lot, including, without limitation, telephone, electricity, water, Lot Irrigation Lines (as defined
in Section 3.2 below), natural gas, storm and sanitary sewers, provided that the same are
constructed and installed within the Utility Easements and constructed, installed, maintained, and
repaired in compliance with all laws, orders, rules and regulations of any governmental or private
authority having jurisdiction over same, including without limitation, the requirements of any
utility companies. The dominant Lot Owner shall use reasonable efforts to minimize any disruption
or demolition of a servient Lot by reason of the use of this easement, and work by the dominant
Lot owner pursuant to this easement shall not exceed one (1) day in duration except during the
period when the servient Lot is undeveloped and unless such disruption or demolition cannot be
reasonably completed within such one (1) day period, in which event the period will be extended
to such time period as reasonably is required and such area forthwith shall be restored as quickly
as reasonably possible by the dominant Lot owner to its original condition at no expense to the
servient Lot Owner;
(c) a non-exclusive easement over each Lot to permit the temporary occupation of the servient
Lot in order to facilitate the construction or maintenance of the improvements on the dominant
Lot, provided that the dominant Lot owner shall use reasonable efforts to not interfere with the
construction or operation of the improvements on the servient Lot and shall repair any damage
done to the servient Lot during such temporary occupation at no expense to the servient Lot Owner;
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 4
2378153_3
(d) a non-exclusive easement to permit the construction, use, and maintenance of monument
sign(s) in location(s) agreed in writing by the servient Lot Owner and dominant Lot Owner,
including any electrical lines required to illuminate the sign(s), provided that all lines are
constructed underground. All signage shall comply with any sign code regulations of the any
governmental or private authority having jurisdiction over same.
2.2 INDEMNIFICATION. The dominant Lot Owner shall indemnify, defend, and hold harmless
the other Lot Owners and their Occupants and Users from all claims, liens, damages and expenses,
including, without limitation, reasonable attorneys’ fees, arising out of its use of any of the
easements established in this Article II.
2.3 NO PUBLIC DEDICATION. Nothing herein shall create a gift or dedication to the general
public or for the general public or for any public purpose or otherwise create any rights of the
general public in any portion of the Property, it being the intention of the Parties that this
Agreement shall be strictly limited to and for the purposes herein expressed. Each Lot Owners
agree that any public ingress and egress to and within the Property, and on its Lot, is permissive
and shall not ever give rise to a claim for a prescriptive easement arising from continued public
use of same. Notwithstanding any other provision herein to the contrary, each Lot Owner may
periodically restrict ingress and egress on its Lot in order to prevent a prescriptive easement from
arising by continued public use of same.
2.4 NO PARKING USE IMPLIED. No parking easements are created under this Agreement and,
therefore, nothing herein shall be construed to permit the Occupants or Users of one Lot to park in
parking spaces on any other Lot unless expressly authorized by a Lot Owner. Each Lot Owner may
install signage within its parking areas to restrict parking to the Occupants and Users of such Lot.
ARTICLE III
MAINTENANCE AND REPAIRS
3.1 LOT MAINTENANCE. Each Lot Owner shall be responsible, at its sole cost and expense, for
the repair and upkeep of that portion of its Lot outside the Private Access Easement and any
common landscaping areas, which repair and upkeep shall be performed in a workmanlike,
diligent, and efficient manner and shall include:
(a) Maintenance of paved surfaces in a level and smooth condition, free of potholes, with the
type of material as originally used or a substitute equal in quality;
(b) Removal of all trash and debris and washing or sweeping as required;
(c) Removal of snow and ice from paved surfaces and sidewalks;
(d) Maintenance of appropriate parking area entrance, exit, and directional markers;
(e) Cleaning of lighting fixtures and relamping as needed;
(f) Restriping parking lots and drive aisles as required to keep same clearly visible;
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 5
2378153_3
(g) Mowing, grooming, and irrigation of all seeded, sodded, grass, or ground covered areas
and maintenance and replacement of all landscaped areas (including maintenance, repair, and
replacement of irrigation systems);
(h) Maintenance and cleaning of all storm water drainage systems; and
(i) Maintenance, repair, and replacement of enclosures for trash receptacles.
3.2 IRRIGATION AND STORMWATER MAINTENANCE AND REPAIR.
(a) Irrigation water for the Property will be provided from the Reynolds & Cain Ditch. Water
from the Reynolds & Cain Ditch is delivered to a collection box located on the northern property
line of Lot 2 within the Irrigation Easements and will be pumped to Lots 1, 2, and 3 through
pipelines located within the Irrigation Easements. The collection box, pump, irrigation delivery
pipeline, all stormwater collection and other drainage infrastructure serving the Property are
referred to herein as the “Common Irrigation and Stormwater Infrastructure.” Irrigation lines
within and serving each Lot are referred to as the “Lot Irrigation Lines.”
(b) All costs for the operation (including electricity costs, spring start-up, and winterization),
maintenance, repair, and replacement of the Common Irrigation and Stormwater Infrastructure
(collectively, the “Shared Irrigation and Stormwater Expenses”) shall be borne by the owners
of Lot 1, Lot 2, and Lot 3 based on their Pro Rata Shares of Shared Irrigation and Stormwater
Expenses. The Owner of Lot 1 shall be responsible for coordinating the operation, maintenance,
repair, and replacement of the Common Irrigation and Stormwater Infrastructure. With respect to
the Lot Irrigation Lines, the Owner of each Lot shall be responsible for the operation, maintenance,
repair, and replacement of the Lot Irrigation Line(s) serving such Owner’s Lot.
3.3 WATER AND SEWER CONSTRUCTION, MAINTENANCE, AND REPAIR. Potable water for the
Property will be provided by the City of Glenwood Springs (the “City”). Sanitary sewer service
to the Property will be provided by the West Glenwood Sanitation District (the “District”). Any
extension of the existing sanitary sewer main line needed to serve Lot 2 and Lot 3 will be dedicated
to the District. The existing water main line and any extension thereof to serve Lot 2 and Lot 3
shall be privately owned and maintained by the Lot Owners. New fire hydrants shall be dedicated
to the City. All costs to construct an extension of the water and sanitary sewer main lines to serve
Lot 2 and Lot 3 and to install all required fire hydrants shall be paid for by 214 Center. Once
installed, all costs for the operation, maintenance, repair, and replacement of the water main line
(the “Shared Waterline Expenses”) shall be borne by the owners of Lot 1, Lot 2, and Lot 3 based
on their Pro Rata Shares of Shared Waterline Expenses. In the event the Owner, Occupant, or User
of one Lot damages the water main line, the Owner of such Lot will be response for repairing such
damage at its sole cost and expense. The Owner of each Lot shall be responsible for the operation,
maintenance, repair, and replacement of the water and sanitary sewer service lines serving such
Owner’s Lot from the point of connection of the service line with the main line.
3.4 ROADWAY CONSTRUCTION, MAINTENANCE, AND REPAIR. 214 Center shall be
responsible, at its cost and expense, for constructing the roadway, including curb, gutter, and
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 6
2378153_3
sidewalk, within the Private Access Easement (the “Roadway”), except for that portion of the
Roadway that exists as of the date hereof. The Owner of Lot 3 will be responsible, at its expense,
for constructing any driveways or drive aisles needed to connect Lot 3 to the Roadway. Once the
Roadway is constructed, all costs for the operation (including the cost of electricity for and
maintenance of any Roadway lighting), maintenance (including snow removal and landscaping
within the Private Access Easement), repair, and replacement of the Roadway (the “Shared
Roadway Expenses”) shall be borne by the owners of Lot 1, Lot 2, and Lot 3 based on their Pro
Rata Shares of Shared Roadway Expenses. If the Owner, Occupant, or User of one Lot causes any
damage to the Roadway, including by construction vehicles or other heavy equipment, the Owner
of such Lot causing the damage shall be solely responsible for the cost to repair the damage.
3.5 COLLECTION OF PRO RATA SHARE OF SHARED EXPENSES. Unless otherwise agreed by
the Lot Owners, the Owner of Lot 1 shall send the other Owners by no later than March 1 of each
year, a reasonably detailed statement showing the actual Shared Expenses incurred during the
previous year, together with an invoice for such Lot Owner’s Pro Rata Share of such Shared
Expenses. Notwithstanding the foregoing, to the extent actual Shared Expenses exceed $10,000,
the Owner of Lot 1 may issue an invoice to other Lot Owners immediately. The amounts due shall
be paid to the Lot 1 owner within 30 days. Amounts not paid within 30 days shall accrue interest
at the rate provided in Section 5.3 hereof until paid. The Lot 1 owner shall have the right to lien
the Lot of any other Owner that fails to pay within 90 days.
ARTICLE IV
INSURANCE AND INDEMNIFICATION
4.1 The owner of each Lot shall maintain comprehensive general liability insurance, including
contractual liability coverage, naming the other Lot Owners as additional insureds and providing
coverage with a combined bodily injury, death, and property damage limit of Two Million and
00/100 Dollars ($2,000,000.00) or more per occurrence. The Owner of a Lot shall provide a Lot
Owner with a certificate of insurance upon request, which certificate shall provide that the
coverage referred to therein shall not be modified or cancelled without at least thirty (30) days
written notice to each named insured thereunder.
4.2 INDEMNIFICATION. Each Owner does hereby covenant and agree to fully protect, defend,
indemnify and hold harmless all other Owners and their respective Occupants and Users against
any and all losses, damages, claims, demands and suits (and all reasonable costs and expenses
incidental thereto, including attorney fees and costs) of any kind or nature that another Owner may
suffer or incur or to which it may be made liable (collectively, “Claims”), arising from or relating
to use of the Roadway or any other infrastructure or improvement for which costs are shared under
this Agreement; provided, however, that the indemnity obligations provided for herein shall
exclude Claims resulting from the gross negligence or malicious acts (or omissions) of another
Owner or its Occupants or Users.
4.3 NOTICE OF CLAIMS. The indemnity and defense obligations of the Owners under Section
4.2 are conditioned upon receipt of written notice of a Claim, received reasonably promptly, but
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 7
2378153_3
in any event no later than sixty (60) days after the occurrence of the event or the assertion of the
third party claim forming the basis of the Claims.
ARTICLE V
5.1 NOTICE OF BREACH; OPTION TO CURE. Except as otherwise expressly set forth in this
Agreement, should a Lot Owner breach any of its obligations hereunder and such breach continue
for a period of thirty (30) days after an Owner’s receipt of written notice of such breach, any of
the other Lot Owners shall be entitled to cure such breach in addition to all remedies at law or in
equity, provided that such party furnish prior notice to the other Lot Owners of the Owner’s intent
to cure the breach, and further provided that no notice is required should the breach create an
emergency or interfere with use of a Lot. All expenses incurred by the other Lot Owner(s) or to
cure the defaulting Lot Owner's uncured breach pursuant to the preceding notice shall be
reimbursed by the defaulting Lot Owner within thirty (30) days after receipt of written evidence
confirming the payment of such expenses
5.2 COSTS OF ENFORCEMENT. In the event of litigation by reason of this Agreement, the
prevailing party in such litigation shall be entitled to recover reasonable attorneys’ fees in addition
to all other expenses incurred by an Owner in connection with such litigation.
5.3 INTEREST. Any sums remaining unpaid in accordance with Article III or Section 5.1,
together with interest calculated at the rate of eight percent (8%) per annum, may be secured by a
lien on the Lot of the owner in default and may be perfected in accordance with the laws of the
State of Colorado.
ARTICLE VI
MISCELLANEOUS
6.1 TERM. The rights and easements granted and conveyed under this Agreement shall run
with title to the Lots and inure to and be for the benefit of each Owner and their respective
Occupants, Users, successors, and assigns.
6.2 AMENDMENT & TERMINATION. This Agreement and the rights and easements granted
and conveyed under this Agreement may be amended or terminated only with the written approval
of all Lot Owners. Any such amendment, termination or rescission shall be evidenced by a written
instrument recorded in the Office of the Clerk & Recorder of Garfield County, Colorado.
6.3 FUTURE SUBDIVISION. Any Lot may be subdivided by the Owner of such Lot (subject to
compliance with all applicable rules and regulations of Garfield County and any other
governmental body having jurisdiction). In such case, the subdivided lots or parcels shall be
subject to this Agreement, and the owner of such subdivided lot or parcel shall have all the rights
and obligations applicable to the owners of the Lots in the subdivision as of the date hereof.
6.4 RELATIONSHIP OF OWNERS. This Agreement shall not create an association, partnership,
joint venture, or a principal and agency relationship between or among any of the Owners of the
Lots or their Occupants or Users.
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 8
2378153_3
6.5 NOTICES TO OWNERS. All notices and approvals required or permitted under this
Agreement shall be served by (i) certified mail, return receipt requested, or (ii) nationally
recognized overnight courier, to a Party at the last known address of its principal place of business.
Date of service of notice or approval shall be the date on which such notice or approval is deposited
in a Post Office of the United States Postal Service or any successor governmental agency. An
Owner may change the address for required notices upon a minimum of fifteen days’ prior written
notice to the other Owner at such other Owner’s specified address.
6.6 NO IMPLIED RESTRICTIONS ON LAND USE, DEVELOPMENT, OR CONSTRUCTION. It is the
intention of the parties that no term or provision of this Agreement shall be interpreted to limit or
restrict the rights of the Owners in the subdivision, design, development, or construction or
improvements of or on the Properties. Each party hereby reserves the right to develop and improve
the portions of the Properties owned by each; to locate and construction buildings on the
Properties; to lay out paved areas on the Properties; and to relocate from time to time any
improvements on the Properties in any fashion determined by the party in such party's sole and
absolute discretion) (subject, however, to Paragraph 6.1). Neither party hereto, nor their
successors, shall have or claim any right or interest arising out of this Agreement to limit or restrict
in any way the rights of the other party in the subdivision, design, development or construction of
improvements on or to the Properties (except for the express limitation contained in Paragraph
6.1).
6.7 WAIVER. No waiver of any provision hereof shall be deemed to imply or constitute a
further waiver thereof or any other provision set forth herein.
6.8 INJUNCTIVE RELIEF PERMITTED. In addition to all other rights and remedies provided for
hereunder and at law or in equity, any Party hereto may seek and obtain injunctive relief to enforce,
protect, and preserve the rights and easements herein created and granted, and to prevent or enjoin
violations or threatened violations of this Agreement.
6.9 BINDING EFFECT. This Agreement shall be binding upon and shall inure to the benefit of
each of the Parties hereto and the respective heirs, successors, and assigns of the Parties and any
Person claiming by, through, or under any of the Parties or their heirs, successors, and assigns.
The rights and easements created and granted hereunder shall be appurtenant and shall run with
the land in perpetuity as between the Lot of the grantor as the servient estate, and the Lot of the
grantee as the dominant estate.
6.10 ENTIRE AGREEMENT; SEVERABILITY. This Agreement contains the entire undertaking by
the Parties hereto and there are no other terms, expressed or implied, except as contained herein.
Should any provision hereof be declared invalid by a legislative, administrative or judicial body
of competent jurisdiction, the other provisions hereof shall remain in full force and effect and shall
be unaffected by same
6.11 EXISTING TITLE CONDITIONS. The easements granted herein are conveyed and accepted
subject to any and all conditions and restrictions of this Agreement; rights existing or hereafter
acquired by the mortgagees of the Parties hereto or their successors; and are subject to any
RECIPROCAL EASEMENT AND OPERATION AGREEMENT - Page 9
2378153_3
encumbrances and restrictions relating to the Property to the extent, and only to the extent, that the
same may still be in force and effect and shown of record in the Office of the County Clerk of
Garfield County, Colorado.
6.12 MULTIPLE COUNTERPARTS. This Agreement may be executed in any number of separate
documents which shall be counterparts hereof, each of which shall have the same force and effect
as an original instrument as if both parties and all those consenting to the aggregate counterparts
had signed the same documents. If executed in separate counterparts, all counterparts shall
constitute but one and the same instrument.
[Signatures appear on following pages.]
RECIPROCAL ACCESS EASEMENT AGREEMENT
214 CENTER DRIVE, LLC
A Colorado limited liability company
By:
Name:
Title:
Date of Execution:
STATE OF COLORADO )
) ss.
COUNTY OF GARFIELD )
On the _____ day of _______________, the foregoing was acknowledged before me by
____________________ as ______________ of 214 Center Drive, LLC
Notary Public
RECIPROCAL ACCESS EASEMENT AGREEMENT
GLENWOOD PARTNERSHIP LLLP
By:__________________________________________
Name:
Title:
STATE OF COLORADO )
) ss.
COUNTY OF GARFIELD )
The foregoing Agreement was acknowledged before me this ____ day of ____________, 2023, by
______________ as ________________ of Glenwood Partnership LLLP.
WITNESS my hand and official seal.
My commission expires:
_______________________________
Notary Public