Loading...
HomeMy WebLinkAboutGrading PlanCONTRACTOR NOTES: BY ÊE ACI OF SUBMINNC A BID FOR BIS PROPOSED CONMACT, THE B]DDER WARRANTS THAT frE BIDOER, ÀND ALL SUACONIRACÎORS ANÐ MAIRIÀL SUPPLLERS HE INENDS IO USE, HAW CAREFULLY AND IHOROIGHLY REVEffiÐ frE DRAWNGS, SPEC]FICATONS ÀND ALL OfrER CONRACI DOCUMENIS ÀND HAW FOUND frEM COMPLEE AND FREE FROM ANY AMBIGUNES AND SUFFICIENI FOR DELIWRING üE PURPOSE INTENDEO. THE BIODER FURfrER WARRANIS frAI IO frE BESI OF HIS OR H]S SUBCONfRACTORS, AND MATERIAL SUPPLIERS' KNOIEDGE, ALL MÀERIÀLS ÀNÐ PRODUCÍS SPECIFIED OR INDICÀED HEREIN ARE ACCEPIÀBLE FOR ALL ÀPPLICABLE CODES AND AUfrORINES, CONIRACÍOR IS fO CON]ÀCI ENCINTER AND OMER PRIOR IO CONSNUCÌNG ANY IÎEMS frAf REOUIRE À CONMACI CHANCE ORDER. BE ENGÌNEER SHALL NOI 8E HELD RESPONSIBLE FOR INFRASTRUCIURE PLACED BASED ON ASSUMPIIONS AND BE CONRACIOR IS RESPONSIBLE FOR ALL UÏILITY RELOCÀIONS, frE LOCANON OF ALL EXISNNG UÌLINES SHOW ON ÏHESE PLANS HAS BEEN BASED UPON RECORD NFORMATON ONLY AND MAY NOI MAICH LOCANONS AND/OR ÐEPIHS ÀS CONSM!CED. frE CONIRACÍOR SHÀLL CONIACI BE LOCÀL AREA "ONE CALL" SYSEM, OR ßE OWNER OF EACH INDIVDUAL UlLITY, FOR ASSISTANCE IN DEIRMINING EXISNNG UNLIry LOCANONS ÀNO DEPIHS PRIOR IO BEGINN NG ANY CONSNUCTION. CONTRACTOR SHALL FIELD VERIFY LOCANONS OF ALL UNL]IY CROSSINGS PR]OR IO BEGINNING ANY CONSMUCIION. PROJECT NOTES: OF IHE CAO FILES ItsAI REPRESENI THESE IMPROVEMENIS: SANDL]N SERVICES, LLC AND II'S ASSOC]ATES TAKE NO RESPONS]BILIT FOR IHE LOCAIION OF IBESE IMPROVEMENIS IN ÀNY COORDNAIE SYSIEM. OIGIIAL FILES USED IO PRODUCE ÎHESE PUNS WERE PARIIÀLLY CRilTEÐ BY PARTIES OTHER ÍHAN SÁNDLIN SERVICES, LLC AND ARE NOÏ INIENDED FOR USE IN CONSIRUCIION SIÀKING. VERIICAL ÀND HORIZONIAL DAIA SHALL BE INOEPENDENILY VERIFIED BY CONIRACTOR'S R.P.L.S. SANDLIN SERVICES, LLC HAS END&VORED fO DESIGN IHESE PUNS COMPLIANI WIH ADÀADLR AND OTNER ACCESSIBIL]I REQUIREMENIS. HOWryER, IHE CONIMCIOR SHÁLL NOT BE RELIWED OF ANY RESPONSIAIL]Û FOR CONSIRUCTING THESE IMPROVEVENTS COMPLIANI WIH ALL APPLICABLE ACCESSIBiLñ SIANDARDS. ]F ÎHË CONÍRACIOR NOIICES ANY DISCREPANCIES BryEEN IHESE PUNS AND ACCESSTBTLñ úWS/RULES, HE tS TO SIOP WORK IN THE ÆA OF CONFLCT AND NOIIñ IHE ENCINEER IMMEDIAIELY FOR A RESOLUIION AND/OR RryISION TO THESE PUNS. SÁNOLIN SERVICES, LLC SHALL NOI 8E HELD RESPONSIBLE FOR CONSIRUCÍING IHIS SIIE COMPLIANI WIIH ACCESSIBILIñ UWS/RULES REGAROLESS OF WHAI IS SHOWN IN IHESE PUNS, HIS CONSMUC¡ON OPERANONS WÍHIN THE aND WfrtN R|CHI OF WAY)- CONRACIOR SHALL Wfr frE INTENT OF IHE DESIGN RECOMMENDAÏIONS ILLUSTRAEO HFRFIN AND ON IHF DRAINAGE PLAN. IZ MINIMUM SLOPE SHALL BË MAINTANEO OWR PROPOSEO ORADE. J- frE ENCINEÊR SHALL BE MADE ÀWARE OF ANY EXISTNG GRADES THAI MAY NEGANWLY IMPACÎ THE CONSMUCION OF frE CRADINC AND DRAINAGE IMPROVEMENTS-4. IHE CONMACIOR MUSÍ IMPLEMENT BEST MÀNACEMENI PRACIICES (BMP'S) TO M]NIMIZE NE TRANSPORIAION OF STDIMENT BEYOND IHE L]MIIS OF DISruRBANCE. 5, THE CONNACIOR SHALL CONÌAIN HIS CONSfRUCNON OPERÀNONS IO IHE AREA WNIN frE LIMIIS OF DISruREANCE, IHÊ CONRACTOR SHÀLL NOI OPERAE OUfSIDE ÎHIS AREA WfrOUI IHE PRIOR CONSENI OF frE PROPERIY OWER ]NVOLWO.6 COMPÀCNON IN FXCAVAIED ÀREAS SHALL BE 95% SIANDARD PROCIOR DENS!ry AS SPËC]flED IN frE GEOICNN]CAL REPORI. 7, frE UÎLIÎIES AS SFOW, MAY NOI R€PRËSENT ACTUAL F]ELO CONDIIIONS. frE CONIRACIOR SHALL CONTACI ALL UILIIY COMPANIES FOR FIELD LOCAIIONS OF UTLIIES PRIOR IO coNsRUcltoN. 8. ALL SPOT ELEVAÌONS AND GRADING CONCEPTS SHALL AE FIELD WRIFIEO PRIOR IO CONSMUCION. ANY DEVAÏONS SHALL BE COORDINAEO WIH üE OMER, ENGINEER ÁND LÀNDSCAPE ARCHIIECI. 9, THE CONMACTOR SHALL ADHERE IO ALL CEOTECHNICAL RECOMMENDAlONS, 10. ÐESTGN BASED ON 6" OF EXPOSEO FOINDAIONS/SLAB CONCREE MINIMUM WIH 6 FI Of FALL AWAY FRO frE HOME WIHIN frE FIRSI 5 FT OF PERVOUS LANDSCAPING AND À MIN]MUM SLOPE OF 3'' OF FALL AWAY FROM frE HOME WfrIN IHE FIRST 10 FÏ OF PAVED AREAs. MAINÎAIN POSIIIVE DRÀNACE AWAY FROM SRUCruRES IN ALL DIRECIIONS AT ALL TIMES I]. AN UNDERDRAIN IS NOI NECESSARY FOR FOINDAIION DESGN. ROOF OOMSPOUTS SNOULD DISCtsARGE MLL BEYOND THE LIMITS OF BACXFILL, 12. ALL LANDSCÀPING AND IRRCATON DESIGN GUIDELINES DEFINED WfrIN THE IRONBRIDCE HOA DESIGN REVEW EOARD CUIDELINES WLL BE FOLLOMO DURING AND AFER CONSIRUCNON OF HOME 13 Â RFPRFSFNIATW OF ÈE CEOIEHNICAL €NGINEER SHALL EVÀLUÀÊ ffE COMPACTON OF NE flLL MAERIAL AND OBSERW ÀLL FOOÎNG EXCÀVATONS PRIOR IO CONCREIE PLACEMENI FOR BEARING coND[toNs. EROSION AND SEDII¡ENTATION CONTROL NOTES 1. CONNACIOR ]S RESPONSALE FOR INSTALLANON AND VA]NIENANCE OF ALL EMPORARY EROSION CONMOL MEÁSUREs, 2. OUST CAUSED AY EXCAVATON, TOPSO]L REMOVAL OPERANONS, OR ROAD BASE PLACEMENI SHÀLL BE CONMOLLED BY frE CONMACIOR AI HIS EXPENSE, THE ENG]NEÊR OR CTY MAY REOUIRE lHE CONMÀCIOR AI ANY lME TO DISCONNNUE CONSRUCNON ACÏVÏES INTL DUSI CONDITONS ARE REDUCEO TO frE COUNIY'S sArsÊAc10N. J. MAINENANCE OF PROPER ORAINAGE ANÐ CLEANING IEMPORÀRY SEDIMENT CONTAIÑMENI DURINC frE PROGRESS OF ftE CONTRÀCI IS ESSENIIAL. ANY DAMAGE DUE TO IMPROPER MAINENANCE OF SAID DRAINAGE PRIOR IO FINAL ACCEPÍANCE OF IHE PROJECI WLL BE ftE CONNACTOR,S RESPONS BILITY. 4. BMP,S SHALL AE INSÎALLEO 8EFO8E ANY EARIH DISruRAINC ACTVlES COMMENCE. 5. SIORM WAER DISCHARGES FROM CONSMUCNON ACÎVIES SHALL NOI CAUSE, HÀVE flE REASONABLE POIENNAL TO CAUSE, OR MEASURABLY CONIRIBUÍE IO AN VOLAÏON OF ANY WATER QUAL IY SfANDARD 6, CONSTRUCTION SHALL BE PHASED IN A MANNER IO LIVLI EARIH DISruRAlNG ACÎVTIES (.E. THE ENIRE PROJECÍ SIIE SHOULD NOT BE DISruRAED IF CONSNUCÍION WLL ONLY BE OCCURRINC IN ONE PARICULAR SECÌON). 7. SEDIMENT CAUSED BY ACCËLERAIED SOL EROSION SHALL AE REMOVED FROM RUNOFF WÀER BEFORE II LEAVES frE coNsmucnoN 5tlE. 8. BULK STORAGE SMUCruRES FOR PETROLEUM PRODUCIS AND ANY OBER CHEM]CALS SHALL HAVE SECONDARY CONIAINMENI OR EQUiVALENI PROECIION TO CONIAIN ALL SP¡LLS AND PREWNT ÁNY SPILLEO MÀfERIAL FROM ENIERING SÍAIE WAÉRS, 9. ffE EROSON CONROL PLAN SHALL BE CONIINUOUSLY IPDAED TO REFLECT NEW OR REVISED BESI MANAGEMENT PRACTICES (BMP'Sì) DUE IO CHANGES IN DESIGN, CONSMUCNON, OPERAION, OR MAINENANCE OF frE CONSTRUCNON S¡8. UPDÀES MUST BE MAOE WTHIN 72 HOURS FOLLOWNC BE CHANGE !N BMP'S. 10. rHE CONÌRÀCrOR SHÀLL TNSPECT BE CONSTRUCION SrrE (TNCLUDTNC ALL BMPS, SIORAGE CONÍAINERS, AND CONSNUCTION EQUIPMENI) A U]N]MI'M OF FVFRY 14 CAIENDAR DAYS ANO WffIN 24 HOURS AFER A PRECIPITAÍION EVENI OR SNOW MELT IIAT MAY CAUSE SURFACE EROSION. 11, THE CONIRACIOR SHALL KEEP A RECORD OF ALL INSPECNONS ON SIE AND AVAILABLE FOR REMEW BY CIñ SÏAFF. INSPECTON REPORIS MUSI IDENNFY ANY INCIOENIS OF NON-COMPLIÀNCE Ufr TNE TERMS AND CONONONS OF BE PERMIT, 12. SIRAW BALES SHALL NOI BE USEÐ FOR PRIMARY EROSON OR SEO]MENI CONIROL (I,E. SRAW BÀLES MAY BE USED FOR REINFORCEMENI BEHIND ANOfrER BMP SUCts ÀS SILÍ FENCE). 1J. BMPS INIENDED FOR SHEET FIOW SEDIMENÍ RUNOFF SHALL BE PLACED PARALLEL IO frE SLOPE, 14. ÁLL BMPS SHALL BE CLEANED WEN SEDIMENI LEWLS ACCUMULAE IO HALF ÊE DESIGN OF THE BMP UNLESS OÊERWSE SPECNED. 15. ALL PORIA PONY SNUCruRES MUSI BE NRMLY SECURED Wfr #4 REBÀR ANCHORS OR EAUAL. MUST BE PLACED AWÀY FROM FLOW LINES OF SIREEI, SWALES, RAIN CARDENS & AWAY FROM INLEIS. ]6. SIOCKPILES OF SO]L OR OÎHER ERODABLE MAIERIALS MUSI BE MANAGED SO IHAI SIORMWAER DOES ÑOI COME N CONIACI Mfr IHE PILE AND POÎENTALLY WÀSH POLLUIANIS OFFSIE, A1 A MINIMUM SIOC(PILES SHALL BE ROUÍNELY ÆIIED AND/OR SLANKEED AS ffiLL ÀS INCLUDE AN EROS]ON SOC( PERIMEIER BARRIER 1O PREWNT WND EROSION AND SEDIMENT ÎRANSPORT OFFSIÍE. SIOCKPILES frAI ARE INACNW FOR MORE ÈAN 7 DAYS WLL REOUIRE SOIL BINDER OR HÁVE MUCLH,/MULCH IACKIFIER APPLIED, 17. EROSION CONMOL BLANKETS SHALL BE INSIALLED ON ALL SLOPES EXCEEoING J:l- A MACI OF LAND gruA[D IN LOI 54 ACCORDINC IO frE PLAI OF IRONBRIOGE PLANNED UNIT DEVELOPMENT PHASE il, RECORDED AS RECÊPTON NO. 868309, SECNON 1, IOMSHIP 7 SOUIH, RANGE 89 WESI OF frE 6IH. PRINCIPÁL MER]DIAN, COUNTY OF CARFIELD, SIAE OF COLORADO UTILITY CONSTRUCTION NOTES 1. ÊE CONMACIOR SHALL CONTA]N LIMLTS OF CONSMUC1ON (ON LOT NOI OPFRAIF OUISIDE IHIS AREA C)o -a'. LEGEND SIREÍ CENIERUNE æa pRoposcD comouRs )so üßnNc coffouRs EXÍNG PROPERÌ LNE -------- / Fow --F-- -+F-+ Ø I D S o SS LN AS NOIED CÀIE VALVE AS NOIED DOUBLE SERVICE SNCLE SERVICE PROP SPOT TLEV, GRADE CONTROL TOP OF WALL IOP OF CURB BOTTOM OF CURB TOP OF SIDEWALK 000.00 0.0% G.c. TW 000.00 TC 000.00 BC 000.00 TS 000.00 I E É 9 9 q 9 I Fl=1 + =_lHI' El l-F ='IEE slbrÞdl¡E =äti-E J ld ltfr Hils¡ F ËIr t! lJfl+d lco¡t!F-c¡ Hl-s;- Et- !F l¡-NI; do l;l ËlF ,:1;: Àø c lnq' ./!)aÕ;+ ry A 510 SCALE 1 =10' 20 IF DRAWNG AAR DOES NOT MEASURE 2'' HIS PRINT 15 NAT TO SCALE s9s.5 59.c, sgsu "ùp -.t': '!-snu, - .-_ si, a: P:r:iì l5 - DAÏEBYìEV NN 1 SHEET oFl REVISION DESCRIPIION I RON BRI DGE LOT 54 SANDLIN SERV]CES,ILC 556 VALLT ORIVE UNIT 27 AUSIIN. û 78727 -7-f t--. L:r',:a: E,a.:i.1:rr_ ."É WAIER SERVICE IO BUILDING CONIRACÍOR TO ENEND EXISÏING WATER SERVICE SIUB CONÍRACTOR TO EXIEND CÀS SERV¡CE TO BUILDING ô.9s2 coNlMcloR lo vERtry EXISING GÀS LINE SERVICE SURVryORS BENCHMARK \ 5 Aa: E HERON DRIVE LOT 54 I 5 ÕjE] S.-,.F] r t\lo L/4,. ,,/V , Sì2os{l o {. 6 È a- o/ )a:s.eio /g o è qI WARNING I!I! CONIRACIOR IO FIELD VERIñ ALL EXISI. UIILIÍIES VERICALLY AND HOR¡ZONIALLY PRIOR IO CONSIRUCIION. IHÊ CONTMCIOR IS IO CONTACI ENGINEER IF ANY EXISIING UÏILIT INFORMÀIION DIFFERS FROM DAIA SHOWN IN IHE PUNS, CÁll A]1 BFFORF YOU D]G CONfRACIOR IO ENEND ELECIRICAL SERVICE IO BUI DING WAY CLüNOUI AND ENEND SMER SERVICE IO ÊUILDINô COÑIRACIOR TO INSÎALL ruO EX]STNC SilER SERV¡CE SfUB IÔCAIION AND DFPIH CONIRACIOR IO VERñ '¿þ1b"3 CEOECHNICAL NOE: REFER TO ffE H'P KUMAR INC SUBSO]L SruDY FOR FOUNDAIION DESICN FOR LOT 54 OF RONERIDGE FOR NSßUCTONS AND RESIRCIIONS ON CRADING AND DRAINAGE FOR frT PROPERry. FLOODPLAIN NOÌEIfrË ROARING FORK RIVER FLOODPLAIN OOES NOT EXIEND IO IHIS SIE. NO FLOODPLAIN ON frIS LOI PER FEMÁ MAP PANEL #08020514658 EFF. DAIE JANUÀRY 3, 1946 WAER SUPPLY NOTE:frE IRONBRIDGË SUBDIVSION IS SUPPLIED FROM A MUNIC]PAL WAER SYSTEM AND NO WLLS ÁRE LOCAED OR ASSOCIAIED.