HomeMy WebLinkAboutConditions of PermitCOND IT IONS OF PERMIT
BLM F-09-23-8300
SHANKS HPW LLC / ERIC WILLIAMS, MANAGER
1,BOO SO FT MANUFACTURED HOME ON FOUNDATION CRAWL SPACE
(PLANS INCLUDE UNFINISHED COLD STORAGE ATTIC SPACE)
44157 HWY ó, NEW CASTLE - 212334100170
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSTNG (C.D.O.H.)AND
ALL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNry MUST MEET C.D.O.H.
GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE.
1)
2)
3)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 20,I5 I.R.C.,
20 1 8 I.E.C.C. AND MAN UFACTURER'S I NSTALLATION REOUI REM ENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNry'S BUILDING REOUIREMENTS AND
MAN UFACTURER'S I NSTALLATION REOUI REM ENTS.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH-IN APPROVAL, IF ANY, WORK PROPOSED IN ATTIC LOFT. ELECTRICAL FINALAPPROVAL
REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY.
NOTE TO PROPERTY OWNER: STAMPED PLANS FROM C.D.O.H. SHOW AN UNFINISHED COLD
STORAGE ATTIC SPACE. GARFIELD COUNry COMMUNITY DEVELOPMENT DEPARTMENT WILL
REOUIRE A SEPARATE BUILDING PERMIT APPLICATION / LABELED FLOOR PLANS, CODE REVIEW &
FEES FOR ANY FUTURE ATTIC LIVING FINISH WORK. FUTURE FINISH WORK SHALL COMPLY WITH
BUILDING & LAND USE DEVELOPMENT CODES IN EFFECT AT TIME OF FUTURE WORK.
4)
s)
ó)
7) GARFTELD COUNry BUtLDtNG DEPT. tNSpECTtONS TO INCLUDE THE FOLLOWTNG:
A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT PREPARED BY THE GEOTECHNICAL ENGINEER IS
REOUIRED AT FIRST FOOTING INSPECTION, 1,500 PSF. SUPPLY REPORT TO GARFIELD COUNTY
BUILDING INSPECTOR.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION TO PRE-EXISTING SEPTIC SYSTEM
D. PLUMBING/GAS (NATURAL GAS BY XCEL ENERGY)
E. SITE FRAMING, STAIRS, HANDRAILS, LANDINGS, AND GUARD(S)
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C,D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY