HomeMy WebLinkAboutCondition of PermitCONDITIONS OF PERMIT B LRE-0 9-23-8298 CEDRIC & JENNIFER FISCHER New Single-family dwelling w/ attached garage 303 Blue Heron Dr, GWS lronbridge PUD, Lot 54 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESIDENTIAL CODE (l.R.C.)AND 2018 I NTERNATIONAL EN ERGY CONSERVATION CODE (I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION, ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORN/IATION. 5) OPEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF. INCLUDE COMPACTION REPORT IF ANY STRUCTURAL FILL. ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR BUILDING INSPECTOR AT TIME OF FRAME INSPECTION. 7) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 8) PRESCRIpTtVE PATH HAS BEEN CHOSEN FOR ENERGY COMPLTANCE OF THE HOIVIE DESIGN. 8S.1, AD.1 , AD-2, EL-1 AND ZEPHYR DESIGN LOAD CALCULATIONS ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2) SHOWN ON SHEET A-1) ttnrrø