Loading...
HomeMy WebLinkAboutApplicationGarfield County Community Development Department RËCËlVËÞ L08 8th Street, Suite 401. Glenwood Springs, CO 8160L 'i!il, ,.,ir ,lli.'' (g7Ol94S-82L2 üARFtÊLÐ ç6rJ[¡'¡@ COMMIJN ITY NF\iFLOPMENT ^/, ^ BUILDING PERMIT APPLICATION TYPE OF CONSTRUCTION Com mercial/Multi-Family Demolition Manufactured Home (Single or Multi-Level) !ô Residential (SF, Duplex or Townhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET INVOTVED PARTIES Phone: t L .- (" Email Address: Property Owner: Mailing Address: o fKPhone: ë o -t Mailing Address: Emaíl Address: tÞl/unelë, Contractor: Architect: Phone: (-)- Mailing Address: Email Address: 5 z0d lú, Phone: úTEt Ç1f- l0d1Engineer: Mailing Address: Email Address: ller: ^¿0 GrHLr++4- -ûlanirift tüffiHonrer{ n st a la v(Mailing Address: Email Address: Phone: 2ol PROJECT DETAITS Describe Work: Height ) i1 23,[,nô Owner's Valuation of Work: S /5.Òtt' Sub t1 €'Sq. Ft. of Building:/-ö o fofFl Assessor's Parcel Number: Job Address: Lot t2?-. Block _ Property Size (Sq. Ft. or Acres): b t 5917 tt<, X Remodel/Alteration AdditionClass of Work:New VGarageched Detached PROJECT DETAITS CONTINUED CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. Iunderstand that the Building Division accepts the Application, alon g with the plans and specifications and other datasubmitted by me or on my behalf (submittals), based upon my ce rtification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building perm it will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the s ubmittals reviewed by the Building Division. ln consideration of the issuance of the Building permit, I agree that I and my agents will comply with provisions of anyfederal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses, are subject to Article 7 of the Land Use and Development Code. I acknowledge that the BuildingPermit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law I hereby grant permission to the Building Division to enter the property, describecl above, to ¡nspect the work. Ifurther acknowledge that the issuance of the Building Permit does not prevent the Building official from: (1) requiringthe correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of thestructure(s) or facility(ies) if such is in violation of county Regulation(s) or any other applicable law. Review of thisApplication, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the county of errors, omissions, or discrepancies. As the owner, I acknowledge that responsibility for compliance with federal, state and local laws and county Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and und erstand the Notice and Certification above, as well as, have provided the requ information which is correct and accurate to the best of my knowledge L Print Date CWTS CommunltySeptic: Type of Heat:Electric otn"Ni,/.l (u Driveway Permit: PropaneNatural Gas Exempt Permit #: or an authorized agent, lf the signature below is not that of the lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property forpurposes of inspections by the Building Division. other Permits. Multiple separate permits may be required: (1) State Electrical permit, (2) county owTS permit, (3) another permit required for use on the property identified above, e.g. state or County Highway/ Road Access or a State Wastewater Discharge permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 1g0 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. NOTICE Authoritv This application for a Building permit must be si the Owner ofthe property, described above,gned by Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Ø/UÞ/Vtil<6æalþaúed OFFICIAT USE ON[Y Special Conditions: II Plan Check 'åI ¡tPerm Manu. Home Fee:Misc. Fee's: 6ê Fees 'ü.s,Balance Due: A,5 OWTS No: Setbacks:OCC Group:Const BUTtDtNG / PIANNtNG DIV|S|ON : Siened Approval I ure Date Gørfreld Count¡t BU,LDING DEPARTMENT 108 E¡ghth Street, Suite 407, Glenwood Spr¡ngs, CO 87607 Tel: (970) 945-8272 PLAN REV IEW CHECKLIST Perm it No: âLqKF- Ø- ZA-92 73 Building lssues Engineered Foundation riveway Permit rveyed Site Plan Septic Permit and Setbacks Grade/Topography 30% Attach Residential Plan Review List Subdivision Plat Notes NA Fire Department Review Valuation Deteimination/ Fees Red Line Plans/ Stamps/ Sticker Attach Conditions Application Signed Planning/Zoning lssues Property Line Setbacks / 35ft.streamsetbacks Flood Plain I Building Height Zoning Sign-Off Road rmpact Fees n o f. lS' ./ Grade/Topography40% -a- Planning lssues ásr¡bdivision Plat Description & Summarv /îo/artà./**l¿ugeS PtvÉLao êz-2/ .ê¿¿zF4t-Z-zzlf -'/ -/ tlÅ * 6oax Energy Compliance Path/Plan Received Plan Reviewer to S¡gn Application Parcel/Schedule No. 40# Snowload Letter - Manuf. Homes Soils Report Ve/or/,e/h/srbra¿t=-/ "rr //s¿"r/ 2 /lØa Un /,parb// a/" rà ett/â/*/ ,r/alùsl€l?ä7 laâah¿rz.- Ø, ENERGY COMPLIANCE SHEET REQUIREMENTS: Effective June 30, 2023 Please provide details showing how building complies / meets Garfield County's adopted 2018lECC and 9.[41þ@!. Depict and show outline the structure's building thermal envelope. Outline should clearly show portions of the building to be conditioned inside the envelope (and label or othenruise identify any areas remaining unconditioned outside this envelope) Energy Compliance Plan should further include: Chosen Energy Compliance Path. Prescriptive: Cross Sections of insulated assemblies including the selected material i R-Value and U-Values to comply with IRC Table R402.1.2 . @ Provide a ResCheck RePort . Total U-Factor Alternative: Provide software generated submittal design reports and inspection checklist for any RESNET ERI index or other performance path designs Air sealing details around openings, pipes, penetrations, joints Fenestration U-factors Provide mechanical system design details including proposed efficiency rates, types of equipment, fuel types, locations Energy efficient lighting specifications - 90% to be high-efficacy (LED complies) Manual J Report required for new building structures and new equipment installations. STRUCTURAL PLANS: Please provide the following information on the structural plans. . SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific soils investigation report or if Structural plans make a specific reference to a soils report, then a copy of the soils report is required to suþmit a building permit application. . Design specifications to include roof and deck snow load, wind and seismic design and frost depth.. Foundation plan showing complete footing and foundation dimensions. ¡ Footing and foundation details specifying reinforcement and referenced on plans. . Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. . Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application andior plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must þe signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. Owner Print Sig Date